Radiogram No.

4781u Form 24 for 03/01/07


SM БГ2 ОДУ [Integrated Propulsion System Fuel Tank 2] refueling via DC1 Transit from Progress
359 БГ1, 2 СД [Propulsion System Fuel Tanks 1 and 2]
GMT CREW ACTIVITY

02:00-02:10 Morning inspection


02:10-02:30 FE-1 Post-sleep
02:10-02:20 FE-2 Post-sleep
02:10-02:20 CDR
02:20-02:30 FE-2 HEMATOCRIT. Hematocrit test
02:30-02:40 FE-1
02:30-02:50 FE-2 Post-sleep
02:40-02:45 FE-1 HEMATOCRIT. Stowage
02:45-02:55 FE-1 Post-sleep
02:50-03:40 CDR, FE-2 BREAKFAST
02:55-03:45 FE-1 BREAKFAST
03:40-03:45 CDR, FE-2 Prep for Work
03:45-04:00 Daily Planning Conference (S-band)
04:00-04:25 CDR, FE-2 Prep for Work
04:00-04:15 FE-1 Prep for Work
04:15-04:30 FE-1 Private medical conference with Physical Exercise specialist (S-band)
04:25-04:55 FE-2 Crew Medical Officer (CMO) proficiency training
Disconnect SKV1 Heat Exchanger Unit [БТА] from Compressor and condenser
04:30-05:30 FE-1
unit. Tagup (S-band)
04:40-05:40 CDR Physical Exercise (RED)
05:00-05:10 FE-2 Carbon Dioxide Monitoring Set up
05:25-05:45 FE-2 EarthKAM – Earth study. EarthKAM hardware stow
05:45-06:30 FE-2 LAB window inspection
05:45-05:55 FE-1 On MCC Go: Demate СКВ1 БТА telemetry connectors from БИТС2-12
05:55-08:40 CDR, FE-1 СКВ1 Heat Exchangers Unit [БТА] R&R. Tagup (S-band)
06:30-06:45 FE-2 Rebooting all PCS (weekly)
07:15-08:40 FE-2 OUM-PFE – hardware installation
08:40-08:50 FE-1 On MCC-M GO Mate СКВ1 БТА Telemetry Connectors [ТМИ] to БИТС2-12
08:40-09:10 FE-2 OUM-PFE – evaluation protocol
08:40-09:10 CDR OUM-PFE - operator
08:50-09:50 FE-1 Physical Exercise (VELO+RED) day 1
09:10-09:45 FE-2 OUM-PFE deactivation and stowage 1
09:20-09:50 CDR Stow US tools post-EVA (RS)
09:45-09:50 FE-2 On MCC Go ISS O2 repress from Progress 358 СрПК (start)
09:50-10:50 . LUNCH
10:50-10:55 FE-2 ISS O2 repress from Progress 358 СрПК (terminate)
10:50-11:50 FE-1 Closeout ops after БТА СКВ1 changeout. Tagup (S-band)
10:50-11:50 CDR Stow US tools post-EVA (RS)
10:55-11:15 FE-2 IMS update
11:15-11:25 FE-2 OUM-PFE Laptop power down
11:40-12:10 FE-2 СОЖ Maintenance
Post-EVA SM ПхО and DC1 Reconfiguration and Tool Stowage. Tagup as
necessary (S-band )
11:50-12:50 CDR, FE-1
In-flight comm procedure from DC1
Return to nominal comm config
12:10-12:25 FE-2 Set up video equipment to record RED exercise
12:25-13:25 FE-2 Physical Exercise (RED)
12:50-14:20 FE-1 Physical Fitness Evaluation (on treadmill)
12:50-14:20 CDR Physical Exercise (CEVIS)
13:25-13:40 FE-2 Stow video equipment used to record the RED exercise
13:40-13:50 FE-2 Terminate EMU Metox Regeneration
13:50-14:00 FE-2 Start EMU Metox Regeneration
14:00-14:35 FE-2 Evening work prep
14:20-14:50 CDR Crew Medical Officer (CMO) proficiency training
14:20-14:50 FE-1 Evening work prep
14:35-14:45 FE-2 Carbon dioxide monitor stow
14:45-14:50 FE-2 Transfer TVIS/RED/CEVIS/HRM data to MEC
14:50-15:05 Daily Planning Conference (S-band)
15:05-15:30 Evening work prep
15:30-16:00 DINNER
16:00-16:30 Daily Food Prep
16:30-17:30 Pre-sleep
17:30-02:00 SLEEP
ТБУ (Universal Bioengineering Thermostat). Temperature check
Task List FE-1
URAGAN. Observation and photography
Note: See OSTP for references to US activities.
End of Radiogram