OHSAS 18001-2007
Page1of4
(ii) Annual turnover by the firm in the best three financial years out of last five financial year
ending March 2016 should not be less than `. 11.00 Lacs.
b) Manufacturers Test Certificate: the Test certificate showing the conformity of the material
proposed to be supplied to the specifications given under Section IV of the Bid Document.
c) Authenticated documentary evidence in support of qualifying requirements, as mentioned under
Serial No. 3.0 above shall be submitted along with the containing Techno-Commercial bid under
Envelope I, along with EMD & copy of the Test Certificates. Bids submitted without fulfilling the
qualifying requirements shall be rejected.
d) Bidders shall submit a self declaration of ineligibility for corrupt and fraudulent practices, under
which circumstances the bid will be rejected, if the same is observed at any point of time.
e) The above requirements are minimum and the Corporation reserves the right to request for any
additional information and also reserves the right to reject the proposal of any bidder if, in the
opinion of owner, the qualification data furnished by the bidder is incomplete or the bidder is found
to be not qualified to perform the work satisfactorily.
f) Notwithstanding anything stated above, the Corporation reserves the right to assess bidders
capability and capacity to perform the work, should the circumstances warrant such an assessment, in
the overall interest of the Owner.
g) Each bidder shall submit only 1 (one) bid, either individually. A bidder who submits or participates
in more than 1 (one) bid will be disqualified
h) If an agent submits bid on behalf of one manufacturer/ dealer, the same agent shall not submit a bid
on behalf of another manufacturer/dealer in the same tender.
5. E-Tendering / E-Procurement :
This tender is being processed through e-tendering/e-procurement system. The bidding documents are to
be downloaded, filled in bids are to be submitted/ uploaded through e-tendering system of NEEPCO
Ltd. at https://neepco.abcprocure.com.
6. Participation in Bids:
5.1 Portal Registration: The bidders intending to participate in the e-tendering and download the
detailed bid document have to register themselves in the portal https://neepco.abcprocure.com.
Relevant information about the bidder required during the registration is available in the portal.
5.2 Vendor registration fee: The fees for Vendor Registration in the portal is `. 3000.00(Indian Rupees
three thousand) only per year. The bidder shall furnish the copy of the receipt of payment for vendor
registration at the e-mail id provided below to advise the service provider for approval of the vendor.
Bidders who are already registered in the system shall ensure to keep their registration valid
till completion of the entire bidding process.
5.3 Procedure for payment of vendor registration fee: Bidders shall make payment of vendor
registration fee of `. 3000.00 (Indian Rupees Three thousand only) at the following Account:
Name of Account: E Procurement Account, NEEPCO Ltd.
Account No: 913020005982636 of Axis bank IFS Code: UTIB0000270
7. Procedure for Payment of BID Fees and EMD:
6.1 Bid Fees
a) Bidder shall make payment of non refundable Bid fees of amount `. 1000/- (Rupees One
Thousand) only through Demand Draft/Bankers Cheque from Nationalized bank/Schedule bank
drawn in favour of NEEPCO Ltd and shall be payable at State Bank of India, Yazali Branch,
Arunachal Pradesh (Code 9917). The Demand Draft/Bankers Cheque shall be made available to
the Tendering authority of RHEP, NEEPCO before the schedule date of opening of the bid, detailed
hereafter. Further Documentary evidence of the Bid Fees paid shall accompany the Technical Bid.
b) Bids received online without Cost of Bid Documents shall be rejected
6.2 EMD
a) Bidder shall make payment of refundable EMD of amount `. 15,000/-- (Rupees Fifteen Thousand)
only through Demand Draft/Bankers Cheque from Nationalized bank/Schedule bank drawn in
favour of NEEPCO Ltd and shall be payable at State Bank of India, Yazali Branch, Arunachal
Pradesh (Code 9917). The Demand Draft/Bankers Cheque shall be made available to the Tendering
Page2of4
authority of RHEP, NEEPCO before the schedule date of opening of the bid, detailed hereafter.
Documentary proof of the payment made should also be accompanied along with the Bid
Submitted.
b) Bids received online without EMD shall be rejected.
6.3 The Bankers Cheque/Demand draft submitted as Bid Fees/EMD is to be submitted separately prior
to opening of the Bid as per the date and time indicated hereafter in separate covers super-scribed as
BID Fees against NIT No 14 Dtd 20.05.17 & EMD against NIT No 14 Dtd 20.05.17 to the
Tendering authority to the address given below:
(i) If the Offline Documents are delivered through post, then the same is to be delivered to the
address, prior to specified date, as given below:
Sr. Manager (E/M), C&P,
NEEPCO Transit Camp
C/o Green View Hotel, North Lakhimpur, Assam, 787 001.
(ii) If the Offline Documents are delivered by hand, then the same is to be handed over to the
address, prior to specified date, as given below:
Sr. Manager (E/M), C&P,
O/o the Head of Plant,
Ranganadi H.E. Plant, NEEPCO Ltd.,
43 km Yazali, Dist; L. Subansiri, Arunachal Pradesh 791 119
Relevant offline Documents received after the due date shall be returned to the bidders unopened and
the online bid shall not be considered.
6.4 Exemptions for MSMEs shall be applicable under the Govt. of India norms under PPC guidelines.
6.5 Also the Price preference as applicable to MSMEs as per Govt. of India Norms, during evaluation of
the Bid shall be applicable.
7. For any clarification related to e-procurement, bidders are requested to contact:-
Sr. Manager (E/M), C&P, O/o HOP, RHEP, NEEPCO, 43kmYazali, Dist: L.Subansiri, A.P. - 791119
Phone No: 03809 222206, Mobile no: 09435701311, e-mail ID: contracts.rhep@gmail.com
8. Bidders may also contact e-Procurement Technologies Ltd. (Service Provider) having the following
contact details:
e-Procurement Technologies Ltd
A - 201-208, Wall Street - II / Opp. Orient Club
Near Gujarat College / Ellisbridge
Ahmedabad - 380015.
Gujarat, India Tel: +91-79-40016802 - 77, Cell: 91-9374519754 | 9377988119
9. Submission and opening of Bids
9.1 Bidders shall prepare and submit their bids in the electronic form at
https://neepco.abcprocure.com. Online bidding forms will be available in the above website.
9.2 Bidders may view the tender opening results of techno-commercial and price bids at
https://neepco.abcprocure.com by marking their presence for online tender opening.
10. Bidders are requested to visit https://neepco.abcprocure.com and http://www.neepco.gov.in regularly
for any clarification of the bid document.
11. Submission of bids shall not automatically construe qualification for evaluation. The Owner reserves
the right to reject any or all bids, or to annul the bidding process and reject all the bids and reject all
the bids for any justified and genuine grounds, without thereby incurring any liability to the affected
bidders, nor does it have any obligation to inform the bidders of the ground for such action on the part
of the Owner.
12. Important information and dates:
Tender Fee `. 1000.00
Earnest Money Deposit (EMD)/ Bid Security `. 15,000.00
Bid validity Period 180 days
Date of commencement of downloading of 17:00 hrs. of 20.05.2017.
bid document from https://neepco.abcprocure.com
Page3of4
Last date & time for receipt of online bids: 10:00 hrs. of 19.06.2017.
Last date & time for receipt of offline documents (Bid Fees/EMD) 17:00 hrs. of 17.06.2017.
Date & time of online opening of bids 11:45 hrs. of 17.06.2017.
13. In the event the date of opening of bids is declared as a closed holiday for NEEPCO, the date of opening
of bids will be the following working day at the appointed times.
14. If the bidder is eligible for any concessional duties and taxes he should invariably mention this in the
bid. The price bid shall be evaluated on the basis of the information supplied by the bidder and hence
the actual payments of taxes and duties shall be limited to the extent mentioned in the bid or in
subsequent confirmation before opening of the price bids.
15. Any action on the part of the bidder to revise the price or to change the structure of the price at his own
instance after opening of the bid and within the validity of the offer shall not be possible.
16. NEEPCO reserves the right to extend the last date and time for submission of Bid.
17. NEEPCO is not liable for any delay in receipt of the documents as per the schedule given above.
Therefore bidders are requested to ensure that the off line documents are made available to the
tendering authority before the specified date.
18. In case of receipt of the off line documents after opening, the bid will not be considered for evaluation.
-Sd-
Sr. Manager (E/M) C&P
O/o the Head of Plant, RHEP,
NEEPCO Ltd.,
43 km, Yazali, A.P.
Page4of4
Bid Document for RHEP: NEEPCO LTD. 1
NIT NO 14/2017 Instruction to Bidders : Sec-II
INSTRUCTION TO BIDDERS:
LOCATION
Ranganadi Hydro Electric Plant is located in 2(two) districts of Arunachal Pradesh with
the Power House located in Papumpare District & the Dam/Tunnel intake located in the
Lower Subansiri District of Arunachal Pradesh. The Central Store is located in the
Administrative Complex situated at 43km, Yazali, L. Subansiri District, Arunachal
Pradesh.
The Plant is connected by road from state capital Itanagar as well as from North
Lakhimpur, the nearest town in the state of Assam. The Plant is also connected by
Railway, the nearest station is Naharlagun in Arunachal Pradesh, which is situated at a
distance of 60 Km (appx) from the Plant. The distance of the Plant is approximately
500km from the Guwahati.
CLIMATIC CONDITIONS :
Elevation : 573.00 m
Maximum Temperature of air : 35 Deg. C.
Minimum Temperature of air : 5 Deg. C.
Relative Humidity : 60% to 100%
Average Rainfall : 1232 mm
Basic Seismic co-efficient : a) 0.32 g - Horizontal
b) 0.16 g Vertical
Max. Wind pressure/wind speed : 150 Kg/ Mtr. Sq.
Note: Moderately hot & humid tropical climate conductive to rust & fungus growth. The
climatic conditions are also prone to wide variations in ambient conditions. Fog is also present
in the atmosphere. Heavy lightning also occurs during June to October.
1. Bidders are advised to submit the Bid based strictly on the terms & conditions and
specifications contained in the tender documents and not stipulate any deviations in normal
case.
2. Scope of Work: The scope of work shall be the Supply of ACSR Conductor RACOON for
Ranganadi H.E. Plant, Arunachal Pradesh. This shall include the supply of the items required
for erection of the 33kV line in Ranganadi H.E. Plant duly enclosed as Annexure A. The
terms and conditions governing this tender are detailed in the subsequent sections of the Bid
Document
3. The Bidder is advised to assess the entire scope of work as specified under the Technical
specifications of the Bid Document prior to his quoted rates. It is also advised that the bidder
may also carry out site visit to assess the scope of repairing work in totality.
4. The Bidder shall be deemed to have exhaustively examined the tender Documents including
the General Conditions of the Contract, Technical Specifications, to have obtained all
information and clarifications on all matters whatsoever that might affect the carrying out the
supply and to have satisfied himself as to the adequacy of his Tender. He is deemed to have
known the scope, nature and magnitude of the entire supply including the Technical
specifications commensurating to the relevant IS codes to supply of materials within the
specified time and that he has to complete the supply within the specified time, in accordance
with the Contract whatever be the defects, omissions or errors that may be found in the Tender
Documents. An undertaking to this effect shall be submitted in the prescribed format
enclosed in Section VI of Bid Document by the Contractor in the letterhead of the Firm
duly signed by the Authorized signatory bearing the credentials..
5. Before quoting the rate the Bidder should go through the specifications, scope of work, and get
himself conversant with them. No relaxation or request for revision of quoted/ accepted rates
shall be entertained, subsequent to bid opening on account of mobilization or safety costs.
Submission of Bid by a Bidder implies that he has read this notice and all the Bid documents,
Page 1 of 8
Bid Document for RHEP: NEEPCO LTD. 2
NIT NO 14/2017 Instruction to Bidders : Sec-II
and has made himself aware of the scope of supply and specifications of the material to be
supplied and of local conditions and other factors bearing on the execution of the same.
6. In consideration of the Owner opening and considering the Bid for purpose of award of
contract, the Bidder shall keep his Bid valid for a period of 180 (one hundred eighty) days
from the date of opening of the Bid, during which period the Bidder agrees not to vary, alter or
revoke his Tender in whole or in part. If the Bidder however, fails to keep his tender valid for
one hundred eighty days or varies its terms and conditions during the said period, then the
owner shall be entitled to forfeit the Earnest Money amount without any notice. The Bidder
shall submit his Bid in the E-Tender portal as detailed hereafter, as required along with the
letter of undertaking in the proforma enclosed herewith.
7. Bid Fees
a) Bidder shall make payment of non refundable Bid fees of amount `. 1000/- (Rupees One
Thousand) only through Demand Draft/Bankers Cheque from Nationalized bank/Schedule
bank drawn in favour of NEEPCO Ltd and shall be payable at State Bank of India, Yazali
Branch, Arunachal Pradesh (Code 9917). The Demand Draft/Bankers Cheque shall be
made available to the Tendering authority of RHEP, NEEPCO before the schedule date of
opening of the bid, detailed hereafter. Further Documentary evidence of the Bid Fees paid
shall accompany the Technical Bid.
b) Bids received online without Cost of Bid Documents shall be rejected.
8. EMD
a) Bidder shall make payment of refundable EMD of amount `. 15,000/- (Rupees Fifteen
Thousand) only through Demand Draft/Bankers Cheque from Nationalized bank/Schedule
bank drawn in favour of NEEPCO Ltd and shall be payable at State Bank of India, Yazali
Branch, Arunachal Pradesh (Code 9917). The Demand Draft/Bankers Cheque shall be
made available to the Tendering authority of RHEP, NEEPCO as specified in the NIT.
Documentary proof of the payment made should be accompanied along with the Bid
Submitted.
b) Bids received online without EMD shall be rejected.
8.1 Exemptions for MSMEs shall be applicable under the Govt. of India norms under PPC
guidelines.
8.2 EMD shall be made payable without any condition to the Owner. The EMD shall be valid
for a period of 180 (One hundred eighty) days after the date set for opening of bids.
8.3 EMD of unsuccessful bidders will be returned as promptly as possible. EMD of the
successful bidder shall be returned on receipt of 10% (Ten percent) Security Deposit.
8.4 Any bid not accompanied by a EMD shall be rejected by the Owner as non-responsive Bid.
8.5 No interest shall be payable by the Purchaser on the above EMD.
9. PRICE BASIS:
9.1 Price quoted for the scope of supply shall be on a per unit basis as indicated in the prescribed
format of the Financial Bid of the E-tender at FOR Central Store, 43kM, Yazali, A.P. Basis.
9.2 The quoted price for the supply of the items shall on FOR SITE Basis which shall be
inclusive of all Charges, but exclusive of VAT/CST and Arunachal Pradesh Entry Tax 12.5%
as Applicable, which shall be quoted separately in the prescribed format of the online Price
Bid. The Price shall remain FIRM during the tenure of contract and shall not be revised under
any circumstances for whatsoever reason.
9.3 The Taxes and duties are to be indicated in the Online Price Bid in the Prescribed format.
9.4 Bidders outside the State of Arunachal Pradesh should also take into account the Expenditure
against Entry Tax for the State of A.P.
9.5 Change in statutory laws of Tax after the date of bid of opening shall be reimbursed at actual on
production of proof of payment.
Page 2 of 8
Bid Document for RHEP: NEEPCO LTD. 3
NIT NO 14/2017 Instruction to Bidders : Sec-II
Page 3 of 8
Bid Document for RHEP: NEEPCO LTD. 4
NIT NO 14/2017 Instruction to Bidders : Sec-II
10.7 The bidders are requested to submit the bid through online e-tendering system well before the
bid submission end date and time (as per server system clock). The Corporation shall not be
responsible for any sort of delay or difficulties faced during the submission of bids online by
the bidders at the eleventh hour.
11. SIGNATURE OF BIDS:
11.1 For online bids, all the documents submitted by the bidder must be signed and sealed by the
authorised signatory at each page by the Bidder with his usual signature before scanning and
uploading.
11.2 Bids by Corporation/Company must be signed with the legal name of the Corporation /
Company by the President, Managing Director or by the Secretary or other person or persons
authorized to bid on behalf of such Corporation / Company in the matter.
11.3 A bid by a person who affixes to his signature the word President, Managing Director,
Secretary, Agent, or other designation must be supported by his name.
11.4 The bidders name stated on the proposal shall be the legal exact name of the firm.
12. TAXES AND DUTIES:
12.1 The quoted price of the materials shall be exclusive of all Taxes and duties as applicable for
the supply of the item, which shall remain FIRM during the tenure of contract and shall not be
revised under any circumstances for whatsoever reason. The details of the taxes shall be
indicated separately in prescribed format of the Financial Bid of the E-tender.
12.2 As per the Corporation norms CST @2% is applicable against the Tax to be paid against
Supply along with an Entry Tax of 12.5% for the State of A.P. if the bidder is not from the
State of Arunachal Pradesh.
12.3 If the Bidder is from the State of A.P. then only the VAT at the rate of 14.5% is applicable.
Proof of the location of the firm should be indicated in the trade license submitted as a part of
the Techno Commercial Criteria.
12.4 Change in statutory laws of Tax after the date of bid of opening shall be reimbursed at actual
on production of proof of payment
12.5 Income Tax and Corporate Tax:
12.5.1 Income Tax and surcharge thereof leviable as per the taxation laws of India on the
Contractors company or its personnel in respect of income arising in favour of either of the
Company or its personnel under this Contract Agreement, shall be the absolute liability of the
Contractor and not of the Owner.
12.5.2 Payments stipulated under this Contract Agreement shall be made by the Owner to the
Contractor after deduction of income tax at source at the applicable rates. The Owner shall
provide the Contractor with certificates for tax deducted at source.
12.5.3 In this connection, attention of the Bidders is invited to the provisions of Indian Income Tax
Act and Corporate Tax Act and any other circular issued by the Central Board of Direct
Taxes, Government of India from time to time.
12.5.4 Any exemption in tax shall be accompanied by supporting documents certified by competent
authority.
13. EFFECTS AND VALIDITY OF BIDS:
13.1 The submission of any bid connected with these documents and specifications shall constitute
an Understanding/Agreement that the bidder shall have no cause of action or claim against the
Owner for rejection of his bid. The Owner shall always be at the liberty to reject any bid or
bids at his sole discretion and any such action will not be called into question and the bidder
shall have no claim in this regard against the Owner.
13.2 Bids should be kept valid for acceptance for a period of 180 (One Hundred Eighty) calendar
days from the date set for opening of the Techno-Commercial bid, exclusive of the date of
opening. If the bidder withdraws his bid before the said period or makes any modification in
the terms and conditions of the bid, the Owner shall, without prejudice to any other right or
remedy, be at liberty to forfeit the Bid Guarantee (Earnest Money).
13.3 Bids giving validity of less than 180 (One Hundred Eighty) calendar days will be rejected.
Page 4 of 8
Bid Document for RHEP: NEEPCO LTD. 5
NIT NO 14/2017 Instruction to Bidders : Sec-II
13.4 The Owner may request the bidders to extend the period of validity of Bid and Bid Guarantee
(Earnest Money) for a specified additional period. The request and the bidders response shall
be made in writing. A bidder may refuse the request without forfeiting his bid security. A
bidder agreeing to the request will not be required or permitted to otherwise modify his bid,
but will be required to extend the validity of bid and Bid Guarantee (Earnest Money) for the
period of extension.
14. OWNERS RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS:
The Owner reserves the right to accept or reject any bid, and to annul the bidding process and reject
any or all bids at any time prior to Contract award, without thereby incurring any liability to the
affected bidder or bidders. The bidding process may be cancelled if the responsive bids substantially
exceed the budget or the rates of the bid are obviously and clearly unreasonably high.
15. POLICY OF BIDS UNDER CONSIDERATION
15.1 Bid shall be deemed to be under consideration immediately after they are opened until such
time official intimation of award / rejection is made by the Owner to the bidders. While the
bids are under consideration, Bidders and / or their representatives or other interested parties
are advised to refrain from making correspondences and contacting by any means the Owner
and / or his Employees / representatives on matters related to the bids under consideration.
The Owner, if necessary, will obtain clarifications on the bids by requesting for such
information from any or all the bidders, either in writing or through personal contact, as may
be necessary. Bidders will not be permitted to change the Price Bid or substance of the bid
after the bid has been opened.
15.2 Any efforts by a bidder to influence the Corporation in the process of examination,
clarification, evaluation and comparison of bids and in any decision concerning award of
contract, may result in rejection of the bidders bid. Canvassing in connection with the bid is
strictly prohibited and the bids submitted by the bidders who resort to canvassing shall be
liable for rejection.
15.3 During the evaluation of techno-commercial bid, the Owner may seek / obtain clarifications,
confirmations or modifications if any. The clarifications shall be submitted online within the
due date and time indicated in the Tender.
15.4 Any action on the part of the bidder to revise the price or the structure of price or to change
the substance of the bid at his own instance after opening of Price bid and within the validity
period of the bid will result in rejection of the bid and/or debarring the bidder from
participating in future tenders of NEEPCO. The Bid Guarantee (Earnest Money), in that case,
is liable to be forfeited.
15.5 If the bidder withdraws his bid while it is under consideration and within the validity period
of bids, the Bid Guarantee (Earnest Money) shall be forfeited, along with other action, as the
Owner deems fit. All techno-commercial consultation and clarifications required by the
bidder should be completed before opening of Price Bid.
15.6 The Corporation shall notify the successful bidder through Letter of Intent issued online
through the portal or manually by FAX / E- Mail / Registered Letter and, in no case, this
notification should be construed as an Agreement with the bidder. The Corporation will enter
into an Agreement, subject to fulfilment of further requirements as stipulated in the bid
documents.
16. BID OPENING AND EVALUATION OF BIDS
16.1 OPENING OF BIDS:
16.1.1 The Owner will first open online the Envelope 1 containing Techno-Commercial Bid
(Technical Part) at the scheduled date and time. If there is any discrepancy in the information
furnished online by the bidder vis--vis documents submitted in hard copy, then the bid will
be cancelled with forfeiture of his EMD.
16.1.2 Envelope-2 containing the Price Bid(s) of the bidders, whose Technical and Commercial bids
have been found to be acceptable by the Owner will be opened online on the stipulated date,
Page 5 of 8
Bid Document for RHEP: NEEPCO LTD. 6
NIT NO 14/2017 Instruction to Bidders : Sec-II
which will be notified on-line to the techno-commercially qualified bidders. The bidders will
be given notice intimating the date of opening of the Price Bids.
16.1.3 The bidder may view tender opening results of techno-commercial and price bid in the online
portal by making their presence for online tender opening. The bidders may also depute
their authorized representative to be present during tender opening in the Office of the
O/o the HOP, RHEP, NEEPCO Ltd., Yazali, Arunachal Pradesh.
16.1.4 In the event of the specified date of bid opening being declared a holiday for the Owner, the
bids shall be opened at the appointed time and location on the next working day.
16.1.5 The Bidders names, Bid modifications or withdrawals, and the presence or absence of
requisite bid security and such other details as the Owner, at its discretion, may consider
appropriate, will be announced at the opening of the Techno-Commercial bids. No bid shall
be rejected at the time of bid opening, except for late bids, which shall be returned unopened
to the bidder. Bid not accompanied with the EMD will, however, be rejected.
16.1.6 Any hard copy of document submitted as per bid condition which is received by the Owner
after the deadline for submission of bids prescribed by the owner, will be rejected and / or
returned unopened to the bidder.
16.1.7 Bids that are not opened and declared at the time of bid opening shall not be considered further
for evaluation, irrespective of the circumstances.
17. EVALUATION AND COMPARISON OF BIDS:
17.1 General:
17.1.1 The bids will be evaluated by the Owner (Corporation) to ascertain the lowest evaluated
technically and commercially responsive bid for the complete scope of the proposal as
detailed in the bidding documents.
17.1.2 Evaluation of the bids will be carried out in two stages:
Stage 1 Evaluation of Techno-Commercial bids (Envelope -1) Stage 2 Comparison of Price bids
(Envelope -2) of the acceptable Techno-Commercial bids. Price Bids (Envelope-2) of only those
bidders whose Techno-Commercial bids have been evaluated as acceptable after Stage 1will be
evaluated in Stage 2.
If the bid, which results in lowest evaluated bid price, is seriously unbalanced or front- loaded in
relation to the Corporations estimate of the items of work to be performed under the Contract, the
Owner may request the bidder to produce detailed price analysis for the item in the Bill of
Quantities, to demonstrate the internal consistency of those prices.
If a bid price appears to be unusually low in relation to the services to be rendered, the bidder will
be requested to submit a written breakdown of his price calculation. If after review of the notes
submitted by the bidder reasonable doubt persists as to whether the required works can be provided
at the rates offered and if this is reasonably expected to pose a considerable risk to the performance
of the Contract, the bid in question will be excluded.
17.2 Stage 1: Evaluation of Techno-commercial Bids (Envelope 1)
17.2.1 During Techno-commercial evaluation of bids, the Owner may, at its discretion, request
bidders for clarifications on their bid. The request for clarification and the response shall be
online through the portal and no change in prices or substance of the bid shall be permitted.
17.2.2 The Owner will examine the bids to determine whether they are complete and conform to
the stipulated specification, whether the documents have been properly signed, whether all
the Forms, Datasheets have been filled up as per the formats provided in the bid documents
and whether the bids are generally in order. The Owner will determine the substantial
responsiveness of each bid to the bid documents. A substantially responsive bid is one which
conforms to all terms and conditions, technical specification of the bid documents without
material deviations. Deviations from or objections or reservations to critical provisions such
as those concerning performance security, warranty, force majeure, payment terms,
completion time, applicable law and taxes & duties will be deemed to be a material
deviation. The Owners determination of bids responsiveness shall be based on the contents
of the bid itself without recourse to extrinsic evidence. The Owner may waive any minor
Page 6 of 8
Bid Document for RHEP: NEEPCO LTD. 7
NIT NO 14/2017 Instruction to Bidders : Sec-II
Page 7 of 8
Bid Document for RHEP: NEEPCO LTD. 8
NIT NO 14/2017 Instruction to Bidders : Sec-II
End of Section-II
Page 8 of 8
Bid Document for RHEP: NEEPCO LTD. 1
NIT NO 14/2017 General Conditions of Contract : Sec-III, Part-A
SectionIIIConditionsofContract
Ranganadi Hydro Electric Plant is located in the Lower Subansiri District of Arunachal Pradesh.
The nearest town in its vicinity is Yazali which is at a distance of 12km from the Plant HQ. The
Plant is connected by road from state capital Itanagar as well as from North Lakhimpur, the nearest
town in the state of Assam. The distance of the Plant is approximately 500km from the Guwahati
and around 85 km for the North Lakhimpur in Assam.
2. DEFINITIONS:
i. The "Purchaser" / "Corporation"/Owner/ "NEEPCO" shall mean the North Eastern Electric
Power Corporation Ltd., Shillong and shall include its legal representatives, successors and
permitted assigns.
ii. The Chairman- and-Managing Director" shall mean the administrative head of the North
Eastern Electric Power Corporation Ltd., Shillong.
iii. Contract means the agreement entered into between the Purchaser/Owner and the Contractor
as per the Contract Agreement signed between the parties including all attachments and
appendices thereto and all documents incorporated by reference therein.
iv. The "Contractor" shall mean the Tenderer /bidder whose tender/bid has been accepted by the
Purchaser for the award of Contract and shall include such successful bidders legal
representatives, successors and permitted assigns.
v. The "Engineer"/Engineer- in- Charge shall mean the Engineer Officer appointed by the
Corporation to sign or cause to sign the Contract Agreement on behalf of the Corporation and /
or the Engineer Officer appointed by the Corporation or its duly authorized representative to
direct, supervise and be in charge of work for the purpose of the contract.
vi. The word "Specifications" shall mean collectively, all the terms and stipulations contained in
this book including the conditions of contract, technical & financial forms and Annexure thereto
and list of corrections and amendments.
vii. Words imparting persons shall include firms, companies, corporations and association or body
of individuals, whether incorporated or not.
viii. Terms and expressions not herein defined shall have the same meaning as are assigned to
them in the Indian Sale of Goods Act (1930), failing that in the Indian Contract Act (1872) and
failing that in the General Clause Act (1897) including amendments thereof, if any.
ix. A Day shall mean a day of 24 hours from mid-night to mid-night irrespective of the number
of hours worked in that day.
x. Month shall mean calendar month.
xi. A week shall mean a continuous period of seven (7) days.
xii. Schedule(s) / Section (s) referred to in these conditions shall mean the relevant schedule (s)/
Section (s) annexed to the tender papers issued by the Corporation.
Servants Act, 1923 (XIX of 1923) also applies to them and shall continue to apply even after
the execution of such works under the Contract.
5. QUALIFYING REQUIREMENTS:
a) Technical: The bidders shall fulfill the requirements as stipulated below and furnish the
relevant documents in support of the requirement along with the bid document submitted.
(i) Trade License of the firm, showing his credential as a reputed repairing firm dealing in
supply of Electrical Line materials.
(ii) Certificate of incorporation in case of a company, partnership deed in case of a
partnership firm as the credential of the firm.
(iii) The bidders shall have executed supply works of all the Line Materials as indicted in the
price bid.
(iv) The bidder shall have supplied the materials in the order as specified below:
(a) A single order of not less than Rs 16.0 lacs executed by the firm in the last 02(two)
years and the bidder shall submit the copy of the said supply order, or.
(b) Two orders of not less than Rs 8.0 lacs each executed by the firm in the last 02(two)
years and the bidder shall submit the copies of the largest supply orders, or.
(c) Three orders of not less than Rs 6.0 lacs each executed by the firm in the last 02(two)
years and the bidder shall submit the copies of the largest supply orders.
(v) The bidders shall also attach the following in support of his credentials:
(a) In case of authorized Dealer - Valid Dealership certificate of the particular brand of
material to be supplied as specified in the technical specifications, given by the
manufacturer/ distributor of the item.
(b) In case of other repairing agencies - Valid Trade License showing the firm to be
dealing in repairing works of Elevators / Other T&P items.
(vi) Copy of VAT-TIN/CST-TIN Certificate, PAN number, Bank account No (along with
IFSC code) number should be submitted along with the Bid. The documents submitted
in support of the credential should be valid till the opening of the Bid as specified in the
Tender.
b) Financial: The bidders shall fulfill the requirements as stipulated below and furnish the
relevant documents in support of the requirement along with the bid document submitted.
(i) Solvency certificate, not older than 6 months, by the firm from a nationalized /
scheduled bank specifying the firm is financially sound to execute the contract
amounting to`.16.00 Lacs.
(ii) Annual turnover by the firm in the best three financial years out of last five financial
year ending March 2016 should not be less than `.25.00.
c) While the above stated requirements need be fulfilled by the bidder as qualification
requirement, NEEPCO may also ask for any additional information as may be deemed
necessary. Documents in support of the above are to be submitted along with the bid, falling
which the bid will be treated as incomplete & will be rejected.
in the relevant section of the bid document. The contractor shall furnish a Bank Guarantee from
a Nationalised Bank or a Scheduled Bank for the above specified amount by way of guarantee
for the due and faithful performance of the agreement and for the due and faithful
performance of the Supply Order along with the other terms and conditions agreed to within
10 (Ten) days from the date of issue of Detailed Order.
13. ARBITRATION.
If any dispute or difference of opinion whatever shall arise between the Supplier and the Purchaser
upon or in relation there to or in connection with this contract, and if the matter is not settled
amicably by and between the parties and on rejection, such matter of dispute or difference of
opinion shall be referred to the Arbitration strictly in accordance with the provision contained in the
Arbitration and Conciliation Act 1996 (Act No 26 of 1996) and any amendment thereto. All suits
arising out of this Purchase Order if any are subject to the Jurisdiction in the city of Shillong only.
14. TIME OF COMPLETION
The supply shall be completed within 60(Sixty) days from the date of issue of the Order.
15. TERMS OF PAYMENT.
90% (Ninety percent) payment shall be paid after Successful completion of the work as certified by
the Engineer-In-Charge. The remaining 10% will be release after expiry of the Defect Liability
Period.
Or
100% (one hundred percent) payment shall be paid after Successful completion of the work as
certified by the Engineer-In-Charge, subject to submission of Bank Guarantee of 10% of the
Contract sum which will be released after expiry of Defect Liability Period.
16. CANCELLATION OF THE CONTRACT
The Corporation may without prejudice to any other remedy for breach of contract by written notice
of default reserves the right to cancel the Purchase Order, and shall be entailed to rescind the
contract wholly or in part in a written notice to the successful tenderer owing to any of the
following reasons:
a) If the successful tenderer fails to comply with the terms of the purchase order.
b) If the tenderer fails to perform any other obligation(s) under the Contract
c) The successful tenderer becomes bankrupt or goes into liquidation.
d) The successful tenderer fails to deliver goods on time and / or to replace the rejected goods
promptly.
e) The successful tenderer makes a general assignment for the benefit or creditors and a
receiver is appointed for any of the property owned by them
f) If the tenderer, in the judgment of Corporation has engaged in corrupt or fraudulent
practices in competing for or in executing the Contract.
Upon receipt of the said cancellation notice the successful tenderer shall discontinue all work on the
Purchase order and matters connected with it. Ranganadi H.E. Plant in that event will be entitled to
procure the requirements in the open market and recover excess payment over the successful
tenderers agreed price, if any, from the successful tenderer reserving to itself the right to forfeit the
security deposit, if any, submitted by the successful tenderer against the contract.
17. LIQUIDATED DAMAGES.
The Purchaser reserves the right to recover from the Supplier a sum equivalent to 0.5% (half
percent) of the total Contract Price for each week of delay and part thereof subject to a maximum of
10 % (ten percent) of the total Contract Sum as Liquidated Damage (LD). However, the Purchaser
reserves the right not to accept the delayed items and cancel the order depending upon the
discretion of Purchasing Authority.
Bid Document for RHEP: NEEPCO LTD. 5
NIT NO 14/2017 General Conditions of Contract : Sec-III, Part-A
18. CONSIGNEE:
The Sr. Manager (E), S&T, RHEP, NEEPCO shall be the Consignee. The materials shall be
consigned to the following address:
Sr. Manager (E), S&T,
NEEPCO, RHEP, Yazali, Dist Lower Subansiri, Arunachal Pradesh
19. CLARIFICATION ON TENDER DOCUMENT
19.1 Any prospective bidder requiring any clarification on the bid document regarding various
provisions / requirements/ submission of the tender, may contact the Sr. Manager (E/M), C&P,
RHEP, NEEPCO in writing by letter or fax/ email (E-mail ID = contracts.rhep@gmail.com) within
the date as prescribed in the NIT. Queries received later than as prescribed in the NIT shall not be
entertained.
19.2 Verbal clarifications and informations shall not be entertained in any way.
20. EXEMPTION TO SMALL SCALE INDUSTRIES.
Statutory exemptions for participating bidders registered under Small Scale Industries as per the
Government of India Guidelines/ Norms shall be considered.
21. SIGNING OF CONTRACT / AGREEMENT
A formal signing of the agreement is avoided. The unconditional acceptance of the Order and the
EMD submitted along with the supply order shall be treated as the binding contract against this
supply.
22. SUBLETTING OF CONTRACT
The Contractor shall not sub-let, transfer or assign the whole or any part of the supply work under
the Contract. However, the employment of piece rate workers shall not be construed as subletting.
23. FORCE MAJEURE
23.1 The term Force Majeure shall, herein, mean riots (other than among the Contractors
employees), Civil commotion (to the extent not insurable), war (whether declared or not),
invasion, act of foreign enemies, hostilities, civil war, rebellion, revolution, insurrection,
military or usurped power, damage from aircraft, nuclear fission, acts of God, such as floods,
earthquake, lightning, fires not caused by Contractors negligence and other such cause over
which the Contractor has no control and are accepted as such, by the Engineer-in-Charge,
whose decision shall be final and binding. In the event of either party being rendered unable
by Force Majeure to perform any obligation required to be performed by them under the
Contract, the relative obligation of the party effected by such Force Majeure shall be treated
as suspended for the period during which such Force Majeure cause lasts, provided the
party alleging that it has been rendered unable, as aforesaid, thereby shall notify within
10(ten) days of the alleged beginning and ending thereof giving full particulars and
satisfactory evidence in support of such cause.
23.2 On occurrence of Force Majeure the liability of either party shall be dealt with in
accordance with the provisions of the Contract.
23.3 There should be a request for extension of time arising out of Force Majeure the same
shall be considered in accordance with the provision of completion time and extension clause.
No compensation, whatsoever, will be allowed to the Contractor for the delay arising out of
Force Majeure condition.
24 INSPECTION OF SITE BEFORE TENDER:
The Contractor shall inspect and examine the site and its surrounding and shall satisfy himself
before submitting his tender so as to verify the nature of the supply & site, and the means of access
to the site, obtain necessary information as to risk contingencies and other circumstances that may
have a bearing / effect on his tender. No extra charges consequent on misunderstanding or
otherwise shall be allowed.
End of Section - III
Bid Document for RHEP: NEEPCO LTD
NIT NO 14/2017 Reverse Auction Process: Sec-III, Part-B
Page1of5
2.1 The philosophy followed for reverse auction shall be English Reverse (No ties).
2.2 For the proposed reverse auction, technically and commercially acceptable bidders only
shall be eligible to participate.
2.3 NEEPCO will engage the services of a service provider who will provide all necessary
training and assistance before commencement of on line bidding on Internet.
2.4 NEEPCO will inform the Bidder in writing in case of reverse auction, the details of service
provider to enable them to participate.
2.5 Business rules like event date, time, start price, bid decrement, extensions, etc. also will be
communicated through service provider for compliance.
2.6 Bidders have to fax/mail the PROCESS COMPLIANCE FORM (Section-VI, Part-D) in the
prescribed format before start of Reverse auction. Without this, the Bidder will not be
eligible to participate in the event.
Reverse auction will be conducted on schedule date & time.
2.7 At the end of reverse auction event, the lowest bidder value will be known on the network.
2.8 The lowest bidder has to fax/mail the duly signed filled in the prescribed format
PRICE CONFIRMATION as provided (Section-VI, Part-E) to NEEPCO through
service provider within 24 hours of auction without fail.
2.9 Any variation between the on-line bid value and signed document will be considered as
sabotaging the tender process and will invite disqualification of the bidder to conduct
business with NEEPCO as per prevailing procedure.
2.10 In case NEEPCO decides not to go for Reverse auction procedure for this tender
enquiry, the price bids already opened and evaluated may be considered for finalizing the
tender.
2.11 The reverse auction will be treated as closed only when the bidding process gets
closed in all respects for the item listed in the tender.
2.12 All the bidders should have a VALID DIGITAL CERTIFICATE to participate
in the online event. Under no circumstances will the bidders be allowed to participate
in the online event without Digital Certificate.
3. BUSINESS RULE:
NEEPCO may finalize the procurement against this Tender through reverse auction mode.
NEEPCO has made arrangement with M/s. e-Procurement Technologies Ltd, Ahmedabad,
(ETL) who shall be NEEPCOs authorized service provider for the same.
The bidders are required to read carefully the guidelines given below and submit their
acceptance/compliance to the same along with the Techno-Commercial Bid.
3.1 Computerized Reverse auction shall be conducted by NEEPCO, on pre-specified date & time,
while the Bidders shall be quoting from their own offices/place of their choice. Internet
connectivity and other paraphernalia requirements shall have to be ensured by Bidders
themselves.
In the event of failure of their Internet connectivity, (due to any reason whatsoever it may be) it
is the bidders responsibility / decision to send fax communication, immediately to E-
Procurement Technologies Ltd (ETL) furnishing the price, the bidder wants to bid online, with
a request to ETL to upload the faxed price on line on behalf of the Bidder. The Bidder shall note
clearly that the concerned bidder communicating this price to service provider has to solely
ensure that the fax message is received by ETL in a readable / legible form and also the Bidder
should simultaneously check up with ETL over phone about the clear receipt of the price faxed.
It shall also be clearly understood that the bidder shall be at liberty to send such fax
communications of prices to be up loaded by ETL only before the closure of Bid time and under
no circumstances it shall be allowed beyond the closure of bid time. Such bidders have to
Page2of5
Page4of5
ANNEXURE- I
(Item Description)
The List of Items to be procured along with the Quantities and the Auction Start Time & Close
Time is as follows:
ITEM DESCRIPTION:
Page5of5
1.3 However, in an event where the supplier offers ACSR conductor conforming to standards other than
the above, then the salient points of comparison between the standards adopted and the standards
quoted herein shall be detailed in relevant schedule with an authenticated English version of such
standards referred to.
2.0 GENERAL TECHNICAL REQUIREMENTS
The General Technical Requirements are given in Clause-31.0. The Conductor shall conform to these
technical requirements.
2.1 Materials/ Workmanship
2.1.1 The material offered shall be of best quality and workmanship. The steel cored aluminium
conductor strands shall consist of hard drawn aluminium wire manufactured from not less than
99.5% pure electrolytic aluminium rods of E.C. grade and copper content not exceeding 0.04%.
Page1of10
Page2of10
Page3of10
Page4of10
Page5of10
Page6of10
Page7of10
Page8of10
Page9of10
Page10of10
PRICE SCHEDULE.
The detailed breakup of prices should be given by the tenderer as given below:
Annexure-A
NB:
(i) The prices against supply of items should be quoted on FOR Site basis.
(ii) In case taxes and duties are not mentioned specifically, it shall be construed that the rate is all
inclusive.
(iii)The L1 status shall be arrived at taking into consideration of all Taxes as applicable for the
tendered item and as such all taxes are to be clearly stated. The successful tender shall
have to submit all relevant documents in this regard.
-Sd-
Sr. Manager (E/M) C&P
O/o the Head of Plant,
RHEP, NEEPCO Ltd.,
43 km, Yazali, A.P.
UNDERTAKING
(IN COMPANY LETTER HEAD DULY SIGNED BY AUTHORISED SIGNATORY)
Tender No Date .
To,
(Name & Address of the Purchaser)
______________________
______________________
Dear Sir,
1. I / We having read and examined the following, relating to Supply of ACSR RACCOON
Conductor for Ranganadi H.E. Plant, Arunachal Pradesh,
Section I Notice Inviting Tender
Section II Instruction to Bidders
Section III Condition of Contract
Section IV Technical Specification
Section V Schedule of Rates, (PRICE BID).
Section VI Forms
Part-A Undertaking
Part-B Warranty Form
Part-C Model Form of Bank Guarantee in lieu of Security Deposit.
2. I/ We hereby tender for Supply of ACSR RACCOON Conductor for Ranganadi H.E. Plant,
Arunachal Pradesh, referred to in the documents mentioned in paragraph-1 above upon the terms and
conditions contained or referred to in the aforesaid documents and in accordance to all respects with the
specifications and other details given therein and at the rates contained in the Price Schedule and within
the period(s) as given in Sec-1 and subject to such terms and conditions as stipulated in the General
Conditions of Contract
3. I / We undertake to undertake the works of Supply of ACSR RACCOON Conductor for Ranganadi
H.E. Plant, Arunachal Pradesh, In addition, the supply of the items will be made as per the
Technical Specifications, Section - IV of the Bid Document.
4. The requisite amount of Earnest Money in the form of Demand Draft/Bankers cheque issued in favour
of NEEPCO of _______________________________ (name of bank) is submitted along with the bid.
5. I / We agree that if I/We fail to keep the validity open, as aforesaid or make any modification in the
terms and conditions of my/our tender of our own accord and/or after the acceptance of our tender or if
I/We fail to submit the security deposit and enter into contract or fail to commence the execution of the
works as provided in the documents referred to in paragraph-1 above, I/We shall become liable for
forfeiture of my/our Earnest Money, as aforesaid, and the Corporation shall without prejudice to any other
right or remedy, be at liberty to forfeit the said Earnest Money absolutely.
Should the tender be accepted, I / We agree to abide and fulfill all the terms and conditions and provisions
of the above tender documents.
6. We agree to abide by this Bid for a period of 180 days from the date fixed for Bid opening and it shall
remain binding upon us and may be accepted of any time before the expiration of that period.
7. This Bid together with our written acceptance thereof in your notification of award/letter of intent shall
constitute a binding contract between us.
8. We understand that you are not bound to accept the lowest or any bid, you may receive.
PermanentAddress______________________________________________________________
Postal / OfficeAddress____________________________________________________________
WARRANTY FORM
Date:-
(Signature)
(For and on behalf of the contractor)
MODEL FORM OF BANK GUARANTEE
(In lieu of Security Deposit)
(To be stamped in accordance with Stamp Act)
Ref No.. Bank Gurantee No
Date.
To,
In consideration of North Eastern Electric Power Corporation Ltd., (herein after referred to as the
Purchaser which expression shall unless repugnant to the context or meaning thereof include its
successors, administrators or and assigns) having awarded to M/s
.......................
.. (Name of the Contractor) with its Registered/ Head Office at . (Address
of the Contractor) (herein after referred to as the Contractor which expression shall unless repugnant to
the context or meaning thereof include its successors, administrators or and assigns) a contract by issue of
Purchasers Letter of Intent No .. dtd .. and the same having
been unequivocally accepted by the Contractor resulting in a Contract valued at `
(Rupees) only for (Scope of the Contract) the Contractor having agreed to provide a
contract performance Guarantee for the faithful performance of the entire Contarct Equivalent to 10 (Ten)
percent of the said value of the contract to the Purchaser.
We, the (Name & address of the Bank) at
a Nationalized Bank of India having its registered office at
......( herein after referred to
as the Bank which expression shall unless repugnant to the context or meaning thereof include its
successors, administrators , executors or and assigns) do hereby guarantee and undertake to pay the
Purchaser, on demand any and all money payable by the contractor to the extents of as aforesaid at any
time up to .. (Day/ month / Year) with out any demur, reservation, contest, recourse of protest and
without any reference to the Contractor. Any such demand made by the Purchaser on the Bank shall be
conclusive and binding not withstanding any difference between the Purchaser and the Contractor or any
dispute pending before any court, Tribunal, Arbitrator or any other authority. The Bank undertakes not to
revoke this guarantee its currency without previous consent of the Purchaser and further agree that the
guarantee herein contained shall continue to be enforceable till the Purchaser discharge this guarantee.
The Purchaser shall have the fullest liberty without affecting in any way the liability of the Bank
under this guarantee from time to time to extend the time for performance of the contract by the Contractor.
The Purchaser shall have the fullest liberty without affecting this guarantee, to postpone from time to time
the exercise of the any powers vested in them or of any right which they might have against the Contractor
and to exercise the same at any time in any manner and either to enforce to forbear to enforce any
covenants, contained or implied in the Contract between the Purchaser and the Contractor or any other
coarse or remedy or security available to the Purchaser. The Bank shall not be released of its obligations
under these presents by any exercise by the Purchaser of its liberty with reference to the matters aforesaid
or any of them or any reasons or any other acts of omission or commission on the part of the Purchaser or
any other indulgence shown by the Purchaser or any other matter or thing whatsoever which under law
would, but for this provision, have the effect of relieving the Bank.
The Bank also agrees that the Purchaser at its option shall be entitled to enforce this Guarantee
against the Bank as a principal debtor in the first instance without proceeding against the Contractor and
not withstanding any security or other guarantee the Purchaser may have in relation to the Contractors
Liabilities.
The Liability or obligation of the Bank under this guarantee bond shall not be affected or suspended
by any dispute between the purchaser and the supplier and the payment under this guarantee a\bond need
not wait till the disputes are decided by a Competent Court or Tribunal or any other authority and that any
payment made by the Bank to the Purchaser under the guarantee bond shall be deemed to have been
rightfully and lawfully made.
Lastly the Bank also assures that the guarantee bond will not be discharged due to the change in the
constitution of the Bank or the Contractor.
Not withstanding anything contained herein above our liability under this guarantee is restricted to
Rs (Rupees.) only and it will remain in force upto and including .. and
shall be extended from time to time for such periods as may be advised by the Purchaser who is the
beneficiary under this guarantee and in the events if the contractors fail to comply such extension within
the validity period, this shall be treated as a claim by the Purchaser on the Bank.
Dated (this day ).of .
Witness
. ....
Signature Signature
Name Name
.
Official Address Authority as per Power of Attorney No.
Date ..
Banks Rubber stamp
Note:
For proprietary Concern :
Shri..s/o. resident of carrying on business
under the name and style of .at ..( hereinafter called
the said Contractor which expression shall unless the context requires otherwise include his heirs,
executors, administrators and legal representative ).
For Partnership Concern :
M/s..a partnership firm with its registered office at ( hereinafter
called the said Contractor which expression shall unless the context requires otherwise include their
respective heirs, executors, administrators and legal representatives ), the names of their partners being
1. Shris/o 2. Shri .s/o..
For Companies :
M/s. a company registered under the Companies Act, 1956 and
having its registered office at in the state of ..(hereinafter called the
said Contractor which expression shall unless the context requires otherwise include its heirs,
executors, administrators and legal representatives ).
Process Compliance Form
(The bidders are required to print this on their companys letter head and sign, stamp before sending)
To,
Date:
Sr. Manager(E/M),C&P Wing,
RHEP, NEEPCO LTD.,
Yazali, Dist. Lower Subansiri, A.P.
Email id: contracts.rhep@gmail.com Mobile No. 94357-01311
Sub: Agreement to the Process related Terms and Conditions for the Reverse Auction
Dear Sir,
This has reference to the Terms & Conditions for the Reverse Auction mentioned in the Tender document
against NIT No. ..for .
This letter is to confirm that:
1) The undersigned is authorized representative of the company.
2) We have studied the Commercial Terms and the Business rules governing the Reverse Auction as
mentioned in NIT No. ..dtd. of NEEPCO as well as this document and confirm our
agreement to them.
3) We also confirm that we have taken the training on the auction tool and have understood the
functionality of the same thoroughly.
4) We confirm that NEEPCO and ETL(Service provider) shall not be liable & responsible in any
manner whatsoever for my/our failure to access & bid on the e-auction platform due to loss of
internet connectivity, electricity failure, virus attack, problems with the PC, any other unforeseen
circumstances etc. before or during the auction event.
5) We understand that in the event we are not able to access the auction site, we may authorize ETL to
bid on our behalf by sending a intimation/information containing our offer price before the auction
close time and no claim can be made by us on either NEEPCO or ETL regarding any loss etc.
suffered by us due to acting upon our authenticated instructions.
6) I/we do understand that ETL may bid on behalf of other bidders as well in case of above mentioned
exigencies.
7) We also confirm that we have a valid digital certificate issued by a valid Certifying Authority.
8) We also confirm that we will send the price confirmation within 24 hour of the completion of the
reverse auction and the format as requested by NEEPCO/ ETL.
9) We, hereby confirm that we will honor the Bids placed by us during the auction process.
With regards
Sub: Final price quoted during reverse auction against NIT No.Dtd
Dear Sir,
We confirm that we have quoted Rs. (In figure) ( Rupees (in words) ) as our final rate
for total quantity during the Reverse Auction conducted on ..
Thanking you.
Yours sincerely,
For _________________
Name:
Company:
Date:
Seal:
COPY TO:
M/s. e-Procurement Technologies Ltd.
A -201, Wall street 2,