PROJECT: AHEC REF. :


LOCATION: REV. NO.: 00
CONTRACTOR:
Date:
TPA CHECK LIST - COMMERCIAL CHECKED REMARKS
1 TECHNO-COMMERCIAL REVIEW
Project Title
Project Attributes
SOW Summary
Signatories
Key Dates
Payment Terms
3 COMMERCIAL SUMMARY
Project Attributes
Investments
Subcontract Work Summary
Calculated Risks
4 CONTINGENCY
Contingency %
+- Quantity Variations
Guarantee/Bond
% of CV
Duration of Project
Financial Cost
5 PROJECT CASH FLOW (FINANCE SHEET)
Payment Terms
CV Value
Difference of CV Value
Progress Curve
Outflow
Investment
Credit on Materials & Hired Equipment
Mob/Demob Loading
Interest Rate
Total of Financial Charges
6 MANPOWER RESOURCE SCHEDULE
Construction Schedule
Salaries / Updated Data Bank
Salary Factor
Direct / Indirect Ratios
SS / JS / JE Definitions
Camp Accommodation Cost
Accommodation
Laundry
Furnishing
Catering
Manpower Transportation
No. of HSE Sets
7 PLANT RESOURCE SCHEDULE
Construction Schedule
Manpower & Staff Transportation
Equipment Deployment
Operator & Driver Deployment
Power at Site / Workshop / TSF
Equipment Data Bank
CNIA / Non CNIA
Fuel Rate
Tariff
DALMA Factor
Zone '1' Safety Requirement
Equipment Mob / Demob Charges
ADCO IVMS System
Crane Months / Crane Utilization
Crane to Rigger Ratio
Crane to Mechanical / Piping Supervisor
Ration
8 MATERIALS / SUBCON / CONSUMEALES
Quotes / Existing Rates & Assumptions
9 TOOLS & SCAFFOLDING
Hand Tools
No. of Craft / Deployment
% Charging

4/23/20153:14 PMTPA Check List


AHEC

PROJECT: AHEC REF. :


LOCATION: REV. No.
CONTRACTOR: Date:

Scaffolding
10 HSE
Training Matrix
PPE Sets
Mask / H2S
Inspection ( Third Party or Lifting)
IVMS
11 Site Camp Accommodation
Office Cabins
Furniture
Store / Ware House / Yard / Workshop
Area Requirement
Preparation Charges
Lease
Setup Charges
Fence . Etc
Utilities Network
Setup Cost
Running Cost
Power Supply for Offices
Mob / Demob for Site Offices
12 Mobilization & Insurance
Project Duration
Current Updated Visa Cost
Trapezoidal Curve
Manpower Deployment
Mobilization Ticket
Idling Cost
Client Medical
Leave Cycle
Leave Salary
Demobilization %
Equipment / TSF Mob & Demob
Marine Logistics
Insurance Feedback from Finance
13 Head Office Support
CNIA Gate Pass Cost
MISC Authority Permit Cost
Management Site Visit Cost
Warranty Maintenance
2 COST CALCULATION SUMMARY
Links from Respective Cost Heads
Project Data / Bid No. / Date
No. of Bid Revisions
Currency Conversion Factor

Direct & Indirect Manmonths/Manhours

Overhead & Profit


BOQ Cost Distribution

TPA CHECK LIST - TECHNICAL CHECKED REMARKS


1 Complete TPA Hard Copy Duly Signed

2 Manpower Deploymet
Direct Manpower
In Direct Manpower
Histogram
3 Equipment Deployment
Project Vehicles
Direct Equipment
4 Project Organization Chart
5 Proposed Schedule