SM БГ2 ОДУ [Integrated Propulsion System Fuel Tank 2] refueling via DC1 Transit from Progress 359 БГ1, 2 СД [Propulsion System Fuel Tanks 1 and 2] GMT CREW ACTIVITY
02:00-02:10 Morning inspection
02:10-02:30 FE-1 Post-sleep 02:10-02:20 FE-2 Post-sleep 02:10-02:20 CDR 02:20-02:30 FE-2 HEMATOCRIT. Hematocrit test 02:30-02:40 FE-1 02:30-02:50 FE-2 Post-sleep 02:40-02:45 FE-1 HEMATOCRIT. Stowage 02:45-02:55 FE-1 Post-sleep 02:50-03:40 CDR, FE-2 BREAKFAST 02:55-03:45 FE-1 BREAKFAST 03:40-03:45 CDR, FE-2 Prep for Work 03:45-04:00 Daily Planning Conference (S-band) 04:00-04:25 CDR, FE-2 Prep for Work 04:00-04:15 FE-1 Prep for Work 04:15-04:30 FE-1 Private medical conference with Physical Exercise specialist (S-band) 04:25-04:55 FE-2 Crew Medical Officer (CMO) proficiency training Disconnect SKV1 Heat Exchanger Unit [БТА] from Compressor and condenser 04:30-05:30 FE-1 unit. Tagup (S-band) 04:40-05:40 CDR Physical Exercise (RED) 05:00-05:10 FE-2 Carbon Dioxide Monitoring Set up 05:25-05:45 FE-2 EarthKAM – Earth study. EarthKAM hardware stow 05:45-06:30 FE-2 LAB window inspection 05:45-05:55 FE-1 On MCC Go: Demate СКВ1 БТА telemetry connectors from БИТС2-12 05:55-08:40 CDR, FE-1 СКВ1 Heat Exchangers Unit [БТА] R&R. Tagup (S-band) 06:30-06:45 FE-2 Rebooting all PCS (weekly) 07:15-08:40 FE-2 OUM-PFE – hardware installation 08:40-08:50 FE-1 On MCC-M GO Mate СКВ1 БТА Telemetry Connectors [ТМИ] to БИТС2-12 08:40-09:10 FE-2 OUM-PFE – evaluation protocol 08:40-09:10 CDR OUM-PFE - operator 08:50-09:50 FE-1 Physical Exercise (VELO+RED) day 1 09:10-09:45 FE-2 OUM-PFE deactivation and stowage 1 09:20-09:50 CDR Stow US tools post-EVA (RS) 09:45-09:50 FE-2 On MCC Go ISS O2 repress from Progress 358 СрПК (start) 09:50-10:50 . LUNCH 10:50-10:55 FE-2 ISS O2 repress from Progress 358 СрПК (terminate) 10:50-11:50 FE-1 Closeout ops after БТА СКВ1 changeout. Tagup (S-band) 10:50-11:50 CDR Stow US tools post-EVA (RS) 10:55-11:15 FE-2 IMS update 11:15-11:25 FE-2 OUM-PFE Laptop power down 11:40-12:10 FE-2 СОЖ Maintenance Post-EVA SM ПхО and DC1 Reconfiguration and Tool Stowage. Tagup as necessary (S-band ) 11:50-12:50 CDR, FE-1 In-flight comm procedure from DC1 Return to nominal comm config 12:10-12:25 FE-2 Set up video equipment to record RED exercise 12:25-13:25 FE-2 Physical Exercise (RED) 12:50-14:20 FE-1 Physical Fitness Evaluation (on treadmill) 12:50-14:20 CDR Physical Exercise (CEVIS) 13:25-13:40 FE-2 Stow video equipment used to record the RED exercise 13:40-13:50 FE-2 Terminate EMU Metox Regeneration 13:50-14:00 FE-2 Start EMU Metox Regeneration 14:00-14:35 FE-2 Evening work prep 14:20-14:50 CDR Crew Medical Officer (CMO) proficiency training 14:20-14:50 FE-1 Evening work prep 14:35-14:45 FE-2 Carbon dioxide monitor stow 14:45-14:50 FE-2 Transfer TVIS/RED/CEVIS/HRM data to MEC 14:50-15:05 Daily Planning Conference (S-band) 15:05-15:30 Evening work prep 15:30-16:00 DINNER 16:00-16:30 Daily Food Prep 16:30-17:30 Pre-sleep 17:30-02:00 SLEEP ТБУ (Universal Bioengineering Thermostat). Temperature check Task List FE-1 URAGAN. Observation and photography Note: See OSTP for references to US activities. End of Radiogram