Sie sind auf Seite 1von 1

Legend

LOCAL AREA BOUNDARY


Attachment 4: Infastructure Upgrades BT1
PROPOSED STORM TUNNEL
Scenario 3 PROPOSED SEWER CONNECTION TO TUNNEL (SHAFT)

PROPOSED STORM SEWER


(SIZED FOR 100 YEAR RETURN PERIOD)

ML1 PROPOSED STORM SEWER


KN2
(SIZED FOR 5 YEAR RETURN PERIOD)
CL1
BM1
NM1
PROPOSED DOWNTOWN INTENSIFICATION STORM
TUNNEL (OTHER PROJECT)
GG1
DW1
DW2
WT1 KT1
EXISTING STORM PIPES IN COMBINED AREAS
CA1

CA-SS1
LA-SS1 KD1
PROPOSED SWALE
KI1

TUN10-113AST(A)
KI-SS1
LA2
AL1
PROPOSED SWMF IN SURPLUS SCHOOL SITE
IH1
DL-SS1

IVER
EW-SS1
SB1
BC3 PROPOSED SWMF IN GREEN SPACE / SCHOOLYARD

NR
WW-SS1 NT1
DC1
EW-SS2 MR-SS2 NT-SS1 BC2
SEWER SEPARATION AREAS (VARIOUS COLOURS)

A
HEW
TUN08-118AV TUN09-118AV

HL-SS1
ROAD RE-GRADE

ATC
WC1 AA-SS3 BV1
IG1
AA-SS1 AV HL-SS2
PD-SS2 -112

TUN09-101ST
BV-SS1 TUN12
SA-SS1

ASK
S3
AA-SS2 PD-SS1 HL-S

TH S
IG2
VP-SS1

QM-SS3 MC-SS2

NOR
HP1
MQ1
QM2 QM1
CM-SS1 MC-SS1 1:2 YEAR (APPLIED THROUGHOUT STUDY AREA)
QM-SS2
QM-SS1

BY-SS1 FH-SS1
FP1
FP3 FP2
RV3 FH-SS3 GB1
GR1

OL-SS1 FH-SS2
RV1 RV2 TH-SS1

CD3 FH-SS4 FH1


CD4
NOR

TUN05-91ST(A)
CD2
TH S HR-SS1
ASK RD4 CD1 SE-SS2
ATC TUN05-95AV
1:50 YEAR
H EWA RD1 OW1

TUN05-91ST(B)
NR (~5km2)
RD2 RD3 SE-SS3 OW-SS1 OW-SS2
WP1 IVER BD-SS2
HR-SS2
WP2
WM1 IW-SS1

TUN03-105ST
IW1
GN-SS3 SC-SS2 SC-SS3 BD-SS1
SC-SS1 KW1
TUN03-83AV(A) TUN03-83AV(C) KW-SS1
TUN03-83AV(B)

GN-SS2 RC-SS2

GN-SS4
BR1
RC1

QA-SS1
RC-SS1

TUN03-GATBLV
RC2
MK-SS1
RC3
LB1 MK1
BR2
CW3 RT1
CW2 TUN02-72AV QA-SS2

CW1 HD2

CW4 GH1 PA1

OP2 AD1
AD-SS1
IV-SS1
SAMPLE STORM CELL
BS1
OP1
Prepared By:
PV-SS1 PV-SS2
GP1

BG1

RH1 BS2 EP2


LD1 EP1
MP1

AG2
RP1
BH1
Client:
RR1 DG1
WE1
AG1
GF1
WE2
HE1
GF2
FN1

CC1 SG1
SH1
R

BQ3 ES1
VE

BQ2 BQ1
Project:
RI

BQ4
CITY-WIDE FLOOD MITIGATION STRATEGY
AN
EW

KH1
FRAMEWORK DEVELOPMENT
CH

KH2
AT
SK

Title: RECOMMENDED IMPROVEMENT CONCEPT -


SA

1:100 YEAR CLOUDBURST RAINFALL


H
RT
NO

(~5km2)
Scale: Figure:

1:90,000 -

Das könnte Ihnen auch gefallen