PT. GUTEG HARINDO is a consulting firm incorporated in Indonesia with particular strength in
power and energy, transportation, architecture and engineering, urban and regional development,
environment, agriculture, and education and training. Since its establishment in 1985 PT. GUTEG
HARINDO has expanded steadily and has performed numerous projects funded by either government
or international funding agencies such as the World Bank, the Asian Development Bank, JBIC, USAID,
etc.
PT. GUTEG HARINDO presently has a full-time professional staff of about 40 Indonesians
representing various fields of expertise. The home office is centrally located in Jakarta, with regional
and project offices in most provinces throughout Indonesia. The firm's computer center provides
support services in engineering design and analysis, computer-aided design and drafting (CADD),
project management, and project benefit monitoring and evaluation (PBME).

SCOPE OF SERVICES
Transportation Engineering & Planning Evironmental Protection
E Feasibility Study E Environmental Impact Analysis
E Transportation Planning E Evaluation and Assessment
E Traffic Engineering E Environmental Study
E Highway Planning and Design E Strategy and Policy Development
E Bridge and Flyover Design
E Harbour Engineering
E Construction Supervision Training and Institutional Development
E Curriculum Development
Urban and Regional Development E In-country & Overseas Training Management
E Strategy and Policy Development E On-the-job Training
E Feasibility and Appraisal Studies E Institution Strengthening
E Urban and Rural Planning E Training Master Plan Development
E Institutional and Organizational Strengthening
E Urban Infrastructure Engineering & Design

BOARD OF TRUSTEES
COMMISSIONER
Henni Ishak (Ennie)

PRESIDENT DIRECTOR
Paulus Wawolumaya, Ir. in Civil Engineer from Bandung Institute of Technology, Bandung; and M.Sc. In Highway
Engineering from Bandung Institute of Technology, Bandung

DIRECTOR
Harry Djajadi, Ir. in Architecture from Trisakti University, Jakarta.
Organization Chart
PT. GUTEG HARINDO
BOARD OF DIRECTORS
Assistant Director
Operations &
Contract Management

PT. GUTEG HARINDO


Administration Financial Projects Operation Marketing
Manager Manager Manager Manager

General Affairs Personnel Adm. Financial Project Quality Marketing


Accountant Assurance
Adm. Officer Officer Officer Officers Officers Staff

Book
Cashier Invoice Keeper Projects On-Going
PT. GUTEG HARINDO

TRANSPORTATION ENGINEERING AND PLANNING


PT. GUTEG HARINDO has accumulated substantial strength in the field of
transportation with extensive experience gained from various national and
international client's commissions all aspects of transportation project including:
l Highway design and construction supervision, capacity expansion study, pavement condition
surveys, road inventory survey.
l Transport planning, traffic modeling and forecasting, transport economics, investment planning and
infrastructure development programming including new transport facilities
as well as rehabilitation of extension of existing facilities.
l Transport infrastructure investigation and analyses including soils and
material surveys, geotechnical investigation, hydrological and hydraulic
surveys, drainage, environmental impact assessment, and surveys and
mapping.
l Technical, economic and financial feasibility studies, preliminary and detailed
engineering design, cost estimation, preparation of tender documents, bid evaluation, construction
supervision, contract administration, project management, quality control, procurement,
maintenance, institutional development and training, and technical assistance.

Significant Experience
Supervision of Reconstruction of Tangerang-Merak Toll Road
Technical Audit on Implementation of Tangerang-Merak Toll Road Reinvestment Plan
Supervision of the Tanjung Priok Access Road Construction Project under JBIC Loan IP-
531
Land Acquisition and Resettlement Action Plan for Regional Roads Development Project
Study on Supply Chain of Portland Cement in Indonesia
Software Modification and Improvement on Indonesia Bridge Management System
(BMS)
Feasibility Study of Kuta-Tanah Lot-Soka-Seririt Road Project
Performance Evaluation on Road projects Implementation under the Directorate of Roads and Bridges Western
Region
Consulting Services for Procurement Advisor under Strategic Road Insfrastructure
Project (SRIP)
Project Preparation Technical Assistance (PPTA) for Regional Roads Development
Project
Trans Sulawesi West Corridor Road Development Project, North Sulawesi
Engineering Design of Jayapura Ring Road (50 Km) at Kabupaten Jayapura
Consulting Services for Technical Assistance for Toll Road Investment Evaluation
Technical Assistance for Preparation for The Establishment of Road Board and Road
Fund, Eastern Indonesia Region Transport Project (EIRTP) under IBRD Loan No. 4643-IND
Urban Road Network Development Study in Kalimantan, Java and Bali
Road Network Improvement Study in Flores Island
Land Transportation Management (Model Implementation on Urban Roads Management System)
Strategic Planning for Sumatera East Coast Highway Project
Technical Assistance for Preparation for a Road Fund Demonstration Project in Indonesia
Technical Assistance for Preparation of Road Rehabilitation (Sector) Project
Urban Transport Study for Strategic Urban Road Improvement Project
Northern Java Road Improvement Project
Land Transport Development Plan
Feasibility Study and Final Engineering Design for Road Capacity Expansion Project
Feasibility Study of Cikampek Cirebon Toll Road
Feasibility Study of Cirebon Batang Toll Road
Bandar Lampung Urban Road and Transportation Study
Jakarta South Outer Ring Road Traffic Study
PT. GUTEG HARINDO

URBAN AND REGIONAL DEVELOPMENT


PT. GUTEG HARINDO offers a multidisciplinary approach to urban and regional
development planning. The firm's areas of expertise include integrated urban
infrastructure development programming, impact analysis of environmental, social
and economic factors affecting development, municipal finance and budgeting, revenue generation,
urban information systems and urban housing. Employing state-of-the-art planning and management
techniques. PT. GUTEG HARINDO develops innovative project designs, programs and
implementation guidelines. The firm's activities in urban and regional development have proven
successful in addressing existing and future needs.
Significant Experience
Land Acquisition and Resettlement Action Plan for Sumatera-Java Interconnection Transmission
Project
Consultant Service for Strategic Structural Plan for Kuta (IBRD Loan No. 4155)
National Urban Development Study (NUDS) Project Degrading Transportation Sub
Contract
Coordinated Local Environmental Action Network (CLEAN -URBAN Project
Malang East Java)
Urban Institutional and Manpower Development Study
Municipal Finance Project Ministries of Finance, Home Affairs and Public Works
Master Plan of the City of Jakarta (1985 2005) in the Sector of Economy and Socio-Culture
Demonstration Project for Institutional Development of PDAM West Java
Preparation Project Establishment PDAM Tangerang West Java
Yogyakarta Urban AGRICULTURE & WATERSupport
Infrastructure Management RESOURCES ENGINEERING
Consultancy Advisory Services Project Implementation and Urban Management Support to PPMO and
PPMU in DI Yogyakarta
Consultancy Advisory Services Project Implementation and Urban Management Support to PPMO and
PPMU in DI Yogyakarta (Extension)
Preparation of Second Stage Implementation Program West Java UDSP SPAR
Preparation of Memorandum Program PSD-PU-Cipta Karya Prop. D.I.Y.
Project Policy and Strategic
Second West Java and Sumatera Strategic Cities Urban Development (Sector)
Project (WJD-SCUDP 2) SPAR/DED
Revenue Improvement Action Plan (RIAP) Implementation Advisory, Semarang
Surakarta Urban Development Project, Kodya Surakarta Planning Advisory
Preparation of Technical Guidelines for Medium Term Program of Local Governments -P3KT Guidelines
PJM
Urban Housing Policy Studies, Nation-wide Housing supply & demand/Policy recommendation Ministry of
Housing/World Bank
Yogyakarta Urban Development Programme Planning/Design/Institutional Strengthening
I n t eg r a t e d U r b a n I n f r a s t r u c t u r e D eve l o p m e n t P r og r a m m e ( I U I D P ) fo r M a t a r a m
Planning/Design/Institutional Strengthening
Integrated Urban Infrastructure Development Programme (IUIDP) for Aceh, Riau, Jambi, Bengkulu and
Lampung Planning/Design/Institutional Strengthening
Integrated Urban Infrastructure Development Programme (IUIDP) for North Sumatera, West Sumatera and
South Sumatera Planning/Design/Institutional Strengthening
Integrated Urban Infrastructure Development Programme (IUIDP) for the City of Bandar Lampung
Planning/Design/Institutional Strengthening
Integrated Urban Infrastructure Development Programme (IUIDP) Training Extension Package-D :
Sumatera Training
Consultancy Assistance Services for IUIDP Training: SCUDP West Java and Sumatera Training
Project Benefit Monitoring and Evaluation Small Towns Sanitation Project Monitoring and Evaluation
Survey of Private Sector Participation in Selected Cities in Indonesia -USAID
PT. GUTEG HARINDO

Environmental Protection
The issue of environmental study is not new to PT. GUTEG HARINDO. The firm has
carried out various environmental impact analyses in its projects relating to urban and
regional development, architecture, engineering and transportation projects. In these
impact studies, PT. GUTEG HARINDO examines social, cultural, economic, physical and ecological
effects of development work. The firm is committed to protecting the environment and ecological
balance while encouraging the implementation of development projects.

Significant Experience
Technical Assistance for Improving Management of Environmental and Socio Cultural Impacts of
Road Development in Sensitive Areas, including Treatment of Isolated Vulnerable People
Feasibility Study and Final Engineering Design and Environmental
Impact Assessment for Road Capacity Expansion Project (Phase II),
under IBRD Highway Sector Investment Project (HSIP) Loan No. 31712
IND
Management and Conservation of Tropical Forest Ecosystems and
Biodiversity
Feasibility Study and Environmental Impact Assessment of Rural Roads
Development Project in Lolak and Sang Tambolong
Consulting Services for BAPEDAL Training Program, BAPEDAL
Development Technical Assistance Project (BDTAP)
Study on Catchment Preservation and on Environmental Impact of the Water Supply Project of
Bandung and Sukabumi, West Java
Training of Regional Planning Board staff on ecological and environmental impacts of
infrastructure development
Environmental impact studies for university campus development to predict effects and to prepare
impact anagement and monitoring plans
Institutional development and establishment of pollution monitoring and control authorities in
North Sumatera and West Kalimantan
Forestry Environmental evaluation study for HPH (Hak Pengusaha Hutan) in Riau Province

TRAINING AND INSTITUTIONAL DEVELOPMENT


PT. GUTEG HARINDO has versatile experience in various planning assignments
including that for education. Our experts are multidisciplinary by training and are
outstanding in their respective fields of expertise. With these highly qualified in-house
experts of education system planning, the firm is actively involved in education software planning,
training program management for trainers as well as for administrative personnel and others. PT.
GUTEG HARINDO works on a principle that education planning in its application requires feed-
back and modifications in such a way that the technology to be benefited is based on unique
characteristics and condition of particular education institution concerned, as well as its long and
short term needs. The existing data and information serves as main input in diagnosing needs and
Formulating scope for all aspects of planning possibilities. PT. GUTEG HARINDO believes that
good scheme can only be crystallized close cooperation between the Institution and the Consultant.

Significant Experience
Study and Preparation of Guidelines of Standard Operations Procedure for Road Ledger
Consulting Services in Training of Road and Bridge Works Capacity Building
Study on Job Title and Preparation of Work Competency Standard and Training Material for Road,
Bridge and Building
PT. GUTEG HARINDO

Study of Construction Industry Training


Bina Marga's Master Training Plan
Management Training needs assessment for Ministry of Education
Review and up-grading of training program for Ministry of Public
Works
In-service/on the job training in regional planning
Assessment of the degree to which local government institutions are able to implement urban
development policy. Formulation of proposals for institutional and human resources development
for these government agencies
Formal and informal (on the job) training in integrated urban infrastructure development
Training for planning board staff to assess environmental impact of infrastructure development
Development of interactive computer training modules for an employment and income
distribution model
Marine science master training plan and its implementation

LIST OF CLIENTS
International National
E World Bank E Ministry of Public Works
E Asian Development Bank (ADB) E Ministry of Communications
E United Nations Development Program (UNDP) E Ministry of Home Affairs
E United States Agency for International E Ministry of Agriculture
Development (USAID) E Ministry of National Education
E Australian Agency for International Development E Ministry of Mining and Energy
(AUSAID) E Ministry of Forestry
E Korean Government E The National Planning Board (BAPPENAS)
E Canadian International Development Agency E Coordinting Ministry of Economic Affairs
(CIDA) E City Government of Jakarta
E Japan International Cooperation Agency ( JICA) E State Toll Road Corporation ( Jasa Marga)
E Japan Bank for International Cooperation ( JBIC) E Various private sector clients

COLLABORATION WITH INTERNATIONAL CONSULTANTS


E AUSTRALIA : GHD Pty Ltd
E CANADA : ND Lea Inetrantional Ltd
MMM Group Ltd
E DENMARK : Grontmij|Carl Bro A/S
E FRANCE : BCEOM
E GERMANY : Dorsch Consult
Gitec Consult
E ITALY : C. Lotti Associati
E JAPAN : Katahira & Engineers International
E KOREA : Korean Consultants International
E TAIWAN : Sinotech
CECI
E UNITED KINGDOM : Mott MacDonald Ltd
WSP International
E USA : SECID
De Leuw Carter International

6
I. Data Pengalaman Perusahaan 10 (sepuluh) tahun terakhir untuk pekerjaan sejenis

Pemberi Tugas/ Pejabat Pembuat Komitmen Kontrak Tanggal Selesai Menurut


BA serah terima
Sub Bidang pekerjaan/Surat
No. Nama Paket Pekerjaan Lokasi
Pekerjaan Nama Alamat dan Telepon No dan Tanggal Nilai (Rp.) Kontrak Keterangan
Panyelesaian
Pekerjaan
1 2 3 4 5 6 7 8 9 10

Jasa Enjiniring
Kuasa Pengguna
Fase Konstruksi Jalan Prof. DR. Hazairin,
Pengawasan Jasa Konsultansi Anggaran Bidang Bina 602.1/ 625 /B.IV/DPU/2013
1 dan Instalasi Bengkulu SH No. 901 Bengkulu 149,627,000 12/24/2013 12/24/2013
Pembangunan Jembatan Air Aur Marga Dinas PU Propinsi Tgl. 15 Juli 2013
Pekerjaan Tek. Telp. (0736) 22328-21139
Bengkulu
Sipil Transportasi

Technical Support for


Implementation of the Provincial Jasa Nasehat/Pra-
Sun Micro Building Suite
Road Improvement and Desain dan Disain
Nusa Tenggara 2, Level 1, 243 ABN 32 065 440 619
2 Maintenance (PRIM) Enjiniring SMEC/AusAID 30,127,493,000 30/06/2015 -
Barat Northbourne Avenue Tgl. 11 Juli 2013
Project Implementation Unit Pekerjaan Teknik
Lyneham ACT 2602
Consultant (PIUC) Service - IndII Sipil Transportasi
Activity T252.03

Jasa Enjiniring Jl. Jatipadang Poncol No.


Fase Konstruksi 38
Pengawasan Pelaksanaan Jalan Jakarta dan SNVT P2JN Kota HK.02.03/P2JNKMJ/08;
3 dan Instalasi Pasar Minggu - 1,918,757,000 22/10/2013 -
Nasional Metropolitan XV Jakarta Tangerang Metropolitan Jakarta Tgl. 07 Maret 2013
Pekerjaan Tek. Jakarta Selatan;
Sipil Transportasi Telp. (021) 7802568

Jasa Enjiniring Jl. Wolter Monginsidi No.


Pengawasan Teknis Jalan Bukit Fase Konstruksi 220
SNVT P2JN Prov. 14/KTR-PW/P2JN/2013;
4 Kemuning - Bts. Kota Kotabumi, Jl. dan Instalasi Lampung Teluk Betung - 788,411,000 16/09/2013 -
Lampung Tgl. 15 Maret 2013
Raden Intan (kotabumi) (PW-14) Pekerjaan Tek. Bandar Lampung;
Sipil Transportasi Telp. (0721) 472591

Paket 10, Pengawasan Teknis Jalan


Nasional Prov. Jambi :
- Berkala Jln Sei Bengkal - Bts. Kab. Jasa Enjiniring
Batanghari/Kab. Tebo (4,5 Km) Fase Konstruksi Jl. MT. Haryono No. 14
KU.03.01/P2JN-JBI/203;
5 - Berkala Jln Bts. Kab. dan Instalasi Jambi SNVT P2JN Prov. Jambi Telanaipura; 868,367,000 20/09/2013 -
Tgl. 11 Maret 2013
Batanghari/Kab. Tebo - Muara Pekerjaan Tek. Telp. (0741) 63808
Tembesi (3,5 Km) Sipil Transportasi
- Pnk. Batas Kab. Batanghari/Kab.
Tebo - Muara Tembesi (8 Km)

Jasa Manajemen
Satker Direktorat Bina Jl. Pattimura No. 20
Kajian Manfaat Pinjaman Luar Proyek Terkait
Program; Kebayoran Baru, KU.03.01/SP/PKLN/III/2013/19
6 Negeri Untuk Penanganan Jalan dan Konstruksi Jakarta 887,590,000 18/10/2013 -
Kegiatan Pembiayaan dan Jakarta 12110, Tgl. 18 Maret 2013
Jembatan Pekerjaan Teknik
Sipil Transportasi Kerjasama Luar Negeri Telp. (021) 7248870

Jasa Nasehat/Pra- Jl. Manado-Bitung


Desain dan Disain PPK Seksi Perencanaan KM 14, Suwaan,
HK.02.03/BPJN XI/PPK 02/13
7 Kalibrasi NAASRA Enjiniring Sulawesi Utara dan Pelaksanaan; Kec. Kalawat 95378 788,667,000 30/09/2013 30/09/2013
Tgl. 04 April 2013
Pekerjaan Teknik BPJN XI Sulawesi Utara Telp. (0431) 891203
Sipil Transportasi

PT. Guteg Harindo Hal 1 dari 9


Pemberi Tugas/ Pejabat Pembuat Komitmen Kontrak Tanggal Selesai Menurut
BA serah terima
Sub Bidang pekerjaan/Surat
No. Nama Paket Pekerjaan Lokasi
Pekerjaan Nama Alamat dan Telepon No dan Tanggal Nilai (Rp.) Kontrak Keterangan
Panyelesaian
Pekerjaan
1 2 3 4 5 6 7 8 9 10

Jasa Nasehat/Pra-
Jl. Pattimura No. 20,
Desain dan Disain Satker Sekretariat Pengatur KU.03.01/SAT-
Kajian Pembulatan Perhitungan Kebayoran Baru,
8 Enjiniring Jakarta Jalan Tol; SPJT/SPK/SESTARIF/IV/100413.16 1,635,920,000 10/12/2013 -
Penyesuaian Tarif Tol Jakarta 12110
Pekerjaan Teknik Badan Pengatur Jalan Tol Tgl. 15 April 2013
Telp. (021) 7258063
Sipil Transportasi

Jasa Manajemen
Satker Direktorat Bina Jl. Pattimura No. 20
Evaluasi Efisien dan Efektifitas Proyek Terkait
Program; Kebayoran Baru, 450/SPK/PSEK/III/2013
9 Alokasi Anggaran Penyelenggaraan Konstruksi Jakarta 746,130,000 31/10/2013 -
Kegiatan Pengembangan Jakarta 12110, Tgl. 25 Maret 2013
Jalan Pekerjaan Teknik
Sistem dan Evaluasi Kinerja Telp. (021) 7210371
Sipil Transportasi

Jasa Manajemen
Kajian Rantai Pasok Material Beton Lt. 13 Jl. Pattimura
Proyek Terkait
Pracetak Untuk Mendukung Satker Pusat Pembinaan No. 20, Keb. Baru, KU.02.08-Ki.3/V/914
10 Konstruksi Jakarta 630,762,000 20/11/2013 -
Peningkatan Efisiensi Dan Efektifitas Sumber Daya Investasi Jakarta Selatan 12110 Tgl. 20 Mei 2013
Pekerjaan Teknik
Penyelenggaraan Konstruksi Sipil Transportasi Telp. (021) 7226179

Add. Kontrak :
Jasa Nasehat/Pra-
Penyelenggaraan Workshop Gedung Karya PL.102/12/1.A/SATKER-LLAJ/2013
Desain dan Disain
Sosialisasi dan Penyusunan Kementerian Perhubungan Jl. Merdeka Barat N0. 8 Tgl. 10 Mei 2013
11 Enjiniring Jakarta 2,000,000,000 3/11/2013 -
Peraturan Pemerintah yang Terkait Dirjen Perhubungan Darat Jakarta 10110 Kontrak :
Pekerjaan Teknik
dengan UU No. 22/2009 Sipil Transportasi
Telp. (021)3506138 PL. 102/11/20/SATKER-LLAJ/2013
Tgl. 8 Mei 2013

Penyusunan Rancangan Standar


Kompetensi Kerja Nasional
Pendidikan/
Indonesia (RSKKNI), Kurikulum Satker Pusat Pembinaan Jl. Sapta Taruna Raya
Pengembangan
Pelatihan Berbasis Kompetensi Kompetensi dan Pelatihan Komplek PU Pasar Jumat 05//Kontrak/PPK2/Kt/2013
12 Kurikulum dan Jakarta 732,082,000 13/11/2013 13/11/2013
(KPBK), dan Materi Uji Kompetensi Konstruksi; Badan Jakarta Selatan 12310 Tgl. 15 Mei 2013
Metodologi
(MUK) Bidang Keahlian Konstruksi Pendidikan Pembinaan Konstruksi (021) 7656532
Bidang Bina Marga
(Paket 2)

Penyusunan Rancangan Standar


Kompetensi Kerja Nasional
Pendidikan/
Indonesia (RSKKNI), Kurikulum Satker Pusat Pembinaan Jl. Sapta Taruna Raya
Pengembangan
Pelatihan Berbasis Kompetensi Kompetensi dan Pelatihan Komplek PU Pasar Jumat 02//Kontrak/PPK2/Kt/2013
13 Kurikulum dan Jakarta 732,082,000 13/11/2013 13/11/2013
(KPBK), dan Materi Uji Kompetensi Konstruksi; Badan Jakarta Selatan 12310 Tgl. 15 Mei 2013
Metodologi
(MUK) Bidang Ketrampilan Pendidikan Pembinaan Konstruksi (021) 7656532
Konstruksi Bidang Bina Marga
(Paket 5)

Penyusunan Dokumen Rencana General Manager PT PLN


Jl. Wijaya I No. 63, 006.Pj/613/ISJ/2012;
Kerja Pengadaan Lahan dan Sumatera Selatan, (Persero) Unit Induk
Kebayoran Baru, Jakarta Tgl. 29 Juni 2012
14 Pemukiman Kembali (LARAP) untuk Studi Lingkungan Lampung, Banten, Pembangunan Transmisi 2,844,974,000 31/05/2013 -
Selatan 12160 ; Amandemen - 4
Proyek Pembangunan Transmisi Jawa Barat Interkoneksi Sumatera
Telp. 021-7265158 Tgl. 14 Mei 2013
Interkoneksi Sumatera Jawa Jawa

PT. Guteg Harindo Hal 2 dari 9


Pemberi Tugas/ Pejabat Pembuat Komitmen Kontrak Tanggal Selesai Menurut
BA serah terima
Sub Bidang pekerjaan/Surat
No. Nama Paket Pekerjaan Lokasi
Pekerjaan Nama Alamat dan Telepon No dan Tanggal Nilai (Rp.) Kontrak Keterangan
Panyelesaian
Pekerjaan
1 2 3 4 5 6 7 8 9 10

Penyusunan SKKNI, KPBK, MUK Pendidikan/


Pejabat Pembuat Jl. Sapta Taruna Raya,
Bidang Keahlian Jabatan Kerja Ahli Pengembangan
Komitmen Pembina Komp. Ps. Jum'at, Jakarta 04/KONTRAK/PPK2/Kt/2012;
15 Perencana Terowongan, Ahli Kurikulum dan Jakarta 1,188,225,500 11/30/2012 -
Kompetensi dan Pelatihan Selatan 12310 ; Telp. 021- Tgl. 1 Juni 2012
Keselamatan Jalan, Ahli Material Metodologi
Konstruksi 7656532
Engineering Pendidikan

Jasa Manajemen
Pejabat Pembuat
Proyek Terkait Jl. D.I. panjaitan Kav 12
Kajian Rantai Pasok Semen untuk Komitmen Satker Pusat KU.02.08-Ki.1/V/851;
16 Konstruksi Jakarta Lt. 6, Jakarta Timur ; Telp. 574,475,000 11/24/2012 -
mendukung Investasi Konstruksi Pembinaan Sumber Daya Tgl. 16 Mei 2012
Pekerjaan Teknik 021-85910617
Investasi
Sipil Transportasi

Jasa Konsultan Pengawasan Teknik Jasa Enjiniring Karawaci Office Park Blok
Paket 2 untuk Pekerjaan Fase Konstruksi H No. 66-68,
061/PJ/M-1/IV/2012;
17 Rekonstruksi Perkerasan Jalan dan Instalasi Tangerang-Merak PT Marga Mandala Sakti Lippo Karawaci 870,045,000 9/15/2012 -
Tgl. 12 April 2012
pada Jalan Tol Tangerang-Merak Pekerjaan Tek. Tangerang 15811,
Tahun 2012 Sipil Transportasi Telp. 021-55769412

Pengawasan Teknis Penanganan


Jembatan Wilayah Utara Jasa Enjiniring Kepala SNVT
Jl. Ir. Rustandi Sugianto
(Penggantian Jembatan Air Besi, Fase Konstruksi Prerencanaan dan
KM. 12+225 Pulau Baai KU.03.08/151/SNVT-P2JJ/2012;
18 Berkala Jembatan Ruas Ketahun- dan Instalasi NKRI (Bengkulu) Pengawasan Jalan 614,669,000 12/13/2012 -
Bengkulu ; Tgl. 02 April 2012
Sebelat, Bintunan-Lasai dan Pekerjaan Tek. Nasional Provinsi
Telp. 0736-52436
Jembatan Ruas Kerkap-Pasar Sipil Transportasi Bengkulu
Pedati (Sungai Hitam) - PAKET 10

Pengawasan Teknis Penanganan


Jasa Enjiniring Kepala SNVT
Jalan Wilayah Utara - I (Berkala Jl. Ir. Rustandi Sugianto
Fase Konstruksi Prerencanaan dan
Jalan Bintunan-Lais, Rekonstruksi KM. 12+225 Pulau Baai KU.03.08/148/SNVT-P2JJ/2012;
19 dan Instalasi NKRI (Bengkulu) Pengawasan Jalan 606,158,667 10/29/2012 -
Jalan Lain-Kerkap dan Rekonstruksi Bengkulu ; Tgl. 02 April 2012
Pekerjaan Tek. Nasional Provinsi
Jalan Kerkap-Pasar Pedati) - Telp. 0736-52436
Sipil Transportasi Bengkulu
PAKET 07
Pejabat Pembuat
Jasa Manajemen
Komitmen Kegiatan Jl. Pattimura No. 20
Penyusunan Konsep Pedoman Proyek Terkait
Pengembangan Sistem Kebayoran Baru, Jakarta 435/SPK/PSEK/III/2012;
20 Pengembangan Sistem Manajemen Konstruksi DKI Jakarta 750,365,000 11/5/2012 -
dan Evaluasi Kinerja, Selatan 12110, Tgl. 30 Maret 2012
Kinerja Organisasi Pekerjaan Teknik
Satuan Kerja Direktorat Telp. 021-7210371
Sipil Transportasi
Bina Program

Jasa Enjiniring
Jl. Jatipadang Poncol No.
Pengawasan Pelaksanaan Jalan Fase Konstruksi Pejabat Pembuat
NKRI 38 Ps. Minggu, Jakarta KU.08.08/P2JNKMJ/III/2012/07;
21 dan Jembatan Nasional dan Instalasi Komitmen SNVT P2JN 1,547,315,000 11/28/2012 -
(Jawa Barat) Selatan 12540 ; Tgl. 29 Maret 2012
Metropolitan XVI Jakarta Pekerjaan Tek. Kota Metropolitan Jakarta
Telp 021-7802568
Sipil Transportasi
Pejabat Pembuat
Komitmen Kegiatan
Jasa Manajemen
Pembiayaan dan Jl. Pattimura No. 20
Penyusunan Konsep Dokumen- Proyek Terkait
Kerjasama Luar Negeri, Kebayoran Baru, Jakarta KU.03.01/SP/PKLN/III/2012/
22 Dokumen Kerjasama Pinjaman dan Konstruksi Jakarta 836,990,000 10/27/2012 -
Satker Dirketorat Bina 12110, 07.01; Tgl. 28 Maret 2012
Hibah Luar Negeri (PHLN) Pekerjaan Teknik
Program Dirjen Bina Telp. (021) 7248870
Sipil Transportasi
Marga Kementerian
Pekerjaan Umum

PT. Guteg Harindo Hal 3 dari 9


Pemberi Tugas/ Pejabat Pembuat Komitmen Kontrak Tanggal Selesai Menurut
BA serah terima
Sub Bidang pekerjaan/Surat
No. Nama Paket Pekerjaan Lokasi
Pekerjaan Nama Alamat dan Telepon No dan Tanggal Nilai (Rp.) Kontrak Keterangan
Panyelesaian
Pekerjaan
1 2 3 4 5 6 7 8 9 10

Jasa Manajemen
Sumatera, Jawa, Pejabat Pembuat Jl. Pattimura No. 20
Jasa Konsultansi Paket Pekerjaan Proyek Terkait
Sulawesi, Komitmen Pembinaan Wil Kebayoran Baru, Jakarta HK.02.03/SKDBPW.II/VII/2011/34;
23 Penyiapan Data-Data Jalur Lebaran Konstruksi 1,138,500,000 9/12/2011 9/12/2011
Kalimantan, Bali II, Satuan Kerja Dir Bina 12110, Tgl. 11 Juli 2011
(Paket-4) Pekerjaan Teknik
dan NTB Pelaksanaan Wil II Telp. (021) 72395725
Sipil Transportasi

Jasa Enjiniring Pejabat Pembuat


Jl. Iskandarsyah Raya No.
Jasa Konsultansi Audit Pelaksanaan Fase Konstruksi Komitmen Satuan Kerja KU.03.01/SAT-SPJT/SPK/PKT-
35 Kebayoran Baru,
24 Reinvestasi Jalan Tol Tangerang- dan Instalasi Tangerang-Merak Sekretariat Pengatur Jalan 11/VII/070711.11; 895,090,900 20/12/2011 20/12/2011
Jakarta 12160,
Merak (Paket-11) Pekerjaan Tek. Tol, Badan Pengatur Jalan Tgl. 07 Juli 2011
Telp. (021) 7257067
Sipil Transportasi Tol

Pejabat Pembuat
Jasa Enjiniring Jl. Pattimura No. 20 Gd.
Komitmen Kegiatan
Fase Konstruksi Makassar, Sapta Taruna Lt. 8
Pembinaan Kemampuan Tenaga Pembinaan Wilayah III, HK.02.03-34/DBPWIII/VI/2011;
25 dan Instalasi Jayapura, Ambon Kebayoran Baru, Jakarta 1,323,646,500 18/12/2011 18/12/2011
Pengawas Lapangan (Paket-5) Satuan Kerja Direktorat Tgl. 22 Juni 2011
Pekerjaan Tek. dan Manado 12110,
Bina Pelaksanaan Wil III,
Sipil Transportasi Telp. (021) 7396771
Dirjen Bina Marga
Kepala Satuan Kerja Non
Vertikal Tertentu
Jasa Manajemen
Pembinaan Administrasi Jl. Pattimura No. 20
Jasa Konsultansi Pekerjaan Proyek Terkait
Propinsi NAD dan dan Pelaksanaan Kebayoran Baru, Jakarta KU.03.01/SP/PHLN/VI/2011/
26 Bantuan Teknis Manajemen UP3 Konstruksi 555,500,000 5/1/2012 30/12/2011
Kepulauan NIAS Pengendalian PHLN, 12110, 114.11; Tgl. 17 Juni 2011
RRI (Paket-G2) Pekerjaan Teknik
Dirjen Bina Marga Telp. (021) 72398615
Sipil Transportasi
Kementerian Pekerjaan
Umum

Pejabat Pembuat
Jasa Manajemen
Komitmen Kegiatan Jl. Pattimura No. 20
Proyek Terkait
Jasa Konsultansi Modifikasi dan Pengembangan Sistem Kebayoran Baru, Jakarta 823/SPK/PSEK/VI/2011;
27 Konstruksi DKI Jakarta 1,211,562,000 30/12/2011 2/1/2012
Perbaikan Software BMS dan Evaluasi Kinerja, 12110, Tgl. 17 Juni 2011
Pekerjaan Teknik
Satuan Kerja Direktorat Telp. (021) 7210371
Sipil Transportasi
Bina Program

Pejabat Pembuat
Jasa Konsultansi Penyusunan
Pendidikan/ Komitmen Satuan Kerja
Modul dan Kurikulum Pelatihan
Pengembangan Pusat Pelatihan Jasa Jl. Sapta Taruna Raya,
Tukang Pasang Ubin, Tukang 11/KONTRAK/PPK/Kt/2011;
28 Kurikulum dan Nasional Konstruksi, Badan Komplek PU Ps. Jum'at, 1,149,010,500 15/06/2011 12/12/2011
Pasang Batu Bata, Tukang Tgl. 14 Juni 2011
Metodologi Pembinaan Konstruksi dan Jakarta Selatan
Tanaman pada Bangunan Gedung,
Pendidikan SDM, Kementerian
Pemasang Dinding Partisi
Pekerjaan Umum

Kepala SNVT P2JN NTB


Paket 09: Pengawasan Teknik Pengembangan Balai Pelaksanaan Jalan Jalan Pancaka No. 09A, KU.03.01/KONT/SNVT P2JN-
29 Pemeliharaan Jalan Pulau Sarana Provinsi NTB Nasional VIII, Dirjen Bina Kodya Mataram (NTB), NTB/210/2011; 533,659,000 16/10/2011 16/10/2011
Sumbawa 02 Transportasi Marga Kementerian Telp. 0370-649244 Tgl. 16 April 2011
Pekerjaan Umum

Jasa Konsultan Pengawasan Teknik Jasa Enjiniring Karawaci Office Park Blok
Paket 3 untuk Pekerjaan Jasa Fase Konstruksi H No. 66-68,
042/PJ/M-1/II/2011;
30 Pemborongan Rekonstruksi Jalan dan Instalasi Tangerang-Merak PT Marga Mandala Sakti Lippo Karawaci 1,601,050,000 31/12/2011 31/12/2011
Tgl. 23 Februari 2011
pada Jalan Tol Tangerang-Merak Pekerjaan Tek. Tangerang 15811,
Tahun 2011 Sipil Transportasi Telp. 021-55769412

PT. Guteg Harindo Hal 4 dari 9


Pemberi Tugas/ Pejabat Pembuat Komitmen Kontrak Tanggal Selesai Menurut
BA serah terima
Sub Bidang pekerjaan/Surat
No. Nama Paket Pekerjaan Lokasi
Pekerjaan Nama Alamat dan Telepon No dan Tanggal Nilai (Rp.) Kontrak Keterangan
Panyelesaian
Pekerjaan
1 2 3 4 5 6 7 8 9 10
Jasa Enjiniring
Consulting Services for Construction
Fase Konstruksi Directorate General of Jl. Pattimura No. 20,
Supervision of The Tanjung Priok KU.08.08/PJATP-CSK/XI/2010-01;
31 dan Instalasi Jakarta Highway Ministry of Public Kebayoran Baru, Jakarta 111,161,747,844 30/6/2015 -
Access Road Construction Project, Tgl. 23 November 2010
Pekerjaan Tek. Works Selatan 12110
Phase 2 under JBIC Loan IP-531
Sipil Transportasi

Penyusunan RSKKNI, Kurikulum Satker Pusat Pelatihan


Pendidikan/
Pelatihan Berbasis Kompetensi Jasa Konstruksi Pusat
Pengembangan Jl. Sapta Taruna Raya,
(KPBK) dan Materi Uji Kompetensi Pembinaan Kompetensi 04/KONTRAK/PK/PPJK/2010;
32 Kurikulum dan Jakarta Ps. Jum'at, Jakarta 856,394,000 20/11/2010 18/11/2010
(MUK) Jabatan Kerja Mekanik dan Pelatihan Konstruksi Tgl. 18 Mei 2010
Metodologi Selatan
Engine Tingkat Dasar, Ahli Hidrologi Kementerian Pekerjaan
Pendidikan
dan Tukang Bangunan Umum Umum

Pejabat Pembuat
Jasa Enjiniring
Komitmen SNVT Jl. Jatipadang Poncol
Fase Konstruksi KU.08.08/P2JJKMJ-
Pengawasan Preservasi Jalan dan Perencanaan dan No. 38 Pasar Minggu-
33 dan Instalasi Jakarta Bh/III/2010/04; Tgl. 1,917,485,000 15/12/2010 15/12/2010
Jembatan - II Pengawasan Jalan dan Jakarta Selatan 12540
Pekerjaan Tek. 30 Maret 2010
Jembatan Kota Telp. 021-7802568
Sipil Transportasi
Metropolitan Jakarta

Satker Direktorat Jalan


Jasa Enjiniring dan Jembatan Wilayah
Manajemen Konsultan Wilayah Fase Konstruksi Barat Kegiatan Pembinaan Jl. Pattimura No. 20, KU.08.02-SKDJJWB/SPK-
34 Barat Direktorat Jalan dan dan Instalasi Sumatera Pelaksanaan Jalan dan Kebayoran Baru, KMP/159; 8,392,076,000 15/12/2010 15/12/2010
Jembatan Wilayah Barat Pekerjaan Tek. Jembatan Wilayah Jakarta Selatan 12110 Tgl. 3 Maret 2010
Sipil Transportasi Sumatera, Dirjen Bina
Marga
Jasa Nasehat/Pra-
Disain dan Disain Bina Marga, Dinas
FS Jalan Kuta - Tanah Lot - Soka - 602.1/7901/DPU;
35 Enjiniring Denpasar, Bali Pekerjaan Umum Jl. Beliton No. 2 Denpasar 451,385,000 30/12/2009 30/12/2009
Seririt Tgl. 11 Nopember 2009
Pekerjaan Teknik Pemerintah Propinsi Bali
Sipil Transportasi

Satuan Kerja Direktorat


Jasa Enjiniring
Consulting Services for Bina Program Pejabat
Fase Konstruksi Jl. Pattimura No. 20,
Procurement Advisor (PAS) under Pembuat Komitmen 06-20/SRIP/TA/A/4834/08-09;
36 dan Instalasi Kalimantan Timur Kebayoran Baru, 7,235,831,900 17/11/2010 17/11/2010
IBRD Loan No. 4834-IND, Strategic Kegiatan Penyiapan Tgl. 18 Agustus 2009
Pekerjaan Tek. Jakarta Selatan 12110
Road Infrastructure Project (SRIP) Program dan Administrasi
Sipil Transportasi
Pinjaman Luar Negeri

Pejabat Pembuat
Penyusunan Modul Pelatihan
Pendidikan/ Komitmen Satuan Kerja
Jabatan Kerja Operator Gondola
Pengembangan Pusat Pelatihan Jasa Jl. Sapta Taruna Raya,
Pada Bangunan Gedung, Mandor 12/KONTRAK/PK/PPJK/2009;
37 Kurikulum dan Jakarta Konstruksi, Badan Ps. Jum'at, Jakarta 830,879,500 30/11/2009 30/11/2009
Pemasangan Rangka Atap Baja Tgl. 01 Juni 2009
Metodologi Pembinaan Konstruksi dan Selatan
Ringan dan Tukang Plambing Tahun
Pendidikan SDM, Departemen
2009
Pekerjaan Umum

Satker Direktorat Jalan


Jasa Enjiniring
dan Jembatan Wilayah
Evaluasi Kinerja Pelaksana Proyek Fase Konstruksi Jl. Pattimura No. 20,
Barat Kegiatan Pembinaan KU.08.09-SKDJJWB/SPK-1/367;
38 Direktorat Jalan dan Jembatan dan Instalasi Jawa Kebayoran Baru, 762,531,000 14/12/2009 14/12/2009
Pelaksanaan Jalan dan Tgl. 15 Mei 2009
Wilayah Barat Pekerjaan Tek. Jakarta Selatan 12110
Jembatan Wilayah Jawa,
Sipil Transportasi
Dirjen Bina Marga

PT. Guteg Harindo Hal 5 dari 9


Pemberi Tugas/ Pejabat Pembuat Komitmen Kontrak Tanggal Selesai Menurut
BA serah terima
Sub Bidang pekerjaan/Surat
No. Nama Paket Pekerjaan Lokasi
Pekerjaan Nama Alamat dan Telepon No dan Tanggal Nilai (Rp.) Kontrak Keterangan
Panyelesaian
Pekerjaan
1 2 3 4 5 6 7 8 9 10

Jasa Pengawasan Teknik Pekerjaan Jasa Enjiniring


Pelebaran Jalan dan Jembatan di Fase Konstruksi FE02.HK2.4 049 M.A.:14,62,
Plaza Tol Tangernag,
39 lokasi KM 00+375 - 00+627 (B) dan dan Instalasi Jakarta PT. Jasa Marga (Persero) 2413.31; 434,390,000 25/10/2009 25/10/2009
Banten-Indonesia
Jembatan Kali Grogol pada Jalan Pekerjaan Tek. Tgl. 27 April 2009
Tol Jakarta - Tangerang Sipil Transportasi

Jasa Nasehat/Pra-
Studi Sinergi Antara Jaringan Kereta Sekretariat Badan
Disain dan Disain
Api Perkotaan dengan Properti Jawa dan Penelitian dan Jl. Medan Merdeka Barat PL.102/14/7-BLT-2009;
40 Enjiniring 584,631,740 30/11/2009 30/11/2009
Pemukiman di Pulau Jawa dan Sumatera Pengembangan No. 8, Jakarta 10110 Tgl. 10 Maret 2009
Pekerjaan Teknik
Sumatera Perhubungan
Sipil Transportasi

Jasa Enjiniring Karawaci Office Park


Review Kondisi Stabilitas Lereng
Fase Konstruksi Blok H No. 66-68,
Badan Jalan Km. 56+700 dan Km. 183B/PJ/M-1/XI/2008;
41 dan Instalasi Tangerang PT. Marga Mandalasakti Lippo Karawaci 170,000,000 24/01/2009 24/01/2009
36+500 (arah merak) pada Jalan Tol Tgl. 28 Nopember 2008
Pekerjaan Tek. Tangerang 15811,
Tangerang - Merak Tahun 2008
Sipil Transportasi Telp. 021-55769412

Jasa Nasehat/Pra-
Studi Penyusunan Rencana Induk Satuan Kerja Peningkatan
Disain dan Disain 01-XI/KTR/PFPPP-MP/VIII/PHB-
(Master Plan) Pelabuhan Pada Semarang, Jawa Fungsi Pelabuhan dan Jl. Medan Merdeka Barat
42 Enjiniring 08; 353,650,000 15/12/2008 15/12/2008
Lokasi Pelabuhan Bawean Tengah Pengerukan Pusat, No. 8, Jakarta 10110
Pekerjaan Teknik Tgl. 15 Agustus 2008
Tahun 2008 Departemen Perhubungan
Sipil Transportasi

Pengawasan Teknik Pekerjaan


Jasa Enjiniring
Pemeliharaan Periodik Tahap I
Fase Konstruksi FE02.HK2.4.085 M.A. 17, 62,
Tahun 2008 Dengan Jaminan Plaza Tol Tangerang,
43 dan Instalasi DKI Jakarta PT. Jasa Marga 2815.31; 351,340,000 25/11/08 26/11/2008
Performa Selama 2 Tahun Lokasi Banten, Indonesia
Pekerjaan Tek. Tgl. 21 Juli 2008
Ruas Jalan Tol Pondok Ranji -
Sipil Transportasi;
Ulujami

ADB TA 7085-INO: Regional Roads


Asian Development Bank ADB FAX by. James P. Lynch,
Development - Engagement of PT.
44 Studi Lingkungan Kalimantan, Jawa Asian Development Bank Telp. (632)-632444, Fax Director, SETU, 10 Desember 708,000,000 12/10/2009 3/30/2010
Guteg Harindo for Land Studies
(632) 636-2015 2009
(LARAP RRDP)

Jasa Nasehat/Pra-
TA7085-INO : Preparing the Disain dan Disain Asian Development Bank
COSO/80-087;
45 Regional Roads Development Enjiniring Kalimantan, Jawa Asian Development Bank P.O. Box 789 0980 Manila 15,487,962,500 20/03/09 20/03/2009
Tgl. 7 Juli 2008
Project (LARAP RRDP) Pekerjaan Teknik Philippines
Sipil Transportasi

Public-Private Partnership for Urban


Jasa Nasehat/Pra-
Transportation Infrastructure
Disain dan Disain 093K/P2KDIPA-
Project, Pilot Project of Yogyakarta Coordinating Ministry for Jl. Lapangan Banteng
46 Enjiniring Yogyakarta 0021/M.EKON/06/2008; 812,075,000 15/12/2008 15/12/2008
City, Private Provision for Economic Affairs Timur No. 2-4, Jakarta
Pekerjaan Teknik Tgl. 12 Juni 2008
Infrastructure Technical Assisstance
Sipil Transportasi
(PPITA) IBRD Loan No. 4696-IND

Studi Jabatan Kerja dan Pendidikan/


Satker Pusat Pelatihan Jl. Sapta Taruna Raya,
Penyusunan RSKKNI, Kurikulum Pengembangan
Jasa Konstruksi, Komp. PU, Pasar Jum'at KU.08.08/PK/PPJK/10;
47 Berbasis Kompetensi dan MUK Kurikulum dan Jakarta 1,340,823,000 18/11/08 18/11/2008
Departemen Pekerjaan Jakarta Selatan 12310 Tgl. 2 Mei 2008
Bidang Pekerjaan Jalan dan Metodologi
Umum Telp. 021-7511847
Jembatan Pendidikan

PT. Guteg Harindo Hal 6 dari 9


Pemberi Tugas/ Pejabat Pembuat Komitmen Kontrak Tanggal Selesai Menurut
BA serah terima
Sub Bidang pekerjaan/Surat
No. Nama Paket Pekerjaan Lokasi
Pekerjaan Nama Alamat dan Telepon No dan Tanggal Nilai (Rp.) Kontrak Keterangan
Panyelesaian
Pekerjaan
1 2 3 4 5 6 7 8 9 10
Jasa Manajemen
Konsultan Manajemen Program dan Proyek Terkait Satker Pembinaan dan Jl. Pattimura No. 20,
KU.08.08/SP/P2APLN/24;
48 Anggaran Tahun 2008 dan 2009 Konstruksi Jakarta Pengembangan Program Kebayoran Baru, 6,440,790,400 31/12/09 31/12/2009
Tgl. 13 Pebruari 2008
( Multi Years) Pekerjaan Teknik Jalan dan Jembatan Jakarta Selatan 12110
Sipil Transportasi
Jasa Nasehat/Pra-
Disain dan Disain Jl. Tikala Ares No. 80
Perencanaan Teknis Jalan Lintas Satker Non Vertikal KU.08.08/Bt-P2JJ/386/2007;
49 Enjiniring Sulut Manado 215,572,000 30/11/07 30/11/2007
Tengah Sulut (23,52 Km) Tertentu P2JJ Sulut Tgl. 26 September 2007
Pekerjaan Teknik Telp. 0431- 857623
Sipil Transportasi
Jasa Nasehat/Pra-
Satker Pembinaan dan
Disain dan Disain Jl. Pattimura No. 20, KU.08.08/PPK-
Penyusunan DED Flyover Pinang Pengembangan Jalan
50 Enjiniring Sumut Kebayoran Baru, PPTJJ/PPJBHJK/IX/2007/21; 594,770,000 17/12/07 14/12/2007
Baris Medan Bebas Hambatan dan
Pekerjaan Teknik Jakarta Selatan 12110 Tgl. 17 September 2007
Jalan Kota
Sipil Transportasi
Jasa Manajemen
Manajemen Operasional Pilot Proyek Terkait Satker Standarisasi,
Jl. Medan Merdeka Barat 81D/KOTRAK/SPJTJ/VII/2007;
51 Project Jembatan Timbang di 3 Konstruksi Sumbar dan NAD Perencanaan Jaringan 4,143,387,000 31/12/07 31/12/2007
No. 8 Jakarta Tgl. 6 Juli 2007
Lokasi Sumbar dan 1 Lokasi NAD Pekerjaan Teknik Transportasi Jalan
Sipil Transportasi

Kegiatan Pengemb.
Jasa Nasehat/Pra- Sistem Data dan Informasi,
Jl. Pattimura No. 20,
Disain dan Disain Satker Pembinaan dan
Penyusunan SOP Leger Jalan 2007 Kebayoran Baru, 038/KTR/PPK-DATIN/APBN/2007;
52 Enjiniring Jakarta Pengemb. Program Jalan 386,520,200 11/11/2007 12/11/2007
(Paket D-1) Jakarta Selatan 12110 Tgl. 11 Juni 2007
Pekerjaan Teknik dan Jembatan, Ditjen Bina
Telp. 021-7210393
Sipil Transportasi Marga, Dep. Pekerjaan
Umum

Jasa Nasehat/Pra-
Disain dan Disain Jl. Tikala Ares No. 80
Perencanaan Teknis Jalan (70,95 Satker Non Vertikal KU.08.08/Bt-P2JJ/175/2007;
53 Enjiniring Sulawesi Utara Manado 479,268,000 26/10/2007 26/10/2007
KM) di Propinsi Sulawesi Utara Tertentu P2JJ Sulut Tgl. 25 April 2007
Pekerjaan Teknik Telp. 0431- 857623
Sipil Transportasi
Pusat Pembinaan
Pendidikan/ Kompetensi dan Pelatihan
Studi Jabatan Kerja Dan Jl. Sapta Taruna Raya,
Pengembangan Konstruksi, Badan
Penyusunan SKK, SLK, MUK dan Komp. PU, Pasar Jum'at KU.08.08/PK/PPJK04;
54 Kurikulum dan Jakarta Pembinaan Konstruksi dan 2,416,491,000 16/11/2007 16/11/2007
Materi Latih Berbasis Kompetensi Jakarta Selatan 12310 Tgl.16 April 2007
Metodologi Sumber Daya Manusia,
Bidang Ke-Cipta Karya-an Telp. 021-7511847
Pendidikan Departemen Pekerjaan
Umum

Jasa Nasehat/Pra-
Perencanaan Teknis Jalan (DED) Disain dan Disain
Jl. Sumatera No. 15 Dok 050.1/663.U;
55 Ring Road Jayapura (50 Km), di Enjiniring Papua Dinas PU Provinsi Papua 741,587,000 31/9/2007 31/9/2007
IV, Jayapura Tgl. 02 April 2007
Kabupaten Jayapura Pekerjaan Teknik
Sipil Transportasi

Jasa Enjiniring
Pengawasan Teknis Pembangunan Fase Konstruksi
Jl. Sumatera No. 15 Dok 050.1/663;
56 Jalan Kepi - Sumuraman dan Instalasi Papua Dinas PU Provinsi Papua 261,294,000 31/8/2007 31/8/2007
IV, Jayapura Tgl. 02 April 2007
(Dermaga), di Kabupaten Jayapura Pekerjaan Tek.
Sipil Transportasi

PT. Guteg Harindo Hal 7 dari 9


Pemberi Tugas/ Pejabat Pembuat Komitmen Kontrak Tanggal Selesai Menurut
BA serah terima
Sub Bidang pekerjaan/Surat
No. Nama Paket Pekerjaan Lokasi
Pekerjaan Nama Alamat dan Telepon No dan Tanggal Nilai (Rp.) Kontrak Keterangan
Panyelesaian
Pekerjaan
1 2 3 4 5 6 7 8 9 10
Technical Assistance for Improving
Management of Environmental and
Socio-Cultural impacts of Road Jasa Nasehat/Pra-
Directorate of Technical
Development in Sensitive Areas, Disain dan Disain Jl. Pattimura No. 20,
Affairs, Directorate 01-20/IMES/TA/A/4744/01-07;
57 including Treatment of Isolated Enjiniring Jakarta Kebayoran Baru, 5,837,690,000 30/6/2008 30/6/2008
General of Highways, Tgl. 12 January 2007
Vulnerable People (IMES) for Pekerjaan Teknik Jakarta Selatan
Ministry of Public Works
Second Eastern Indonesia Region Sipil Transportasi
Transport Project (EIRTP-2) Under
IBRD Loan No. 4744-IND

Perencanaan dan Pengawasan Jasa Nasehat/Pra-


Teknik Perbaikan Konstruksi Disain dan Disain Plaza Toll TMII,
Purwakarta, 14/SPP-DD/2006;
58 (stabilitas lereng) pada Jalan Tol Enjiniring PT. Jasa Marga Jakarta Timur 13550 1,045,436,700 25/8/2007 25/8/2007
Jawa Barat Tgl. 11 Juli 2006
Cipularang Tahap II Seksi 2 dan Pekerjaan Teknik Telp. 021-8413526
Seksi 4 Sipil Transportasi

Jasa Manajemen Pembinaan Manajemen


Jl. Pattimura No. 20,
Consulting Services in Training of Proyek Terkait Ke-Binamargaan, 03/PK/PMK/TRB/TA/A/
Kebayoran Baru,
59 Road and Bridge Works Capacity Konstruksi Jakarta Directorate General of 1798/1205; 7,458,310,000 31/3/2007 31/3/2007
Jakarta Selatan
Building ADB Loan No. 1798-INO Pekerjaan Teknik Highways, Ministry of Tgl. 12 December 2005
Telp. 021-7221950
Sipil Transportasi Public Works

Pusat Pembinaan
Pendidikan/ Kompetensi dan Pelatihan
Jl. Sapta Taruna Raya,
Pekerjaan Penyusunan SKK, SLK Pengembangan Konstruksi, Badan
Komp. PU, Pasar Jum'at KU.08.08-Hc/01;
60 dan MUK Materi Pelatihan Jalan & Kurikulum dan Nasional Pembinaan Konstruksi dan 2,031,729,700 31/12/2005 31/12/2005
Jakarta Selatan 12310 Tgl. 12 Agustus 2005
Jembatan dan Bangunan Gedung Metodologi Sumber Daya Manusia,
Telp. 021-7656532
Pendidikan Departemen Pekerjaan
Umum

Jasa Enjiniring
Pengawasan Teknik Pemeliharaan
Fase Konstruksi Plaza Toll TMII,
Perkerasan (Scrapping Filing dan Jakarta dan 45/SPP-DIR/2005;
61 dan Instalasi PT. Jasa Marga Jakarta Timur 13550 532,917,000 4/11/2006 4/11/2006
Pelapisan Ulang) pada Jalan Tol Banten Tgl. 11 Agustus 2005
Pekerjaan Tek. Telp. 021-8413526
Cawang-Tomang-Cengkareng
Sipil Transportasi;

Unit Pelaksana Kegiatan


Jasa Enjiniring Pembinaan Jalan dan
Fase Konstruksi Jembatan Tol, Satker Jl. Pattimura No. 20, KU.03.04.02/PPK-
Bantuan Teknis Evaluasi Penerusan
62 dan Instalasi Pulau Jawa Kantor Direktorat Jenderal Jakarta Selatan 12110, PJJT/VIII/030805.02; 11,186,708,500 15/12/2005 15/12/2005
Jalan Tol
Pekerjaan Tek. Bina Marga, Ditjend Bina Telp. 021-72793789 Tgl. 03 Agustus 2005
Sipil Transportasi Marga, Departemen
Pekerjaan Umum

Jasa Nasehat/Pra- Satker Standarisasi,


Pekerjaan Perencanaan Teknis dan Jl. Medan Merdeka Barat
Disain dan Disain Perencanaan Jaringan
Penetapan Pedoman Keselamatan No. 8 046E/Kontrak/SPJKTJ/ VII/2005;
63 Enjiniring Jakarta Keselamatan Transportasi 387,942,500 28/12/2005 28/12/2005
Sebagai Masukan Dalam Jakarta Pusat 10110 28 Juli 2005
Pekerjaan Teknik Jalan, Ditjen. Perhubungan
Pembentukan GRSP Telp. 021-3506135
Sipil Transportasi Darat

Jasa Enjiniring Proyek Perencanaan dan


Pekerjaan Pengawasan Teknis Fase Konstruksi Pengawasan Jalan dan Jl. Sumatera No. 15
AP.04.02/P3JJ-PUA/148/2004;
64 Jalan dan Jembatan Di Kabupaten dan Instalasi Papua Jembatan (P3JJ) Papua, Dok IV, Jayapura 620,117,000 2/11/2004 2/11/2004
Tgl. 02 Juni 2004
Merauke, Paket 09 Pekerjaan Tek. Ditjend Praswil, Telp. 0967-537698
Sipil Transportasi; Departemen Praswil

PT. Guteg Harindo Hal 8 dari 9


Pemberi Tugas/ Pejabat Pembuat Komitmen Kontrak Tanggal Selesai Menurut
BA serah terima
Sub Bidang pekerjaan/Surat
No. Nama Paket Pekerjaan Lokasi
Pekerjaan Nama Alamat dan Telepon No dan Tanggal Nilai (Rp.) Kontrak Keterangan
Panyelesaian
Pekerjaan
1 2 3 4 5 6 7 8 9 10
Jasa Nasehat/Pra-
Studi Pengembangan Sistem Bagpro Fasilitas Sistem Jl. Pattimura No. 20,
Disain dan Disain KU.08.08/201.1/BP.04-
Jaringan Jalan Sekunder Kalimantan, Jawa Jaringan Jalan Kota dan Kebayoran Baru,
65 Enjiniring FSJJKD/V/2004; 1,221,220,000 19/11/2004 19/11/2004
(Perkotaan) di Kalimantan, Jawa dan Bali Desa, Ditjend Praswil, Jakarta Selatan
Pekerjaan Teknik Tgl. 24 Mei 2004
dan Bali (Paket-D1) Dep. Kimpraswil Telp. 021-72793740
Sipil Transportasi
Jasa Nasehat/Pra- Proyek P3TJJ Wilayah
Perbaikan Jaringan Jalan di Pulau
Disain dan Disain Timur, Direktorat Jl. Pattimura No. 20,
Flores, Provinsi Nusa Tenggara KU.08.08/P3TJJ-WT/V/03/2004;
66 Enjiniring Flores Prasarana Wilayah Timur, Kebayoran Baru, 432,366,000 5/9/2004 5/9/2004
Timur di Lokasi Rawan Bencana, Tgl. 05 Mei 2004
Pekerjaan Teknik Ditjend Praswil Timur. Jakarta Selatan
Paket III
Sipil Transportasi Dep. Kimpraswil
Pimpro Peningkatan
Jasa Nasehat/Pra- Fungsi Kawasan
Penyempurnaan Sistem Informasi Jl. Pattimura No. 20,
Disain dan Disain Perkotaan dan Perdesaan,
Pembangunan Ditjen. Tata Kebayoran Baru, KU.08.08-HGL/PFK/23/I/2004;
67 Enjiniring Jakarta Ditjend Tata Perkotaan 542,960,000 31/11/2004 31/11/2004
Perkotaan dan Tata Perdesaan Jakarta Selatan Tgl. 19 Januari 2004
Pekerjaan Teknik dan Tata Perdesaan
(P-1) Telp. 021-7392230
Sipil Transportasi Direktorat Bintek, Dep.
Kimpraswil
Jasa Nasehat/Pra-
Bagpro Fasilitasi Sistem
Paket C - 5 : Pedoman Disain dan Disain Jl. Pattimura No. 20, KU.08.08/73.05/BP.03-
Jaringan Jalan Kota dan
68 Pemasangan Rambu Tetap dan Enjiniring Jakarta Kebayoran Baru, FSJJKD/VII/2003; 242,440,000 30/11/2003 30/11/2003
Desa, Ditjend Prasarana
Rambu Sementara Jalan Perkotaan Pekerjaan Teknik Jakarta Selatan Tgl. 4 Juli 2003
Wilayah, Dep. Kimpraswil
Sipil Transportasi
Jasa Enjiniring Pimpro Pengawasan
Paket 10 : Pengawasan Teknis Fase Konstruksi Teknis Jalan dan Jl. Sumatera No. 15,
050.1/55;
69 Penanganan Jalan Strategis di dan Instalasi Papua Jembatan Tersebar di 12 Dok. IV Jayapura 299,928,000 15/12/2003 15/12/2003
Tgl. 1 Juli 2003
Kabupaten Merauke Pekerjaan Tek. (Dua Belas) Telp. 0967-537897
Sipil Transportasi Kabupaten/Kota
Jasa Nasehat/Pra-
Bagpro P3JJ Wilayah Jl. Pattimura No. 20,
Disain dan Disain
Peningkatan Kompetensi Perencana Timur, Direktorat Praswil, Kebayoran Baru, KU.08.08/P3TJJ-WT/VI/02/2003;
70 Enjiniring Jakarta 435,237,000 30/11/2003 30/11/2003
Teknis Jalan, Paket II Ditjend Praswil, Dep. Jakarta Selatan Tgl. 04 Juni 2003
Pekerjaan Teknik
Kimpraswil Telp. 021-7396771
Sipil Transportasi
Jasa Manajemen
Bagpro. Pengembangan Jl. Wijaya I No. 68
Land Transportation Management Proyek Terkait Jatim, Jateng,
Kapasitas Manajemen Kebayoran Baru, 01/CTR-PKMK/2003;
71 (Model Implementation on Urban Konstruksi Riau dan 674,954,500 30/11/2003 30/11/2003
Kebijakan, Ditjen. TPTP, Jakarta Selatan Tgl. 19 Mei 2003
Roads Management System) Pekerjaan Teknik Lampung
Dep. Kimpraswil Telp. 021-7399170