Beruflich Dokumente
Kultur Dokumente
373
general arrangement drawings have been issued. The initial analysis proceeds as
follows:
Due to problems which occur during construction, the as-built drawings often
differ from the piping drawings. In most instances, these changes are minor and
do not affect the results of the analysis. Should any major changes occur during
construction, the effect on the analysis results would need to be evaluated.