In connection with the 5-Point Agenda of President Rodrigo Roa Duterte and the
8-Point Agenda of DOE Secretary Alfonso G. Cusi to achieve 100% electrification
of targeted/identified households, completion of the National Rural Electrification
Program is the topmost priority
It is in this context that all electric cooperatives are hereby directed to submit all
validated unenergized sitios within your franchised areas. This will facilitate the
Sitio Electrification Program Phase 2 (SEP-P2), comprising of the initially
inventoried 23,464 unenergized sitios.
We recognize the time constraint but submittals must be received by NEA-
Corplan on or before 15 June 2017 in hard and soft copies, drafted by the EC
Technical Manager and duly-noted by the EC General Manager. Attached is the
format for your perusal which will be the basis for consequent DBM budget
allocations.
In addition, please take note that a “validated” sitio shall mean the existence of a
viable tapping point, significant number of potential households, no constraints on
right-of-way, peace & order, and other impediments that can hinder electrification
efforts.
For your guidance and strict compliance.