SL.N Measurement
ITEM OF WORK Qty. Unit
o.
No. L. B. H.
1 Dismantling tiled floors including stacking of
dismantled materials as directed by
Engineer-in- charge with in a distance of 60
mt. (S.I.No.698)
Toilet Floor 1 1 2.90 1.8 5.22 Sqm
1 2 0.70 0.3 0.42 Sqm
Total (A) 5.64 Sqm
Toilet Walls 1 2 2.90 2.15 12.47 Sqm
1 2 1.80 2.15 7.74 Sqm
Extra James 2 2 0.30 1.80 2.16 Sqm
Ded Door 1 2 0.70 1.80 -2.52 Sqm
Total (B) 19.85 Sqm
G. Total A+B 25.49 Sqm
2 Providing and fixing 1st quality ceramic glazed wall tiles
(bell/kajaria/somany)conforming to IS : 15622 (thickness to be
specified by the manufacturer), of approved make, in all
colours, shades except burgundy, bottle green, black of any
size as approved by Engineer-in-Charge, in skirting, risers of
steps and dados, over 12 mm thick bed of cement mortar 1:3
(1 cement : 3 coarse sand) and jointing with grey cement
slurry @ 3.3 kg per sqm, including pointing in white cement
mixed with pigment of matching shade complete. 300x450mm
(Kajaria Digital standerd tile)
1 1 1.00 No.
SL.N Measurement
ITEM OF WORK Qty. Unit
o.
No. L. B. H.
5 Providing and Fixing 20mm thick densified tegular edged eco friendly
light weight false ceiling tiles (Armstrong Mineral Fiber Acoustical
Suspended Ceiling with Dune Max RH99 BEV TEG 600x600x20mm
module) of approved textu respintone/cosmos/Hexa or minimum)
sheet with the help of rawl plugs at 450 mm centre to centre with 25
mm long dry wall screws @ 230 mm interval and laying 15 mm thick
densified edges ceiling tiles vedtexture(Spintone/Cosmos/Hexa) in
the grid including, cutting/making opening for services like diffusers,
grill light fittings,smoke detectors etc. wherever required. Maing 'T'
runners to be suspended from ceiling using Vertical Hanger fixed to
ceiling with Anchor fasterner M6, 2.68mm G.I. adjusted rods with
galvanised steel level clips, spaced at 1200 mm centre to centre
along main 'T' bottom exposed with 24 mm of all T-sections shall be
pre-painted with polyster baked paint, for all heights, as per
specifications, drawing and as directed by engineer-in-charge Note.
Only calcium silicate false ceiling area will be measured from wall to
wall. No deduction shall be made for exposed frames/opening (cut
outs) having area less than 0.30sqm.The false ceiling tile shall have
NRC, value of 0.50 (Minimum), light reflection >85%, non -
combustible as per B.S. 476 Part IV, 100% humidity resistance and
also having thermal conductivity <0.43 w/m 0 KC. The Tile &
Gridsystem used together should carry a 15 year warrantee.
Rate AMOUNT
45.00 1147.05
1165.00 23125.25
1099.50 6201.18
21383.00 21383.00
Rate AMOUNT
1579.00 8015.00
Total 59871.48
Executive Engineer
Maint.Division No.1 (Civil)
P.W.D. Lucknow
izfrosnu
: izeq[k vfHk;Urk dk;kZy; fLFkr f}rh; ,oa r`rh; ry ij ,y0vkj0ih0 fo
Q'kZ ij foVhQkbM VkbYl yxkus dk dk;ZA
voj vfHk;Urk
vuqj{k.k [k.M lgk;d vfHk;Urk
vuqj{k.k [k.M
ua0&1flfoy ua0&1flfoy
yks0fu0fo0] y[ku yks0fu0fo0] y[ku
; ry ij ,y0vkj0ih0 foax dh xSyjh ds
s dk dk;ZA
bZth@23&5&14&50
#0- 5-04 yk[k ek= dk
vf/k'kklh vfHk;Urk
vuqj{k.k [k.M
ua0&1flfoy
yks0fu0fo0] y[ku
CHECKING PROFORMA
Preliminary and Detailed Estimate
Sl.No. Particulars
1 Report-
(a) Proper reference have been quoted and attested copies attached with the estimate.
(b) In case of revised estimate the amounts of excess has been given Item wise in the comparative
statement with detailed reasons.
(c) Signatures of A.E., E.E., & S.E. exist.
(d) Details of forest land with name of village & chainage.
(e) Required certificates are mentioned or not.
(f) Name of JE/AE who surveyed the work for preparaion of estimate.
2 Specifications-
(a) Detailed specifications for each item of work are included in the estimate.
4 Analysis of Rates-
(a) Analysis of non-schedule items are based on the market rates is attached or not.
(b) Each analysis have been signed by J.E.,A.E., E.E. & S.E. in the end.
5 Details of measurements-
Each page has been signed by J.E.,A.E. & by E.E. in the end of each set.
6 Bill of Quantity-
Each page has signature of J.E. , A.E. and E.E. at the end of each set.
7 Summary of estimated cost-
These have been signed by J.E., A.E., E.E. & S.E.
8 Plans-
These have been signed by J.E., A.E., E.E. & S.E.
9 General-
1- Name and designation should exist, below all signature and corrections.
2- Each page of the design, analysis of rates, details of the measurements, bill of quantity and summary of
estimated cost should be certified 'checked and corrected' by JE(T) of divisional office and circle office
with their signature at the end.
10 Designation-
Divisional Office:- Maintance Division No. 1(civil), P.W.D., Lucknow
S.No. Name Designation
Yes/NA
Yes/NA
Yes
NA
Yes
Er. Vijay Kumar/ Er.
Pradeep Kr Chaurasiya
Yes
Yes
Yes/NA
Yes/NA
Yes/NA
Yes
Yes
Yes
Yes
Yes/NA
Yes
Yes
Total = Rs.
Say Rs. In Lacs
Amount
59871.48
598.71
898.07
61368.27
0.61
Executive Engineer
Maint. Division No.-1(Civil)
P.W.D. Lucknow
fo"k; lwph
dz0la0 en dk fooj.k
1 'kh"kZd i`"B
2 tkap izi=
3 fo"k; lwph
4 izfrosnu
5 lUnHkZ
6 fof'kf"V;kW
7 nj fo'ys"k.k
9 ykxr dk lkjka'k
10 ekufp=
"k; lwph
i`"B la[;k
--------
fof'kf"