Sie sind auf Seite 1von 4

Bored Piling

SINGAPORE
Keller Foundations (SE Asia) Pte Ltd
18 Boon Lay Way #04-104 Tradehub 21
Singapore 609966
Tel. +65 6316 8500
Email: info@kellersing.com.sg

Resource Piling Pte Ltd


1 Upper Aljunied Link #07-06,
Block A Joo Seng Warehouse Singapore 367901
Tel: +65 6382 3400
Email: info@resource-piling.com.sg
Web: www.resource-piling.com.sg

MALAYSIA
Keller (M) Sdn. Bhd
B5-10, Block B, Plaza Dwitasik Bandar Sri Permaisuri
56000 Kuala Lumpur Malaysia
Tel: +60 3 91733198
Email: info@keller.com.my

VIETNAM
Keller Foundations Vietnam Co., Ltd
7th Floor, Nhaxanhs Building III, 24 Dang Thai Mai, Ward
7 Phu Nhuan District Ho Chi Minh City Vietnam
Tel: + 84 8355 15022
Email: lequang@keller.com.vn

INDONESIA
Keller Foundations (SE Asia) Pte Ltd
Allianz Tower, 29th Floor Unit 8820, Jalan HR Rasuna Said
Superblok 2 Kawasan Kuningan Persada Jakarta Selatan
12980 Indonesia
Tel: +62 21 2935 3005
Email: leongkw@kellersing.com.sg

INDIA
Keller Ground Engineering India Ptv. Ltd.
Chennai
7th Floor, Eastern Wing, Centennial Square, 6A, Dr.
Ambedkar Road,
Kodambakkam, Chennai 600024 India
Tel: +91 44 2480 7500
Email: info@kellerindia.com
Web: www.kellerindia.com

Mumbai
203, Wellington Business Park I D. P. Road,
Off Andheri Kurla Road Marol, Andheri (E)
Mumbai 400059 India
Tel: +91 22 2856 1053

New Delhi
604, Tower B, Global Business Park, MG Road,
Gurgaon 122004 India
Tel: +91 124 404 0045/46/47

Kolkata
Apanjan Apartment, Flat No. C-43, Dhali Para,
Mohishgote, Kolkata 700102 India
Tel: +91 87545 09647

Hyderabad
Flat No. 102, Plot No. 9, Navajyothi Residency, Telecom
Nagar,
Gachi Bowli, Hyderabad 500032 India
Tel: +91 40 2300 2026

KELLER ASIA
18 Boon Lay Way, #04-105 Tradehub 21 Singapore 609966
Tel: +65 6316 8500
Fax: +65 6316 8652
Email: info@kellerasia.com
Web: www.kellerasia.com
BORED PILING

Bored piling is a method that involves boring a circular hole into the ground,
installing steel reinforcement and filling the bore hole with concrete to
form a pile. Boring is carried out to the required depth by means of either
a crawler crane-mounted rotary boring unit or a purpose-built hydraulic
drilling machine. Bored pile foundations are suitable for all types of soil
conditions and compared with conventional driven piling methods, bored
piling activities generate less noise and vibration.

Aside from building foundation piles, the Bored piling method is also
used to form Contiguous and Secant bored pile walls for earth retention.
Contiguous bored pile wall is formed by installing closely spaced Bored
piles, with a small gap (typically 75 to 150 mm) between adjacent piles.
A Secant pile wall is formed by installing overlapping Bored Piles. Secant
Piles are usually selected where there are particular concerns about Drilling
groundwater inflow.

Static load tests are used to verify the capacity of bored piles. The most
common reaction frame is the kentledge system. Also used are reaction
piles, to provide tensile resistance. Conventional static load tests provide
valuable data regarding the actual capacity of the installed piles, the
corresponding design assumptions, and the distribution of load along the
length of the pile.

Over the years, Keller has provided various innovative piling solutions to
construction markets. For example, in 2010 Resource Piling drilled 2.5 m
diameter piles to unprecedented depths of 92 m for the Marina Coastal
Expressway project, Singapore. Also in 2010, Resource Piling was the first
piling contractor in Singapore to perform a 5,700 ton kentledge load test. Reinforcement
Keller was one of the earliest contractors to utilise polymer for borehole
stabilisation in India. In 2013, Keller performed a 7,500 ton reaction pile test
on a 1.8 m diameter bored pile in Kuala Lumpur, Malaysia.

Keller is also able to combine bored piling with other geotechnical solutions
such as grouting and ground anchors for retaining systems, and vibro stone
columns for liquefaction mitigation. In Asia, Keller is known for its high
safety standards, technical quality, on-time project delivery and overall cost-
effectiveness.

finished pile

Bored Piling Process


Working Sequence & Typical Plant Setup Working Sequence & Typical Plant Setup Working Sequence & Typical Plant Setup
for Bored Piles for Bored Piles for Bored Piles

Step 1 Step 2 Step 3


Installation of Drilling to final depth Installations of
temporary casing using auger and reinforcement cage
drilling bucket

vibrator

generator / power pack


OUR PROJECTS

Tun Razak Exchange Load Test, Malaysia - A 7,500 Reaction pile load Archean Chemical Plant, India
test was performed on a 1.8 m diameter Bored pile Over 1,600 piles were installed to support the heavily loaded structures

Gardens by the Bay, Singapore Vale Iron Ore Facility, Malaysia - 1,000 Bored piles
Over 1,500 piles were installed for various structures were constructed to support the stacker reclaimers
and the conveyor system.

Working Sequence & Typical Plant Setup Working Sequence & Typical Plant Setup The Bored piling method is used in a
for Bored Piles for Bored Piles wide range of construction sectors
including power plants, highways, railways
Step 4 Step 5 and infrastructure. Our capability to offer
Placing of concrete
through tremi pipe
Extraction of
temporary casing
bored piling and ground improvement
solutions as a package enables us to offer
the optimal foundation solutions to our
customers. Some projects in Asia:
vibrator

Changi Airport Terminal 3, Singapore


Cochin Metro Project, India
Gardens by the Bay, Singapore
Marina Barrage, Singapore
concrete
Pipavav Shipyard, India
generator / power pack Tun Razak Exchange Project, Malaysia
Vale Iron Ore Facility, Malaysia