Sie sind auf Seite 1von 1
NATIONAL ELECTRIFICATION ADMINISTRATION “The F Performance Governance System sti Tationl Government Agency? TINa Rand Gocnnen Gre Sian Gooner hy oem mT May 23, 2017 MEMORANDUM No. 2017-013 TO ALL ELECTRIC COOPERATIVES (ECs) SUBJECT ‘Submission of SEP- P2 Unenergized Sitios (2017-2022) In connection with the 5-Point Agenda of President Rodrigo Roa Duterte and the 8-Point Agenda of DOE Secretary Alfonso G. Cusi to achieve 100% electrification of targeted/identified households, completion of the National Rural Electrification Program is the topmost priority It is in this context that all electric cooperatives are hereby directed to submit all validated unenergized sitios within your franchised areas. This will facilitate the Sitio Electrification Program Phase 2 (SEP-P2), comprising of the initially inventoried 23,464 unenergized sitios. We recognize the time constraint but submittals must be received by NEA- Corplan on or before 15 June 2017 in hard and soft copies, drafted by the EC Technical Manager and duly-noted by the EC General Manager. Attached is the format for your perusal which will be the basis for consequent DBM budget allocations. In addition, please take note that a “validated” sitio shall mean the existence of a viable tapping point, significant number of potential households, no constraints on right-of-way, peace & order, and other impediments that can hinder electrification efforts. For your guidance and strict compliance. EDGARDO R. MASONGSONG Administrator wou 3 Ay (02) 920-1009 4 wiweinea. goveh Enerlying the Countryside, Electrifying the Patina”

Das könnte Ihnen auch gefallen