Beruflich Dokumente
Kultur Dokumente
Date of evaluation:
All data supplied by the proposed subcontractor to be specific to the project requirements.
Sub contractors corporate details not relevant to the evaluation must be avoided.
Prepared by
For Subcontractor
Give a brief on previous project visits by CSCEC team.
1) Checked by:
Construction Manager
2) Checked by:
Technical Manager
3) Reviewed by:
Contracts Manager
Note: 1) The evaluation sheet to be submitted along with the price comparison statement.