Sie sind auf Seite 1von 64

1 OF 64

MASTERMIND ENGINEERING CONSULTANCY PVT.LTD.


Yeti Plaza, Bagbazar, Kathmandu.
Phone No: 01-4248199

Detail Estimate
Project : Toilet Construction Works.
Site: Deurali-09, Nuwakot.

S.n. Description of Works No Length(ft) Breadth(ft)


A CIVIL WORKS
1 SITE CLEAREANCE WORKS

Site Cleareance before and after completition of works


including grass cutting, root excavation out, Levelling
of ground, sweeping all complete works as per design,
1.1 drawing, specification and instruction of site engineer.
Toilet/Bathroom 1 25 20

2 EARTH WORKS IN CUTTING & FILLING

E/W in Excavation in soft soils for mass cutting site


levelling including hauling distance & lift all complete
work as per specification and instruction of site
2.1 engineer.
Toilet/Bathroom 1 22 21

E/W in Excavation in soft soils in foundation including


hauling distance & lift all complete work as per
2.2 specification and instruction of site engineer.
Toilet
F 4 5.000 5.000
Grid 1 & 2 2 5.750 1.500
Grid A & B 2 11.750 1.500
Septic Tank 1 10.000 6.000

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
2 OF 64

S.n. Description of Works No Length(ft) Breadth(ft)

Earthwork in Filling in floor and foundation with proper


ramming with jumper / iron rammers in 0.15m. layers
after sprinkling with water and consolidating to as per
2.3 specification and instruction complete work.
Toilet
L.Toilet 1 10.500 7.750
G.Toilet 1 10.500 7.750

3 STONE & BRICK SOLING WORKS

Provinding and Laying Stone Soling in foundation and


floor with stone dust,sand,crush stone etc in level and
line and compaction all complete work as per site
3.1 instruction of Enginner.
Foundation
Toilet
F 4 5.000 5.000
Grid 1 & 2 2 5.750 1.500
Grid A & B 2 11.750 1.500

Provinding and Laying flat brick Soling in foundation


and floor with brick of approved size and quality to
level and line and compaction all complete work as
3.2 per site instruction of Enginner.
Floor
Toilet
L.Toilet 1 10.500 7.750
G.Toilet 1 10.500 7.750
Septic Tank 1 10.000 6.000
Toilet Step Base 2 3.000 2.000

4 PCC & RCC WORKS

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
3 OF 64

S.n. Description of Works No Length(ft) Breadth(ft)

Providing and Laying Plain Cement Concrete ( P.C.C.)


in 1:2:4 in floor and foundation with cement, sand and
aggregate including mixing, laying, finishing to
approved level, line and dimensions and curing all
complete as per specification and instruction of site
4.1 Engineer.
Foundation
Toilet
F 4 5.000 5.000
Grid 1 & 2 2 5.750 1.500
Grid A & B 2 11.750 1.500
Floor
Toilet
L.Toilet 1 10.500 7.750
G.Toilet 1 10.500 7.750
Septic Tank 1 10.000 6.000
Toilet Step Base 2 3.000 2.000

Providing and Laying P.C.C.(1:1.5:3) M20 for


R.C.C.work in foundation, columns, beams, slabs,
lintels etc. with cement, sand, and cruss Aggregate
including mixing with concrete mixture, compacting
the concrete with vibrator machine, laying, finishing to
approved level ,lines and dimensions and curing all
4.2 complete as per instruction of site Enginner.
(a) Footing
Toilet
F Rectangular 4 4.500 4.500
F Trapezoidal ((4.5+1.5)/2) 4 3.000 3.000
(b) Column
Column upto Tie Beam
Toilet
Column C1 4 1.000 1.000
Column upto First Floor
Toilet
Column C1 4 1.000 1.000
(C) Beam
Tie Beam
Toilet

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
4 OF 64

S.n. Description of Works No Length(ft) Breadth(ft)


Grid 1 & 2 2 9.750 0.750
Grid A & B 2 15.750 0.750
First Floor Beam
Toilet
Grid 1 & 2 2 9.750 0.750
Grid A & B 2 15.750 0.750
(d) Slab
Septic Tank
cover slab 1 10 6
toilet Slab 1 15.75 21.5

5 REINFORCEMENT WORKS

Providing Reinforcement bars (Grade 500) work


including straightening, cleaning, cutting, bending,
binding with 20 SWG annealed wire & fixing in
position as per drawing, bar bending schedule for
foundation column, beam, wall, stair, slab in all R.C.C.
works as per specification, drawing & instruction of
5.1 site engineer.
1.85 % Of RCC Works

6 FORM WORKS

19mm water proof plywood and steel prop formwork


for all works necessary propping, scaffoldong, staging,
supporting inclusive of wedging and cutting holes for
utilization work till the support is full unyielding nett for
6.1 Column/Slab/Beam etc. complete work.
(a) Footing
Toilet
F Rectangular 4 18.000 4.500
(b) Column
Toilet
Column C1 4 4.000
Column upto First Floor
Toilet
Column C1 4 4.000
(C) Beam
Tie Beam
Toilet

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
5 OF 64

S.n. Description of Works No Length(ft) Breadth(ft)


Grid 1 & 2 4 9.750
Grid A & B 4 15.750
First Floor Beam
Toilet
Grid 1 & 2 4 9.750
Grid A & B 4 15.750
(d) Slab
Septic Tank
cover slab 1 10 6
Toilet Slab 1 15.75 21.5

7 STONE AND BRICK MASONARY WORKS

Providing & laying Rubble Stone Masonary Works in


1:6 C/S mortar in sub/superstructure in perfect line
level finish including wetting the blocks, racking the
joints and curing the work for at least 7 days as per
specification, drawings & instructions of the site
7.1 engineer all complete. .
Foundation Beam to Plinth Beam
Toilet
Grid 1 & 2 2 9.750 1.500
Grid A & B 2 15.750 1.500

Providing & laying 1st class local chimney made


brickwork in 1:4 C/S mortar in Sub/superstructure in
perfect line level finish including wetting the brick,
racking the joints and curing the work for at least 7
days as per specification, drawings & instructions of
7.2 the site engineer all complete. .
Toilet
Grid 1 & 2 2 9.750 0.75
Grid A & B 2 15.750 0.75
Septic Tank 2 10.000 0.75
2 4.500 0.75
Less
D -2 3.000 0.75
V -6 2.000 0.75

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
6 OF 64

S.n. Description of Works No Length(ft) Breadth(ft)

Providing & laying Half Brick 1st Class Local Chimney


made brickwork in 1:4 C/S mortar in superstructure in
perfect line level finish including wetting the blocks,
racking the joints and curing the work for at least 7
days as per specification, drawings & instructions of
7.3 the site engineer all complete. .
Toilet
Inner partation 1 10.25
1 5.5
1 8
less D1 -3 2.5

8 FLOORING AND FINISHING

38mm thick P.C.C. in (1:2:4) (Screeding) for floors &


top of slab etc with approved quality of cement, sand
& crushed stone Chips/aggregare including
mixing,laying curing all complete work in approved of
8.1 site eng.
Floor
Toilet
L.Toilet 1 10.500 7.750
G.Toilet 1 10.500 7.750
Toilet Step Base 2 3.000 5.000

3mm.th. C.S. punning(1:1) on floor, dado and skirting


8.2 etc. as per specification and direction complete work.
Floor
Toilet Step Base 2 3.000 5.000
Main Building
Toilet Slab 1 15.75 21.5

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
7 OF 64

S.n. Description of Works No Length(ft) Breadth(ft)

Providing and Laying 6mm.th.porcelain glazed tiles


on walls of approved colored laid with cement sand
mortar (1:4) finished with cement slurry all complete
8.3 as per site instruction of Engineer.
Toilet
Floor 2 10.5
Toilet Wall 6 10.5
2 5
2 3.25
6 4
-2 3
-6 2.5

9 PLASTERING AND POINTING WORKS

12.50mm. Th. Cement sand plaster (1:4) on of good


finish including racking the joints, wetting the surface
9.1 and curing the work all complete
Toilet Outer 2 17.500
2 11.750
Parpet inner 2 17.500
2 11.750
less door -2 3.000
V -6 2.000
inner wall
Toilet Wall 6 10.5
2 5
2 3.25
6 4
D -2 3
D1 -6 2.5
V -6 2.000

Providing 2 mm thick white putty on wall and celling


as per design drawing and specification all complete
9.2 work.
Wall plaster 1 680.82
Main Building
Toilet Slab 1 15.75 21.5

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
8 OF 64

S.n. Description of Works No Length(ft) Breadth(ft)

Providing 20 mm thick Jhallar/Pani patti/band in 1:2


Plaster with water proof compound as per design
9.3 drawing specification all complete work.
1 58

10 Wood Works

Supplying and fitting sal wooden chaukose with all


10.1 neccessary hardware all complete.
D 2 21.000 0.250
D1 3 20.000 0.250
V 6 8.000 0.250

Supplying and fitting Ready made Teak wood


Doors,special (Seasoned and Poisoned treated ,one
side teak and other side water proof ply fitting) with all
10.2 neccessary hardware all complete.
D 2 3.000
D1 3 2.500

Supplying and fitting 5 mm glass on 38x75 mm sal


wooden frame with all neccessary hardware all
10.3 complete.
V 6 2.000

11 PAINTING WORKS

Supplying & Laying two coat weather coat distemper


over 1 coat primer to give uniform colouring after
11.1 rendering the surface all complete.
Inner Surface
Toilet Wall 6 10.5
2 5
2 3.25
6 4
D -2 3
D1 -6 2.5
V -6 2.000

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
9 OF 64

S.n. Description of Works No Length(ft) Breadth(ft)


Toilet Slab 1 15.75 21.5

Supplying & laying two coat weather Coat over 1 coat


primer to give uniform colouring after rendering the
11.2 surface all complete.
Toilet Outer 2 17.500
2 11.750
Parpet inner 2 17.500
2 11.750
less door -2 3.000
V -6 2.000

Supplying & laying two coat enamel paint over 1 coat


primer to give uniform colouring after rendering the
11.3 surface all complete.
Factor
D 2 3.000 2.25
D1 3 2.500 2.25
V 6 2.000 1.25

B. SANITARY WORKS
12 (50x40)cm Porcelain clay white glaze Oval Wash
basin with mixture
complete set
2

13
Small Flat back White glazed urinal
(46.5x35.5x26.5)cm with cistern all complete set
3

14
Porcelain Clay White Glazed Toilet Paper Holder
3

15 C P towel rod 18" size Heavy


2

16 Glass Shelf with CP Guard Rail


2.00

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
10 OF 64

S.n. Description of Works No Length(ft) Breadth(ft)


17
Looking Mirror Modi guard 450x600mm (18"x 24")
2.00

18 15mm Urinal C.P. Spreader


Office 3

19 C.P.Soap Dish (polyurethane).


2.00

20 15mm C.P. Angle valve


8.00

21 Supply and Fitting Stainless Steel


Shower rose with sliding bar complete
set with all sets as per Site Engineer

Checked by : Forwarded by :
Name : Name : 2.00
Desingation : Desingation :

22 Supply and Fitting 15mm CP Bib Cock


Checked by : Forwarded by :
as per Site Engineer
Name : Name :
Desingation : Desingation :
3.00

Supply and Fitting PVC Grating 100mm


(4") dia as per Site Engineer
23
5.00

Supply and Fitting PVC Floor Trap


11x7.5cm (4" X 2") as per Site
24 Engineer
5.00

Supplying and Fitting 50 mm CPVC


(Chlorinated Polyvinyl Chloride) Pipe
SDR 11 CTS, 28.1
kg/cm2 (Flowguard or ISI Standard)
with complete fitting as per site
25 Engineer.
1st Floor 1.00 36.00

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
11 OF 64

S.n. Description of Works No Length(ft) Breadth(ft)


Supplying and Fitting 20 mm CPVC
(Chlorinated Polyvinyl Chloride) Pipe
SDR 11 CTS, 28.1
kg/cm2 (Flowguard or ISI Standard)
with complete fitting as per site
26 Engineer.
1st Floor 1.00 200.00

Supplying and Fitting 110 mm dia PVC


Pipe 6 kg/cm2 with complete fitting as
27 per site Engineer.
1 24.00

Supplying and Fitting 75 mm dia PVC


Pipe 6 kg/cm2. with complete fitting
as per site Engineer.
28
1 60.00
Total

Supplying and Fitting 50 mm dia PVC


Pipe 6 kg/cm2. with complete fitting
as per site Engineer.
29
1 30.00

Supplying and Fitting 50 mm Gate


Valve with complete fitting as per site
30 Engineer.
1.00

Supplying and Fitting 50mm Check


Valve with complete fitting as per site
31 Engineer.
1.00

Supplying and Fitting 2000 Ltr.


PVC\HDPE Water Tank with complete
fitting as per site Engineer.
32
1.00

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
12 OF 64

S.n. Description of Works No Length(ft) Breadth(ft)

Supplying and Fitting 1 H.P. Electrical


motor water pump Multi stage coupled
pump (Crompton) with complete fitting
as per site Engineer.
33
1.00

Sink Stainless Steel 37" long 8" deep


with sink cock all complete set
34 1.00

35 160mm dia. HDP Pipe (4 Kg/cm2 1.00 18.00

530mm Porcelain clay white glazed


Orissa pan with low level cistern with
36 complete se 1.00

White glazed porcelain clay One Piece commode with


'P ' & 'S ' trap and
slow falling seat cover complete set.(Hindware,
Paryware, Somany, cera or
37 eqv.) 2

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
13 OF 64

LTANCY PVT.LTD.
du.

Height(ft) Quantity Remarks

500.00
Total 500.00 Sq.ft.

5 2310.00
Total 2310.00 Cu.ft.

5.000 500.00
3.750 64.68
3.750 132.18
5.000 300.00
Total 996.86 Cu.ft.

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
14 OF 64

Height(ft) Quantity Remarks

1 81.37
1 81.37
Total 162.74 Cu.ft.

0.500 50.00
0.500 8.62
0.500 17.62
Total 76.24 Cu.ft.

81.37
81.37
60.00
12.00
Total 234.74 Sq.ft.

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
15 OF 64

Height(ft) Quantity Remarks

0.25 25.00
0.25 4.31
0.25 8.81

0.25 20.34
0.25 20.34
0.25 15.00
0.25 3.00
Total 96.80 Cu.ft.

1 81.00
0.5 18.00

4.25 17.00

9 36.00

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
16 OF 64

Height(ft) Quantity Remarks


0.75 10.96
0.75 17.71

0.750 10.96
0.750 17.71

0.42 25.20
0.42 142.22
Total 376.76 Cu.ft.

1550.83
Total 1550.83 Kgs

1 324.00

4.25 68.00

9 144.00

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
17 OF 64

Height(ft) Quantity Remarks


0.75 29.25
0.75 47.25

0.750 29.25
0.750 47.25

60.00
338.62
Total 1087.62 Sq.ft.

2 58.50
2 94.50
Total 153.00 Cu.ft.

8.3 121.38
8.3 196.08
5 75.00
5 33.75

7.5 -33.75
2 -18.00

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
18 OF 64

Height(ft) Quantity Remarks


Total 374.46 Cu.ft.

8.3 85.07
8.3 45.65
8.3 66.40
7 -52.50
Total 144.62 Sq.ft.

81.37
81.37
30.00
Total 192.74 Sq.ft

30.00

338.62
Total 368.62 Sq.ft.

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
19 OF 64

Height(ft) Quantity Remarks

7.75 162.75
5 315.00
5 50.00
5 32.50
5 120.00
5 -30.00
5 -75.00
Total 575.25 Sq.ft.

12.42 434.70
12.42 291.87
3.5 122.50
3.5 82.25
7.500 -45.00
2.000 -24.00

9 567.00
9 90.00
9 58.50
9 216.00
7.5 -45.00
7.5 -112.50
2.000 -24.00
Total 1612.32 Sq.ft.

680.82

338.62
Total 1019.44 Sq.ft.

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
20 OF 64

Height(ft) Quantity Remarks

58.00
Total 58.00 Rf.t.

0.42 4.41
0.42 6.30
0.42 5.04
Total 15.75 Cu.ft.

7.500 45.00
7.500 56.25
Total 101.25 Sq.ft.

2.000 24.00
Total 24.00 Sq.ft.

9 567.00
9 90.00
9 58.50
9 216.00
7.5 -45.00
7.5 -112.50
2.000 -24.00

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
21 OF 64

Height(ft) Quantity Remarks


338.62
Total 1088.62 Sq.ft.

12.42 434.70
12.42 291.87
3.5 122.50
3.5 82.25
7.500 -45.00
2.000 -24.00
Total 862.32 Sq.ft.

7.500 101.25
7.500 126.56
2.000 30.00
Total 257.81 Sq.ft.

2.00
Total 2.00 Set

3.00
Total 3.00 Set

3.00
Total 3.00 Set

2.00
Total 2.00 Set

2.00
Total 2.00 Set

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
22 OF 64

Height(ft) Quantity Remarks

2.00
Total 2.00 Set

3.00
Total 3.00 Set

2.00
Total 2.00 Set

8.00
Total 8.00 Set

2.00
Total 2.00 Set

3.00
Total 3.00 Set

5.00
Total 5.00 Set

5.00
Total 5.00 Set

36.00
Total 36.00 R.ft.

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
23 OF 64

Height(ft) Quantity Remarks

200.00
Total 200.00 R.ft.

24.00
Total 24.00 R.ft.

60.00
Total 60.00 R.ft

30.00
Total 30.00 R.ft.

1.00
Total 1.00 Set

1.00
Total 1.00 Set

1.00
Total 1.00 Set

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
24 OF 64

Height(ft) Quantity Remarks

1.00
Total 1.00 Set

1.00
Total 1.00 Set
18.00
Total 18.00 R.ft

1.00
Total 1.00 Set

2.00
Total 2.00 Set

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
25 OF 64

MASTERMIND ENGINEERING CONSULTANCY PVT.LTD.


Yeti Plaza, Bagbazar, Kathmandu.

Abstract of Cost
Project No:
Project : Toilet Construction Works.
Site: Deurali-09, Nuwakot.

S.n. Description of Works Quantity Unit Rate


A CIVIL WORKS
1.0 SITE CLEAREANCE WORKS

Site Cleareance before and after completition


of works including grass cutting, root
excavation out, Levelling of ground, sweeping
all complete works as per design, drawing,
1.1 specification and instruction of site engineer. 500.00 Sq.ft. 1.13

2.0 EARTH WORKS IN CUTTING & FILLING

E/W in Excavation in soft soils for mass cutting


site levelling including hauling distance & lift
all complete work as per specification and
2.1 instruction of site engineer. 2310.00 Cu.ft. 10.81

E/W in Excavation in soft soils in foundation


including hauling distance & lift all complete
work as per specification and instruction of site
2.2 engineer. 996.86 Cu.ft. 10.81

Earthwork in Filling in floor and foundation with


proper ramming with jumper / iron rammers in
0.15m. layers after sprinkling with water and
consolidating to as per specification and
2.3 instruction complete work. 162.74 Cu.ft. 7.54

3 STONE & BRICK SOLING WORKS

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
26 OF 64

Provinding and Laying Stone Soling in


foundation and floor with stone
dust,sand,crush stone etc in level and line and
compaction all complete work as per site
3.1 instruction of Enginner. 76.24 Cu.ft. 67.86

Provinding and Laying flat brick Soling in


foundation and floor with brick of approved
size and quality to level and line and
compaction all complete work as per site
3.2 instruction of Enginner. 234.74 Sq.ft. 96.86
4 PCC & RCC WORKS

Providing and Laying Plain Cement Concrete (


P.C.C.) in 1:2:4 in floor and foundation with
cement, sand and aggregate including
mixing, laying, finishing to approved level, line
and dimensions and curing all complete as per
4.1 specification and instruction of site Engineer. 96.8 Cu.ft. 443.88

Providing and Laying P.C.C.(1:1.5:3) M20 for


R.C.C.work in foundation, columns, beams,
slabs, lintels etc. with cement, sand, and cruss
Aggregate including mixing with concrete
mixture, compacting the concrete with vibrator
machine, laying, finishing to approved level
,lines and dimensions and curing all complete
4.2 as per instruction of site Enginner. 376.76 Cu.ft. 528.95

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
27 OF 64

5 REINFORCEMENT WORKS

Providing Reinforcement bars (Grade 500)


work including straightening, cleaning, cutting,
bending, binding with 20 SWG annealed wire
& fixing in position as per drawing, bar bending
schedule for foundation column, beam, wall,
stair, slab in all R.C.C. works as per
specification, drawing & instruction of site
5.1 engineer. 1550.83 Kgs 110.09
6 FORM WORKS

19mm water proof plywood and steel prop


formwork for all works necessary propping,
scaffoldong, staging, supporting inclusive of
wedging and cutting holes for utilization work
till the support is full unyielding nett for
6.1 Column/Slab/Beam etc. complete work. 1087.62 Sq.ft. 69.55

7 STONE AND BRICK MASONARY WORKS

Providing & laying Rubble Stone Masonary


Works in 1:6 C/S mortar in sub/superstructure
in perfect line level finish including wetting the
blocks, racking the joints and curing the work
for at least 7 days as per specification,
drawings & instructions of the site engineer all
7.1 complete. . 153 Cu.ft. 276.51

Providing & laying 1st class local chimney


made brickwork in 1:4 C/S mortar in
Sub/superstructure in perfect line level finish
including wetting the brick, racking the joints
and curing the work for at least 7 days as per
specification, drawings & instructions of the
7.2 site engineer all complete. . 374.46 Cu.ft. 403.49

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
28 OF 64

Providing & laying Half Brick 1st Class Local


Chimney made brickwork in 1:4 C/S mortar in
superstructure in perfect line level finish
including wetting the blocks, racking the joints
and curing the work for at least 7 days as per
specification, drawings & instructions of the
7.3 site engineer all complete. . 144.62 Sq.ft. 201.75
8 FLOORING AND FINISHING

38mm thick P.C.C. in (1:2:4) (Screeding) for


floors & top of slab etc with approved quality
of cement, sand & crushed stone
Chips/aggregare including mixing,laying curing
8.1 all complete work in approved of site eng. 192.74 Sq.ft 67.87

3mm.th. C.S. punning(1:1) on floor, dado and


skirting etc. as per specification and direction
8.2 complete work. 368.62 Sq.ft. 22.45

Providing and Laying 6mm.th.porcelain glazed


tiles on walls of approved colored laid with
cement sand mortar (1:4) finished with cement
slurry all complete as per site instruction of
8.3 Engineer. 575.25 Sq.ft. 198.12

9 PLASTERING AND POINTING WORKS

12.50mm. Th. Cement sand plaster (1:4) on of


good finish including racking the joints, wetting
9.1 the surface and curing the work all complete 1612.32 Sq.ft. 33.59

Providing 2 mm thick white putty on wall and


celling as per design drawing and
9.2 specification all complete work. 1019.44 Sq.ft. 19.32

Providing 20 mm thick Jhallar/Pani patti/band


in 1:2 Plaster with water proof compound as
per design drawing specification all complete
9.3 work. 58 Rf.t. 38.37

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
29 OF 64

10 Wood Works

Supplying and fitting sal wooden chaukose


10.1 with all neccessary hardware all complete. 15.75 Cu.ft. 3100.48

Supplying and fitting Ready made Teak wood


Doors,special (Seasoned and Poisoned
treated ,one side teak and other side water
proof ply fitting) with all neccessary hardware
10.2 all complete. 101.25 Sq.ft. 464.05

Supplying and fitting 5 mm glass on 38x75 mm


sal wooden frame with all neccessary
10.3 hardware all complete. 24 Sq.ft. 528.76
11 PAINTING WORKS
Total
Contengency 5%
Grand Total

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
30 OF 64

T.LTD.

Amount Remarks

565.00

24971.10

10776.06

1227.06

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
31 OF 64

5173.65

22736.92

42967.58

199287.20

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
32 OF 64

170730.87

75643.97

42306.03

151090.87

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
33 OF 64

29176.36

13081.26

8275.52

113968.53

54157.83

19695.58

2225.46

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
34 OF 64

48832.56

46985.06

12690.24

1096564.71
54828.24
1151392.95

Estimated By: Checked By:


Manik Lal Ghising Er.Sunil Tamang Waiba
National Zoological Garden 35 of 64

MASTERMIND ENGINEERING CONSULTANCY PVT.LTD.


Yeti Plaza, Bagbazar, Kathmandu.

Bill of Quantity
Project No:
Project : Toilet Construction Works.
Site: Deurali-09, Nuwakot.

1. Supplying the materials along with accessories to the site


2. Fixing anderecting them in position as per general practive, specifications and instructions of site Engineer
3. Test & Maintenance up to the period, specified in the agreement
B. The itemwise rete should be quoted with out VAT

rate
S.n. Description of Works Unit Quantity
in Fig.

A CIVIL WORKS
1 SITE CLEAREANCE WORKS

Site Cleareance before and after completition of works Sq.ft. 500


including grass cutting, root excavation out, Levelling of
ground, sweeping all complete works as per design,
1.1 drawing, specification and instruction of site engineer.
2 EARTH WORKS IN CUTTING & FILLING

Contactor Sign and Seal


National Zoological Garden 36 of 64

E/W in Excavation in soft soils for mass cutting site Cu.ft. 2310
levelling including hauling distance & lift all complete work
2.1 as per specification and instruction of site engineer.

E/W in Excavation in soft soils in foundation including Cu.ft. 996.86


hauling distance & lift all complete work as per
2.2 specification and instruction of site engineer.

Earthwork in Filling in floor and foundation with proper Cu.ft. 162.74


ramming with jumper / iron rammers in 0.15m. layers after
sprinkling with water and consolidating to as per
2.3 specification and instruction complete work.

Contactor Sign and Seal


National Zoological Garden 37 of 64

3 STONE & BRICK SOLING WORKS

Provinding and Laying flat brick Soling in foundation and


floor with brick of approved size and quality to level and Sq.ft. 234.74
line and compaction all complete work as per site
3.2 instruction of Enginner.
4 PCC & RCC WORKS

Providing and Laying Plain Cement Concrete ( P.C.C.) in Cu.ft. 96.8


1:2:4 in floor and foundation with cement, sand and
aggregate including mixing, laying, finishing to approved
level, line and dimensions and curing all complete as per
4.1 specification and instruction of site Engineer.

Providing and Laying P.C.C.(1:1.5:3) M20 for R.C.C.work


in foundation, columns, beams, slabs, lintels etc. with Cu.ft. 376.76
cement, sand, and cruss Aggregate including mixing with
concrete mixture, compacting the concrete with vibrator
machine, laying, finishing to approved level ,lines and
dimensions and curing all complete as per instruction of
4.2 site Enginner.
5 REINFORCEMENT WORKS

Contactor Sign and Seal


National Zoological Garden 38 of 64

Providing Reinforcement bars (Grade 500) work including


Kgs 1550.83
straightening, cleaning, cutting, bending, binding with 20
SWG annealed wire & fixing in position as per drawing,
bar bending schedule for foundation column, beam, wall,
stair, slab in all R.C.C. works as per specification, drawing
5.1 & instruction of site engineer.
6 FORM WORKS

19mm water proof plywood and steel prop formwork for


all works necessary propping, scaffoldong, staging, Sq.ft. 1087.62
supporting inclusive of wedging and cutting holes for
utilization work till the support is full unyielding nett for
6.1 Column/Slab/Beam etc. complete work.

Contactor Sign and Seal


National Zoological Garden 39 of 64

7 STONE AND BRICK MASONARY WORKS

Providing & laying Rubble Stone Masonary Works in 1:6 Cu.ft. 153
C/S mortar in sub/superstructure in perfect line level finish
including wetting the blocks, racking the joints and curing
the work for at least 7 days as per specification, drawings
7.1 & instructions of the site engineer all complete. .

Providing & laying 1st class local chimney made brickwork Cu.ft. 374.46
in 1:4 C/S mortar in Sub/superstructure in perfect line
level finish including wetting the brick, racking the joints
and curing the work for at least 7 days as per specification,
7.2 drawings & instructions of the site engineer all complete. .

Providing & laying Half Brick 1st Class Local Chimney


made brickwork in 1:4 C/S mortar in superstructure in Sq.ft. 144.62
perfect line level finish including wetting the blocks,
racking the joints and curing the work for at least 7 days as
per specification, drawings & instructions of the site
7.3 engineer all complete. .

Contactor Sign and Seal


National Zoological Garden 40 of 64

8 FLOORING AND FINISHING

38mm thick P.C.C. in (1:2:4) (Screeding) for floors & top Sq.ft 192.74
of slab etc with approved quality of cement, sand &
crushed stone Chips/aggregare including mixing,laying
8.1 curing all complete work in approved of site eng.

Sq.ft. 368.62
3mm.th. C.S. punning(1:1) on floor, dado and skirting etc.
8.2 as per specification and direction complete work.

Providing and Laying 6mm.th.porcelain glazed tiles on Sq.ft. 575.25


walls of approved colored laid with cement sand mortar
(1:4) finished with cement slurry all complete as per site
8.3 instruction of Engineer.

Err:509 Err:509

Err:509 Err:509
9 PLASTERING AND POINTING WORKS

12.50mm. Th. Cement sand plaster (1:4) on of good finish Sq.ft. 1612.32
including racking the joints, wetting the surface and curing
9.1 the work all complete

Providing 2 mm thick white putty on wall and celling as Sq.ft. 1019.44


9.2 per design drawing and specification all complete work.

Contactor Sign and Seal


National Zoological Garden 41 of 64

Providing 20 mm thick Jhallar/Pani patti/band in 1:2 Rf.t. 58


Plaster with water proof compound as per design drawing
9.3 specification all complete work.
10 Wood Works

Supplying and fitting sal wooden chaukose with all Cu.ft. 15.75
10.1 neccessary hardware all complete.

Supplying and fitting Ready made Teak wood


Doors,special (Seasoned and Poisoned treated ,one side Sq.ft. 101.25
teak and other side water proof ply fitting) with all
10.2 neccessary hardware all complete.

Supplying and fitting 5 mm glass on 38x75 mm sal Sq.ft. 24


10.3 wooden frame with all neccessary hardware all complete.
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Contactor Sign and Seal


National Zoological Garden 42 of 64

11 PAINTING WORKS

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

Contactor Sign and Seal


National Zoological Garden 43 of 64

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509

Contactor Sign and Seal


National Zoological Garden 44 of 64

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509


Err:509 Err:509 Err:509 Err:509
Err:509 Err:509
Err:509
Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509

Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Contactor Sign and Seal


National Zoological Garden 45 of 64

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Contactor Sign and Seal


National Zoological Garden 46 of 64

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509

Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Contactor Sign and Seal


National Zoological Garden 47 of 64

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509

Contactor Sign and Seal


National Zoological Garden 48 of 64

Err:509 Err:509
Err:509 Err:509 Err:509

Err:509

Err:509

Grand Total (A+B+C+D)

Total Amount in Words

Name of Contractor :
Phone:
Address:
Date:

Contactor Sign and Seal


National Zoological Garden 49 of 64

ONSULTANCY PVT.LTD.
Kathmandu.

ntity

rate
Amount Re.
in Word

Contactor Sign and Seal


National Zoological Garden 50 of 64

Contactor Sign and Seal


National Zoological Garden 51 of 64

Contactor Sign and Seal


National Zoological Garden 52 of 64

Contactor Sign and Seal


National Zoological Garden 53 of 64

Contactor Sign and Seal


National Zoological Garden 54 of 64

Contactor Sign and Seal


National Zoological Garden 55 of 64

Contactor Sign and Seal


National Zoological Garden 56 of 64

Contactor Sign and Seal


National Zoological Garden 57 of 64

Contactor Sign and Seal


National Zoological Garden 58 of 64

Contactor Sign and Seal


National Zoological Garden 59 of 64

Contactor Sign and Seal


National Zoological Garden 60 of 64

Contactor Sign and Seal


National Zoological Garden 61 of 64

NRS: One Lakh Only.


Non-Competitive
items
NRS: Seven Lakh Only.

Contactor Sign and Seal


National Zoological Garden 62 of 64
Non-Competitive
items

NRS: One Lakh Only.

Signature :
Mobile:
Fax:
E-mail:

Contactor Sign and Seal


FEATURES OF CONSTRUCTION
1. Retaining wall of 100 m length and 3 m height back sight
2. site levelling cutting/filling, land scaping
3. septic tank and underground water tank
4. Entrance gate 2 set with rcc pillar
5. Office Building
6. Canteen
7. Garage/Guard

Area (Sq.m)
DESCRIPTION
GF FF SF TF TOTAL
OFFICE BUILDING 370.75 316.7 278.27 29.62 995.34
CANTEEN 140 140
GARAGE/GUARD 169.7 169.7 19.53 358.93
Total 1494.27 Sq.m
16078.3452 Sq.ft.
Rate per Sq.ft. 6048.39021589
with provisional cost
a. lab test, insurance
b. 10% physical contengency
c. 10% price excalation
d. 13% vat
e. 5 % contengency
Estimated Cost
97248105.795456

Das könnte Ihnen auch gefallen