Sie sind auf Seite 1von 2

QCS 2014 Section 27: External Works Page 1

Part 09: Miscellaneous Other External Works

9 MISCELLANEOUS OTHER EXTERNAL WORKS .................................................... 2

9.1 GENERAL ................................................................................................................. 2


9.1.1 Scope 2
9.1.2 General Requirements 2

D
N
U
O
R
G
ER
D
N
U
E
N
LI
N
EE
R
G
QCS 2014 Section 27: External Works Page 2
Part 09: Miscellaneous Other External Works

9 MISCELLANEOUS OTHER EXTERNAL WORKS


9.1 GENERAL

9.1.1 Scope

1 This Part provides for inclusion of special specifications for any external building works or
elements designated in the Project Documentation.

9.1.2 General Requirements

1 All items in this Part require approval by the Engineer.

D
2 The Contractor shall submit manufacturers literature, drawings, samples or mock-up units

N
for items covered in this Part for approval by the Engineer.

U
3 If external work items related to this Part are not specified or otherwise detailed within the

O
Project Documentation, the Contractor shall submit appropriate specifications for approval
by the Engineer.

R
G
END OF PART
ER
D
N
U
E
N
LI
N
EE
R
G

Das könnte Ihnen auch gefallen