Structures Details for Chakeri -Allahabad section

VUP
Sr.No Span Clearance No of Locations
1 1 x 12 5.5 14
2 1 x 12 5.5 2

PUP
Sr.No Span Clearance No of Locations
1 1x7 3 24
2 1 x5 6

Flyover
Sr.No Span Clearance No of Locations
1 3*30 5.5 1
2 1*30 5.5 2

Elevated Structure
Sr.No Span Clearance No of Locations
1 3*30 5.5 4
2 2*30 5.5 2

Minor Briges
Sr.No Span Clearance No of Locations

3*10.75 & 2*6.5 &, 1* 7.2


1 - 10
and 1*13

2 3*19 - 1

3*10.75 & 2*6.5 &, 1* 7.2


3 - 12
and 1*13
3*10.75 & 2*6.5 &, 1* 7.2
4 14
and 1*13

Major Bridges
Sr.No Span Clearance No of Locations
1 3 *25 - 1
2 3*25 2
Slab/Box Culvert
Sr.No Span Clearance No of Locations
1 1*7.1 & 1* 6.1 - 148
2

Pipe Culvert
Sr.No Span Clearance No of Locations
1 - 28
2

96.221 Km
Total SR length
20 km

51.332 km
Total Slip length
ri -Allahabad section

Status
New Construction
Repair/Rehabilitation

Status
New Construction
Repair/Rehabilitation

Status
New Construction
New Construction

Status
New Construction
New Construction

Status

New Construction on SR

Reconstruction on MCW

Widening to 6lanning

Repair/Rehabilitation

Status
New Construction
Repair/Rehabilitation
Remarks
Status
Widening
The proposed location and widening is
tentative, it may vary as per site condition.
The exact location and proposed widening
should be finalized during the detail design by
the concessionaire in consultation with NHAI
Status and Independent Engineer.
Widening

New construction (7m / 5.5m


Wide)
Widening/Rehabilitation

New construction (7m / 5.5m


Wide)

Das könnte Ihnen auch gefallen