Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 1 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

Weld and NDT Visual Inspection Procedure

Al-Anba Company

Prepared By F.Zolfaghari ASNT Level III


Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 2 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

INTRUDUCTION

The company is responsible for deliver a defect free weld joint therefore a discipline requires through visual inspection procedure is
needed to do so. The procedure is not only guide line. Cods, standards and project specification also should be consulted. The visual
inspection procedure is a general guideline and QC plan attached to it should describe work sequences as part of VT procedure which
.is Appendixes in last section of this procedure

SCOPE

This visual inspection procedure in general covers weld, welding and performing NDT on weld in tanks, piping, pipelines, steel
structures , bridges and pressure vessels therefore for design, construction and inspection of above mentioned facilities cods and
.standards including but not limited to , should be used to prepare work procedures by executer and project specification by designer

ASME SECTIONS AND OTHER REFRENCED DOCUMENTS

Projects Specification
AWS specifications
AWS D 1.1
AWS D1.5
:ASME
I Rules for Construction of Power Boilers
II Materials
Part A Ferrous Material Specifications
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 3 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

Part B Nonferrous Material Specifications


Part C Specifications for Welding Rods, Electrodes, and Filler Metals
Part D Properties (Customary)
Part D Properties (Metric)
V Nondestructive Examination
VIII Rules for Construction of Pressure Vessels
Division 1
IX Welding and Brazing Qualifications
ASME B31.3 Process Piping
API 650 Design and construction of oil storage tanks
API 1104 pipelines and related facilities
SNT-TC-IA Qualification and Certification of NDT personnel

REQUIREMENTS OF A VISUAL EXAMINATION PROCEDURE

Visual examinations shall be performed in accordance with a written procedure, which shall, as a minimum, contain the following
:requirements

1. Direct to or from translucent


2. Direct testing
3. Remote visual Inspection and aids
4. Personnel qualifications
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 4 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

5. Lighting intensity and equipment


6. Configurations to be examined and base
7. Material product forms (pipe, plate, forgings, etc.)
8. Methods or tools used for surface Preparation
9. Equipment or devices used for a direct technique
10. Sequence of examination

DIRECT VISUAL INSPECTION, LIGHTING INTENSITY AN LIGHTING EQUIPMENT

Direct visual examination may usually be made when access is sufficient to place the eye within 24 in. (600 mm) of the surface to be
examined and at an angle not less than 30 degree to the surface to be examined. Mirrors may be used to improve the angle of vision,
.and aids such as a magnifying lens may be used to assist examinations

Illumination (natural or supplemental white light) for the specific part, component, vessel, or section thereof being examined is
required. The minimum light intensity at the examination surface/site shall be 100 footcandles (1000 lux). The light source, technique
,used, and light level verification is required to be demonstrated one time
.documented, and maintained on file

REMOTE VISUAL INSPECTION AND AIDS

In some cases, remote visual examination may have to be substituted for direct examination. Remote visual examination may use
visual aids such as mirrors, telescopes, borescopes, fiber optics, cameras, or other suitable instruments. Such systems shall have a
.resolution capability at least equivalent to that obtainable by direct visual observation
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 5 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

Optical aids to vision, such as mirrors, lenses, microscopes, borescopes, fiberoptics, and magnifiers, compensate for some of the limits
of the human eye by enlarging small discontinuities. For example, borescopes permit direct visual inspection of the interior of hollow
.tubes, chambers, and other internal surfaces

TRANSLUCENT VISUAL EXAMINATION:


Translucent visual examination is a supplement of direct visual examination. The method of translucent visual examination uses the
aid of artificial lighting, which can be contained in an illuminator that produces directional lighting. The illuminator shall provide light
of an intensity that will illuminate and diffuse the light evenly through the area or region under examination. The ambient lighting
must be so arranged that there are no surface glares or reflections from the surface under examination and shall be less than the light
applied through the area or region under examination. The artificial light source shall have sufficient intensity to permit candling
.any translucent laminate thickness variations

: DEMONSTRATION AND CALIBRATION OF VISUAL INSPECTION DIRECT AND OPTICAL RECORDING MEDIA

The procedure shall contain or reference a report of what was used to demonstrate that the examination procedure was adequate. In
general, a fine line 132 in. (0.8 mm) or less in width, an artificial imperfection or a simulated condition, located on the surface
or a similar surface to that to be examined, may be considered as a method for procedure demonstration condition or artificial
imperfection should be in the least discernable location on the area surface to be examined to validate the procedure..

PERSONNEL QUALIFICATIONS
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 6 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

The contractor is responsible for assigning qualified personnel to perform visual examinations according to recommended practice
SNT-TC-IA. At the option of the manufacturer, he may maintain one certification for each product, or several separate signed records
,based on the area or type of work, or both combined. Where impractical to use specialized visual examination personnel

NDT Level I. An NDT Level I individual should be qualified to properly perform specific calibrations, specific NDT, and specific
evaluations for acceptance or rejection determinations according to written instructions and to record results. The NDT Level I should
.receive the necessary instruction and supervision from a certified NDT Level II or III individual

NDT Level II. An NDT Level II individual should be qualified to set up and calibrate equipment and to interpret and evaluate results
with respect to applicable codes, standards, and specifications. The NDT Level II should be thoroughly familiar with the scope and
limitations of the methods for which qualified and should exercise assigned responsibility for on-the-job training and guidance of
.trainees and NDT Level I personnel. The NDT Level II should be able to organize and report the results of NDT tests

NDT Level III. An NDT Level III individual should be capable of developing, qualifying, and approving procedures, establishing and
approving techniques, interpreting codes, standards, specifications, and procedures; and designating the particular NDT methods,
techniques, and procedures to be used. The NDT Level III should be responsible for the NDT operations for which qualified and
assigned and should be capable of interpreting and evaluating results in terms of existing codes, standards, and specifications. The
NDT Level III should have sufficient practical background in applicable materials, fabrication, and product technology to establish
techniques and to assist in establishing acceptance criteria when none are otherwise available. The NDT Level III should have general
familiarity with other appropriate NDT methods, as demonstrated by an ASNT Level III Basic examination or other means. The NDT
Level III, in the methods in which certified, should be capable of training and examining NDT Level I and II personnel for
certification in those methods. Personnel shall have an annual vision test to assure natural or corrected near distance acuity such that
they are capable of reading standard J-1 letters on standard Jaeger test type charts for near vision. Equivalent near vision tests are
.acceptable
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 7 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

LIMITED CERTIFICATION: Non-destructive test methods may be further subdivided into limited disciplines or techniques to
.meet specific employers needs; these are Level II certifications, but to a limited scope

knowledgeable and trained personnel, having limited qualifications, maybe used to perform specific examinations, as techniques
subset to Visual Testing method like PWHT,HARDNESS TEST ,HYDROTEST, REPORTING WELDED JOINTS, MIS AND
WELDING CONTROL SYSTEM (WCS AND etc. To sign the report forms. Personnel performing examinations shall be
.qualified in accordance with requirements of the referencing Code Section

:CONFIGURATIONS TO BE EXAMINED AND BASE

Configuration and base metal to be examined should be performed according to the welding procedure Specifications (WPS) which
.shall be incorporated with this visual Inspection Procedure

:For process piping joint configuration in ASME B 31.3 should be considered along with joint design in related WPSs as follows
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 8 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor


Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 9 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor


Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 10 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor


Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 11 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor


Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 12 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

For steel structure figure 3.3 should be taken as a reference. For tanks figures joint configuration in ASME section VIII Dev.1 should
.be used

MATERIAL PRODUCT FORMS (PIPE, PLATE, FORGINGS, ETC.)

The scope of this procedure as it came in introduction is all kind of metals, products which should be welded and Non-destructive
.tested including only Pipe and Plate. Forging is excluded to this procedure

METHODS OR TOOLS USED FOR SURFACE PREPARATION: Method of preparation for joint fit up initial and interposes
:cleaning is brushing and grinding

SEQUENCE OF EXAMINATION
Sequences of visual inspection are detailed in the following QC plan before during and after welding. Sequence of preparing WPS ,
Qualifying PQR and Welders Tes will be done according to following chart. For technical issues regarding essential, supplementary
.essentials and non-essential variables of welding refer to ASME section IX welding qualification part
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 13 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor


Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 14 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

Project Name : xxxxxxxxxxxxxxx Inspection Co. : xxxxxxxxxxxxxxxxx. 1 CLIEN xxxxxxxxxxxxxx


T:

2
Classification
I.C.S Location : xxxxxxxxxxxx Contractor : xxxxxxxxxxxxxx
Society:
Reference INSPECTION
Reporting
No. Description of inspection test Remarks
Specification , code Format Respon Contra
T.P.I Client C.S
or standard se ctor

1.0 Approvals

Welding Procedure Specification ASME SEC IX & B WPS


1.1 QC H H H H
(WPS) 31.3 form

Procedure Qualification Record ASME SEC IX & B PQR AFG ,


1.2 H H R H
(PQR) 31.3 form ASJ
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 15 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

WQT
1.3 Welder Qualification Test (WQT) ASME SEC IX QC H H R R
form
ASME SEC V
Review Procedures and Formats
AFG AFG ,
1.4 ( NDT painting and Insulation , AWS D1.1 R R H R
manuals ASJ
hydro tests)
SSPC-SP 1
Project AFG ,
1.5 Equipment and instruments Certificates R R H R
specifications ASJ
CONTRACTOR : INSPECTION : OWNER : Classification Society

xxxxxxxxxxxxxxx xxxxxxxxxxxxxxxx. xxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxx

Form
AFG-FR-218-R0
No.:

Project Name : xxxxxxx xxxxxxxx Inspection Co. : xxxxxxxxxxxxxxx. xxxxxxxxxxxxxxxxxx)


CLIENT:
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 16 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

Classification
I.C.S Location : xxxxxxxxxxxxx Contractor : xxxxxxxxxxxxx
Society:
Reference INSPECTION
Reporting
No. Description of inspection test Specification , code Respon Contrac Remarks
Format T.P.I Client C.S
or standard se tor

2.0 Materials

AFG ,
2.1 Receiving materials MTR/MTC - H V,D,R R R
ASJ
Material Inspection : MTR/MTC
Quantities and Quality Report for : B.O.M
O.S.D AFG ,
2.2 Conformance to ASME B36.10M ASJ , H H H H
requirements Form QC
API 5L
Dimension, size,
ASME 31.3
Diameter thickness, P No. ,
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 17 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

type, grade, class, Bore, rating,


Heat treatments
Marking and Tags

Over, Shortage ,
Damage (OSD)
Material certification

CONTRACTOR : INSPECTION : OWNER : Classification Society

Form
AFG-FR-218-R0
No.:

Respon Contrac T.P.I Client C.S


Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 18 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

se tor

3.0 Shop Fabrication


Documents: Project
Approved Specs, Drawings, Specification AFG ,
3.1 Procedures and formats available at - ASJ , H H R R
WPS
work station (WPS, PQR, WQT, QC
NDT, Plans, and Isometrics etc.) WQT

Dimensions check :
Check with shop Drawings Quantity API 5L
and Dimensions with Plan and Dimensio
Isometric for: AS4041 n check AFG ,
3.2 H H R R
ASME 31.3 Report QC
Dimension, orientations, size,
(Code ?)
Diameter thickness, P No. , type, Drawings
grade, class, Bore, rating, Heat
treatments
3.3 Fit Up Check for: Drawing , Fit Up AFG , H W R R
Report QC
(Quality before welding) Acceptance Criteria
(Code ?)
Root opening , Angle, Root Face,
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 19 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

Misalignment , pre-cleaning , Tack


weld and clamps, preheat , post WPS
heat
CONTRACTOR : INSPECTION : OWNER : Classification Society

Form
AFG-FR-218-R0
No.:

Reference INSPECTION
Reporting
No. Description of inspection test Specification , code Respon Contrac Remarks
Format T.P.I Client C.S
or standard se tor
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 20 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

During welding:
Ampere , voltage, current , time
Drawing ,
between passes for heat input and AFG ,
3.4 maintenance Acceptance Criteria - QC , H D,M W W
ASJ
Electrode, F no. , brand, type , WPS
size , baking , maintenance,
abnormalities
After welding Daily
Drawings ,
welding AFG ,
Visual inspection and Daily
3.5 Acceptance Criteria Report QC , H D,M W W
welding Report for
Form ASJ
ASME B 31.3
VT : Discontinuities and Defects (Code)
Spool tracing : Check for spool and Drawing , Spool AFG ,
3.6 sub spool identification , weld , Tracing QC , H W R,W R
welder and spool Number, Acceptance Criteria Report ASJ
Spec., Procedures
PWHT AFG ,
Post Weld Heat treatment (PWHT)
3.7 Acceptance Criteria QC , - H R,W R
and Hardness tests Report ASJ
ASME B 31.3
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 21 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

CONTRACTOR : INSPECTION : OWNER : Classification Society

Form
AFG-FR-218-R0
No.:

4
Classification
I.C.S Location : Turkmenistan Contractor : Atabak Sanaat Jonoob Co
Society:
Reference INSPECTION
Reporting
No. Description of inspection test Specification , code Respon Contrac Remarks
Format T.P.I Client C.S
or standard se tor
3.8 NDT , Request, Results (High Spec., Procedures NDT AFG , H W R,W R
Pressures) Request ASJ
Acceptance Criteria
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 22 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

Groove welds (100% UT or RT)


Before PWHT
Groove welds (100% UT or RT)
After PWHT
Results
Fillet Welds (Branch Connections ASME sec. V ,QC
Reports
and Reinforcements Pads) 100%
MT
Fillet welds (small Bores i.e.
Threadolets) 100% PT
NDT , Request, Results (Low
Pressures)
NDT
Groove welds (35% UT or RT) Spec., Procedures
Request AFG ,
Fillet Welds (Branch Connections Acceptance Criteria ASJ H W R,W R
Results
and Reinforcements Pads) 35% MT ,QC
ASME sec. V
Reports
Fillet welds (small Bores i.e.
Threadolets) 35% PT
3.9 Repairs : Removals and Project Spec. Steps 3.1 AFG , H R,W R R
management Drawings, Reports to 3.9 ASJ
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 23 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

,QC

Spool AFG ,
3.10 Spool is Release for Erection Above history Release ASJ H H H H
Form ,QC

CONTRACTOR : INSPECTION : OWNER : Classification Society

ATABAK SANAAT JONOOB A.F.G Co. NDCO I.C.S

Form
AFG-FR-218-R0
No.:
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 24 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

4 Site Erection

Documents:
Specification
Approved Specs, Drawings, AFG ,
4.1 Procedures and formats available at WPS - ASJ , H H R R
work station (WPS, PQR, WQT, QC
WQT
NDT, Plans, and Isometrics etc.)
4.2 Dimensions check : API 5L Dimensio AFG , H H R R
n check ASJ ,
Check with shop Drawings Quantity AS4041
Report QC
and Dimensions with Plan and
ASME 31.3 (Code ?)
Isometric for:
Drawings
Dimension, orientations, size,
Diameter thickness, P No. , type,
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 25 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

grade, class, Bore, rating, Heat


treatments
Fit Up Check for: (Quality before
welding) Drawing , Fit Up AFG ,
4.3 Root opening , Angle, Root Face, Acceptance Criteria Report ASJ , H W R R
Misalignment , pre-cleaning , Tack QC
WPS (Code ?)
weld and clamps, preheat , post
heat
CONTRACTOR : INSPECTION : OWNER : Classification Society

Form
AFG-FR-218-R0
No.:

6
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 26 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

During welding
Ampere , voltage, current , time
Drawing ,
between passes for heat input and AFG ,
4.4 maintenance Acceptance Criteria - ASJ , H D,M W W
QC
Electrode, F no. , brand, type , WPS
size , baking , maintenance,
abnormalities
After welding Daily
Drawing , welding AFG ,
Visual inspection and Daily
4.5 Report ASJ , H R R R
welding Report for Acceptance Criteria Form QC
VT Discontinuities and defects (Code)
Spool tracing : Check for spool and Drawing , Spool AFG ,
4.6 sub spool identification , weld , Tracing ASJ , H W R,W R
welder and spool Number, Acceptance Criteria Report QC
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 27 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

Spec. PWHT AFG ,


Post Weld Heat treatment (PWHT)
4.7 ASJ , - H R,W R
and Hardness tests Acceptance Criteria Report QC
CONTRACTOR : INSPECTION : OWNER : Classification Society

ATABAK SANAAT JONOOB A.F.G Co. NDCO I.C.S

Form
AFG-FR-218-R0
No.:

Project Name : xxxxxxxxxxxxx Inspection Co. : xxxxxxxxxxxx. xxxxxxxxxxxxxxx)


CLIENT :
Classification
I.C.S Location : xxxxxxxxx Contractor : xxxxxxxxxxxx
Society:
No. Description of inspection test Reference Reporting INSPECTION Remarks
Format
Specification , code Respon Contrac T.P.I Client C.S
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 28 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

or standard se tor

NDT , Request, Results (High


Pressures)
Groove welds (100% UT or RT)
Before PWHT
NDT
Project Spec.
Groove welds (100% UT or RT) Request AFG ,
4.8 After PWHT Drawings, Reports ASJ H W R,W R
Results
,QC
Fillet Welds (Branch Connections ASME sec. V
Reports
and Reinforcements Pads) 100%
MT
Fillet welds (small Bores i.e.
Threadolets) 100% PT
4.9 NDT , Request, Results (Low Project Spec. NDT AFG , H W R,W R
Pressures) Request ASJ
Drawings, Reports
,QC
Groove welds (35% UT or RT) Results
ASME sec. V
Fillet Welds (Branch Connections Reports
and Reinforcements Pads) 35% MT
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 29 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

Fillet welds (small


Bores i.e. Threadolets) 35% PT
Steps 4.1
Repairs : Removals and Project Spec.
4.10 to 4.9 ASJ,QC H R,W R R
management Drawings, Reports
Repeated
Final Check List
1. Civil and structure Final
(pavement and Supports) check list
Project Spec.
4.11 Report ASJ,QC H H H H
2. Mechanical (value and Drawings, Reports
with Test
instruments) Package
3. Welding & NDT
Hydro
Project Spec.
4.12 Hydro Test Test ASJ,QC H R R R
Drawings, Reports
Report
CONTRACTOR : INSPECTION : OWNER : Classification Society
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 30 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

Form
AFG-FR-218-R0
No.:

Project Name : xxxxxxxxxxx Inspection Co. : xxxxxxxxxx


CLIENT:
Classification
I.C.S Location : xxxxxxxxxxxxx Contractor :
Society:
Reference INSPECTION
Reporting
No. Description of inspection test Specification , code Respons Contract Remarks
Format T.P.I Client C.S
or standard e or

5.0 Painting (execution)

Pre-cleaning : control cleaning Daily


SSPC AB 1;Oil AFG,
methods (Brushings) and ambient Primer No visible oil
5.1 condition (temperature , humidity) ASTM D 7237 Report ASJ , H W H H grease
as per project specs and QC contamination
Conductivity; form
manufacturer instructions
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 31 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

ASTM D 4940

SSPC AB 1;Oil
Appling first coat Primer and
measure D.F.T and cohesiveness. ASTM D 7237 AFG ,
5.2 - ASJ , H W R R
Time between coats according to Conductivity; QC
manufacturer instructions
ASTM D 4940
SSPC AB 1;Oil
Appling mid coat and final coat and
measure D.F.T and cohesiveness. ASTM D 7237 AFG , No visible oil
5.3 - ASJ , H M R R or water on
Time between coats according to Conductivity; QC collector
manufacturer instructions
ASTM D 4940
Daily
Verify correct storage condition for Painting AFG ,
5.4 AS PER SPEC Report H W H H
spools and proper erection painting QC
form

5.5
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 32 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

CONTRACTOR : INSPECTION : OWNER : Classification Society

Form
AFG-FR-218-R0
No.:

Project Name : Iran Khazar Jack Up RIG Inspection Co. : Arya Foulad Gharn Ins. Co. 7 CLIEN North Drilling Co. (NDCo)
T:

Classification
I.C.S Location : Turkmenistan Contractor : Atabak Sanaat Jonoob Co
Society:
Reference INSPECTION
Reporting
No. Description of inspection test Specification , code Respons Contract Remarks
Format T.P.I Client C.S
or standard e or

5.6
Date : 20 December 2014

Visual Inspection Procedure (VT) & Quality Control Plan Report No.: xxxxxxxxxxxxxxx

(QCP)
Page No.: 33 Of 10

Inspection Codes Responsibility

H Hold Point V Visual Inspection UT Ultrasonic Testing C.I Client QC Shop Inspection
W Witness Point D Dimension Inspection MT Magnetic Particle Testing T.P.I Third Party Inspection C.S Classification Society

M Monitor R Review & Approve Documentation PT Liquid Penetration Testing C Contractor

6.0 Final Delivery 100% Progress

Rapture
Inspect delivery documents to test and
Approved and
commission the work. pre- AFG,AS
6.1 signed test H H R R
commissi J,QC
Rapture Test packages
oning
Report
Commissi AFG ,
Commissioning
6.2 Final inspection and release oning ASJ , H H H H
Report
Report QC