Sie sind auf Seite 1von 17

RICHARD L.

CALINGASAN

Personal Data:

Position Applied For : PIPE FITTER/ FABRICATOR

Date of Birth : September 15.1972

Place of Birth : Poblacion, San Pascual,

Civil Status : Married

Nationality : Filipino

Sex : Male

Height : 5 10

Weight : 145 lbs.

S. S. S. No. : 33-1518852-0

Educational Attainment : High School Graduated

Passport Number : XX1501210

Valid Until : June 29, 2013


Employment Records:

Company : AG&P
Position : Pipe Fitter
Inclusive Date : April 15, 2010 up to present
Address : San Roque, Bauan, Batangas

Scope of Work :

a. Assigned in field, install fabricated spools on


underground, pipe rock, slippers and to different
equipment nozzles. Spool erection on pipe rock and
alignment. Alignment and installation on different kinds of
fitting material and valves.
b. Dismantle old process pipe and fittings including valves
and pipe support and replace with newly fabricated pipe
spools. Box up and bolting different kinds and sizes of
valves. Line check the line prior for air testing bowling
and hydro testing of commissioning crew.

Company : Chin Wui Heng


Position : Pipe Fitter
Inclusive Date : March 29, 2007 to March 27, 2009
Address : Lot 2771 Jln Badas Seria
BruneiDarussalam

Scope of Work :

a. Fit-up pipes to all kinds of fittings such as pipe to elbows,


reducers, tees, flanges and valves. Fitting up requires proper
alignment. Installation of small and large bore pipes.
Fabrication of shower lines pipes for vessels. Erection and
rigging of pipes.
b. Installation of various flanges welded or screwed valves.
Fabrication of saddles. Miter turn for large pipes and other
types of branch connection.

Company : HANOVER BELLELI Energy Spa


Position : Pipe Fitter
Inclusive Date : April 26,2006 to February 11, 2007
Address : P.O. Box 24205 Doha State of Qatar
Scope of Work :
a. Fabrication of different sizes and schedule of pipe spool as
per isometric drawing.
b. Lay-out, cutting, grinding and fit-up fittings such as
elbows (90oand 45o), flanges, tee, cap and reducer.
c. Performs housekeeping and observe safety procedures to
attain zero defect.

Company : HYUNDAI ENGINEERING & CONSTRUCTION


CO. LTD.
Position : Pipe Fitter
Inclusive Date : May 06, 2004 to May 03, 2005
Address : Mellitah Plant, Libya

Scope of Work :
a. Assigned in fabrication shop. Fabricate different pipe
schedule of small bore and large bore pipes, fittings and
jacketed pipes as per isometric drawing. Coordinate to piping
supervisor, piping foreman and to welder for proper execution
of piping works.
b. Assigned in field, install fabricated spools on
underground, pipe rock, slippers and to different
equipment nozzles. Spool erection on pipe rock and
alignment. Alignment and installation on different kinds of
fitting material and valves.
c. Dismantle old process pipe and fittings including valves
and pipe support and replace with newly fabricated pipe
spools. Box up and bolting different kinds and sizes of
valves. Line check the line prior for air testing bowling
and hydro testing of commissioning crew.

Company : NPCC
Position : Pipe Fitter 1
Inclusive Date : September 29, 2002 to December 07, 2003
Address : P. O. Box 2058, Mussafah, Abu Dhabi U. A. E.

Scope of Work :
a. Assigned in fabrication shop. Fabricate different pipe
schedule of small bore and large bore pipes, fittings and
jacketed pipes as per isometric drawing.
b. Assigned in field, install fabricated spools on
underground, pipe rock, slippers and to different
equipment nozzles.
c. Involve hydro testing of piping systems.
d. Re install all piping materials including control valves
as per posttest punch list.
e. Fabricate and install different kinds of pipe supports such
as pipe shoes, guides, U-Bolts, Tee and Base Supports.
f. Coordinate to piping supervision, piping foreman and to
welders for proper execution of piping works.

Company : P. E. C. PTE. LTD


Position : Pipe Fitter
Inclusive Date : March 03, 2001 to March 02, 2002
Address : 21 Shipyard Road, Singapore

Scope of Work :
Spool erection on pipe rack, fit up installation and
alignment. Alignment and installation of different kinds of pipe
with the use of different kinds of fitting materials and valves.
Box up and bolting different kinds and sizes of valves. Line
check in blinding prior for air testing and hydro testing on
commissioning screw.

Company : C. C. I. C. S. A. L.
Position : Pipe Fabricator
Inclusive Date : June 16, 1999 to June 18, 2000
Address : OGD II Project Abu Dhabi, U. A. E.

Scope of Work :
a. Dismantle old process pipe and fittings including valves
and pipe support and replace with newly fabricated pipe.
b. Study the piping plan and piping isometric drawing to
ensure that the fabricated spool will be as per drawing.
c. Fabricate and install different pipe schedule of small bore
and large bore pipes, fittings, valves, strainer expansion
joint and associated pipe support as shown on piping
isometric drawing.
d. Coordinate to welders, piping foreman and supervisor for
proper execution of piping works.

Company : STORK WESCAR ARUBA N. V.


Position : Pipe Fabricator
Inclusive Date : June 23, 1998 to September 10, 1998
Address : San Nicolas, Aruba

Scope of Work :
a. Assigned in fabrication shop, field erection, preparation of
all tools and materials needed.
b. Fabricate and install different kinds of layout such as Tee,
lateral and elbow.

Company : C. C. C. W. L. L.
Position : Pipe Fabricator
Inclusive Date : April 07, 1997 to December 03, 1997
Address : Safco, 2nd Ammonia Urea Plant, Jubail

Scope of Work :
a. Assigned in fabrication shop, study piping plan and piping
isometric drawing. Lay-out, cutting, grinding and fit-up
different kinds and sizes of pipe spool with the use of different
kinds of fittings.
b. Perform some repair works and modifications as per
revision and engineering request.

Company : C. C. I. C. S. A. I.
Position : Pipe Fitter
Inclusive Date : January 18, 1996 to October 17, 1996
Address : QLNG Ras Laffan, Doha Qatar

Scope of Work :
a. Fabrication of pipe spool in accordance to isometric
drawing.
b. Erection and fit up of pipe spool in pump, equipment
nozzles and into pipe rack.
c. Re-instate pipe spool to their corresponding area.
d. Box up and bolting different kinds and sizes of valves.
e. Check all blinds prior to air test blowing and hydro
testing of commissioning screw.

________________________________
RICHARD L. CALINGASAN
Applicants Signature

Das könnte Ihnen auch gefallen