Sie sind auf Seite 1von 2

Schedule of Project Work

DAY 7.30 LAB 10.45AM LAB 2.30PM LAB


10.15AM 1.30PM 5.15PM
MONDAY B1, B2, B3, AEC B13, B14, AEC B24, B25, AEC
B4, B5, B6 B15, B16, B17 B26, B27,
B28, B29
B7, B8, B9, DEC B18, B19, DEC B30, B31, DEC
B10, B11, B20, B21, B32, B33,
B12 B22, B23 B34, B35
TUESDAY B1, B2, B3, AEC B13, B14, AEC B24, B25, AEC
B4, B5, B6 B15, B16, B17 B26, B27,
B28, B29
B7, B8, B9, DEC B18, B19, DEC B30, B31, DEC
B10, B11, B20, B21, B32, B33,
B12 B22, B23 B34,B35
WEDNESDA --- -- --- B1, B2, B3, AEC
Y B4, B5, B6
--- -- --- B7, B8, B9, DEC
B10, B11,
B12
THURSDAY -- -- -- B13, B14, AEC
B15, B16,
B17
B18, B19, DEC
B20, B21,
B22, B23
FRIDAY -- -- -- B24, B25, AEC
B26, B27,
B28, B29
-- -- -- B30, B31, DEC
B32, B33,
B34,B35

Note that attendance of all the batches indicated is


compulsory and all the batch members should be present
without fail. The respective guides will visit the respective
labs. During this time the batch members should interact
with the guide and show the progress. Maintain the
project diary and get the signature of the guide /
coordinator during every visit. The Projects which are
purely software based can be done in M.Tech / Computer
Lab if required and this should be brought to the notice of
the coordinator and the respective guides.

Das könnte Ihnen auch gefallen