Sr.No
Description No. L W D/H Qty
1 Excavation in foundation in ordinary
soil,lome,clay or sand] including lift upto 1.5
m & lead upto 30m including filling watering
& ramming of excavated earth into the
trenches or into the space beetween the
building & the sides of foundation trenches
or in to the plinth & removal & disposal of
surplus earth as directed by the engineer
-in-charge upto a distance of 30m from the
foundation trenches.
23 cm wall
Ist offset 1 1 189.58 0.80 0.15 22.75
IInd offset 1 1 189.58 0.70 0.15 19.91
IIIrd offset 1 1 189.58 0.60 0.15 17.06
Ivth offset 1 1 189.58 0.45 0.55 46.92
Plinth 1 1 181.83 0.35 0.36 22.91
Plinth for Court yard wall 1 1 7.75 0.35 0.30 0.81
11.5 cm wall
Ist offset 1 1 39.55 0.60 0.15 3.56
IInd offset 1 1 39.55 0.50 0.15 2.97
IIIrd offset 1 1 39.55 0.35 0.25 3.46
Plinth 1 1 19.46 0.23 0.36 1.61
Plinth for Court yard wall 1 1 20.09 0.23 0.30 1.39
Total Qty 143.35
Deduction for junctions
A type 2 1 0.35 0.60 0.15 0.06
2 1 0.30 0.50 0.15 0.05
2 1 0.23 0.35 0.25 0.04
2 1 0.18 0.23 0.30 0.02
B Type 10 1 - - -
C Type 8 1 0.35 0.60 0.15 0.25
8 1 0.30 0.50 0.15 0.18
8 1 0.23 0.35 0.25 0.16
8 1 0.18 0.23 0.30 0.10
D type 29 1 0.40 0.80 0.15 1.39
29 1 0.35 0.70 0.15 1.07
29 1 0.30 0.60 0.15 0.78
29 1 0.23 0.45 0.55 1.65
29 1 0.18 0.35 0.36 0.66
E Type 3 1 0.30 0.70 0.15 0.09
3 1 0.25 0.60 0.15 0.07
3 1 0.18 0.45 0.55 0.13
3 1 0.12 0.35 0.36 0.05
Total Deduction 6.76
Net Qty 136.59
For Verandah
Main Ent 1 1 5.40 0.23 0.90 1.12
Front 2 1 4.95 0.23 0.90 2.05
Sides 2 1 3.82 0.23 0.90 1.58
Rear 2 1 4.90 0.23 0.90 2.03
For Steps
Sr.No
Description No. L W D/H Qty
Main Ent 1 3 3.00 0.30 0.15 0.41
Front 2 3 3.21 0.30 0.15 0.87
Sides 2 3 3.24 0.30 0.15 0.87
Rear 2 3 4.90 0.30 0.15 1.32
10.25
Total Qty (A+B) 146.84
5 Cast cement concrete door
sills,chaukhats,boundary posts,shelves and
similar small works with cement, approved
coarse sand, & 2cm.(3/4") gauge approved
stone ballast in the proporation 1:1.5:3
excluding supply of reinforcement and its
bending the same with 24 B WG binding wire
and necessary centering and shuttering etc, and
also including supply of all materials labour and
tools and plants etc required for proper
completion of works.
Inner Walls
Drawing room 6 1 17.60 3.30 348.48
Ver 1.00 mt wide 6 1 5.74 3.30 113.65
Toilet 6 1 7.78 3.30 154.04
Front Bed Room 6 1 13.50 3.30 267.30
Almirah in Front B/R 6 1 1.10 3.30 21.78
Pass for Front B/R 6 1 3.20 3.30 63.36
Kitchen 6 1 12.47 3.30 246.91
Dinning/Lounge 6 1 20.12 3.30 398.38
Pass for Dinn. 6 1 1.78 3.30 35.24
Almirah in Dinning 6 1 2.66 3.30 52.67
Bed Room 6 1 14.00 3.30 277.20
Almirah in B/R 6 1 1.10 3.30 21.78
Toilet 6 1 8.20 3.30 162.36
Box Room 6 1 6.66 3.30 131.87
Almirah in Box room 6 1 1.10 3.30 21.78
Master Bed Room 6 1 15.16 3.30 300.17
Almirah in rear B/R 6 1 1.10 3.30 21.78
Stair Case 3 1 11.44 3.30 113.26
Mumty Inner 1 1 13.96 2.50 34.90
Total Qty 2786.90
Deductions for Doors & windows
D1 6 2 1.10 2.10 27.72
D2 6 4 1.05 2.10 52.92
D3 6 3 0.90 2.10 34.02
D4 6 3 0.75 2.10 28.35
W1 6 1 2.50 1.20 18.00
W2 3 1 2.00 1.20 7.20
W3 6 5 1.00 1.20 36.00
W4 6 1 1.50 1.05 9.45
W5 6 2 0.50 1.00 6.00
W6 6 2 1.50 1.20 21.60
Sr.No
Description No. L W D/H Qty
D/W,D 6 1 1.05 2.10 13.23
D/W,W 6 1 0.55 1.20 3.96
Opening for Kitchen 6 1 1.00 2.10 12.60
Opening for Front B/R 6 1 1.05 2.10 13.23
Door in Mumty 2 1 0.90 2.10 3.78
Total Deduction 288.06
Net Qty 2498.84
Plaster on outer Surfaces
Main structure walls 2 1 52.80 11.85 1251.36
Back side of stair case 1 1 3.46 13.05 45.15
Mumty Outer 1 1 12.34 2.50 30.85
Parapet Inner surface 2 1 52.80 0.90 95.04
Top of Parapet 2 1 52.80 0.23 24.29
Top of Parapet (bottom side) 2 2 52.80 0.06 12.67
For railling above foyer 2 2 3.00 0.90 10.80
sunshades
W1 6 1 2.80 0.60 10.08
W2 2 3 2.30 0.60 8.28
W3 6 2 1.30 0.60 9.36
W3 (Front B/R) 6 1 2.10 0.60 7.56
W4 6 1 1.80 0.60 6.48
W5 6 2 0.80 0.60 5.76
W6 6 2 1.80 0.60 12.96
Wall of Courtyard 1 2 7.58 2.50 37.90
1 2 20.09 2.50 100.45
Less for Courtyard door 2 1 1.05 -2.10 -4.41
1664.58
Stairs 3 21 1.20 0.44 33.26
For Steps
Main Ent 1 3 3.00 0.45 4.05
Front 2 3 3.21 0.45 8.67
Sides 2 3 3.24 0.45 8.75
Rear 2 3 4.90 0.45 13.23
67.96
Total Qty (A+B+C) 4231.38
17 Finishing wall with Birla Putty of approved
brand including supply of all materials to
give an even shade and sand papreing the
surface even and smooth.
Ceillings
Main ent 3 1 5.4 2.975 48.20
Front Ver 6 1 1.745 3.21 33.61
Side Ver 6 1 1.3 3.24 25.27
Rear Ver 6 1 7.64 45.84
Walls of Stair Case 3 1 11.44 3.30 113.26
Mumty Inner wall 1 1 13.96 2.10 29.32
same as
item No
Outer walls of main structure 19 (B) 1664.58
Total Qty 1960.07
23 Supply and fixing Salwood wrought framed
and fixed including simple moulding straight
work as in Chaukhat frame including supply
of all materials, labour, T&P etc. required
for proper completion of work.
W1 6 4 24
W2 (in landing) 3 4 12
W3 30 2 60
W4 6 2 12
W5 12 2 24
W6 12 2 24
Sr.No
Description No. L W D/H Qty
D/W,W 6 2 12
Total Qty 168
30 I.S.I. marked aluminium anodized tower
bolt
a 10 mm dia 150 mm long
D1 12 2 24
D2 24 2 48
D3 12 2 24
D4 18 2 36
D/W,D 6 2 12
D2 (Mumty,Court yard,Stair case) 6 2 12
Wiremesh doors
D2 6 2 12
D3 6 2 12
D/W,D 6 2 12
Total Qty 192
b 10 mm dia 80 mm long
W1 6 8 48
W2 (in landing) 3 8 24
W3 30 4 120
W4 6 4 24
W5 12 4 48
W6 12 4 48
D/W,W 6 4 24
Total Qty 336
31 I.S.I. marked aluminium anodized sliding
bolt with nuts and blots
Area of windows
W1 6 1 2.50 1.20 18.00
W2 3 1 2.00 1.20 7.20
W3 6 5 1.00 1.20 36.00
W4 6 1 1.50 1.05 9.45
W5 6 2 0.50 1.00 6.00
W6 6 2 1.50 1.20 21.60
D/W,W 6 1 0.55 1.20 3.96
Total Area 102.21
For One Window (1.50X1.05)
M.S. Angle (30X30X5mm),Hold Fast 4 1 0.10 0.40
Total 0.40
Weight @ 2.20 kg/mt. 0.88
D1 6 2 1.30 15.60
D2 6 4 1.25 30.00
D3 6 3 1.10 19.80
D4 6 3 0.95 17.10
W1 6 1 2.70 16.20
W3 6 5 1.20 36.00
Sr.No
Description No. L W D/H Qty
W4 6 1 1.70 10.20
W5 6 2 0.70 8.40
W6 6 2 1.70 20.40
D/W, 6 1 1.80 10.80
Opening for Kitchen 6 1 1.20 7.20
Opening for Front B/R 6 1 1.25 7.50
Total Qty 199.20
38 Panting two coat with synthetic Enemal
paint on new surface in large area,with
approved paint i/c priming coat on wood /
steel surface including cost of all material,
labour T & P etc. complete.(Sl.No 644&645)
over Slab
2 1 4.26 3.09 26.33
2 1 10.92 4.15 90.64
Less 2 1 2.10 -0.54 -2.27
2 1 11.53 5.31 122.45
Less 2 1 2.48 -1.10 -5.46
2 1 5.25 3.46 36.33
Less 2 1 0.48 -1.73 -1.66
Front Balcony 2 1 3.21 1.74 11.17
Rear Balcony 2 1 7.64 15.28
Total Qty 292.81
Total Amount
Cost & Bill of Quantity
M3
M3
"
M3 90.00 24986.74
Unit Rate Amount
M2 0.00
M3
M3
Unit Rate Amount
M3
"
M3 4300.00 357403.55
189.58-7.75
39.55-20.09
(0.70/2)
(0.60/2)
(0.45/2)
(0.35/2)
No Deduction
(0.70/2)
(0.60/2)
(0.45/2)
(0.35/2)
(0.80/2)
(0.70/2)
(0.60/2)
(0.45/2)
(0.35/2)
(0.60/2)
(0.50/2)
(0.35/2)
(0.23/2)
H-0.60+0.30
L-1.74+3.21
L-0.58+3.24
L-[^*6.24]/4
Unit Rate Amount
B
M3 4682.00 687494.94
189.58-7.75
39.55-20.09
No Deduction
No Deduction
(0.35/2)
(0.35/2)
(0.23/2)
L-1.65+0.20
L-3.985+0.20
in stairs case
M3 8098.00 193850.49
Unit Rate Amount
H-0.60-0.14-.15
A-[^/4*(6.24)2]/4
(0.70/2)
(0.60/2)
(0.45/2)
(0.35/2)
No Deduction
(0.70/2)
(0.60/2)
(0.45/2)
(0.35/2)
(0.80/2)
Unit Rate Amount
(0.70/2)
(0.60/2)
(0.45/2)
(0.60/2)
(0.50/2)
(0.35/2)
M3 56.00 19056.20
H-0.60-0.14
A-[^/4*(6.24)2]/4
H-0.30-0.14
M3 444.00 24803.83
1348509.21
189.58-7.75
For 6 Unit
Unit Rate Amount
For 6 Unit
For 6 Unit
For 6 Unit
For 6 Unit
in stairs case
For 6 Unit
For 6 Unit
For 6 Unit
For 6 Unit
For 6 Unit
For 6 Unit
For 6 Unit
For 6 Unit
M3 5051.00 1734997.29
39.55-20.09
M3 5278.00 199297.99
M3 7926.00 157144.52
Unit Rate Amount
L as plinth B.W.
L as plinth B.W.
L as plinth B.W.
M3 9797.00 88099.82
A-[^/4*(6.24)2]/4
L-3.6+1.3+2.85
M3 9078.00 1119801.27
Unit Rate Amount
Kg 65.00 1347904.68
(3.8+5)*2
2.87*2
(1.485+2.405)*2
(3.6+3.15)*2
(0.55*2)
1.60*2
(2.25+3.985)*2
(3.75+6.31)*2
(0.78*2)+(0.55*2)
(3.85+3.15)*2
(0.55*2)
(1.70+2.40)*2
(1.23+2.10)*2
(0.55*2)
(4.35+3.23)*2
(0.55*2)
(4.22*2)+3.00
(3.98*2)+(3.00*2)
in stairs
Unit Rate Amount
L as parapet wall
(4.44*2)+3.46
(13.82)+(3.135*2)
C
M2 129.00 545848.54
2.25+3.985
(1.485+2.405)*2
(2.40+1.70)*2
M2 76.00 299411.96
(3.8+5)*2
Unit Rate Amount
(3.75+6.31)*2
(4.35+3.23)*2
M2 37.00 41126.98
M2 19.00 21119.26
(3.8+5)*2
(3.75+6.31)*2
(4.35+3.23)*2
M2 48.00 66590.50
M2 33.00 45780.97
A-[^/4*(6.24)2]/4
(4.22*2)+3.00
(3.98*2)+(3.00*2)
M2 98.00 192086.93
Unit Rate Amount
M3 65166.00 224920.45
M2 3143.00 475693.05
(0.6*16+1*8)
(0.4*16+1*8)
(0.4*8+1*4)
(0.7*8+0.8*4)
(0.7*4+.8*4)
(0.7*8+1*4)
(0.5*4+1*2)
M2 2873.00 293649.33
Unit Rate Amount
M2 1866.00 259803.18
M2 3124.36 88575.58
No 6*2
No 6*4
No 6*2
No 6*3
No 6*1
No 6*1
No 3
No 6*5
No 6*1
No 6*2
No 6*2
No 6*1
Each 8.00 4032.00
Unit Rate Amount
M2
RM
a
RM
b
Kg
Unit Rate Amount
Kg
A
(3.50+2.85)
L-1.74+3.21
L-0.58+3.24
L-[^*6.24]/4
sqm
C
(2.2+1.1+2.2)
(2.2+1.05+2.2)
(2.2+0.90+2.2)
(2.2+0.75+2.2)
(2.2+1.05+2.2)
(2.2+1.05+2.2)
(2.5+1.2*3+2.5)
(2.0+1.2*3+2.0)
(1.0+1.2+1.0+1.2)
(1.5+1.05+1.5+1.05)
(0.5+1.+0.5+1)
(1.5+1.2+1.5+1.2)
(0.55+1.2+0.55+1.2)
mtr
Kg D
kg 72.00 411399.79
M2 1848.00 283209.70
Unit Rate Amount
RM 300.00 59760.00
No-6*1
No-3
No-6*5
No-6*1
No-6*2
No-6*2
No-6*1
L-1.74+3.21
L-0.58+3.24
L-[^*6.24]/4
M2 60.00 25806.66
(3.8+5)*2
Unit Rate Amount
M2 984.00 714031.92
M2 850.00 39022.27
M2 833.00 86695.308
Unit Rate Amount
M2 3980.00 164246.64
M2
"
M2 1027.00 80829.01
M2 212.00 11694.13
M2 840.00 245958.216
10793723.13
Abstract of PLINTH AREA RATE
Rate Up to Plinth
dz- en dk uke dqlhZ {ks=Qy Total Estimated Cost Plinth Area
Rate
la- Hkwry izFke f}rh; ry r`rh; ;ksx
ry ry
1 2 3 4 5 6 7 8 9
Vkbi&IV&6
2 293.54 0.00 0.00 0.00 293.54 1348509.21 4593.95
ux
S No Description No L Total L
1 Length of Centre Line for 23 cm wall 1 7.75 7.75
2 3.46 6.92
2 4.58 9.16
2 1.73 3.46
2 0.49 0.98
2 8.83 17.66
2 1.93 3.86
2 3.17 6.34
2 3.38 6.76
2 5.43 10.86
2 3.38 6.76
2 2.10 4.20
2 0.49 0.98
2 0.44 0.88
2 1.66 3.32
2 9.23 18.46
2 2.89 5.78
2 5.89 11.78
2 4.03 8.06
2 4.03 8.06
2 0.66 1.32
1 8.19 8.19
2 5.31 10.62
2 4.22 8.44
2 2.48 4.96
2 7.01 14.02
Total Length 189.58
2 Length of Centre Line for 11.5 cm wall 1 13.71 13.71
2 3.19 6.38
Total for courtyard wall 20.09
2 1.73 3.46
2 1.93 3.86
2 0.54 1.08
2 1.67 3.34
2 2.63 5.26
2 1.23 2.46
Total for main structure wall 19.46
Total Length (A+B) 39.55
3 No of wall Junction
A type (Less half width of 23 cm wall) 2
B Type 10
C Type (Less half width of 23 cm wall) 8
D type (Less half width of 23 cm wall) 29
E Type (Less half width of 11.5 cm wall) 3
4 Length of Parapet wall (Single side) 1 2.25 2.25
1 1.10 1.10
1 2.70 2.70
1 3.46 3.46
1 4.81 4.81
1 1.73 1.73
1 0.44 0.44
1 1.73 1.73
1 1.11 1.11
1 2.16 2.16
1 0.77 0.77
1 3.15 3.15
1 1.35 1.35
1 3.61 3.61
1 2.10 2.10
1 0.44 0.44
1 1.73 1.73
1 2.83 2.83
1 3.09 3.09
1 4.26 4.26
1 7.01 7.01
1 0.97 0.97
Total Length for single side 52.80
ne
,Lucknow
Remark
Courtyard Wall
name
name
name
RM
B
RM
RM