Beruflich Dokumente
Kultur Dokumente
Ricky Pratama
21.2005.097
Key and letter 0.123 m2 TAH R.Makan 3.42 m2 NAD
Pembimbing : rack
Thomas Brunner Ir.,MM
Widji Indahingtias Ir.,MT
AR-500
Tugas Akhir
Periode I TAH
Semester Genap 2014/2015 Safety deposit 0.75 m2 bar - NAD
box
caf 1.1 m2
Office desk 2.03 m2 NAD 2.89 m2 NAD
2.12 m2
BANDUNG CITY HOTEL
4. STUDI LITERATUR Keterangan :
- TAH :The Architects Handbook
Ricky Pratama
21.2005.097
Lay out meja - NAD Pastry cooks 22.4 m2 NAD
Pembimbing : makan
Thomas Brunner Ir.,MM
Widji Indahingtias Ir.,MT
AR-500
Tugas Akhir
Periode I
Semester Genap 2014/2015 service and 0.94 m2 NAD Lay out - NAD
tray Trolley 0.43 m2 kitchen
Ricky Pratama
21.2005.097
superior Twin 34 m2 Sensa Lay out - NAD
Pembimbing : hotel corridor
Thomas Brunner Ir.,MM
Widji Indahingtias Ir.,MT
AR-500
Tugas Akhir
2.17 m2
Sensa suite 141 m2 Sensa Bed 2.57 m2
hotel 3.08 m2 Elite
3.71 m2
BANDUNG CITY HOTEL
4. STUDI LITERATUR Keterangan :
- TAH :The Architects Handbook
Ricky Pratama
21.2005.097
Lay out 160 m2 TAH Anak tangga - NAD
Pembimbing : loundry
Thomas Brunner Ir.,MM
Widji Indahingtias Ir.,MT
AR-500
Tugas Akhir
Urinoir
- Toto Eskalator - NAD
BANDUNG CITY HOTEL
4. STUDI LITERATUR Keterangan :
- TAH :The Architects Handbook
Ricky Pratama
21.2005.097
Lift NAD Sepeda motor 1.68 m2 NAD
Pembimbing : -
Thomas Brunner Ir.,MM
Widji Indahingtias Ir.,MT
AR-500
Tugas Akhir
Periode I
Semester Genap 2014/2015 Pit lift Mobil 7.48 m2 BMW
- NAD
Lay out
parkir - NAD Sirkulasi parkir NAD
-
Ricky Pratama
21.2005.097
Stop rail Turning
Pembimbing : buffer - NAD - NAD
Thomas Brunner Ir.,MM
Widji Indahingtias Ir.,MT
AR-500
Tugas Akhir
Periode I
Semester Genap 2014/2015 Sirkulasi parkir - NAD Surya panel 0.88 m2
Sirkulasi parkir
-r NAD
Ramp
- NAD