Add 25% Deduc nce
Convey- amount
Sl. Lead in Initial Blasting extra for t for chargs
Description Quarry ance excluding Remarks
No. KM Cost charges machine stocki Excludin
Charges conveyan
crushing ng g OH, CP
ce
@14%
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)
1 60-63 mm IRC HBG Metal Agraharam 12.00 419.00 164.00 70.00 489.00 141.04 869.92 53-26
2 50-55 mm IRC HBG Metal Agraharam 12.00 456.00 164.00 70.00 526.00 141.04 1019.50 26-4.75
3 40-45 mm IRC HBG Metal Agraharam 12.00 588.00 164.00 70.00 658.00 141.04 795.00 9.5-4.75
4 25-27 mm IRC HBG Metal Agraharam 12.00 944.00 164.00 70.00 1014.00 141.04
5 19-22 mm IRC HBG Metal Agraharam 12.00 984.00 164.00 70.00 1054.00 141.04
6 40-45 mm IRC HBG Metal Agraharam 12.00 588.00 164.00 70.00 147.00 805.00 141.04
7 25-27 mm IRC HBG Metal Agraharam 12.00 874.00 164.00 70.00 218.50 1162.50 141.04 1089.17
8 19-22 mm IRC HBG Metal Agraharam 12.00 984.00 164.00 70.00 246.00 1300.00 141.04 878.00 WBMM
9 12-14 mm IRC HBG Metal Agraharam 12.00 780.00 164.00 70.00 195.00 1045.00 141.04 967.50 WMM
10 9.5-11.2 mm for Grading 2 Agraharam 12.00 656.00 164.00 70.00 164.00 890.00 141.04 795.00 WMM
11 5-7 mm IRC HBG Metal Agraharam 12.00 504.00 140.00 70.00 126.00 700.00 120.40 878.33 OGPC
12 2.36 mm HBG metal Agraharam 12.00 308.00 140.00 70.00 77.00 455.00 120.40 577.50 Gr.II
13 40mm HBG chips-SS5 Agraharam 12.00 588.00 140.00 70.00 147.00 805.00 120.40 1102.50 MSS
14 20mm HBG chips-SS5 Agraharam 12.00 984.00 140.00 70.00 246.00 1300.00 120.40
15 12mm HBG chips-SS5 Agraharam 12.00 780.00 140.00 70.00 195.00 1045.00 120.40
16 10mm HBG chips-SS5 Agraharam 12.00 656.00 140.00 70.00 164.00 890.00 120.40
17 2.36mm Below metal Agraharam 12.00 330.00 140.00 330.00 120.40
18 Rough stone Agraharam 12.00 140.00 140.00 -50 90.00 120.40
19 Gravel Local 4.00 98.00 68.00 98.00 58.48
19 Sand for mortar Manair vagu 15.00 505.00 200.00 505.00 172.00
20 Sand for Filling Local 12.00 285.00 164.00 285.00 141.04
21 Bitumen 60/70 Vizag 645.00 49273.83 1935.00 2463.69 53672.52
22 Bitumen emulsion (SS-1) Vizag 645.00 41014.99 1935.00 2050.75 45000.74
23 Bitumen emulsion (RS-1) Vizag 645.00 40574.48 1935.00 2028.72 44538.20
24 Cement DEC 2013 Local 5200.00 5200.00
25 Steel DEC 2013 43000.00 43000.00
26 1000mm dia pipes (Part-I) Karimnagar 50.00 5178 541.35 207.12 5926.47
27 700mm dia pipes (Part-I) Karimnagar 50.00 2512 286.20 100.48 2898.68
28 600mm dia pipes (Part-I) Karimnagar 50.00 2019 249.75 80.76 2349.51
29 1000mm dia collars (Part-I) Karimnagar 50.00 908 36.32 944.32
30 700mm dia collars (Part-I) Karimnagar 50.00 491 19.64 510.64
31 600mm dia collars (Part-I) Karimnagar 50.00 364 14.56 378.56
Certified that the above leads are correct and nearest to the work site to best of my knowledge
The stone quarry is of blasting type. Hence provided blasting charges
(ii) Aggregate
Average rate of IRC&MoRT&H
HBG M/C metal of sizes 12- cum 276.75 1102.50 305116.88
14mm, 9.5-11.2mm, 5-7mm, 2.36
- 5mm and HBG 2.36mm&below
premeasurements
Ch 7/0-7/2 km L/S 1X1 2.00 1.00 2.00
Suddala Village end 1X1 1.00 1.00 1.00
1X1 1.00 3.750 3.75
1X1 5.00 1.00 5.00
1X10 0.30 0.30 0.90
R/S 1X7 1.00 1.00 7.00
1X1 2.00 1.00 2.00
1X1 2.00 0.50 1.00
1X1 8.00 1.00 8.00
1X1 10.00 1.50 15.00
1X3 0.50 0.50 0.75
1X1 2.50 3.75 9.38
1X1 2.00 0.50 1.00
7/2-7/4 km 1X2 2.00 1.00 4.00
1X1 2.00 2.00 4.00
L/s 1X1 5.00 2.00 10.00
1X1 4.00 2.00 8.00
1X1 4.00 2.00 8.00
1X1 10.00 1.00 10.00
r/s 1X1 3.00 2.00 6.00
1X5 0.50 0.50 1.25
7/4-7/6 km L/s 1X1 5.00 2.00 10.00
1X6 1.00 1.00 6.00
1X1 5.00 2.00 10.00
1X1 3.00 2.00 6.00
1X1 5.00 1.50 7.50
R/S 1X10 0.50 0.50 2.50
7/6-7/8 KM L/S 1X10 0.50 0.50 2.50
1X1 0.75 0.75 0.56
1X1 2.00 2.00 4.00
R/S 1X4 1.00 1.00 4.00
7/8-8/0 KM 1X10 1.00 1.00 10.00
1X1 3.00 2.00 6.00
1X1 5.00 0.50 2.50
R/S 1X5 0.50 0.50 1.25
1X5 1.00 1.00 5.00
8/0-8/2 1X1 3.00 3.75 11.25
1X1 3.00 2.00 6.00
1X1 2.00 3.75 7.50
8/2-8/4 1X10 0.50 0.50 2.50
1X5 1.00 1.00 5.00
8/4-8/6 KM 1X10 0.50 0.50 2.50
1X5 1.00 1.00 5.00
8/6-8/8 KM 1X10 1.00 1.00 10.00
1X5 0.50 0.50 1.25
8/8-9/0 KM 1X10 1.00 1.00 10.00
1X1 3.00 2.00 6.00
9/0-9/2 1X8 1.00 1.00 8.00
1X1 3.00 2.00 6.00
R/S 1X5 0.50 0.50 1.25
1X8 1.00 1.00 8.00
9/2-9/4 1X1 5.00 2.00 10.00
1X5 1.00 1.00 5.00
9/4-9/6 1X1 2.00 2.00 4.00
1X1 10.00 1.00 10.00
1X5 0.50 0.50 1.25
9/6-9/8 KM 1X10 0.50 0.50 2.50
1X1 3.00 2.00 6.00
1X1 1.50 1.50 2.25
1X1 1.75 2.00 3.50
10/2-10/4 km 1X8 1.00 1.00 8.00
1X5 1.00 1.00 5.00
10/4-10/6 km 1X10 1.00 1.00 10.00
1X5 0.50 0.50 1.25
1X1 1.50 1.50 2.25
10/6-10/8 km 1X8 1.00 1.00 8.00
1X1 1.00 2.00 2.00
1X1 2.00 1.00 2.00
1X8 0.50 0.50 2.00
1X1 2.50 2.00 5.00
1X1 2.00 2.00 4.00
1X8 0.50 0.50 2.00
10/8-11/0 km 1X8 1.00 1.00 8.00
1X1 2.00 3.75 7.50
1X1 1.50 3.75 5.63
11/0-11/2 1X5 1.00 1.00 5.00
1X5 0.50 0.50 1.25
11/2-11/4 km 1X10 0.50 0.50 2.50
1X1 1.50 1.50 2.25
1X8 0.30 0.30 0.72
r/s 1X1 2.50 1.00 2.50
1X1 2.00 2.00 4.00
11/4-11/6 km 1X1 3.00 2.00 6.00
1X1 2.00 2.00 4.00
1X10 1.00 1.00 10.00
1X1 2.00 1.00 2.00
1X1 2.00 1.00 2.00
11/6-11/8 km 1X3 2.00 1.00 6.00
1X1 1.50 2.00 3.00
1X1 2.00 1.00 2.00
1X1 2.00 1.00 2.00
1X1 2.00 1.00 2.00
11/8-12/0 km 1X1 2.50 2.00 5.00
1X5 1.00 1.00 5.00
1X1 2.00 2.00 4.00
1X5 0.50 0.50 1.25
12/0-12/2 km 1X1 2.00 2.00 4.00
1X1 2.00 1.00 2.00
1X6 0.50 0.50 1.50
r/s 1X1 2.00 1.00 2.00
1X1 2.00 2.00 4.00
12/2-12/4 1X1 2.00 2.00 4.00
1X1 2.00 2.00 4.00
1X6 1.00 1.00 6.00
1X1 2.00 1.00 2.00
1X1 2.00 2.00 4.00
1X2 2.00 3.00 12.00
12/4-12/6 km 1X1 1.00 1.00 1.00
1X1 2.00 2.00 4.00
1X1 2.00 1.00 2.00
1X1 2.00 2.00 4.00
1X1 1.00 1.00 1.00
r/s 1X1 2.00 2.00 4.00
1X1 3.00 1.00 3.00
1X1 2.00 1.00 2.00
1X1 1.50 1.00 1.50
1X1 2.00 2.00 4.00
537.68
SQM
2
Removal of all failed material, trimming of completed excavation to provide
firm vertical faces, cleaning of surface, painting of tack coat on the sides and
base of excavation as per clause 503, back filling the pot holes with hot
bituminous material as per clause 504, compacting, trimming and finishing the
surface to form a smooth continuous surface, all as per clause 3004.2
MORTH
premeasurements
ch 7/0-7/2 km l/s 1X1 20.00 0.20 4.00
r/s edges 1X1 20.00 0.25 5.00
7/2-7/4 1X1 15.00 0.20 3.00
Edges 1X1 20.00 0.20 4.00
7/4-7/6 1X1 15.00 0.20 3.00
r/s edges 1X1 20.00 0.30 6.00
7/6-7/8 1X1 15.00 0.20 3
1X1 20.00 0.30 6
r/s edges 1X1 20.00 0.25 5
7/8-8/0 1X1 20.00 0.20 4
1X1 20.00 0.25 5
8/0-8/2 1X1 15.00 0.25 3.75
r/s edges 1X1 20.00 0.20 4
8/2-8/4 1X1 20.00 0.30 6
1X1 30.00 0.25 7.5
8/4-8/6 km 1X1 20.00 0.20 4
1X1 30.00 0.20 6
8/6-8/8 km 1X1 25.00 0.30 7.5
1X1 20.00 0.25 5
8/8-9/0 km 1X1 25.00 0.20 5
1X1 30.00 0.20 6
9/0-9/2 km 1X1 25.00 0.20 5
1X1 30.00 0.30 9
9/2-9/4 km 1X1 30.00 0.25 7.5
1X1 35.00 0.30 10.5
9/4-9/6 km 1X1 40.00 0.25 10
1X1 30.00 0.30 9
9/6-9/8 km 1X1 40.00 0.25 10
1X1 40.00 0.30 12
10/2-10/4 1X1 50.00 0.20 10
1X1 40.00 0.25 10
10/4-10/6 1X1 50.00 0.30 15
1X1 40.00 0.25 10
10/6-10/8 1X1 35.00 0.30 10.5
1X1 40.00 0.25 10
10/8-11/0 1X1 40.00 0.30 12
1X1 40.00 0.25 10
11/0-11/2 1X1 35.00 0.30 10.5
1X1 25.00 0.30 7.5
11/2-11/4 km 1X1 25.00 0.30 7.5
1X1 30.00 0.25 7.5
11/4-11/6 1X1 25.00 0.30 7.5
1X1 30.00 0.25 7.5
11/6-11/8 1X1 20.00 0.30 6
1X1 20.00 0.25 5
11/8-12/0 1X1 20.00 0.30 6
1X1 10.00 0.25 2.5
12/0-12/2 1X1 25.00 0.30 7.5
1X1 25.00 0.30 7.5
12/2-12/4 1X1 20.00 0.30 6
1X1 25.00 0.30 7.5
12/4-12/6 1X1 20.00 0.30 6
1X1 25.00 0.30 7.5
372.75
SQM
Asst Engineer Deputy Executive Engineer
PR Projects, Vemulawada PR Projects, Vemulawada
ExecutiveEngineer
PIUDivision,Karimnagar
FORMAT - F6
DETAILED AND ABSTRACT ESTIMATE
GRANT: 13 th Finance 2014-15
7 Providing and applying tack coat with Bitumen emulsion (RS-1) using
emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the
prepared granular surfaces treated with primer & cleaned with Hydraulic
broom as per Technical Specification Clause 503 MORD,including
overhead charges & Contractors profit but excluding VAT.
3729290
SoR 2013-2014
The above work has been administratively sanctioned for Rs.40.00 Lakhs. Vide G.O. Rt No. 2112
dated: 21-12-2013 of Panchayat raj and Rural Development ( Prog-I) Department
EXISTING FEATURES
A. About Road
The Total Length of Road is 12.60 KM it starts from 0/0 km at Vemulawada kaman . 33/4 of SH-11 and
ends at Marthanpet village at 12/600 km. in 2001-2002 the road was completed a length of 7.00 km up t
Suddala vill-12/6 was completed under PMGSY I Grant. the Road is covered five habitations namely
Marupaka, Suddala, Pallimaktha, Nagaram and Marthanpet.
Now from 0/0-7/0 km sanction is available under 13 th fianance grant up to Suddala Village , from 7/0-12/6
km (pmgsy Road) is proposed for BT renewal with Mixed seal surfacing to Make road traffic worthy.
1 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings
and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of
unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of
1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per
Technical Specification Clause 201 MORD/MORTH including overhead & Contractor profit but
excluding VAT .
2 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound
macadam specification including spreading in uniform thickness, hand packing, rolling with smooth
wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone
screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to
the required density grading 2 as per Technical Specification Clause 405 MORD .For compacted
thickness of 75 mm including overhead charges & Contractor profit, but excluding VAT
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular
base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using
mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam
& WBM) ,including overhead charges & Contractors profit but excluding VAT.
3 Providing and applying Tack Coat with butimen emulsion (Rapid Setting- RS-1) using emulsion
distributor as clause 503 of MORD.
4 Providing , laying of close graded premix surfacing ( Mixed seal surfacing) material of 25 mm
thickness by hot mix plant using hard blasted granite crushed aggregates of 13.2mm to 0.09mm
(Type 'B') as per table 500.15 of specification 509 of MoRD, premixed with bituminous binder 60/70
grade (S-65,VG-30 Bulk) @ 23.75 Kg per 10 Sqm area, including cost of all materials ( excluding
seigniorage ) and transporting the hot mix to work site, laying with mechanical paver finisher to the
required grade, level and alignment, rolling with smooth wheeled roller 8 to 10 Tonnes as per MoRD
Specification 509 complete for finished item of work in all respects as directed by Engineer-in-
charge.
5 Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement
concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any
other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383,
maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using
approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125
mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing),
spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators
and finished in continuous operation including provision of contraction and expansion, construction
joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and
construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound
(where specified) and water finishing to lines and grade as per drawing and Technical Specification
Clause 1501 MORD including overhead charges & Contractors profit but excluding VAT.
6 Construction of Granualar shoulder by providing well graded meterial having soaked CBR not less
than 15% s per IRC technical specification clause 402 of MORD.
7 Amount proposed for road furniture like KM, HM stones, Sign boards, logo boards.
The estimate is prepared with the SoR for the year 2013-2014.
AsstExecutiveEngineer DeputyExecutiveEngineer
PRProjectsSD,Vemulawada PRProjectsSD,Vemulawada
ExecutiveEngineer
PIUDivision,Karimnagar
GENERAL ABSTRACT
Grant: 13 th Finance 2014-15
NAME OF THE WORK: R/F Suddala to Marthanpet via Nagaram-M.P.Konaraopet
PART - A
1 BT Renewal 2.500 KM 3729290
2 Road Furniture 26049
3 Add 5% VAT 3755339 187767
4 Add Q.C . Charges 0.50 % 18777
5 Add Seignorage charges 37716
6 Ls for U/f Items 401
PART - A TOTAL 4000000
Executive Engineer
PIU Division, Karimnagar
FORMAT - F6
DETAILED AND ABSTRACT ESTIMATE
: 13 th Finance 2014-15
NAME OF THE WORK: R/F Suddala to Marthanpet via Nagaram-M.P.Konaraopet
1
Ch 0/0-0/4 km 2 400.00 1.00 800
1/0-1/4 2 400.00 1.00 800
cum
3 Providing and applying primer coat with bitumen emulsion (SS-1) on
prepared surface of granular base including cleaning of road surface and
spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means
as per Technical Specification Clause 502 MORD (for use on Wet mix
macadam & WBM) ,including overhead charges & Contractors profit but
excluding VAT.
2 Providing and applying tack coat with Bitumen emulsion (RS-1) using
emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the
prepared granular surfaces treated with primer & cleaned with Hydraulic
broom as per Technical Specification Clause 503 MORD,including
overhead charges & Contractors profit but excluding VAT.
4 Providing and laying seal coat sealing the voids in a bituminous surface
laid to the specified levels, grade and cross fall using Type B with bitumen
(S-65)-6.80 kg per 10 sqm as per Technical Specification Clause 510
MORD. (using Three wheel 80-100 kN static roller)
1226598
2 #REF!
7 Providing and applying tack coat with Bitumen emulsion (RS-1) using
emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the
prepared granular surfaces treated with primer & cleaned with Hydraulic
broom as per Technical Specification Clause 503 MORD,including
overhead charges & Contractors profit but excluding VAT.
9 Providing and laying seal coat sealing the voids in a bituminous surface
laid to the specified levels, grade and cross fall using Type A, Type B
and Type C as per Technical Specification Clause 510 MORD. (using
Three wheel 80-100 kN static roller)
4025442
4 Providing and fixing of typical PMGSY informatory sign board with as per
MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top
and middle plate duly welded with MS flat iron 25mm x 5m size on back
on edges. The lower plate will be we welded with MS angle irone frame of
25 mm x 25 mm x 5 mm. The angle iron frame of the lower most plate and
flat iron frame of middle plate will be welded to 2 nos. 75 mm x 75 mm of
12 SWG sheet tubes posts duly embedded in cement concrete M-15
grade blocks of 450 mm x 450 mm x 600 mm, 600 mm below ground
level. The top most diamond plate will be welded to middle plate by 47
mm x 47mm of 12 SWG sheet tube. All M.s. will be stove enameled on
both sides. Lettering and printing arrows, border etc., will be pointed with
ready mixed synthetic enamel paint of superior quality in required shade
and colour. All sections of framed posts and steel tube will be painted with
primer and two coats of epoxy paint as per drawing clause 1701 MORD
26049
1 J/C 1.97
2 PATCH WORK
Index
S. No. Code Description of item Unit Qty Rate Amount
Index
S. No. Code Description of item Unit Qty Rate Amount
Unit = cum
Taking output = 300 cum
RATE ANALSIS AS PER MORD Data Sheet
Index
S. No. Code Description of item Unit Qty Rate Amount
a) Labour
Mate day -
Mazdoor skilled day 2.40 315.00 756.00
Mazdoor day 8.00 280.00 2240.00
b) Machinery
Mortar Grader 110 HP @ 50 cum per hour hour 6.00 3216.00 19296.00
Stone Screening
Type B 11.2 mm for Grading 2 @ 0.18 / 0.20 cum 86.40 577.50 49896.00
cum/10sqm
Binding Material @ 0.06 cum per 10 sqm for cum 28.80 330.00 9504.00
Grading 2 material
RATE ANALSIS AS PER MORD Data Sheet
Index
S. No. Code Description of item Unit Qty Rate Amount
By Manual means
Taking out put = 360 cum
a) Labour
Mazdoor (Skilled) day 12.08 280.00 3382.40
Mazdoor (unskilled) day 250.00 280.00 70000.00
b) Machinery
Vibratory Roller 80-100 KN @60cum per hour hour 6.00 2541.00 15246.00
Index
S. No. Code Description of item Unit Qty Rate Amount
channel, laying and fixing of 125 mictron thick polythene film, wedges,
steel plates including levelling the formwork as per drawing),
spreading the concrete with sholvels, rakes, compacted using needle,
scareed and plate vibrators and finished in continuous operation
including provision of contraction and expansion, construction joints,
applying debonding strips, primer, sealant, dowel bars, near
approaches to bridge / culvert and construction joints, admixtures as
approved, curing of concrete slabs for 14- days, curing compound
(where specified) and water finishing to lines and grade as per
drawing and Technical Specification Clause 1501 MORD including
overhead charges & Contractors profit but excluding VAT.
Unit = cum
Taking output = 75cum (172.50 t)
(100x3.75 x 0.200)
a) Labour
Mason (1st class) day 5.00 350.00 1750.00
Mason (2nd class) day 5.00 320.00 1600.00
Mazdoor (unskilled) day 150.00 280.00 42000.00
Mazdoor(skilled) day 6.00 280.00 1680.00
Surveyor day 2.00 280.00 560.00
Mazdoor (semi-skilled) day 6.00 280.00 1680.00
Black smith for cutting of dowel bars including day 1.00 350.00 350.00
removal of burrs, fabrications & fixing of dowel
bars
b) Machinery
Concrete mixer 0.28/0.40 cum capacity ( 6 Hour 36.00 417.40 15026.40
mixers) with weight batcher and suitable
capacity calibrated water tank
Needle vibrator Hour 9.00 0.00 0.00
Screed vibrator Hour 9.00 48.00 432.00
Plate vibrator Hour 9.00 48.00 432.00
Water tanker 6 Kl. Capacity Hour 5.00 624.00 3120.00
Air compressor ( 1hour initial + 1 hour final) Hour 2.00 499.40 998.80
c) Material
(I) Crushed stone coarse aggregates, grading will
be as per clause 1501.2.4.1 (Table 1500.1) of
specifications @ 0.90 Cum/cum of concrete
Index
S. No. Code Description of item Unit Qty Rate Amount
Bitumenous sealant 800 ml. Per joint for 23 joints Litre 19.00 38.00 722.00
Jute rope 12mm dia including 5 per cent wastage m 90.00 6.00 540.00
Curing compound (if used) @ 0.33 litre per Litre 131.25 0.00 0.00
sqm
Joint filler board 20mm thick as per IS:1838 sqm 3.00 630.00 1890.00
(4x3.75x0.200 = 3 sqm)
327318.76
(d) Form work @ 3% on (a+b+c) 9819.56
Cost for 75 cum = a+b+c+d 337138.32
Rate per Cum = (a+b+c+d+e)/75 4495.18
(e) Over head charges & contracots profit @ 629.33
14.00% on (a+b+c+d)
Add for conveyance of metal Cum 0.90 141.04 126.94
Add for conveyance of sand Cum 0.45 172.00 77.40
Rate per cum 5328.85
9 Prime Coat
Low porosity
Providing and applying primer coat with bitumen emulsion (SS-1) on
RBR-BASC-1
10 Providing and applying tack coat with Bitumen emulsion (RS-1) using
emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the
RBR-BASC-2
Index
S. No. Code Description of item Unit Qty Rate Amount
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate day 0.000 280.00 0.00
Mazdoor (Unskilled) day 1.040 280.00 291.20
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.400 357.00 499.80
Air compressor 210 cfm hour 1.400 499.40 699.16
Emulsion pressure distributor @1750 sqm per hour 1.000 860.00 860.00
hour
c) Material
Bitumen emulsion (RS-1) @ 0.275 kg per sqm t 0.480 44538.20 21378.34
12 Seal Coat
Providing and laying seal coat sealing the voids in a bituminous
RBR-BASC-17
surface laid to the specified levels, grade and cross fall using Type A,
Index
S. No. Code Description of item Unit Qty Rate Amount
Bitumen (S-65)
Unit = sqm
Taking output = 1250 sqm
a) Labour
Mate day 0.000 280.00 0.00
Mazdoor (Unskilled) day 15.000 280.00 4200.00
Mazdoor (Semi-Skilled) day 2.850 280.00 798.00
b) Machinery
Mixall 6/10 t capacity hour 2.500 520.00 1300.00
Three wheel 80-100 kN static roller hour 2.500 2541.00 6352.50
Bitumen boiler oil fired 1000 litre capacity fitted hour 2.500 209.00 522.50
with spray set
c) Material
Bitumen (S-65) @ 6.80 kg per 10 sqm t 0.850 53672.52 45621.64
Crushed sand or grit as passing 2.36 mm sieve cum 7.500 505.00 3787.50
and retained on 180 micron sieve applied @
0.06 cum/10 sqm
d&e) Overheads & Contractors Profit 14.00% 62582.14 8761.50
Cost of 1250 sqm = a+b+c+d+e 71343.64
Rate per sqm = (a+b+c+d+e)/1250 57.07
Add for conveyance of sand Cum 0.006 120.40 0.72
Rate per Sqm 57.79
Sl Item Rate 2011- Rate 2013- Rate 2013-14
No. 12 14
LABOUR CHARGES
1 Mazdoor Unskilled 215.00 280.00 280.00
2 Mazdoor skilled 215.00 280.00 280.00
3 Mazdoor semi skilled 215.00 280.00 280.00
4 Mason (1st class) 285.00 350.00 350.00
5 Mason (2nd class) 260.00 320.00 320.00
6 Surveyor Mazdoor 260.00 320.00 320.00
7 Driller 285.00 400.00 400.00
8 Blaster 310.00 400.00 400.00
9 Black smith for cutting of dowel bars including 285.00 350.00 350.00
removal of burrs, fabrications & fixing of dowel
bars
10 Mate 260.00 320.00 320.00
MACHINERY
1 AC Pipe 100 mm dia class 1 188.00 222.00 222.00
2 Dozer D 80 1881.00 2511.70 2511.70 1499.25
3 Paver Finisher Hydrostatic with sensor control 100 2530.00 2249.00 2249.00
TPH
4 Air Compressor 370.00 499.40 499.40
5 Dozer D 50 1081.19 1570.00 1570.00
6 Electric generator set 125 KVA 1090.00 1320.00 1320.00
7 Plate Compactor 40.00 48.00 48.00
8 Binding Wire 55.00 70.00 70.00
9 Emulsion Pressure Distributor 690.00 860.00 860.00
10 Smooth wheeled roller 8 tonne 844.40 1038.40 1038.40
11 Tractor with trolley 345.00 415.00 415.00
12 Bitumen boiler oil fired 170.00 209.00 209.00
13 Front end loader 1320.00 1646.00 1646.00
14 Stone Boulder 90
15 Tractor with grader 345.00 422.00 422.00
16 Vibratory Roller 80-100 1886.90 2541.00 2541.00
17 Bitumen boiler oil fired, capacity1000 lts fitted with 170.00 209.00 209.00
spray set
18 Generator 250 KVA 1550.00 1850.00 1850.00
19 Tipper 5.5cum 696.40 877.30 877.30
20 Tractor with rotavator 345.00 422.00 422.00
21 Water Tanker 6 KL 345.00 624.00 624.00
22 Bitumen Pressure Distributor 940.00 1498.00 1498.00
23 Generator 35 KVA 620.00 766.40 766.40
24 Wet Mix Plant 1320.00 1646.00 1646.00
25 Concrete mixer 0.28/0.40 cum 345.00 417.40 417.40
26 HMP 40/60 15525.00 19120.00 19120.00
27 Hydraulic broom @ 1250 290.00 357.00 357.00
28 Hydraulic Chip Spreader 2070.00 2567.00 2567.00
29 Hydraulic Excavator 2009.50 2754.50 2754.50
30 Joint Filler 540.00 791.00 630.00
31 Mild Steel - 7/2011 41000.00 43000.00 43000.00
32 Mortor Grader 2600.00 3216.00 3216.00
Paint 184 256 256
Painter 300 400 400
Binding Wire 300 70 70
Andhra Pradesh Standard Data
I. Roads and Bridges
MAINTENANCE OF ROADS
NAME OF THE WORK: R/F Suddala to Marthanpet via Nagaram-M.P.Konaraopet
Index- S. No Description Unit Quantity Rate Rs. Amount Rs.
code
Unit = cum
Taking output = 187.5x0.075 = 14.06 cum =
(30.94 Tonne)
(5% area of one km)
(a) Labour
Mate day -
Mazdoor (Unskilled) day 20.800 280.00 5824.00
(b) Machinery
Jack hammer 25 kg with tractor hour 4.000 415.00 1660.00
Compressor 210 cfm with tractor hour 2.000 499.40 998.80
Emulsion pressure distributor hour 4.000 860.00 3440.00
Mixall 6/10 t capacity hour 4.000 520.00 2080.00
Three wheeled 80-100 kN Static Roller hour 4.000 2541.00 10164.00
(c) Materials
Primer with bitumen emulsion @ 9 kg/10 sqm Tonne 0.168 45000.74 7560.12
187.5x9 = 168.75 kg.
Tack coat with bitumen emulsion @ 3.0 kg/ 10
sqm
Bottom = 187.5
Sides = 28.27 Tonne 0.064 44538.20 2850.44
Total = 215.77
Bitumen for BM @ 3.5% by weight of mix = 30.94 Tonne 1.082 53,672.52 58073.67
x 3.5 / 100 = 1.082
Weight of mix (BM) 14.06 cum = (30.94 tonne)
Unit = sqm
Taking output = 200 sqm
(a) Labour
Mate day -
Mazdoor (Unskilled) day 20.800 280.00 5824.00
(b) Machinery
Air compressor 210 cfm with tractor hour 2.000 499.40 998.80
Bitumen pressure distributor hour 2.000 1498.00 2996.00
Mixall 6/10t capacity hour 2.000 520.00 1040.00
Three wheeled 80-100 kN Static Roller hour 4.000 2541.00 10164.00
(c) Materials
Bitumen for tack coat @ 3kg per 10 sqm 200 t 0.064 44,538.20 2850.44
x 3 / 10 = 60 kg
Bitumen for pre-mix carpet @ 14.60 kg per t 0.292 53,672.52 15672.38
10 sqm = 200 x 14.6 / 10 = 292 kg
Bitumen for seal coat @ 6.8 kg per 10 sqm t 0.136 53,672.52 7299.46
= 200 x 6.8 / 10 = 136 kg
Unit = Sqm
Taking out put = 4900 sqm (196 cum)(450
Tonnes)
a) Labour
Mate Day -
Mazdoor (Unskilled) Day 70.000 280.00 19600.00
Mazdoor skilled Day 5.920 280.00 1657.60
b) Machinery
Air compressor 250 cfm hour 6.000 499.40 2996.40
HMP 40/60 hour 6.000 19120.00 114720.00
Tipper 10 tonnes capacity hour 45.000 877.30 39478.50
Smooth wheeled roller 8-10 tonnes hour 12.000 2541.00 30492.00
c) Material
I) Bitumen 80/100 tonne 22.500 52711.39 1186006.33
ii) Bitumen emulsion for tack coat . tonne 1.180 44538.20 52555.08
iii) Aggregates
Grading I - 19mm(Nominal size)
20-10mm 35 per cent cum 99.750 1078.33 107563.75
10-5 mm 23 per cent cum 65.550 795.00 52112.25
5mm and below40 per cent cum 114.000 392.50 44745.00
Add 5 per cent for wastage 10221.05
or
(i) for grading I Material 1662147.95
d&e) Overheads & Contractors Profit 14% 232700.71
b) Machinery
Mixall 6/10 t capacity hou 4.000 520.00 2,080.00
r
Bitumen boiler oil fired 1000 litre capacity fitted with hou 4.000 209.00 836.00
spray set r
Three wheel 80-100 kN static roller hou 2.000 1038.40 2,076.80
r
c) Material
Bitumen (S-65) @ 14.60 kg per 10 sqm t 0.730 53672.52 39,180.94
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cu 13.500 878.33 11,857.50
cum per 10 sqm m
63,893.64
d&e) Overheads & Contractors Profit 14% 8945.11
Cost of 500 sqm = a+b+c+d+e 72838.75
Rate per sqm = (a+b+c+d+e)/500 145.68
Add conveyance of metal cu 0.027 120.40 3.25
m
148.93
17 Seal Coat type-B
i Providing and laying seal coat sealing the voids in a
bituminous surface laid to the specified levels, grade
and cross fall using Type B with bitumen (S-65)-6.80
RBR-BASC-17
A By Manual Means
(II) Bitumen (S-65)
Unit = sqm
Taking output = 1250 sqm
a) Labour
351
RBR-BASC
Inde
Uni Quantit
x- S. No Description Rate Rs. Amount Rs.
t y
code
1 2 3 4 5 6
Mate day -
b) Machinery
Mixall 6/10 t capacity hou 2.500 520.00 1,300.00
r
Bitumen boiler oil fired, capacity 1000 litre fitted with hou 2.500 209.00 522.50
spray set r
Three wheel 80-100 kN static roller hou 2.500 1038.40 2,596.00
r
c) Material
Bitumen (S-65) @ 6.80 kg per 10 sqm t 0.850 53672.52 45,621.64
Crushed sand or grit as passing 2.36 mm sieve and cu 7.500 495.00 3,712.50
retained on 180 micron sieve applied @ 0.06 cum/10 m
sqm
58,750.64
d&e) Overheads & Contractors Profit 14% 8225.09
Cost of 1250 sqm = a+b+c+d+e 66975.73
Rate per sqm = (a+b+c+d+e)/1100 53.58
Add conveyance of metal cu 0.006 120.40 0.72
m
54.30
352
(CD WORKS) RATE ANALYSIS AS PER MORD
S. Index
Code Description of item Unit Qty Rate Amount
No.
13 Excavation for Structures
Excavation of structures:
RBR-FNDN-1
Note : Water for concrete : A provision for cost of water may be added at 1.2
kl / 1 cum (including curing purpose) keeping the site conditions
Coarse Aggregate : Single grade nominal size can also be used instead of
graded metal, keeping the site conditions in view
For height upto 5 m
Unit = cum
P.C.C grade M 15
Nominal mix (1:2.5:5) using CC Mixer (MORD)
Unit = cum
(a) Material
Cement t 0.275 5200.00 1430.00
Coarse sand cum 0.480 505.00 242.40
40 mm aggregate cum 0.480 805.00 386.40
20 mm aggregate cum 0.240 1300.00 312.00
10 mm aggregate cum 0.080 890.00 71.20
(b) Labour
Mate day 0.000 280.00 0.00
Mason (1st Class) day 0.100 350.00 35.00
Mazdoor (Unskilled) day 1.390 280.00 389.20
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.400 417.40 166.96
(d) Formwork @ 10% on cost of material, labour and 10.00% 3033.16 303.32
machinery (a+b+c)
3336.48
(CD WORKS) RATE ANALYSIS AS PER MORD
S. Index
Code Description of item Unit Qty Rate Amount
No.
Overheads & Contractors Profit @ 14% 467.11
Add for conveyance of sand cum 0.48 172.00 82.56
Add for conveyance of metal cum 0.80 141.04 112.83
Rate per cum = a+b+c+d+e+f 3998.97
1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars
below 36 mm dia including over laps and wastage, where they are not
welded ,including overhead charges & Contractors profit but excluding VAT.
Unit = t
(a) Material
HYSD bars including 5 per cent overlaps and wastage t 1.050 43000.00 45150.00
Unit = sqm
Taking output = 40 sqm
a) Labour
Mate day -
Painter (1st Class) day 3.00 400.00 1200.00
Painter Assistant day
Mazdoor (Unskilled) day 2.20 280.00 616.00
b) Material
Cement Primer as per specifications litre 3.00 90.00 270.00
Paint conforming to requirement of Clause 1701.3.8 litre 6.00 200.00 1200.00
Unit = sqm
Taking output = 10 sqm
a) Labour
Mate day -
Painter (1st Class) day 0.60 400.00 240.00
Mazdoor (Unskilled) day 0.65 280.00 182.00
b) Material
Epoxy primer / Red-oxide litre 0.60 110.00 66.00
Epoxy paint litre 1.25 200.00 250.00
Add @ 1 per cent on cost of material for scaffolding
wherever required
c&d) Overheads & Contractors Profit at 14% 738.00 103.32
Cost for 10 sqm = a+b+c+d 841.32
Rate per sqm = (a+b+c+d)/10 84.13
30 Kilometre Stone
RBR- Reinforced cement concrete M15 grade kilometre stone/local stone of
TSRA-13
standard design as per IRC:8 fixing in position including painting and
printing, etc as per drawing and Technical Specification Clause 1703
MORD / 804 MORTH
Unit = each
Take Output = 0.9 sqm
(i) Excavation for foundation
As per item No. 1 of Chapter 11 cum 0.126 89.57 11.29
Providing and fixing of typical informatory sign board with as per MORD
specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle
plate duly welded with MS flat iron 25mm x 5m size on back on edges. The
lower plate will be we welded with MS angle irone frame of 25 mm x 25 mm x
5 mm. The angle iron frame of the lower most plate and flat iron frame of
middle plate will be welded to 2 nos. 75 mm x 75 mm of 12 SWG sheet
RBR-TSRA-20
tubes posts duly embedded in cement concrete M-15 grade blocks of 450
mm x 450 mm x 600 mm, 600 mm below ground level. The top most
diamond plate will be welded to middle plate by 47 mm x 47mm of 12 SWG
sheet tube. All M.s. will be stove enameled on both sides. Lettering and
printing arrows, border etc., will be pointed with ready mixed synthetic
enamel paint of superior quality in required shade and colour. All sections of
framed posts and steel tube will be painted with primer and two coats of
epoxy paint as per drawing clause 1701 MORD
Unit = Each
Taking out put = one typical board
i) Excavation for foundation
As per item No. 1 of Chapter 11 cum 0.252 89.57 22.57
(ii) Cement Concrete M15 grade
As per item No. 4 (A) (iii) or (iv) of Chapter 11 cum 0.252 3998.97 1007.74
(iii) Painting on MS Steel tubes with primer and two
coats of epoxy paint
2x2.05x.30 = 1.23
1x1.10x188 = 0.21
As per item no. 9 of Chapter 10 sqm 1.80 84.13 151.44
(iv) Printing new letters and figures of any shade
with synthetic enamel paint black or any other
approved colour to give an even shade.
Logo Border 60x4x5 = 1200 per cm height per letter
Figure 60x10 = 600 per cm height per letter
Middle plate words 28x5 = 140 per cm height per letter
Cold mix
14 i 20mm thick Open-Graded Premix Carpet using
Bituminous (penetration grade/modified bitumen)
Binder
Providing, laying and rolling of open-graded premix
carpet of 20 mm thickness composed of 13.2 mm to
4
b) Machinery
Mixall 6/10 t capacity hou 4.000 520.00 2,080.00
r
Bitumen boiler oil fired 1000 litre capacity fitted with hou 4.000 209.00 836.00
spray set r
Three wheel 80-100 kN static roller hou 2.000 1038.40 2,076.80
r
c) Material
Bitumen (S-65) @ 14.60 kg per 10 sqm t 0.730 53672.52 39,180.94
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cu 13.500 878.33 11,857.50
cum per 10 sqm m
63,893.64
d&e) Overheads & Contractors Profit 14% 8945.11
Cost of 500 sqm = a+b+c+d+e 72838.75
Rate per sqm = (a+b+c+d+e)/500 145.68
Add conveyance of metal cu 0.027 120.40 3.25
m
148.93
17 Seal Coat type-A
i Providing and laying seal coat sealing the voids in a
bituminous surface laid to the specified levels, grade
and cross fall using Type A with bitumen (S-65)-9.80
RBR-BASC-17
A By Manual Means
(II) Bitumen (S-65)
Unit = sqm
Taking output = 1100 sqm
a) Labour
351
RBR-BASC
Inde
Uni Quantit
x- S. No Description Rate Rs. Amount Rs.
t y
code
1 2 3 4 5 6
Mate day -
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted with hou 2.200 209.00 459.80
spray set r
Three wheel 80-100 kN static roller hou 2.200 1038.40 2,284.48
r
c) Material
Bitumen (S-65) @ 9.80 kg per 10 sqm t 1.078 53672.52 57,858.98
Crushed stone chipping of 6.7 mm size 100 per cent cu 9.900 495.00 4,900.50
passing 11.2 mm sieve and retained on 2.36 mm m
sieve applied @ 0.09 cum per 10 sqm
73,945.76
d&e) Overheads & Contractors Profit 14% 10352.41
Cost of 1100 sqm = a+b+c+d+e 84298.17
Rate per sqm = (a+b+c+d+e)/1100 76.63
Add conveyance of metal cu 0.009 120.40 1.08
m
77.71
352
COST OF BITUMEN / MT
PMGSY
FORMAT - F6
DETAILED AND ABSTRACT ESTIMATE
PMGSY Ph.IAP
GRANT: 13 th Finance 2014-15
6 Providing and applying tack coat with Bitumen emulsion (RS-1) using
emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the
prepared granular surfaces treated with primer & cleaned with Hydraulic
broom as per Technical Specification Clause 503 MORD,including
overhead charges & Contractors profit but excluding VAT.
7427091
1 Gravel shoulders & GSB 610.00 cum Gravel 1.2 732.000 22.00 16104
Superintending Engineer
PR Circle , Karimnagar
FORMAT - F7
1 1000mm dia RCC NP3 pipe 1Vent 0/0, 0/450, 0/692, 0/850, 15 185386 Each 2780790
culvert 1/050, 1/315, 1/490,
1/530, 1/690, 1/850,
1/950, 2/050, 2/200,
2/450, 2/580
TOTAL 16 3048524
Type of Cross Drainage work: 1 Vent RCC NP3 pipe culvert (1000mm dia)
1 2 3 4 5 6 7 8 9 10
4 Providing and laying reinforced cement concrete pipe NP3 for culverts on
first class bedding of granular material including fixing collar with
cement mortar 1:2 but excluding excavation, protection works, backfilling,
concrete and masonry works in head wall and parapets. Tech
Specification Clause 1106 MORD ,including overhead charges &
Contractors profit but excluding VAT.
TOTAL : Rs 185386.00
1 2 3 4 5 6 7 8 9 10
Total: 267734
Page 361 of 80
FORMAT - F7
PMGSY Ph. IAP
COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS
Type of Cross Drainage work: 2 Vent RCC NP3 pipe culvert (1000mm dia)
1 2 3 4 5 6 7 8 9 10
4 Providing and laying reinforced cement concrete pipe NP3 for culverts on
first class bedding of granular material including fixing collar with
cement mortar 1:2 but excluding excavation, protection works, backfilling,
concrete and masonry works in head wall and parapets. Tech
Specification Clause 1106 MORD ,including overhead charges &
Contractors profit but excluding VAT.
TOTAL : Rs 302284.00
Type of Cross Drainage work: 3 Vent RCC NP3 pipe culvert (1000mm dia)
1 2 3 4 5 6 7 8 9 10
4 Providing and laying reinforced cement concrete pipe NP3 for culverts on
first class bedding of granular material including fixing collar with
cement mortar 1:2 but excluding excavation, protection works, backfilling,
concrete and masonry works in head wall and parapets. Tech
Specification Clause 1106 MORD ,including overhead charges &
Contractors profit but excluding VAT.
TOTAL : Rs 342623.00
Total: 180905
6 Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm
metal mechanically mixed in substructure complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204
MORD and 1500, 1700 & 2200 MORTH ,including overhead charges &
Contractors profit but excluding VAT upto 5m height.
7 Providing and laying pitching on slopes laid over prepared filter media as
per drawing and technical specifications Clause 1302 MORD / 2504
MORTH
for Approaches 1 x 2 5.00 6.50 0.225 14.63
14.63 659.42 1Cum 9644
8 Backfilling behind abutment, wing wall and return wall complete as per
drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC,
78 & 2200 MORTH
for Approaches 1 x 2 20.00 6.50 2+0.3 299.00
2
299.00 453.85 1Cum 135701
Total: 1494947
1 2 3 4 5 6 7 8 9 10
1 Earthwork in excavation for structures as per drawing and technical
specifications Clause 305.1 including setting out, construction of shoring
and bracing, removal of stumps and other deleterious material and
disposal upto a lead of 50 m, dressing of sides and bottom and backfilling
in trenches with excavated suitable material as per Technical
Specification 305 MORD / 304 MORTH ,including overhead charges &
Contractors profit but excluding VAT.
0/612 to 1/400, 2/770 to 3/000 2 1000.00 1.00 0.400 800.000
km
TOTAL : Rs 2592411
368
(CD WORKS) RATE ANALYSIS AS PER MORD
S. Index
Code Description of item Unit Qty Rate Amount
No.
13 Excavation for Structures
Excavation of structures:
RBR-FNDN-1
P.C.C grade M 10
Nominal mix 1:3:6
Unit = cum
(a) Material
Cement t 0.22 5200.00 1144.00
Coarse sand cum 0.45 505.00 227.25
40 mm aggregate cum 0.9 805.00 724.50
Water kl 1.2 0.00 0.00
(b) Labour
Mate day 0 280.00 0.00
Mason (1st Class) day 0.10 350.00 35.00
Mazdoor (Unskilled) day 1.39 280.00 389.20
(c) Machinery
Mechanical concrete mixer 0.4/0.28 cum capacity fitted hour 0.40 417.40 166.96
with water measuring device and preferably also with
load cell.
Water tanker 6 kl capacity hour 0.13 624.00 81.12
(d) Formwork @ 4% on cost of material, labour and 4.00% 2768.03 110.72
machinery (a+b+c)
(CD WORKS) RATE ANALYSIS AS PER MORD
S. Index
Code Description of item Unit Qty Rate Amount
No.
2878.75
Overheads & Contractors Profit @18% 518.18
Deduct 4% VAT 2878.75 -115.15
Add for conveyance of sand cum 0.45 172.00 77.40
Add for conveyance of metal cum 0.90 141.04 126.94
Rate per cum = a+b+c+d+e+f 3486.12
Providing and laying reinforced cement concrete pipe NP3 for culverts on
first class bedding of granular material including fixing collar with cement
mortar 1:2 but excluding excavation, protection works, backfilling, concrete
and masonry works in head wall and parapets. Tech Specification Clause
1106 MORD ,including overhead charges & Contractors profit but excluding
VAT.
Unit = m
Taking output = 7.5 m
34 (3 pipes of 2.5 m length each)
i) 1000 mm dia
a) Labour
Mate day 0.00 350.00 0.00
Mason (1st Class) day 0.25 350.00 87.50
Mazdoor (Unskilled) day 2.09 280.00 585.20
Laying & fixing of Pipes with colors in position including rm
lifting, aligning etc.,
b) Material
Sand at site cum 0.04 505.00 20.20
Cement at site t 0.03 5200.00 156.00
RCC pipe NP3 pipe including collar at site m 7.50 5926.47 44448.53
RCC pipe NP3 collar at site nos 2.00 944.32 1888.64
47186.07
Overheads & Contractors Profit @ 18% 8493.49
Deduct 4% VAT 47186.07 -1887.44
Cost for 7.5 m = a+b+c+d 53792.12
Rate per m = (a+b+c+d)/7.5 7172.28
Add for conveyance of sand cum 0.01 172.00 1.72
Rate per m = 7174.00
Note : Water for concrete : A provision for cost of water may be added at 1.2
kl / 1 cum (including curing purpose) keeping the site conditions
Coarse Aggregate : Single grade nominal size can also be used instead of
graded metal, keeping the site conditions in view
For height upto 5 m
Unit = cum
P.C.C grade M 15
Nominal mix (1:2.5:5) using CC Mixer (MORD)
Unit = cum
(a) Material
Cement t 0.275 5200.00 1430.00
Coarse sand cum 0.480 505.00 242.40
40 mm aggregate cum 0.480 805.00 386.40
20 mm aggregate cum 0.240 1300.00 312.00
10 mm aggregate cum 0.080 890.00 71.20
(b) Labour
Mate day 0.000 280.00 0.00
Mason (1st Class) day 0.100 350.00 35.00
Mazdoor (Unskilled) day 1.390 280.00 389.20
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.400 417.40 166.96
(d) Formwork @ 10% on cost of material, labour and 10.00% 3033.16 303.32
machinery (a+b+c)
3336.48
Overheads & Contractors Profit @ 18% 600.57
Deduct 4% VAT 3336.48 -133.46
Add for conveyance of sand cum 0.48 172.00 82.56
Add for conveyance of metal cum 0.80 141.04 112.83
Rate per cum = a+b+c+d+e+f 3998.97
1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars
below 36 mm dia including over laps and wastage, where they are not
welded ,including overhead charges & Contractors profit but excluding VAT.
Unit = t
(a) Material
HYSD bars including 5 per cent overlaps and wastage t 1.050 43000.00 45150.00
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204
MORD and 1500, 1700 & 2200 MORTH ,including overhead charges &
Contractors profit but excluding VAT upto 5m height.
19 RBR- Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm
SBST-5
metal mechanically mixed in substructure complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204
MORD and 1500, 1700 & 2200 MORTH ,including overhead charges &
Contractors profit but excluding VAT 5 to 10m height.
d) formwork
Add on cost of material, labour and machinery (a+b+c) 11.80% 4242.97 500.67
for Formwork
Add on cost of material, Labour and machinery excluding 1.80% 4242.97 76.37
formwork to cater for extra lift
4820.01
Overheads & Contractors Profit @18% 867.60
Deduct 4% VAT 4820.01 -192.80
Rate perm (a+b+c+d+e+f) 5494.81
21 Providing and laying reinforced cement concrete M25 grade (Design Mix)
using 20 & 10mm metal mechanically mixed in superstructure as per
RBR-SPST-1
drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD
/ Sections 1500, 1600 & 1700 MORTH ,including overhead charges &
Contractors profit but excluding VAT upto 5m height.
22 RBR- Providing and laying reinforced cement concrete M25 grade (Design Mix)
SPST-1
using 20 & 10mm metal mechanically mixed in superstructure as per
drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD
/ Sections 1500, 1600 & 1700 MORTH ,including overhead charges &
Contractors profit but excluding VAT 5 to 10m height.
Unit = cum
(a) Material
Cement t 0.407 5200.00 2116.40
Sand cum 0.45 505.00 227.25
20 mm aggregate cum 0.54 1300.00 702.00
10 mm aggregate cum 0.36 890.00 320.40
HYSD bar reinforcement including binding wire (Rate as t 0.075 49123.20 0.00
per item 13.2) except OH & CP
(b) Labour
Mate day 0.00 280.00 0.00
Mason (1st Class) day 0.10 350.00 35.00
Mazdoor (Unskilled) day 1.39 280.00 389.20
Mazdoor (Unskilled) for cleaning deck slab concrete day 0.15 280.00 42.00
surface
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 417.40 166.96
Generator 33 KVA. hour 0.40 766.40 306.56
(d) Formwork @ 3% of cost of concrete 3.00% 3999.21 119.98
4425.75
Overheads & Contractors Profit @18% 796.64
Deduct 4% VAT 4425.75 -177.03
Add for conveyance of sand cum 0.45 172.00 77.40
Add for conveyance of metal cum 0.90 141.04 126.94
Rate per cum = a+b+c+d+e+f 5249.70
Unit = Running m
(CD WORKS) RATE ANALYSIS AS PER MORD
S. Index
Code Description of item Unit Qty Rate Amount
No.
Taking output = 4x12 m
Span = 48 m
(a) M 25 grade R.C.C.
No. of vertical posts = (6+1) 4 = 28 nos
Cross-sectional area of vertical post = 0.25x0.275 =
0.069 sqm
Concrete in vertical posts = 0.069x28x1.00 = 1.932 cum
99386.78
Overheads & Contractors Profit @18% 17889.62
Deduct 4% VAT 117276.40 -4691.06
Cost for 48 m = (a+b+c+d) 112585.34
Rate per m = (a+b+c+d)/48 2345.53
25 RBR- P.C.C. M 15 ordinary grade (1:2.5:5) using 40,20 & 10mm metal
SPST-12
mechanically mixed leveling course below approach slab complete as per
drawing and technical specifications Clauses 800 and 1211 MORD & 2700
MORTH ,including overhead charges & Contractors profit but excluding VAT.
26 RBR- Reinforced Cement Concrete M 25 grade approach slab using 20 & 10mm
SPST-13
metal mechanically mixed excluding reinforcement complete as per drawing
and technical specifications Clauses 800 and 1211 MORD / 1500, 1600,
1700 & 2704 MORTH ,including overhead charges & Contractors profit but
excluding VAT.
Unit = cum
(a) Material
Reinforced cement concrete M 25 grade
Cement t 0.403 5200.00 2095.60
Coarse sand cum 0.45 505.00 227.25
20 mm aggregate cum 0.54 1300.00 702.00
10 mm aggregate cum 0.36 890.00 320.40
(b) Labour
Mate day 0 280.00 0.00
Mason (1st Class) day 0.1 350.00 35.00
Mazdoor (Unskilled) day 1.39 280.00 389.20
Bhisti day 280.00 0.00
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hr / cum 0.4 417.40 166.96
29 RBR- Providing and laying pitching on slopes laid over prepared filter media as per
PTWK-5
drawing and technical specifications Clause 1302 MORD / 2504 MORTH
Stone/Boulder
Unit = cum
(a) Material
Stone boulder (25 kg minimum) /(MORTH - 40 kg) cum 1.00 90.00 90.00
Stone spalls of minimum 25 mm size cum 0.20 90.00 18.00
(b) Labour
Mate day 0.00 0.00
Mason 1st Class day 0.35 350.00 122.50
Mazdoor (Unskilled) day 0.79 280.00 221.20
Overheads & Contractors Profit @18% 18.00% 451.70 81.31
Deduct 4% VAT -4.00% 451.70 -18.07
Add for conveyance of stone cum 1.20 120.40 144.48
Rate per cum = (a+b+c+d) 659.42
Unit = sqm
Taking output = 10 sqm
a) Labour
Mate day -
Painter (1st Class) day 0.60 400.00 240.00
Mazdoor (Unskilled) day 0.65 280.00 182.00
b) Material
Epoxy primer / Red-oxide litre 0.60 115.00 69.00
Epoxy paint litre 1.25 256.00 320.00
Add @ 1 per cent on cost of material for scaffolding
wherever required
c&d) Overheads & Contractors Profit at 18% 811.00 145.98
Deduct 4% VAT 811.00 -32.44
Cost for 10 sqm = a+b+c+d 924.54
Rate per sqm = (a+b+c+d)/10 92.45
32 Kilometre Stone
RBR- Reinforced cement concrete M15 grade kilometre stone/local stone of
TSRA-13
standard design as per IRC:8 fixing in position including painting and
printing, etc as per drawing and Technical Specification Clause 1703
MORD / 804 MORTH
as per Clause 1701.3.9 of MORD for Rural Roads of required shade and
colour supported and welded on 47 mm x 47 mm 12 SWG sheet tube firmly
fixed to the ground by means of properly designed foundation with M15
grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground
level as per drawings and Technical Specification Clause 1701 MORD
Unit = Each
Taking output = one traffic sign
(i) Excavation for foundation
As per item No. 1 of Chapter 11 cum 0.126 89.57 11.29
(ii) Cement concrete M15 grade
As per item No. 4 (A) (iii) or (iv) of Chapter 11 cum 0.126 3998.97 503.87
(iii) Painting two coats including prime coat on
concrete surface with Epoxy Paint as per
specifications
As per item No. 9 of this Chapter sqm 0.46 92.45 42.53
(a) labour (For fixing at site)
Mate day -
Mazdoor (Unskilled) day 0.26 280.00 72.80
b) Material
Support of M.S. Sheet tube
(I) 47 mm x 47 mm x 12 SWG Sheet 3050 mm long kg 12.40 43.00 533.20
(II) Angle iron 50 x 50 x 6 mm for hold fast including 5% kg 1.06 43.00 45.58
wastage
Add 3% cost of MS Sheet tube 12 SWG and angle irons 3% 578.78 17.36
towards the cost of fabrication, drilling holes, nuts and
bolts etc.
(III) 1.5 mm thick M.S. Sheet duly painted with stove sqm 0.36
enameled paint including lettering, signs, border,
message with reflective tape of engineering grade
required size, shade and colour as per Technical
Specifications
(vi) 600 mm x 600 mm square (0.36SQm X 0.0015m X Kg 4.24 40.00 169.60
7850/Kgcum)
(c) Machinery
Tractor with trolley hour 0.08 415.00 33.20
d&e) Overheads& Contractors Profit on a+b+c 18% 871.74 156.91
(CD WORKS) RATE ANALYSIS AS PER MORD
S. Index
Code Description of item Unit Qty Rate Amount
No.
Deduct 4% VAT 871.74 -34.87
Rate per traffic sign = (i+ii+iii+a+b+c+d+e) 1551.47
Note : 1. Any one area of M.S. Sheet given at (i) to (viii) may be adopted as per site requirement and
in accordance with IRC-67.
2. The rate for excavation, cement concrete M-15, and painting may be taken from respective
Chapters.
3. The depth of foundation and quantity of cement in the foundation are indicative. These may
be increased for areas having higher wind velocities like in coastal area. This is applicable to
all road signs and direction boards.
Unit = each
Take Output = 0.9 sqm
(i) Excavation for foundation
As per item No. 1 of Chapter 11 cum 0.126 89.57 11.29
tubes posts duly embedded in cement concrete M-15 grade blocks of 450
mm x 450 mm x 600 mm, 600 mm below ground level. The top most
diamond plate will be welded to middle plate by 47 mm x 47mm of 12 SWG
sheet tube. All M.s. will be stove enameled on both sides. Lettering and
printing arrows, border etc., will be pointed with ready mixed synthetic
enamel paint of superior quality in required shade and colour. All sections of
framed posts and steel tube will be painted with primer and two coats of
epoxy paint as per drawing clause 1701 MORD
Unit = Each
Taking out put = one typical board
i) Excavation for foundation
As per item No. 1 of Chapter 11 cum 0.252 89.57 22.57
(ii) Cement Concrete M15 grade
As per item No. 4 (A) (iii) or (iv) of Chapter 11 cum 0.252 3998.97 1007.74
(iii) Painting on MS Steel tubes with primer and two
coats of epoxy paint
2x2.05x.30 = 1.23
1x1.10x188 = 0.21
As per item no. 9 of Chapter 10 sqm 1.80 92.45 166.42
(iv) Printing new letters and figures of any shade
with synthetic enamel paint black or any other
approved colour to give an even shade.
Logo Border 60x4x5 = 1200 per cm height per letter
Figure 60x10 = 600 per cm height per letter
Middle plate words 28x5 = 140 per cm height per letter
Sl. No. Sl. No. Description Units Qty Rate (Rs) Amount
as per (Rs.)
MORD
SDB for
A. Rural
CONSTRUCTION ACTIVITIES
Roads
1 Clearing and grubbing road land including Cum #REF! #REF!
### #REF!
uprooting wild vegetation, grass, bushes, shrubs,
saplings and trees of girth upto 300 mm, removal
of stumps of such trees cut earlier and disposal of
unserviceable materials and stacking of
serviceable material to be used or auctioned, upto
a lead of 1000 m including removal and disposal of
top organic soil not exceeding 150 mm in thickness
as per Technical Specification Clause 201
MORD/MORTH including overhead & Contractor
profit but excluding VAT .
WBM Grade-III
5 Providing, laying, spreading and compacting stone #REF! #REF!
### #REF!
aggregates of specific sizes to water bound
macadam specification including spreading in
uniform thickness, hand packing, rolling with
smooth wheel roller 80-100 kN in stages to proper
grade and camber, applying and brooming, stone
screening to fill-up the interstices of coarse
aggregate, watering and compacting to the
required density Grading 3 as per Technical
Specification Clause 405 MORD/ MORTH 404. For
compacted thickness of 75 mm, including
overhead charges & Contractor profit, But
excluding VAT
Prime Coat
6 Providing and applying primer coat with bitumen #REF! #REF!
### #REF!
emulsion (SS-1) on prepared surface of granular
base including cleaning of road surface and
spraying primer at the rate of 0.70-1.0 kg/sqm
using mechanical means as per Technical
Specification Clause 502 MORD (for use on Wet
mix macadam & WBM) ,including overhead
charges & Contractors profit but excluding VAT.
Tack Coat
7 Providing and applying tack coat with Bitumen 4293.75 15.46 / 66381
emulsion (RS-1) using emulsion distributor at the 1
rate of 0.25 to 0.30 kg per sqm on the prepared
granular surfaces treated with primer & cleaned s
with Hydraulic broom as per Technical q
Specification Clause 503 MORD,including m
overhead charges & Contractors profit but
excluding VAT.
Seal Coat
9 Providing and laying seal coat sealing the voids in 3168.75 54.30 / 172065
a bituminous surface laid to the specified levels, 1
grade and cross fall using Type A, Type B and
Type C as per Technical Specification Clause 510 s
MORD. (using Three wheel 80-100 kN static roller) q
m
CC pavement
10 Construction of un-reinforced, dowel jointed at #REF! #REF!
### #REF!
expansion and construction joint only, plain cement
concrete pavement, thickness as per design, over
a prepared sub base, with 43 grade cement or any
other type as per Clause 1501.2.2 M30 (Grade),
coarse and fine aggregates conforming to IS : 383,
maximum in a concrete mixer of not less than 0.2
cum capacity and appropeiate weigh batcher using
approved mix design, laid in approved fixed side
formwork (steel channel, laying and fixing of 125
mictron thick polythene film, wedges, steel plates
including levelling the formwork as per drawing),
spreading the concrete with sholvels, rakes,
compacted using needle, scareed and plate
vibrators and finished in continuous operation
including provision of contraction and expansion,
construction joints, applying debonding strips,
primer, sealant, dowel bars, near approaches to
bridge / culvert and construction joints, admixtures
as approved, curing of concrete slabs for 14- days,
curing compound (where specified) and water
finishing to lines and grade as per drawing and
Technical Specification Clause 1501 MORD
including overhead charges & Contractors profit
but excluding VAT.
Gravel Shoulders
11 Construction of gravel shoulders by providing well 99.00 385.61 / 38175
graded material, spreading in uniform layers with C
motor grader on prepared surface, mixing by mix in u
m
place method with rotavator at OMC, and
compacting with three wheel 80-100 kN static
roller / Vibratory Roller 80-100 kN capacity to
achieve the desired density, complete as per
Technical Specification Clause 402 MORD,
including overhead charges & Contractor profit, But
excluding VAT
TOTAL 375000
Note:
1. Rate Analysis shall cover all the items such as Site Clearance, Earthwork, Drainage, Granular Sub Base, &
Surface Course, CD works, Traffic Signs, PMGSY Board & Logo& Maintenance activities
2. Where local material e used at site and the specif cations a rate analysis are not found in BOS &SDB. for
Rural Roads .the analysis & nomenclature of the item can be suitably used based on other standards such
as PWD Schedule or Rate or assessment based on field observation.
3. Completed items rates including feadfor carriage of materials should be shown
By Manual Means
Unit = sqm
Taking output = 500 sqm (205 cum) (450 tonnes.)
a) Labour
unskilled Skilled Mazdoor for
day 21.00 320.00 6720.00
checking line and levels.
Skilled Mazdoor for checking line
day 8.40 280.00 2352.00
and levels.
b) Machinery
Mixall 6-10 t capacity
hour 6.00 520.00 3120.00