Sie sind auf Seite 1von 5

PILING ( ALL PROVISIONAL)

Amount
Item Description Unit Qty Rate
(RM)

PREAMBLES

STEEL SHEET PILE

Ground water level established at 4.00m below original


ground level on 23 June 2015.

Rates for mobilization to the site includes mobilization all


and every equipment, ancillaries and everything required
for these works unless provided for elsewhere and
including distance traveled and allowance for difficulties of
access all and everything

Rate for boring and drilling includes provision of clean water


or clean water with additives as approved by the SO and
usage of compatible rods, core barrels and drill and core
bits to suit the ground conditions and delivery of rock cores
including core boxes.

The site is not near any water catchment.



.
Interlocking steel sheet pile FSDA section type with 400mm
x 85mm x 8mm Flage thick as 6.00m, supply length
temporary steel sheet pile.

A. Total area of pile, not exceeding 12.00m m2 1,207

B. 2 coat of bituminous paint to surfaceof steel sheet pile. m2 986

C. Total driven area, not exceeding 12.00m m2 986

D. Extra over, for special pile, corner m 10

E. Extra Over, for special pile, junction m 5

F. Extra Over, for special pile, closure m 5

G. Extra Over, for special pile, taper. m 5

H. Cutting to form holes nr 86

Piling/SSP/1
PILING ( ALL PROVISIONAL)

To Collection
Amount
Item Description Unit Qty Rate
(RM)

Piling/SSP/1
PILING ( ALL PROVISIONAL)

Amount
Item Unit Qty Rate
(RM)

Piling/SSP/1
PILING ( ALL PROVISIONAL)

To Collection
Amount
Item Description Unit Qty Rate
(RM)

Piling/SSP/1
PILING ( ALL PROVISIONAL)

To Collection

Piling/SSP/1