HANDING OVER OF WATER RETICULATION SYSTEM TO JBALB SARAWAK

Your Ref:
Our Ref:

Developer: ____________________________
Address: ____________________________
____________________________
____________________________

Date: ____________________________

To:

_____________ Water Supply Authority


c/o Divisional Water Engineer, JBALB ______________

PART A
Handing Over Certificate for Water Supply Reticulation

On Lots
__________________________________________________________________________________
__________________________________________________________________________________

I/We, the undersigned being the promoter/proprietor of the above-mentioned housing develop-
ment hereby agree:-

i. To surrender without any conditions to Government all rights to all pipelines and
waterworks fittings within the development with effect from __________ after which these
water supply installations shall be Government property to be operated and maintained by
Jabatan Bekalan Air Luar Bandar Sarawak at Government expenses after expiry of One (1)
Year Defect Liability Period on ______________
ii. That Government shall be relieved of all financial responsibility in respect of liabilities
incurred in the execution of works, etc. Prior to this date of taking over; and
iii. I/We confirm that there are no financial encumbrances on Government in respect of
pipelines and ancillary works surrended hereby to Government.

____________________________ ____________________________
Contractors Signature Developers Signature and Stamp
PART B
(To be completed by Consulting Engineers)
1. Pipeline
Diameter Type Class Make Length

2. Sluice Valves 3. Air Valves


Size Make Nos. Size Type Make Nos.

4. Hydrants 5. Washouts
Size Make Nos. Size Make Nos.

6. I enclosed herewith the following:


i. Certificates of pipeline/pressure/leakage test are attached
ii. One (1) soft copy of as-built drawing in Autocad Format
7. I hereby certify the above installations has been laid in accordance with the plans and speci-
fications approved by Jabatan Bekalan Air Luar Bandar vide: ________________________
date: __________________________.

__________________________________
Consultant Engineers Signature and Stamp
PART C
(For office use)

1. Taking-over approved vide _________________ dated ___________________


2. As-built plans checked by ___________________________________________
3. Pipelines taken over, scoured and put into service on _____________________ _________
by _____________________________

Signature: __________________________
Designation: __________________________

Date : __________________________