(PNAP ADM-18)
(D) Documentation
- Ground Investigation Pile tip founding Ensure founding
material stratum is able to
sustain the designed
load.
1
Excavation piles
(A) Materials
- Bored pile Grade of concrete, Compliance with
mill certificate for approved plans
reinforcement
- Mini-pile & socket H-pile Pile depth, dip angle Ensure mini-piles
for raking pile are constructed in
accordance with the
approved plans
Spread Footing
- Raft/spread footing Bearing stratum Ensure suitability of
founding material
Physical dimensions Compliance with
approved plans
2
Superstructure Things to be audited Objective/concern
(A) Reinforced concrete Hammer test to Concrete strength
structural elements
Select samples of Tensile strength
reinforcing bars for
tensile test
(B) In-situ concrete Coring tests Strength of in-situ
concrete
(C) Critical elements
- Transfer plate Document showing Ensure the stability
RSEs acceptance on of falsework
falsework design by
RGBC
Concreting sequence Instability of
falsework
- Prestressing member Prestressing profile Compliance with the
approved plans
Grout vent Ensure no air
entrapped
- Cantilever canopy Location of Ensure safety
construction joint
and cover
(D) Curtain wall & Glass wall Member size, shape Compliance with
and grade approved plans
(Rev. 2/2006)
3
Appendix II
(PNAP ADM-18)
Initial Auditing
(see Note)
1
Overall BD
No
Performance determines more
Satisfactory? frequent site
2 months for foundation
auditing
Yes
Audited Audited
building works building works
acceptable? acceptable?
Yes
Yes
BD
determines less
frequent site
auditing
Note:
1. Foundation
1 month after commencement of piling works
Next Site Auditing
2. Superstructure
3 months after commencement of superstructural
(S/S)works
2 months for foundation
Audited No
4 months for S/S
building works 1
acceptable?
No Yes
Completion Yes
of all structural End
components