Flush jali door 1X5 0.95 1.95 9.26 Sqm 347.00 3214.09
26 Painting two coat over priming paint one coat on
new surface including s/o all material, labour
T&P etc. complete. (S/R)
Chaukhat 1X5X2 0.39 2.05 8.00 Sqm
1X5 0.39 1.10 2.15 Sqm
1X4X2 0.39 1.35 4.21 Sqm
1X4X2 0.39 1.05 3.28 Sqm
Flush door 1X5X2 0.95 1.95 18.53 Sqm
Jali door 1X5 0.95 1.95 9.26 Sqm
1X4X2 0.90 1.20 8.64 Sqm
54.06 Sqm 60.00 3243.33
27 Mild Steel or Iron work of small sizes and
sections such as holding dwon bolts, hold fasts,
tie, rods, gratings etc. (when not including in an
over all rates) wrought to required form, including
supply of steel, bolts, nuts and wastage etc. and
their fixing required for proper completion of the
work. (SI.No. 502)
35X5 Flat iron for hold fast 1X5X6 0.15 4.50 Rmt
1X4X4 0.15 2.40 Rmt
6.90 Rmt
@ 1.40 Kg. per Rmt 6.90 X 1.40 9.66 Kg. 66.00 637.56
28 Distempering( two coat) with oil bound distemper
of approved brand and manufacture and of
required shade on undecorated wall with one
coats white cement primer after thoroughly
brushing the surface to make free from mortar
dropping the other foreign matter and also
prepairing the surface even with Plaster of Paris
or approved synthetic material and sand papered
to make smooth including cost of all materials for
complete work. (S.I.No.650+650)
1X2 4.30 0.40 3.44 Sqm
1X2 1.85 0.40 1.48 Sqm
1X1 4.30 1.85 7.96 Sqm
1X2 2.30 0.40 1.84 Sqm
1X2 1.80 0.40 1.44 Sqm
1X1 2.30 1.80 4.14 Sqm
20.30 Sqm 56.00 1136.52
Total 294500.10