Abstract The construction of smart grid is an important environment complexity. Power line is the unique resource of
measure to response to the problem of global warming and power companies [1], and the use of power line
energy shortage, while smart power Consumption is a significant communications (PLC) technology to extend Power
part of it. As the basis support for the smart grid, communication Communication Network to consumers home can effectively
technology is the key to achieve its informationization, solve the networking issue of household electrical appliances
automation and interactivity. In this paper, performance testing and equipment, dramatically reduce the cost of construction
experiment of broadband power line communication and the and increase the efficiency of resource Consumption, thus
application of PLC in smart power Consumption pilot projects making it a preferable solution for two-way interactive services
are combined to demonstrate the favorable prospect of PLC
in smart power Consumption.
application in smart power Consumption field. And finally, a
prediction of the future development trend is also presented.
II. SMART POWER CONSUMPTION AND ITS
Keywords-smart grid; power Consumption; power line COMMUNICATION TECHNOLOGY
communication
A. Status quo of Chinas residential power consumption
I. INTRODUCTION
With the problem of global warming and energy shortage According to statistics, China's residential electricity
becoming increasingly serious, governments around the world consumption accounts for about 14.4% of the countrys total
are responding actively to tackle the issue, setting strict energy- power usage, and the average monthly consumption for each
saving and emission reduction targets for their own countries. family is 87 kWh. Ordinary household electrical appliances
The Chinese government pledged to reduce CO2 emissions per mainly consist of air-conditioner, refrigerator, television set,
GDP unit by 40% ~ 45% in the year 2020 comparing to 2005. electric water heater, range hoods, microwave oven and
In China, according to statistics, 80% of the CO2 emissions washing machine. Take electric water heater and washing
come from coal, and more than 50% of the coal is burned to machine for example, the two of the appliances consumes
generate electricity, so China's main energy supply sector- about 9% of the family power. Suppose that the basic price of
"power industry" plays a very important role in this low-carbon electricity is 0.5 RMB/kWh, and 0.2 RMB/kWh at valley time,
war. if the use of electric water heater and washing machine is all
shifted to valley time, then the total household electricity cost
In the face of new situations and new challenges, State Grid will drop by 5%. Therefore, adjusting and controlling the using
Corporation of China put forward the strategy goal for the time and pattern of home appliances has a significant meaning
development of a strong and smart grid. As a significant part of in improving power efficiency and balancing the load of the
the smart grid, smart power consumption is the key to achieve grid.
real-time interaction between customers and the power grid,
thus enhance the power grids comprehensive service B. The efinition and Main Characteristic of Smart Power
capabilities, improve power efficiency, and promote energy
Consumption
conservation and emission reduction.
In contrast with conventional power Consumption, the most
Smart grid requires advanced information, communication prominent feature of smart power Consumption is the real-time
and control technology to be the basic support, and the interaction between users and the grid. Through the real time,
realization of its intelligent features depends on the reliable two-way interactive channel between electricity users and
data transmission via the information and communication power companies, users can inquire about their power
network. As the essential part to connect power companies and Consumption information, flexibly adjust the use time of
end-users, Power Communication Network's "last 100 meters" appliances based on the electricity price policy and the load
has the characteristic of high equipment coverage density and state of the grid, and safely connect in the distributed power
304
TABLE3-B. DESCENT RATE OF USING INTERFERENCE SOURCE 2ENERGY-
SAVING LAMP
High bandwidth
Low bandwidth<50M
Devices (>100M)
Intellon Xeline Yitran Intellon DS2
interfere way
directly into Make no
3.70% 13.50% 16.28% 82.08%
power line influence
into power line Make no
2.47% 9.73% 8.24% 80.96%
extension cord influence
C. Test Conclusion
According to the testing data, network established with
200Mbps BPL device can support more than 20 videos of
1.5Mbps Streaming which is same as DVD or no more than 12
videos of 4Mbps Streaming which is same as HD video on-
demand.
In anti-interference respect, separating BPL device from
home appliances, or using other isolate equipment like
isolating socket between home appliances and power line can
reduce the impact to the BPL single. Figure 2. The general structure of Lianxiangyuan pilot project
305
mobility. The two means complementing each other, thus BPL communication module, using BPL to achieve automatic
forms a real-time, reliable home network. meter reading. In customers home, Ethernet, PLC and wireless
communication such as Zigbee and RF 433MHz are used.
BPLs support for the triple play service is still limited. As
Triple play value-added telecommunication service is
the previous test results shows, a 200Mbps BPL Master can
realized through Ethernet connection to IP telephone, IP set-top
support no more than 12 high-definition video on demand box and computer.
simultaneously, but this still cant meet the requirements in
practical application. In response to this situation, two 3) The analysis of PLC application
improvement schemes are proposed. One is to increase the The pilot project in Yard 95, Fucheng Road also uses PLC
number of BPL Master Equipments. In Lianxiangyuan District, to achieve power Consumption information collecting, smart
the situation of one Master equipment for one whole building home networking and control. Its application results are in line
has been changed into one equipment for every two floors to with those in Lianxiangyuan pilot project. But in the aspect of
ensure the communication support capabilities, but at the same "triple play" construction, since it adopts FTTH, the support for
time, the cost has also increased sharply; The other solution is video on demand, IP telephone and broadband access is much
to adopt FTTH (fiber to the home), and only use BPL better.
technology indoor, thus to tackle constraints posed by
communication capability thoroughly. This improved scheme V. CONCLUSION AND PERSPECTIVE
has been used in the pilot project in Yard 95, Fucheng Road. In the new situation of a worldwide effort of energy-saving
and emission cutting in response to climate change and energy
B. The pilot project in Yard 95, Fucheng Road
security, smart grid construction is facing unprecedented
1) General Structure opportunities and challenges, while communication technology
Featuring in FTTH, the pilot project in Yard 95, Fucheng is its foundation and support, and the key to achieve smart
Road, is based on the intelligent interaction platform of smart grids informationization, automation and interactivity. As the
grid user services. Using set-top box and television to display power industrys specific means of communication, PLC will
information, it has realized a series of services such as reading continue to play a major role in power Consumption
and inquiring of 3 meters (electricity, water, gas), property information collecting, smart home networking and control and
management, distributing, value-added network and medical other smart power Consumption related fields.
treatment service, all of which have shown great interactivity
and intelligence. Due to the restriction of channel characteristic, PLC still
have a considerable gap in aspect of supporting high-speed
The system consists of collecting master station, data transmission, "triple play" and so on comparing to optical
community service master station, concentrator, two-way fiber communication. In the future, power fiber to the home
prepayment smart e-meter, grid-connected solar power (PFTTH) will solve related problems. It adopts optical
generation equipment, smart interactive set-top box, smart composite power cable, using power lines as a fiber optic
socket, home security equipment, and value-added service carrier, and spread the optical fiber into house while paving the
equipments such as IP telephone, VOD and broadband access. electrical power cable, so as to realize the comprehensive
The general structure is shown in Figure 3. connectivity of power communication network and its full
coverage over power consumers. It will save large
infrastructure investment for the country, endorse the power
grid resources with new value of re-development, re-use, re-
value creation for the mankind, and supply full support for the
Chinese governments policy of promoting "triple play" that
combines telecommunication network, radio and television
network and the Internet, thus obtain a new point of economic
growth and industrial reserve, and promote the power grid
development and construction level to a new stage.
REFERENCES
306
in Europe, presented in International Energy Efficiency in Domestic [5] S.Tompros, N. Mouratidis, H. Hrasnica, A novel power line network
Appliances & Lighting Conference 2006. architecture for managing the energy resources of the residential
environment, Proceeding of ISPLC 2009, pp. 211-216