Project:- MUBP86
x<
Location :- Aynalem main campuss , & kedemay weyane secondary school
c]< S/u?
Invester :- Mekelle universty
Y^ }s^
Contractor:Bokra Construction & Trading plc
(As per the attached statement the value of work executed and/or materials suppled todate
PREVIOUS PAYMENTS /
() ()
No. Date Amount(Birr) VAT(Birr)
Advance 43,051,974.63
1 1 ST
Pay
2 2 nd
Pay
3 3 rd
pay
4 4 th
Pay
5 5 th
Pay
6
Total Advance Repayment30% E
5,307,397.95 ( 95/10
Certified by
Name
sign
Date
Date of signature of contract 27/10/2005 Ec
RTIFICTE NO 06/SIX
u< M (w`)
Amount (Birr)
<M 135,182,884.88
Main Contract
}kL <M 8323697.21
Supplementary Contract
K< Y^ 21,525,987.31
Variation Order
pLL U` 165,032,569.40
Total Sum
u< M (w`)
and/or materials suppled todate Amount
Excuted 47343776.14
material on site
u< M (w`)
Deductions Amount
A 20,658,405.37
1. ekV }K
Previous Payments B -
2.S
Retention 5% C 1,032,920.27
3.
penality D
4. pT> 6,197,521.61
Advance Repayment30% E
U`
TOTAL F 7,230,441.88
F=B+C+D+E
G=A-F J=H-I
K=G+J
95/100)
Approved by
Name
sign
Date
MEKELLE UNIVERSITY COMMUNITY SCHOOL
AT MEKELLE
GRAND SUMMARY (Commulative)
BLOCK No. Contract Previously Executed Currently Executed Todate Excuted
No NAME
Name Block Amount AMOUNT AMOUNT AMOUNT
1 B1 Administration block 1 2,115,822.32 1,236,310.17 27,934.27 1,264,244.44
2 B1a Administration block extra 1 2,715,986.20 1,217,099.25 - 1,217,099.25
3 B1b Administration Building 1 4,944,490.73 2,521,498.57 350,959.22 2,872,457.79
B1 ADEMINSTRATIVE OFFICES
AT MEKELLE
SUMMARY
Previous Current Todate
NO. Description Amount Amount Amount
A-SUB STRUCTURE
B-SUPER STRUCTURE
151,571.57 - 151,571.57
1 CONCRETE WORK
BIRR
198,440.83 - 198,440.83
2 BLOCK WORK... BIRR
- - -
8 PAINTING. BIRR - - -
9 GLAZING. BIRR - - -
Contractor Consultant
Excuted Quantity Excuted Amount
ITEM DESCRIPTION UNIT Contract Previous Current Todate Previous Current Todate
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Bulk excavation in ordinary soil not exceeding
1500mm from NGL. m 526 240.4 240.40 55 13,222.00 - 13,222.00
1.2 Excavate in ordinary soil for isolated footing to a
depth exceeding 1500mm but not exceeding
3000mm from reduced level. m 13 18.3 18.30 75 1,372.50 - 1,372.50
1.3 Excavate in weathered rock for isolated footing to a
depth exceeding 1500mm but not exceeding
3000mm from reduced level. m 13 - 410 - - -
1.4 Excavate for trench foundation in ordinary soil to a
depth not exceeding 1500mm from stripped level. m 78 30.66 30.66 61 1,870.26 - 1,870.26
1.5 Fill around trench, isoleted foundation and under
hardcore to maintain the desired level with
selected borrowed material and compact in layers
not exceeding 200mm. m 434 270.735 270.74 156 42,234.66 - 42,234.66
1.6 Cart away surplus excavated material to a distance
not exceeding 2kms. m 711 289.36 289.36 85 24,595.60 - 24,595.60
1.7 250mm. thick sound basaltic or equivalent stone
hard-core finished and blinded with crushed stone. m 224 229.29 229.29 143 32,788.47 - 32,788.47
Total to Summary..Birr - 116,083.49 - 116,083.49
2. CONCRETE WORK - -
2.1 50mm thick lean concrete in C-5 with minimum
cement content of 150Kg/m3under: - -
a. Footing pads m 12 11.36 11.36 75 852.00 - 852.00
b. Under grade beam m 13 11.08 11.08 75 831.00 - 831.00
c. Under stone masonry wall m 44 55.58 55.58 75 4,168.50 - 4,168.50
d. Under ground floor Slab m 224 229.29 229.29 75 17,196.75 - 17,196.75
2.2 Reinforced concrete in class C-25 (with a 28-day
150mm cube crushing strength of 25MPa), cast into
formworks and vibrated around rod reinforcement
bars.( formwork & reinforcement bars are
measured separately.) in: "Type of cement to be - - -
ordinary Portland cement (OPC)"
a. In isolated footing pads m 3 2.21 2.21 2539 5,611.19 - 5,611.19
b. In foundation column m 3 1.01 1.01 2539 2,564.39 - 2,564.39
c. In grade beam m 13 12.34 12.34 2539 31,331.26 - 31,331.26
d. Styrophome expansion joint ml 166 174.02 174.02 70 12,181.40 - 12,181.40
2.3 50mm thick lean concrete class C-15 only 280 kg
cement/m3 of concrete under: - - -
In ground floor slab (10cm thick) m 224 229.29 229.29 199.9 45,835.07 - 45,835.07
2.4 Provide, cut and fix in position sawn Zigba wood or
metal panel form work: - - -
a. In isolated footing pad m 12 11.8 11.80 166 1,958.80 - 1,958.80
b. In foundation column m 36 17.75 17.75 166 2,946.50 - 2,946.50
c. In grade beam m 102 103.7808 103.78 166 17,227.61 - 17,227.61
2.5 Reinforcement bar according to structural
drawings. Price includes cutting, bending, placing
in position & tying wires. - - -
Diameter 8mm deformed bars Kg 1605.77 1178.633 1,178.63 36 42,430.77 - 42,430.77
Diameter 10mm deformed bars Kg 478.8 87.614 87.61 36 3,154.10 - 3,154.10
Diameter 12mm deformed bars Kg 552.2 487.8663 487.87 36 17,563.19 - 17,563.19
Diameter 14mm deformed bars Kg 476 410.7454 410.75 36 14,786.83 - 14,786.83
Total to Summary...Birr - 220,639.37 - 220,639.37
3. MASONRY WORK - -
3.1 500 mm thick hard trachytic or equivalent stone
peripheral foundation wall to a depth of 50cm
bedded in cement mortar 1:3 below natural ground m 35 47.25 47.25 1233 58,259.25 - 58,259.25
level.
3.2 500 mm thick hard trachytic or equivalent stone
peripheral foundation wall to a depth of 100cm
bedded in cement mortar 1:3 above natural ground m 14 12.03 12.03 1253 15,073.59 - 15,073.59
level.
Total to Summary.Birr - 73,332.84 - 73,332.84
B. SUPER STRUCTURE - - -
1. CONCRETE WORK - - -
1.1 Reinforced concrete in class C-25 (with a 28-day
150mm cube crushing strength of 25MPa), cast into
formworks and vibrated around rod reinforcement
bars. (formwork & reinforcement bars are
measured separately.) in: "Type of cement to be - - -
ordinary Portland cement (OPC)"
a. In elevation column m 4 3.51868 3.52 2539 8,933.93 - 8,933.93
b. In intermediate and top tie beams m 10 8.99925 9.00 2539 22,849.10 - 22,849.10
c. In Concrete gutter m 3 2.616642 2.62 2539 6,643.65 - 6,643.65
1.2 Provide, cut and fix in position metal panel or
sawn Zigba wood form work - - - -
a. To elevation column m 62 66.43 66.43 185 12,289.55 - 12,289.55
b. To intermediate and top tie beams m 75 91.1458 91.15 208 18,958.33 - 18,958.33
c. To Concrete gutter m 52 54.3585 54.36 208 11,306.57 - 11,306.57
1.3 Reinforcement bar according to structural
drawings. Price includes cutting, bending, placing
in position & tying wires. - - - -
Diameter 6mm deformed bars Kg 42.84 42.06456 42.06 36 1,514.32 - 1,514.32
Diameter 8mm deformed bars Kg 532.51 722.6841 722.68 36 26,016.63 - 26,016.63
Diameter 10mm deformed bars Kg 51.45 0 - 36 - - -
Diameter 12mm deformed bars Kg 808.5 741.8965 741.90 36 26,708.27 - 26,708.27
Diameter 14mm deformed bars Kg 464.8 454.2005 454.20 36 16,351.22 - 16,351.22
Total to Summary....Birr - 151,571.57 - 151,571.57
2. BLOCK WORK - - -
2.1 200mm thick hollow concrete block wall of type
Class-C with 28 days minimum crushing strength of
18kg/cm2, bedded in cement mortar (1:3) mix, both
sides left for plastering. Price includes 26mm iron
bars laid horizontally every other course (spacing m 177 139.054 139.05 466 64,799.16 - 64,799.16
400mm c/c).
2.2 Ditto but 150mm thick solid block. m 105 63.45 63.45 391 24,808.95 - 24,808.95
2.3 Ditto but 100mm thick solid block. m 139 - 326 - - -
2.4 300mm thick well dressed stone masonry wall
bedded in 1:3 mortar mix. m 153 151.789 151.79 717 108,832.71 - 108,832.71
Total to Summary....Birr - 198,440.83 - 198,440.83
3. ROOFING - - -
- - -
- - -
3.1 Roof cover in Pre-painted EGA 300, 0.5mm thick
fixed to RHS purlins with standard hooks and
washers. Roof cover measured in horizontal
projection. Price includes ridge cover & 50mm thick m 271 0 - 375 - - -
rock
Roof wool
coverinsulation.
in precoated EGA 400, t=0.4mm fixed
3.1* to RHS STEEL.Price shall include ridge cap. (Purlins
measured separately and roof measured in m 0 248.4 248.40 341 84,704.40 - 84,704.40
3.2 horizontal
G-28 projection)
G.I.S roof gutter with development length of
1000mm welded at joint provided 2% slope towards
down pipe and Price includes painting of two coats
of antirust and one coat of metal paint. ml 33 47.99 47.99 348 - 16,700.52 16,700.52
3.3 G28 flat metal sheet flashing with development
length of 330mm and Price includes painting of two
coats of antirust and one coat of metal paint. m 15 - 135 - - -
3.4 G28 flat metal sheet copping with development
length of 330mm and Price includes painting of two
coats of antirust and one coat of metal paint. m 15 89.87 89.87 125 - 11,233.75 11,233.75
Contractor Consultant
Excuted Quantity Excuted Amount
ITEM DESCRIPTION UNIT Contract Previous Current Todate Previous Current Todate
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
3.5 Supply and fix 8 mm thick ribbed sheet eave soffit
ceilings. Price include 40 x 50 mm zigba wood
battens with c/c spacing of 600 mm both ways,
corner list and all other necessary accessories to
complete the work.
m 32 - 288 - - -
- - - -
3.6 Dia 110mm PVC down pipe. ml 86 - 223 - - -
- - - -
Total to SummaryBirr - 84,704.40 27,934.27 112,638.67
- - - -
4. CARPENTRY & JOINERY - - - -
- - - -
Carpentry - - - -
4.1 Supply and fix 8 mm thick chip wood ceilings. Price
include 40 x 50 mm zigba wood battens with c/c
spacing of 600 mm both ways, corner list and all
other necessary accessories to complete the work. ml 153 229.29 229.29 288 66,035.52 - 66,035.52
- - - -
4.4 Supply and fix PVC approved quality doors all
according to manufacturer instruction. Price shall
include ASSA or equivalent (Knob type for toilet
doors) safety locks, hinges, and other necessary - - - -
accessories.
a. Size - 700x2700mm [Toilets] pcs 5 - 2835 - - -
- - - -
Total to SummaryBirr - 66,035.52 - 66,035.52
- - - -
5. METAL WORK - - - -
- - - -
Doors and windows made of Aluminum anodized
tubular profile frames ALLCO-5, 2mm thick average
weight 850gm/m, door kick plate 1500gm/m, partly
covered with aluminum sheet according to the
detail drawing and window door schedule .
Complete work includes all the necessary iron
mongery and approved type of cylindrical lock. All
aluminum windows and doors type shall be
approved by the Consultant. Price includes double
6mm thick tinted tempered glass. - - - -
- - - -
5.1 Aluminum Window - - - -
- - - -
Size 900x 2500 mm pcs 4 - 6750 - - -
- - - -
Size 1800x 2000 mm pcs 1 - 10800 - - -
- - - -
Size 1700x 2000 mm pcs 5 - 10200 - - -
- - - -
Size 1500x 2000 mm pcs 3 - 9000 - - -
- - - -
5.2 Aluminum Door - - - -
- - - -
Size 900x 2700 mm pcs 4 - 7290 - - -
- - - -
Size 1000x 2700 mm pcs 1 - 8100 - - -
- - - -
Size 1200x 2700 mm pcs 1 - 9720 - - -
- - - -
- - - -
Total to Summary.....Birr - - - -
- - - -
6. STRUCTURAL STEEL WORKS - - - -
- - - -
Supply and erect steel roof structure all as shown
on the detail drawing. Apply two coats of antirust
paint. Price includes all necessary preparation work
such as cleaning, wire brushing and finally two
coats of anti-rust paint. - - -
- - -
6.1 Upper, lower, vertical & horizontal chords as
specified on the drawing. - - -
- - -
RHS size: 50 x 50 x 2.5mm kg 703.12 741.03 741.03 60.00 44,461.84 - 44,461.84
- - - -
RHS size: 30 x 30 x 2.5mm kg 319.87 383.40 383.40 60.00 23,003.71 - 23,003.71
- - - -
6.2 Lattice purlin - - - -
- - - -
RHS size: 25 x 25 x 2.5mm kg 887.60 825.88 825.88 60.00 49,552.72 - 49,552.72
- - - -
RHS size: 20 x 20 x 2mm kg 203.30 869.45 869.45 60.00 52,166.81 - 52,166.81
- - - -
6.5 100x400x5mm steel plate welded to truss and fixed
to anchor bolts as shown on the drawing. No. 14 - 415 - - -
6.6 100x200x5mm steel plate welded to truss and fixed
to anchor bolts as shown on the drawing. No. 36 - 375 - - -
- - - -
6.7 Grade 4.8 M12 threaded anchor bolt L-300mm No. 54 - 80 - - -
-
Total to Summary.....Birr - 169,185.09 - 169,185.09
7. FINISHING WORK - - -
7.1 PLASTERING AND POINTING - - -
- - -
Finishing work shall include all surface pre-
cleaning, Preparation and application of the finish,
polishing and cleaning at the end of finished work. -
-
7.1.1 Apply two coats of plaster in cement mortar (1:3) &
final gypsum coating to internal wall , columns &
beams. Provide grooves recessed by 5mm between
beams and walls, columns and walls. m 469 505.443 505.44 140 70,762.02 - 70,762.02
- - -
7.1.2 Ditto item 7.1.2 but two coats to receive ceramic
wall tile. m 27 - 105 - - -
- - -
7.1.3 Apply two coats of external wall plaster in cement
mortar mix 1:3 and one coat of tyrolean rendering
in cement mortar mix 1:2. Provide grooves
recessed by 5mm between beams and walls, m 172 146.709 146.71 154 22,593.19 - 22,593.19
columns and walls. - - - -
7.2 FLOOR & WALL FINISHING - - - -
- - - -
7.2.1 Supply & fix 300x300x2mm asbestos free hard
imported PVC tiles flooring stuck to cement screed
with approved adhesive glue. Price shall includes
48mm thick cement mortar backing. m 98 - 329 - - -
- - - -
7.2.2 100mm high PVC skirting stuck to wall with proper
adhesive. ml 74 - 75 - - -
Contractor Consultant
Excuted Quantity Excuted Amount
ITEM DESCRIPTION UNIT Contract Previous Current Todate Previous Current Todate
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
- - - -
7.2.3 8mm thick best quality imported non-slippery
ceramic tile on with proper grouting of joints in
cement mortar mix of 1:3. Price shall include 42mm
thick mortar beding. m 30 14.784 14.78 604 8,929.54 - 8,929.54
- - - -
7.2.4 20mm thick terrazzo floor tiles on and
including30mm cement sand screed(1:3 ) mix Price
including grinding and polishing. m 6 84.1451 84.15 456 38,370.17 - 38,370.17
- - - -
7.2.5 100mm high terrazzo tile skirting tstuck to wall
with cement mortar(1:3)mix. ml 9 - 85 - - -
- - - -
Marble thread and risers including cement mortar
and joined in cement mortar mix of 1:3 to - - - -
- - - -
External stair case - - - -
7.2.6 Tread, size 340 x 30mm rose white color marble ml 37 - 634 - - -
- - - -
7.2.7 Riser, size 130 x 2cm black color marble ml 37 - 436 - - -
- - - -
Window Sill - - - -
7.2.8 Marble window cill on and including cement mortar
bed jointed in cement mortar mix of 1:3. - - - -
- - - -
Size 280 x 30mm ml 25 - 626 - - -
Door Threshold - - - -
7.2.9 Marble door thresholds on and including cement
mortar bed jointed in cement mortar mix of 1:3 - - - -
- - - -
Size 200 x 20mm ml 10 - 487 - - -
- - - -
7.2.10 Supply 300x200x6mm glazed ceramic wall tile to a
height of 1800mm with cement mortar backing and
joints grouted in white cement. m 27 - 732 - - -
- - - -
7.2.11 1000mm wide well dressed stone pavement bedded
on 150mm thick quarry waste and joints pointed in
cement mortar (1:3) mix around the building. m 107 - 475 - - -
- - - -
7.2.11 1000mm wide Concrete pavement bedded on
150mm thick quarry waste and joints pointed in
cement mortar (1:3) mix around the building. M3 78.35 78.35 199.9 15,662.17 - 15,662.17
- - - -
7.2.12 Supply and lay semi-circular open precast concrete
open channel on 50mm thick sand bedding. Unit
price shall include flat stone/concrete topping,
provision of metal grating at inlet to
manhole,excavation of the trench and cartaway. ml 115 - 274 - - -
Ditch dia.: 1/2 300 mm
-
Total to Summary..Birr - 156,317.07 - 156,317.07
Contractor Consultant
BOKRA CONSTRUCTION & TRADING PLC
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING PLC
SUBSTRUCTURE BAR SCHEDULE SUMMARY
0 394.289 101.188 502.2519
No in a No Total No TOTAL LENGTH OF BAR FOR DIA.
Location Shape Dia. Length
Member Member of Bars 6 8 10 12
SUB
STRUCTURE
Footing Pad
F1 10 1.0 12 11 132 132
F2 10 0.8 8 5 40 32
Total Length(m) 0 0 0
Unit Wt.(kg/m) 0.222 0.395 0.617 0.888
Tot.Wt.(kg) 0 0 0
Grand total
BOKRA CONSTRUCTION & TRADING PLC
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING PLC 42.06 733.06 - 743.10
SUPER STRUCTURE BAR SCHEDULE SUMMARY
No in a No Total No TOTAL LENGTH OF BAR FOR DIA
Location Shape Dia. Length
Member Member of Bars 6 8 10 12
SUPER STRUCTURE
ELEVATION COLUMN
C1 12 3.125 4 5 20 62.5
8 0.7 21 5 105 73.5
C2 12 3.125 6 6 36 112.5
8 0.9 21 6 126 113.4
C3 12 3.825 4 6 24 91.8
8 0.7 21 6 126 88.2
C4 12 3.825 6 4 24 91.8
8 0.6 21 4 84 50.4
C5 12 3.475 6 1 6 20.85
8 0.9 24 1 24 21.6
C6 12 3.885 6 1 6 23.31
8 0.9 27 1 27 24.3
C7 12 4.325 6 2 12 51.9
8 0.9 30 2 60 54
C8 12 3.805 6 1 6 22.83
8 0.9 26 1 26 23.4
C9 12 4.295 6 1 6 25.77
8 0.6 24 1 24 14.4
Total Length(m) 0 463.2 0 503.26
Unit Wt.(kg/m) 0.222 0.395 0.617 0.888
Tot.Wt.(kg) 0 182.964 0 446.8949
BOKRA CONSTRUCTION & TRADING PLC
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING PLC
No in a No Total No TOTAL LENGTH OF BAR FOR DIA
Location Shape Dia. Length
Member Member of Bars 6 8 10 12
SUPER STRUCTURE
Top Tie Beam
Beam On Axis 4/A-Ftop 14 24.46 2 1 2
Bottom 12 24.16 2 1 2 48.32
8 0.94 170 1 170 159.8
Beam On Axis 2/C-F'Top 14 11.015 2 1 2
Bottom 12 10.715 2 1 2 21.43
8 0.94 76 1 76 71.44
Beam On Axis1/A-Etop 14 20.4 2 1 2
Bottom 12 20.7 2 1 2 41.4
8 0.94 144 1 144 135.36
Beam On Axis B&E/2-4 Top 14 6 2 2 4
Bottom 12 5.7 2 2 4 22.8
8 0.94 40 2 80 75.2
Beam On Axis B/1-4Top 14 7.65 2 1 2
Bottom 12 7.35 2 1 2 14.7
8 0.94 51 1 51 47.94
Beam On Axis G / F'-Z Top 14 3.58 3 1 3
Bottom 12 3.28 3 1 3 9.84
8 1.14 21 1 21 23.94
Beam On Axis Z / 4-Itop 14 14.265 3 1 3
Bottom 12 13.965 3 1 3 41.895
8 1.14 94 1 94 107.16
Beam On Axis C/1-4Top 14 7.65 2 1 2
Bottom 12 7.35 2 1 2 14.7
8 0.94 50 1 50 47
Total Length(m) 0 667.84 0 215.085
Unit Wt.(kg/m) 0.222 0.395 0.617 0.888
Tot.Wt.(kg) - 263.80 - 191.00
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING PLC
No in a No Total No TOTAL LENGTH OF BAR FOR DIA
Location Shape Dia. Length
Member Member of Bars 6 8 10 12
Beam On Axis N/J-Ktop 14 5.05 3 1 3
Bottom 12 4.75 3 1 3 14.25
8 1.14 31 1 31 35.34
Beam On Axis K/L-Mtop 14 6.8 3 1 3
Bottom 12 6.5 3 1 3 19.5
8 1.14 45 1 45 51.3
Beam On Axis 1/ C-Ktop 14 7.69 3 1 3
Bottom 12 7.39 3 1 3 22.17
8 1.14 52 1 52 59.28
Beam On Axis J / L-M top 14 4.8 3 1 3
Bottom 12 4.5 3 1 3 13.5
8 1.14 31 1 31 35.34
Beam On Axis Y/G-H Top 14 8.26 2 1 2
Bottom 12 7.96 2 1 2 15.92
8 0.94 56 1 56 52.64
Beam On Axis M/K-H' top 14 5.39 2 1 10.784
Bottom 12 5.092 2 1 2 10.184
8 0.94 35 1 35 32.9
PAGE NO: 1
MMARY
410.74539 0 0 0
TAL LENGTH OF BAR FOR DIA.
14 16 20 24
0 0 0 0
1.21 1.579 2.467 3.55
0 0 0 0
TAKEOFF SHEET NO:01
B1 ADMINSTRATIVE OFFICE
PAGE NO: 2
0 0 0 0
1.21 1.579 2.467 3.55
0 0 0 0
TAKEOFF SHEET NO:01
B1 ADMINSTRATIVE OFFICE
PAGE NO: 3
19.1
18.72
19.1
22.1
21.225
22.17
15
137.415 0 0 0
1.21 1.579 2.467 3.55
166.27215 0 0 0
TAKEOFF SHEET NO:01
B1 ADMINSTRATIVE OFFICE
PAGE NO: 4
23.67
11.34
21
23.55
22.43
101.99 0 0 0
1.21 1.579 2.467 3.55
123.4079 0 0 0
TAKEOFF SHEET NO:01
B1 ADMINSTRATIVE OFFICE
PAGE NO: 5
15.7
15.75
11.184
15.7
24.8
16.92
100.054 0 0 0
1.21 1.579 2.467 3.55
121.06534 0 0 0
TAKEOFF SHEET NO:01
B1 ADMINSTRATIVE OFFICE
PAGE NO: 6
AR FOR DIA.
14 16 20 24
0 0 0 0
0 0 0 0
0 0 0 0
1.21 1.579 2.467 3.55
0 0 0 0
TAKEOFF SHEET NO:01
B1 ADMINSTRATIVE OFFICE
PAGE NO: 7
454.20 - - -
SUMMARY
AL LENGTH OF BAR FOR DIA.
14 16 20 24
0 0 0 0
1.21 1.579 2.467 3.55
0 0 0 0
TAKEOFF SHEET NO:01
B1 ADMINSTRATIVE OFFICE
PAGE NO: 8
48.92
22.03
40.8
24
15.3
10.74
42.795
15.3
219.885 0 0 0
1.21 1.579 2.467 3.55
266.06 - - -
TAKEOFF SHEET NO:01
B1 ADMINSTRATIVE OFFICE
PAGE NO: 9
20.4
23.07
14.4
16.52
58.147328
22.95
155.48733 0 0 0
1.21 1.579 2.467 3.55
188.14 - - 0
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY TAKEOFF SHEET NO:01
NSULTANT :NOMY ENGINEERING PLC BLOCK: B1
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING PAGE NO: 01
3. ROOFING
B1
7.45 Axis K b/n L-M
7.89 Axis L b/n K-I
19.45 Axis L b/n I-F
28.61 Axis 4 b/n A-F
13.02 Axis A b/n 1-4
13.45 Axis I b/n L-M
89.87 ML total
Contractor Consultant
BOKRA CONSTRUCTION & TRADING PLC
MEKELLE UNIVERSTY COMMUNITY SCHOOL
B1a ADEMINSTRATIVE EXTRA OFFICES
AT MEKELLE
SUMMARY
Previous Current Todate
A-SUB STRUCTURE Amount Amount Amount
2 CONCRETE WORK..
BIRR 0 276,755.13 - 276,755.13
B-SUPER STRUCTURE
1 CONCRETE WORK..
BIRR 0 190,228.95 - 190,228.95
2 BLOCK WORK...
BIRR 0 153,994.55 - 153,994.55
3 ROOFING.
BIRR 0 97,865.09 - 97,865.09
5 METAL WORK.
BIRR 0 - - -
8 PAINTING.BIRR 0 - - -
9 GLAZING. BIRR 0 - - -
Contractor Consulatant
Excuted Quantity Excuted Amount
ITEM contract Previous Current Todate Previous Current Todate
DESCRIPTION UNIT QTY. QTY. QTY QTY Rate Amount Amount Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
Bulk excavation in ordinary soil not exceeding 1500mm
1.1 from NGL. m 671 311.07 311.07 55 17,108.85 - 17,108.85
Excavate in ordinary soil for isolated footing to a depth
exceeding 1500mm but not exceeding 3000mm from
1.2 reduced level. m 61 21.50 21.50 75 1,612.50 - 1,612.50
Excavate in weathered rock for isolated footing to a
depth exceeding 1500mm but not exceeding 3000mm
1.3 from reduced level. m 21 - 410 - - -
Excavate for trench foundation in ordinary soil to a depth
1.4 not exceeding
Fill around 1500mm
trench, from
isoleted stripped level.
foundation and under m 49 - 61 - - -
hardcore to maintain the desired level with selected
borrowed material and compact in layers not exceeding
1.5 200mm. m 842 474.64 474.64 156 74,043.06 - 74,043.06
Cart away surplus excavated material to a distance not
1.6 exceeding 2kms. m 889 332.57 332.57 85 28,268.45 - 28,268.45
250mm. thick sound basaltic or equivalent stone hard-
1.7 core finished and blinded with crushed stone. m 260 259.10 259.10 143 37,051.30 - 37,051.30
Total to Summary..Birr - 158,084.16 - 158,084.16
2. CONCRETE WORK - - - -
2.1 50mm thick lean concrete in C-5 with minimum - - - -
cement content of 150Kg/m3under: - - - -
a. Footing pads m 14 18.10 18.10 75 1,357.50 - 1,357.50
b. Under grade beam m 60 21.18 21.18 75 1,588.50 - 1,588.50
c. Under stone masonry wall m 59 51.53 51.53 75 3,864.75 - 3,864.75
d. Under ground floor slab m 260 259.10 259.10 75 19,432.50 - 19,432.50
2.2 Reinforced concrete in class C-25 (with a - - - -
28-day 150mm cube crushing strength of 25MPa) - - - -
, cast into formworks and vibrated around rod - - - -
reinforcement bars. (formwork & reinforcement - - - -
bars are measured separately.) in: "Type of - - - -
cement to be ordinary Portland cement (OPC)" - - - -
a. In isolated footing pads m 5 4.19 4.19 2539 10,638.41 - 10,638.41
b. In foundation column m 6 2.08 2.08 2539 5,268.43 - 5,268.43
c. In grade beam m 15 14.05 14.05 2539 35,672.95 - 35,672.95
d. In external stair case m 4 - 2539 - - -
e. Styrophome expansion joint ml 251 233.60 233.60 70 16,352.00 - 16,352.00
2.3 Reinforced concrete in class C-15 (with a - - - -
28-day 150mm cube crushing strength of 15MPa) - - - -
, cast into formworks and vibrated around rod - - - -
reinforcement bars.(reinforcement bars are - - - -
measured separately): "Type of cement to be - - - -
ordinary Portland cement (OPC)" - - - -
In ground floor slab (100mm thick) m 122 259.10 259.10 199.9 51,794.09 - 51,794.09
2.4 Provide, cut and fix in position sawn Zigba - - - -
wood or metal panel form work: - - - -
a. To isolated footTog pad m 23 23.22 23.22 166 3,854.52 - 3,854.52
b. To foundation column m 83 31.56 31.56 166 5,239.13 - 5,239.13
c. To grade beam m 139 128.64 128.64 166 21,354.24 - 21,354.24
d. To external stair case m 7 - 166 - - -
2.5 Reinforcement bar according to structural - - - -
drawings. Price includes cutting, bending, - - - -
placing in position & tying wires. - - - -
Diameter 8mm deformed bars Kg 2234 1435.81 1,435.81 36 51,689.16 - 51,689.16
Diameter 10mm deformed bars Kg 246 216.26 216.26 36 7,785.36 - 7,785.36
Diameter 12mm deformed bars Kg 898 636.36 636.36 36 22,908.96 - 22,908.96
Diameter 14mm deformed bars Kg 495 498.74 498.74 36 17,954.64 - 17,954.64
Diameter 16mm deformed bars Kg 182 0.00 - 36 - - -
Total to Summary...Birr - 276,755.13 - 276,755.13
3. MASONRY WORK - - - -
500 mm thick hard trachytic or equivalent stone
peripheral foundation wall to a depth of 50cm bedded in
3.1 cement mortar 1:3 below natural ground level. m 49 34.56 34.56 1233 42,612.48 - 42,612.48
500 mm thick hard trachytic or equivalent stone
peripheral foundation wall to a depth of 100cm bedded in
3.2 cement mortar 1:3 above natural ground level. m 10 13.18 13.18 1253 16,514.54 - 16,514.54
Total to Summary.Birr - 59,127.02 - 59,127.02
B. SUPER STRUCTURE - - - -
1. CONCRETE WORK - - - -
1.1 Reinforced concrete in class C-25 (with a - - - -
28-day 150mm cube crushing strength of 25MPa) - - - -
, cast into formworks and vibrated around rod - - - -
reinforcement bars. (formwork & reinforcement - - - -
bars are measured separately.) in: "Type of - - - -
cement to be ordinary Portland cement (OPC)" - - - -
a. In elevation column m 8 7.20 7.20 2539 18,280.80 - 18,280.80
b. In top tie beams m 13 14.48 14.48 2539 36,764.72 - 36,764.72
c. In concrete copping m 1 - 2539 - - -
1.2 Provide, cut and fix in position metal panel - - - -
or sawn Zigba wood form work - - - -
a. To elevation column m 104 102.96 102.96 185 19,047.60 - 19,047.60
b. To top tie beams m 116 163.04 163.04 208 33,912.32 - 33,912.32
c. To Concrete copping m 4 - 208 - - -
1.3 Reinforcement bar according to structural - - - -
drawings. Price includes cutting, bending, - - - -
placing in position & tying wires. - - - -
Diameter 6mm deformed bars Kg 17 - 36 - - -
Diameter 8mm deformed bars Kg 758 911.36 911.36 36 32,808.81 - 32,808.81
Diameter 10mm deformed bars Kg 77 0.00 - 36 - - -
Diameter 12mm deformed bars Kg 808 870.44 870.44 36 31,335.99 - 31,335.99
Diameter 14mm deformed bars Kg 366 502.19 502.19 36 18,078.71 - 18,078.71
Diameter 16mm deformed bars Kg 182 0.00 - 36 - - -
Total to Summary....Birr - 190,228.95 - 190,228.95
2. BLOCK WORK - - - -
200mm thick hollow concrete block wall of type Class-C
with 28 days minimum crushing strength of 18kg/cm2,
bedded in cement mortar (1:3) mix, both sides left for
plastering. Price includes 2f6mm iron bars laid
2.1 horizontally every other course (spacing 400mm c/c). m 160 149.55 149.55 466 69,691.70 - 69,691.70
2.2 Ditto but 150mm thick solid block. m 185 131.13 131.13 391 51,270.66 - 51,270.66
2.3 Ditto but 100mm thick solid block. m 28 - 326 - - -
300mm thick well dressed stone masonry wall bedded in
2.4 1:3 mortar mix. m 41 46.07 46.07 717 33,032.19 - 33,032.19
Total to Summary....Birr - 153,994.55 - 153,994.55
3. ROOFING - - - -
- - - -
Roof cover in Pre-painted EGA 300, 0.5mm thick fixed to
RHS purlins with standard hooks and washers. Roof cover
measured in horizontal projection. Price includes ridge
3.1 cover & 50mm thick rock wool insulation. m 363 0.00 - - 375 - - -
Roof cover in precoated EGA 400, t=0.4mm fixed to RHS
3.1* STEEL.Price shall include ridge cap. (Purlins measured
separately and roof measured in horizontal projection) m 363 286.99 286.99 341 97,865.09 - 97,865.09
- - - -
G-28 G.I.S roof gutter with development length of
1000mm welded at joint provided 2% slope towards down
pipe and Price includes painting of two coats of antirust
3.2 and one coat of metal paint. ml 89 - 348 - - -
- - - -
G28 flat metal sheet flashing with development length of
330mm and Price includes painting of two coats of
3.3 antirust and one coat of metal paint. m 20 - 135 - - -
Contractor Consulatant
Excuted Quantity Excuted Amount
ITEM contract Previous Current Todate Previous Current Todate
DESCRIPTION UNIT QTY. QTY. QTY QTY Rate Amount Amount Amount
- - - -
G28 flat metal sheet copping with development length of
330mm and Price includes painting of two coats of
3.4 antirust and one coat of metal paint. m 4 - 125 - - -
- - - -
Supply and fix 8 mm thick ribbed sheet eave soffit
ceilings. Price include 40 x 50 mm zigba wood battens
with c/c spacing of 600 mm both ways, corner list and all
3.5 other necessary accessories to complete the work. m 50 - 288 - - -
- - - -
Total to SummaryBirr - - - -
- - - -
4. CARPENTRY & JOINERY - 97,865.09 - 97,865.09
- - - -
Carpentry - - - -
Supply and fix 8 mm thick chip wood ceilings. Price
include 40 x 50 mm zigba wood battens with c/c spacing
of 600 mm both ways, corner list and all other necessary
4.1 accessories to complete the work. ml 295 253.90 253.90 288 73,123.14 - 73,123.14
- - - -
Supply and fix flush wooden doors both sides covered
with 4mm thick good quality kerrero ply wood with sides,
top and bottom lipped and edged with hard wood
complete work with all the necessary accessories. Price
includes three coats of varnish paint, best quality locks,
4.2 hinges & stopper. - - - -
- - - -
- - - -
b. Size - 900x2700mm pcs 10 - 6075 - - -
- - - -
c. Size - 1200x2700mm pcs 2 - 8100 - - -
- - - -
- - - -
Supply and fix PVC approved quality doors all according
to manufacturer instruction. Price shall include ASSA or
equivalent (Knob type for toilet doors) safety locks,
4.3 hinges, and other necessary accessories. pcs 3 - 2835 - - -
a. Size - 700x2700mm [Toilets] - - - -
- - - -
Supply and fix 300x25mm zigba wood fascia board price
4.3 include three coats of oil paint. ml 89 - 168 - - -
- - - -
Total to SummaryBirr - 73,123.14 - 73,123.14
- - - -
5. METAL WORK - - - -
- - - -
Windows made of Aluminum anodized tubular profile
frames ALLCO-5, 2mm thick average weight 850gm/m,
door kick plate 1500gm/m, partly covered with aluminum
sheet according to the detail drawing and window door
schedule . Complete work includes all the necessary iron
mongery and approved type of cylindrical lock. All
aluminum windows and doors type shall be approved by
the Consultant. Price includes double 6mm thick tinted
tempered glass. - - - -
- - - -
5.1 WINDOWS - - - -
- - - -
Size 800x 1000 mm pcs 3 - 2400 - - -
- - - -
Size 1500x 1800 mm pcs 16 - 8100 - - -
- - - -
Size 1350x 1800 mm pcs 1 - 7290 - - -
- - - -
Total to Summary.....Birr - - - -
- - - -
6. STRUCTURAL STEEL WORKS - - - -
Supply and erect steel roof structure all as - - - -
shown on the detail drawing. Apply two coats - - - -
of antirust paint. Price includes all necessary - - - -
preparation work such as cleaning, wire - - - -
brushing and finally two coats of anti-rust paint. - - - -
6.1 Upper, lower, vertical & horizontal chords - - - -
as specified on the drawing. - - - -
RHS size: 40 x 40 x 2.5mm kg 774.2 680.76 680.76 60 40,845.88 - 40,845.88
RHS size: 30 x 30 x 2.5mm kg 497.07 441.32 441.32 60 26,479.01 - 26,479.01
- - - -
6.2 Lattice purlin - - - -
RHS size: 25 x 25 x 2.5mm kg 2783.01 1461.01 1,461.01 60 87,660.81 - 87,660.81
- - - -
RHS size: 20 x 20 x 2mm kg 683.36 378.51 378.51 60 22,710.83 - 22,710.83
200x100x5mm thick steel plate with circular holes welded
6.3 to truss as shown on the drawing. No. 14 16.51 16.51 375 6,189.75 - 6,189.75
- - - -
200x100x5mm thick steel plate with slotted holes welded
6.4 to truss as shown on the drawing. No. 14 18.57 18.57 375 6,963.47 - 6,963.47
- - - -
6.5 Grade 4.8 M16 threaded anchor bolt L-300mm No. 28 - 100 - - -
- - - -
Total to Summary.....Birr - 190,849.76 - 190,849.76
7. FINISHING WORK - - - -
7.1 PLASTERING AND POINTING - - - -
- - - -
Finishing work shall include all surface - - - -
pre-cleaning, Preparation and application of - - - -
the finish, polishing and cleaning at the end - - - -
of finished work. - - - -
Apply three coats of plaster in cement mortar mix 1:3 up
to fine finish to internal wall, beams and columns
surface. Mortar for fine finish shall be cement-fine sand
1:2. Provide grooves recessed by 5mm between beams
7.1.1 and walls, columns and walls. m 36 - 137 - - -
- - - -
Apply two coats of plaster in cement mortar (1:3) & final
gypsum coating to internal wall , columns & beams.
Provide grooves recessed by 5mm between beams and
7.1.2 walls, columns and walls. m 567 0.00 - 154 - - -
- - - -
7.1.3 Ditto item 7.1.2 but two coats to receive ceramic wall tile. m 29 - 105 - - -
- - - -
Apply two coats of external wall plaster in cement mortar
mix 1:3 and one coat of tyrolean rendering in cement
mortar mix 1:2. Provide grooves recessed by 5mm
7.1.4 between beams and walls, columns and walls. m 252 0.00 - 154 - - -
- - - -
7.1.5 Apply pointing for external stone wall surface. m 41 - 37 - - -
7.2 FLOOR & WALL FINISHING - - - -
Supply & fix 300x300x2mm asbestos free hard imported - - - -
PVC tiles flooring stuck to cement screed with approved
adhesive glue. Price shall includes 48mm thick cement
7.2.1 mortar backing. m 174 - 329 - - -
- - - -
7.2.2 100mm high PVC skirting stuck to wall with proper adhesiv ml 118 - 75 - - -
- - - -
Contractor Consulatant
Excuted Quantity Excuted Amount
ITEM contract Previous Current Todate Previous Current Todate
DESCRIPTION UNIT QTY. QTY. QTY QTY Rate Amount Amount Amount
8mm thick best quality imported non-slippery ceramic tile
on with proper grouting of joints in cement mortar mix of
7.2.3 1:3. Price shall include 42mm thick mortar beding. m 11 - 604 - - -
8mm thick white 60x60x8mm approved quality porcelain - - - -
tile floor finish with proper grouting at joints laid in
mortar mix 1:3 . Price shall include 42mm thick mortar
7.2.4 beding. m 80 - 604 - - -
- - - -
100x8mm porcelain tile skirting to wall. Price shall
7.2.5 including cement mortar backing ml 36 - 63 - - -
- - - -
Marble thread and risers including cement mortar and
joined in cement mortar mix of 1:3 to - - - -
- - - -
External stair case - - - -
7.2.6 Tread, size 340 x 30mm rose white color marble ml 37 - 634 - - -
- - - -
7.2.7 Riser, size 130 x 2cm black color marble ml 37 - 436 - - -
- - - -
Window Sill - - - -
Marble window cill on and including cement mortar bed
7.2.8 jointed in cement mortar mix of 1:3. - - - -
- - - -
Size 280 x 30mm ml 29 - 626 - - -
- - - -
Door Threshold - - - -
Marble door thresholds on and including cement mortar
7.2.9 bed jointed in cement mortar mix of 1:3 - - - -
- - - -
Size 200 x 20mm ml 14 - 487 - - -
- - - -
Supply 300x200x6mm glazed ceramic wall tile to a height
of 1800mm with cement mortar backing and joints
7.2.10 grouted in white cement. m 29 - 732 - - -
- - - -
1000mm wide well dressed stone pavement bedded on
150mm thick quarry waste and joints pointed in cement
7.2.11 mortar (1:3) mix around the building. m 122 - 475 - - -
- 475 - - -
1000mm wide Concrete pavement bedded on 150mm
thick quarry waste and joints pointed in cement mortar
7.2.13 (1:3) mix around the building. M2 85.40 85.40 199.9 17,071.46 - 17,071.46
- - - -
Supply and lay semi-circular open precast concrete open
channel on 50mm thick sand bedding. Unit price shall
include flat stone/concrete topping, provision of metal
grating at inlet to manhole,excavation of the trench and
7.2.12 cartaway. Ditch dia.: 1/2 300 mm ml 112 - 475 - - -
- - - -
Total to Summary..Birr - 17,071.46 - 17,071.46
- - - -
Contractor Consulatant
SUMMARY OF BILL OF QUANTITIES AND SPECIFICATIONS
FOR
B1b G+1 ADMINISTRATION OFFICE BUILDING
07 JOINERY. . . . . . . . . . . . . . . . . . . . BIRR
11 FINISHING
12 PAINTING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BIRR
13 GLAZING BIRR
Contractor Consultant
Excuted Quantity Excuted Amount
Previous QTY Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT Contract QTY.
QTY QTY Rate Amount Amount Amount
A-SUB STRUCTURE
02. Excavation & Earth work
Excavation & Get out
1 Remove top soil 30cm thick m2 461.16 501.9624 501.9624 16.00 8,031.40 - 8,031.40
Excavation 0 - - -
In according to the attched soil type 0 - - -
Pit and Trench Excavation 0 - - -
2 Bulk Excavation in weathered Rock up to 1.5m m3 230.58 0 55.00 - - -
3 Bulk Excavation in soft Rock 1.5m to 3m m3 0 0 - - -
4 Pit Excavation in weathered rock not exceeding 1.5m m3 84.97 84.20 84.2 410.00 34,522.00 - 34,522.00
5 Trench not exceeding 1.5m m3 157.04 7.64 7.64 410.00 3,132.40 - 3,132.40
Fill 0 - - -
Compaction fill shall be every 20cm thick until it attains a minimum of
95% proctor density 0 - - -
6 Selected borrowed fill m3 181.33 173.93 173.927 156.00 27,132.61 - 27,132.61
7 Disposal m3 610.94 232.39 232.39 85.00 19,753.15 - 19,753.15
8 Hard core 25cm thick m2 350.18 335.60 335.6 143.00 47,990.80 - 47,990.80
0 - - -
TOTAL CARRIED TO SUMMARY 0 140,562.36 - 140,562.36
0 - - -
03. Concrete work 0 - - -
In situ concrete 0 - - -
1 Plain blinding concrete C-5 m3 11.76 396.03 396.032785 75.00 29,702.46 - 29,702.46
Reinforced sub structure concrete 0 - - -
2 C-25 in footing m3 19.38 33.83 33.828771 2,539.00 85,891.25 - 85,891.25
3 C-25 in sub grade column m3 6.0 9.0 9.022 2,539.00 22,906.86 - 22,906.86
4 Shear wall m3 0 0 2,539.00 - - -
5 C-25 in grade beam m3 16.52 16.59 16.59 2,539.00 42,122.01 - 42,122.01
6 C-20 in ground slab & step m3 35.02 ` 2,539.00 - -
Reinforced super structure concrete 0 - - -
7 C-25 in elevation column m3 14.88 14.98 14.98 2,539.00 38,034.22 - 38,034.22
8 C-25 in beams & lintel m3 33.04 47.743 47.743 2,539.00 121,219.48 - 121,219.48
9 C-25 in suspended slab m3 70.04 46.96 46.96 2,539.00 119,231.44 - 119,231.44
10 C-25 in stair case & landing m3 3.46 0 2,539.00 - - -
11 C-25 in shear wall m3 0 0 2,539.00 - - -
12 C-25 water tight concrete in average 10 cm thick 0 - - -
over flat roof slab to be finished with smooth trowel 0 - - -
finish to the given slope and prepare to apply water 0 - - -
proofing material m 0 0 - - -
Form work 0 - - -
Sub structure normal finish to: 0 - - -
13 Footing m2 52.06 45.15 45.1484 166.00 7,494.63 - 7,494.63
14 Sub grade column m2 60.0 176.4 176.43 166.00 29,287.38 - 29,287.38
15 Shear wall m2 0 0 166.00 - - -
16 Grade beam m2 132.16 0 166.00 - - -
17 Steps m2 0 0 - - -
Super structure Normal Finish to: 0 - - -
18 Elevation column m2 148.8 149.76 149.76 185.00 27,705.60 - 27,705.60
19 Beam & lintel m2 231.28 378.43 378.43 208.00 78,713.44 - 78,713.44
20 Balcony & stair baluster m2 0 0 208.00 - - -
21 Parapet m2 0 0 208.00 - - -
22 Sun breaker m2 0 0 208.00 - - -
23 Suspended slab m2 466.9 313.05 313.05 208.00 65,114.40 - 65,114.40
24 Stair case & landing m2 23.045 0 208.00 - - -
25 Shear wall m2 0 0 - - -
Reinforcement Sub structure 0 - - -
26 Diameter 8mm kg 2263.47 509.08 509.076 36.00 18,326.74 - 18,326.74
27 Diameter 10mm kg 0.00 148.08 148.08 36.00 5,330.88 - 5,330.88
28 Diameter 12mm kg 209.09 179.02 179.0208 36.00 6,444.75 - 6,444.75
29 Diameter 14mm kg 993.82 2176.60 2176.5964 36.00 78,357.47 - 78,357.47
30 Diameter 16mm kg 2022.28 1818.69 1818.69192 36.00 65,472.91 - 65,472.91
31 Diameter 20mm kg 1173.27 5140.83 5140.83328 36.00 185,070.00 - 185,070.00
32 Diameter 24mm kg 0.00 0 - - -
Super structure 0 - - -
32 Diameter, 8mm kg 1585.53 2655.10 2655.1031 36.00 95,583.71 - 95,583.71
33 Diameter 10mm kg 459.98 103.66 103.656 36.00 3,731.62 - 3,731.62
34 Diameter 12mm kg 11537.09 8819.41 8819.41176 36.00 317,498.82 - 317,498.82
35 Diameter 14mm kg 2399.00 2272.88 2272.8761 36.00 81,823.54 - 81,823.54
36 Diameter 16mm kg 2312.27 1433.48 1433.47936 36.00 51,605.26 - 51,605.26
37 Diameter 20mm kg 13547.72 13108.65 13108.6512 36.00 471,911.44 - 471,911.44
38 Diameter 24mm kg 0.00 0 - - -
TOTAL CARRIED TO SUMMARY 2,048,580.30 - 2,048,580.30
04. Masonry work 0 - - -
Stone wall 0 - - -
1 concealed form view m3 74.34 17.33 17.33 1,144.00 19,825.52 - 19,825.52
2 Exposed face left for further finish m3 41.30 25.16 25.16 1,220.00 30,695.20 - 30,695.20
Concrete block works 0 - - -
Class 'B' in cement mortar 0 - - -
3 20 cm thick both faces for plaster m 578.44 567.12 567.1182 288.00 - 163,330.04 163,330.04
4 15 cm thick both faces for plaster m 103.80 115.83 115.828 243.00 - 28,146.20 28,146.20
0 - - -
TOTAL CARRIED TO SUMMARY 0 50,520.72 191,476.25 241,996.97
0 - - -
05. ROOF WATER PROOFING 0 - - -
1 Apply APP modified & thickness not less than 4mm 0 - - -
slated Bituminous finish water proofing membrane 0 - - -
or equivalent material for concrete roof slab as per 0 - - -
the manufacturer's instruction. The cost shall include 0 - - -
cleaning of all darts and dust materials. The work 0 - - -
shall be done on sub contractual base with the 0 - - -
supplier of the material which will give material and 0 - - -
warranty for the material and application to the client. m 0 0 - - -
0 - - -
2 Apply Cementious water proofing material which shall 0 - - -
seal void by crystallization for upper floor wet areas 0 - - -
Toilet rooms floor & to a height of 50cm on walls. 0 - - -
To Gutters ,columns , masonry & concrete retaining 0 - - -
walls, and all basement stores as per the manufacturer's 0 - - -
instruction. Price shall include cleaning of all dirt's, trace 0 - - -
of grease, oil and loose particles. 0 - - -
The work shall be done on sub contractual bases with 0 - - -
the supplier of the material which will give material & 0 - - -
construction guarantee to the client. m 0 0 - - -
0 - - -
TOTAL CARRIED TO SUMMARY ...... 0 - - -
6. ROOFING 0 - - -
Supply and fix G-28 galvanized flat metal sheet on gutter per the detail
drawing. Price shall include all necessary accessories including metal
3 bracket holder. 0 - - -
Development length =1000mm ml 83.93 0 259.00 - - -
Rain water down pipe in 110dia. Pvc pipe secured in approved part of
building with metal strops at 100cm c/c with screws & fishers price
3 include metal lath & ploster. ml 113.4 0 120.00 - - -
4 Euculpitus dia. 12cm ml 170.764 0 47.00 - - -
5 Euculpitus dia. 8-10cm ml 113.19 0 47.00 - - -
Contractor Consultant
Excuted Quantity Excuted Amount
Previous QTY Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT Contract QTY.
QTY QTY Rate Amount Amount Amount
6 Purline ml 387.2 0 59.00 - - -
7 Chipwood ceilling(horizontal projection) ml 351.78 0 284.00 - - -
TOTAL CARRIED TO SUMMARY 0 - 159,482.97 159,482.97
0 - - -
07. JOINERY 0 - - -
_Wooden door shall be made of MDF (medium 0 - - -
density fiber board ), 0 - - -
_1.5 mm thick black steel frame, 0 - - -
_ All wooden door locks & handles should be 0 - - -
ASSA and comply with internationally 0 - - -
accepted standard 0 - - -
All complete work according to detail 0 - - -
1 a) D1 size 80x210cm pcs 0 - - -
2 b) D2 size 70x250cm pcs 0 - - -
3 c) D3 size 148x210cm pcs 0 - - -
Contractor Consultant
Excuted Quantity Excuted Amount
Previous QTY Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT Contract QTY.
QTY QTY Rate Amount Amount Amount
Sill 0 - - -
11 Size:- 28 x 3cm m 65.5 0 565.00 - - -
12 Supply and lay carpet flooring comprising of 5mm thick carpet flooring, 20 mm
thick foam cusioning layer and , all as per the drawing and approved by the
Engineer. m2 0 0 - - -
TOTAL CARRIED TO SUMMARY 0 - - -
12. PAINTING
Apply three coats of approved type plastic panit for 0 - - -
1 internal wall surfaces m2 645.47 0 32.00 - - -
Apply three coats of approved type plastic panit for
2 internal wall surfaces of concrete ceiling, landing ,stair
case beams & columns. m2 870.025 0 34.00 - - -
3 Apply three coats of approved type plastic panit for
internal wall surfaces ( balcony ) m2 0 0 - - -
4 Apply Quartiz paint to external HCB walls. m2 456.88 0 200.00 - - -
5 Apply approved type plastic paint to chipwood ceiling m 2
425.57 0 34.00 - - -
TOTAL CARRIED TO SUMMARY ...... 0 - - -
12. GLAZING 0 - - -
1 4mm thick clear Glass m2 0 0 - - -
2 4mm thick figured Glass m2 0 0 - - -
3 Reflective Glass for Aluminium profile frame . m 2
34.2 0 790.00 - - -
TOTAL CARRIED TO SUMMARY ...... 0 - - -
0 - - -
14 SANITARY INSTALLATION 0 - - -
Water Supply Pipes 0 - - -
Supply, lay and connect Galvanized steel pipe for 0 - - -
cold and hot water distribution system and shall be 0 - - -
complete with all accessories . 0 - - -
01 Dia. 15mm lm 90 0 107 - - -
02 Dia. 20mm lm 36 0 144 - - -
Gate valve 0 - - -
Gate valve of approved quality complete with 0 - - -
all accessories 0 - - -
06 Dia. 15mm No 12 0 500 - - -
07 Dia. 20mm No 1 0 547 - - -
chrome angle valve of approved quality complete 0 - - -
with all accessories 0 - - -
11 Dia. 15mm 0 - - -
Swerage Pipes 0 - - -
PVC pipe for waste water drainage system and 0 - - -
shall be supported with galvanized clips screwed 0 - - -
to wall and slab at every joints, bends and c/c 0 - - -
1.0mts and given 2% slope in the direction of flow 0 - - -
complete with all accessories 0 - - -
12 50mm lm 84 0 157 - - -
13 110mm lm 120 0 404 - - -
Sanitary fixtures 0 - - -
15 Supply and fix white vitrous China hand wash 0 - - -
basins with pedestals and complete with all the 0 - - -
necessary accessories 0 - - -
Size, 500 x 400mm No 4 0 2831 - - -
16 Supply and fix crystal glass mirrors and shall be fixed 0 - - -
near hand wash basins complete with all accessories. 0 - - -
Size, 500 x 400mm No 4 0 757 - - -
19 Supply and fix close coupled wash down water 0 - - -
closet (w.c) with low level flash cistern and 0 - - -
complete with all accessories No 12 0 3451 - - -
20 Supply and fix soft paper holder made of white 0 - - -
vitrous China complete with all accessoires No 12 0 619 - - -
21 Supply and fix vent cap made of pvc complete 0 - - -
with all necessary accessories 0 - - -
Diameter 50mm No 2 0 112 - - -
23 Supply and fix glass lined water heater of approved 0 - - -
quality complete with hot water & cold water mixing 0 - - -
& with all accessories 0 - - -
25 Supply and fix floor drain made of enamelled cast iron 0 - - -
& complete with all necessary accessories 0 - - -
Diameter 80mm No 4 0 335 - - -
27 Manhole for sewerage made of reinfored concrete 0 - - -
wall on base of 100mm R.C concrete and 80mm R.C 0 - - -
concrete cover with mass concrete benching and 0 - - -
plastering all as per the detail drawing. 0 - - -
Diameter - 1000mm No 2 0 15593 - - -
29 Supply and fix f approved quality water meter 0 - - -
which comply the municipality standard. 0 - - -
Diameter 32mm No 1 0 9000 - - -
TOTAL TO SUMMARY. . . . . . . . . . . . . . . . . 0 - - -
0 - - -
15. ELECTRICAL WORKS 0 - - -
All electrical materials shall be 3rd party 0 - - -
Certified, all boards shall be type tested 0 - - -
Distribution boards 0 - - -
Note:- 0 - - -
1 Flush mounted metal enclosures sub distribution 0 - - -
board SDB- GF-LAB with lockable door, earthing 0 - - -
Lead, cable terminal, labeling, connectors and all 0 - - -
The necessary accessories consisting of:- 0 - - -
1 pc main MCCB of 40A, 1ph, icu=6KA 0 - - -
1 pc main MCCB of 32A, 1ph, icu=6KA 0 - - -
5 pcs MCB of 10A, 1ph, Icu = 6KA 0 - - -
4 pcs MCB of 16A, 1ph, Icu = 6KA 0 - - -
With bus bar 40A and ample reserve space No 1 0 4650 - - -
2 Ditto as above buf ro SDB FF-LAB consisting of :- 0 - - -
1 pc main MCCB of 32A, 1ph, icu=6KA 0 - - -
5 pcs MCB of 10A, 1ph, Icu = 6KA 0 - - -
4 pcs MCB of 16A, 1ph, Icu = 6KA 0 - - -
With bus bar 40A and ample reserve space No 1 0 4500 - - -
Light points 0 - - -
14 Light points in thermoplastic conduit of diameter 0 - - -
13.5 mm fed through PVC conductor of 2x2.5 sq mm 0 - - -
Color coded and labled No 82 80 80 473 37,840.00 - 37,840.00
Switch with detachable frames & 0 - - -
Corersponding box 3rd party certified 0 - - -
15 Single pole No 22 0 150 - - -
16 Double pole No 14 0 188 - - -
17 Two way No 10 0 165 - - -
Socket out lets 0 - - -
20 16A 240V 2p+e socket out let type in thermoplastic 0 - - -
Conduit of diameter 16mm fed by PVC conductor 0 - - -
Of 3xsq mm color coded labeled No 36 0 603 - - -
Extra over 0 - - -
Socket out letswith detachable frames & 0 - - -
Corresponding box 3rd party certified 0 - - -
23 16A, 1ph No 36 0 150 - - -
Type of light fittings 0 - - -
Supply and install the light fitting with under 0 - - -
Contractor Consultant
Excuted Quantity Excuted Amount
Previous QTY Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT Contract QTY.
QTY QTY Rate Amount Amount Amount
Mentionedspecificaiton 0 - - -
Alllight fixtures shall behtierd party certified 0 - - -
26 Mounting Ceiling surface 0 - - -
Lamp type fluorescent 0 - - -
Number of lamps-4 0 - - -
Optics- Closed louver High glossy 0 - - -
Lamp wattage 18 watts 0 - - -
Luminary material- Steel sheet 0.7 mm 0 - - -
Ingress protection -20 0 - - -
Size Length 596 mm, width 596 mm and 100 mm 0 - - -
height control gear 220V/50HZ, electronics ballast No 32 0 2700 - - -
27 Mounting celling surface 0 - - -
Lamp type flourescent 0 - - -
Number of Lamps -2 0 - - -
Optics- Closed louver high glossy 0 - - -
Lamp wattage 36 watts 0 - - -
Luminare material steel sheet 0.7 mm 0 - - -
Ingress protection 40 0 - - -
Size length 1230 mm width 220 mm and 115 mm height 0 - - -
Control gear 220V/50HZ, electronics ballat No 8 0 2700 - - -
27 Mounting celling surface 0 - - -
Lamp type flourescent 0 - - -
Number of Lamps -1 0 - - -
Optics- Closed louver high glossy 0 - - -
Lamp wattage 36 watts 0 - - -
Luminare material steel sheet 0.7 mm 0 - - -
Ingress protection 40 0 - - -
Size length 1230 mm width 220 mm and 115 mm height 0 - - -
Control gear 220V/50HZ, electronics ballat No 20 0 1800 - - -
28 Mounting ceiling surface 0 - - -
Lamp type compact fluorescent 0 - - -
Numbr of Lamps 1 0 - - -
Lamp wattage 13 watts 0 - - -
Optics Opal direct light 0 - - -
Luminare material Polycarbonate, steel sheet base 0 - - -
Ingress protctin 43 0 - - -
Size- diameter 201 mm, 115 mm height 0 - - -
Control gear 220V/50HZ, eldctronics ballast (HF) No 18 0 1350 - - -
Power cable 0.6/1KV (NYY) 0 - - -
33 5x6 sq mm PVC dia 50 mm No 20 0 165 - - -
34 5x4 sq mm PVC dia. 36mm No 10 0 150 - - -
Lightning preventer 0 - - -
Air termination network 0 - - -
18 Air terminals H= 1.5 meters with base and complete 0 - - -
Accessories 2 No 1 0 14700 - - -
19 30x3 mm Galvanized steel strip m 200 0 1275 - - -
Down conductors 0 - - -
20 30x3mm galvanized steel strip with vertical supporting 0 - - -
Evry 1m to the wall & all the necessary accessories 0 - - -
Coordinate the routing of down conductors with the 0 - - -
Building external skin and architectural features m 40 0 1275 - - -
21 1x70 sq mm bare copper wire m 15 0 525 - - -
22 Diameter 16mm & 2400 mm long copper rod No 4 0 2700 - - -
Data system 0 - - -
Horizontal cabling 0 - - -
43 RJ 45 8 contact data soket out let points to for 0 - - -
Flush mounting in thermoplastic conduit of 19mm 0 - - -
With apopropriate type junction box fed by standard 0 - - -
CAT 6e UTP data cable No 12 0 5355 - - -
Extra over data socket out lets 0 - - -
with detachable frames & corresponding 0 - - -
46 Single module RJ 45 8 contact data socket out lets No 12 0 720 - - -
Data Cable patch panel 0 - - -
48 24 port data switch 0 - - -
Telephone system 0 - - -
The system shall be installed as per ETCstandard 0 - - -
All system cables shall be labeled in all rooms and 0 - - -
terminal blocks and complete analysis of labeling 0 - - -
shall be submitted to the client for future reference. 0 - - -
52 4 contact telephone points in thermoplastic conduit 0 - - -
of 19mm with standard 4 pair CAT 3UTP telephone 0 - - -
Cable with junction boxes as ETC standards and 0 - - -
Regulatins and as No 12 0 5355 - - -
Extra telephone out lets 0 - - -
54 Single moudule RJ 11xRJ11) telephone out 0 - - -
Let of 4 contact for flush mountingwith lebling No 12 0 285 - - -
TOTAL TO SUMMARY . .. . . . . . 0 37,840.00 - 37,840.00
Contractor Consultant
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY TAKEOFF SHEET NO: 01
CONSULTANT :NOMY ENGINEERING PLC BLOCK: B1-b
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING PAGE NO: 01
NO L*W*D QTY DESCRIPTION NO L*W*D QTY DESCRIPTION
20 cm thick both faces for plaster 15 cm thick both faces for plaster
*For Ground Floor only *For Ground Floor only
6.14 Axis 4-5 b/n o-p
6.6 Axis 2,3,4,5,6,7,8,9,10 b/n o & p 1 2.6 15.964 M2
9 2.6 154.44 M2 5.76 0 Axis 8' b/n o & p
24.1 Axis o & P b/n 6-10 1 2.6 14.976 M2
2 2.6 125.32 M2 30.94 M2 Total
20 cm thick both faces for
DDT plaster
-3.6 W2 *For First Floor only
2 1.2 -8.64 M2 6.6 Axis 2 & 10 b/n o-p
-4.63 TW4 2 2.7 35.64 M2
1 0.93 -4.3059 M2 24.1 Axis O & P b/n 6-10
-1.95 W3 2 2.7 130.14 M2
1 1.2 -2.34 M2 -1.8 DDT
-0.4 C1 2 1.2 -4.32 W1
3 2.6 -3.12 M2 -3.6 M2
-0.9 D1 2 1.2 -8.64 W2
3 2.6 -7.02 -1.95 M2
-0.8 D2 1 1.2 -2.34 W3
2 2.6 -4.16 -4.63 M2
20.6 Axis o & P b/n 2-5 1 0.93 -4.31 TW4
2 2.6 107.12 -0.9 D1
DDT 2 2.7 -4.86 M2
-3.6 W2 -0.8 D2
2 1.2 -8.64 M2 2 2.7 -4.32 M2
-1.95 W3 0.4 C1
1 1.2 -2.34 M2 4 2.7 4.32 M2
-1.8 W1 20.6 Axis P b/n 2-5
2 1.2 -4.32 M2 1 2.7 55.62 M2
-0.9 D1 DDT
2 2.6 -4.68 M2 -3.6 W2
-4.23 opening space around stair case 2 1.2 -8.64 M2
1 2.6 -10.998 M2 -1.95 W3
-0.4 C1 2 1.2 -4.68 M2
4 2.6 -4.16 M2 0.4 C1
322.16 M2 Total 2 2.7 2.16 M2
185.77 M2 Total
Contractor Consultant
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY TAKEOFF SHEET NO: 01
CONSULTANT :NOMY ENGINEERING PLC BLOCK: B1-b
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING PAGE NO: 01
NO L*W*D QTY DESCRIPTION NO L*W*D QTY DESCRIPTION
5.8
2 2.7 31.32 Axis 3 &9
4.96
4 2.7 53.57 Axis 3-4, 4-5,7-8,8-9
84.89 M2 Total
Contractor Consultant
BOKRA CONSTRUCTION & TRADING PLC
MEKELLE UNIVERSTY COMMUNITY SCHOOL
B2 READING RM, BOOK STORE &
AT MEKELLE
SUMMARY
Previous Current Todate
NO. Description Amount Amount Amount
A-SUB STRUCTURE
B-SUPER STRUCTURE
8 PAINTING. BIRR - -
9 GLAZING. BIRR - - - -
Contractor Consultant
Excuted Quantity Excuted Amount
Contract Previous Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
A. SUB STRUCTURE
2. CONCRETE WORK
-
2.1 50mm thick lean concrete in C-5 with minimum cement
content of 150Kg/m3under: -
a. Footing pads m 6 6.99 6.99 75.00 524.25 - 524.25
b. Under grade beam m 7 10.11 10.11 75.00 758.25 - 758.25
c. Under stone masonry wall m 31 44.43 44.43 75.00 3,332.25 - 3,332.25
d. Under ground floor Slab m 244 244.31 244.31 75.00 18,323.25 - 18,323.25
2.2 Reinforced concrete in class C-25 (with a 28-day 150mm
cube crushing strength of 25MPa), cast into formworks
and vibrated around rod reinforcement bars.( formwork &
reinfor cement bars are measured separately.) in: "Type of
cement to be ordinary Portland cement (OPC)" - - -
a. In isolated footing pads m3 2 1.34 1.34 2,539.00 3,402.26 - 3,402.26
b. In foundation column m3 2 0.65 0.65 2,539.00 1,650.35 - 1,650.35
c. In grade beam m3 10 8.67 8.67 2,539.00 22,013.13 - 22,013.13
d. Styrophome expansion join ml 143 145.00 145.00 70.00 10,150.00 - 10,150.00
e. Acrylic joint sealing ml 34 - 85.00 - - -
2.3 Reinforced concrete in class C-15 (with a 28-day 150mm
cube crushing strength of 15MPa), cast into formworks
and vibrated around rod reinforcement bars.
( reinforcement bars are measured separately.) in:
"Type of cement to be ordinary Portland cement (OPC)" -
In 100mm thick ground floor slab m 244 244.31 244.31 199.90 48,837.57 - 48,837.57
2.4 Provide, cut and fix in position sawn Zigba wood or
metal panel form work: -
a. To isolated footTog pad m 8 7.60 7.60 166.00 1,261.60 - 1,261.60
b. To foundation column m 24 13.37 13.37 166.00 2,219.42 - 2,219.42
c. To grade beam m 84 82.66 82.66 166.00 13,721.56 - 13,721.56
2.5 Reinforcement bar according to structural drawings.
Price includes cutting, bending, placing in position & - -
tying wires.
Diameter 8mm deformed bars Kg 1278 1,177.80 1,177.80 36.00 42,400.63 - 42,400.63
Diameter 10mm deformed bars Kg 58 54.54 54.54 36.00 1,963.54 - 1,963.54
Diameter 12mm deformed bars Kg 447 347.47 347.47 36.00 12,508.82 - 12,508.82
Diameter 14mm deformed bars Kg 356 290.59 290.59 36.00 10,461.37 - 10,461.37
Total to Summary...Birr - 193,528.25 - 193,528.25
3. MASONRY WORK - -
3.1 500 mm thick hard trachytic or equivalent stone
peripheral foundation wall to a depth of 50cm bedded in
cement mortar 1:3 below natural ground level. m 30 35.37 35.37 1,233.00 43,611.21 - 43,611.21
Total to Summary.Birr - 43,611.21 - 43,611.21
B. SUPER STRUCTURE - -
1. CONCRETE WORK - -
1.1 Reinforced concrete in class C-25 (with a 28-day 150mm
cube crushing strength of 25MPa), cast into formworks
and vibrated around rod reinforcement bars. (formwork &
reinforcement bars are measured separately.) in: "Type of
cement to be ordinary Portland cement (OPC)" - -
a. In elevation column m 3 2.15 2.15 2,539.00 5,458.85 - 5,458.85
b. In intermediate and top tie beams m 7 5.67 5.67 2,539.00 14,396.13 - 14,396.13
1.2 Provide, cut and fix in position metal panel or sawn
Zigba wood form work - - -
a. To elevation column m 40 41.77 41.77 185.00 7,727.45 - 7,727.45
b. To intermediate and top tie beams m 77 67.39 67.39 208.00 14,017.12 - 14,017.12
1.3 Reinforcement bar according to structural drawings.
Price includes cutting, bending, placing in position & - - -
tying wires.
Diameter 8mm deformed bars Kg 384 375.80 375.80 36.00 13,528.91 - 13,528.91
Diameter 10mm deformed bars Kg 38 - - 36.00 - - -
Diameter 12mm deformed bars Kg 468 430.95 430.95 36.00 15,514.07 - 15,514.07
Diameter 14mm deformed bars Kg 275 113.07 113.07 36.00 4,070.46 - 4,070.46
Total to Summary......Birr - 74,712.99 - 74,712.99
2. BLOCK WORK - -
2.1 200mm thick hollow concrete block wall of type Class-C
with 28 days minimum crushing strength of 18kg/cm2,
bedded in cement mortar (1:3) mix, both sides left for
plastering. Price includes 26mm iron bars laid
horizontally every other course (spacing 400mm c/c). m 236 165.96 165.96 466.00 77,335.03 - 77,335.03
Total to Summary....Birr 77,335.03 - 77,335.03
3. ROOFING -
3.1 Roof cover in Pre-painted EGA 300, 0.5mm thick fixed to
RHS purlins with standard hooks and washers. Roof
cover measured in horizontal projection. Price includes
ridge cover & 50mm thick rock wool insulation. m 299 - - - 375.00 - - -
3.1* Roof cover in precoated EGA 400, t=0.4mm fixed to
RHS STEEL.Price shall include ridge cap. (Purlins
measured separately and roof measured in horizontal m 299 298.65 298.65 341.00 101,839.31 - 101,839.31
3.2 projection)
G-28 G.I.S roof gutter with development length of
1000mm welded at joint provided 2% slope towards
down pipe and Price includes painting of two coats of
antirust and one coat of metal paint. ml 54 - 348.00 - - -
- - -
3.3 G28 flat metal sheet flashing with development length
of 330mm and Price includes painting of two coats of
antirust and one coat of metal paint. m 22 - 135.00 - - -
- - -
3.4 G28 flat metal sheet copping with development length
of 330mm and Price includes painting of two coats of
antirust and one coat of metal paint. m 22 - 125.00 - - -
3.5 Supply and fix 8 mm thick ribbed sheet eave soffit
ceilings. Price include 40 x 50 mm zigba wood battens
with c/c spacing of 600 mm both ways, corner list and all
other necessary accessories to complete the work. m 49 - 288.00 - - -
3.6 Dia 110mm PVC down pipe. m 48 - 223.00 - - -
Total to SummaryBirr - 101,839.31 - 101,839.31
4. CARPENTRY & JOINERY - - -
Carpentry - - - -
Contractor Consultant
Excuted Quantity Excuted Amount
Contract Previous Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
4.1 Supply and fix 8 mm thick chip wood ceilings. Price
include 40 x 50 mm zigba wood battens with c/c spacing of
600 mm both ways, corner list and all other necessary
accessories to complete the work. m 250 247.20 247.20 288.00 71,193.60 - 71,193.60
4.2 Supply and fix 300x25mm zigba wood fascia board price
include three coats of oil paint. ml 54 - 168.00 - -
Total to SummaryBirr - 71,193.60 - 71,193.60
5. METAL WORK -
Metal window and doors made of 38x1.5mm LTZ profiles
shown on the drawings, price include approved quality
locks and all iron mongery works, two coats of anti rust,
two coats of synthetic paint, 1mm thick ribbed sheet and
door stopper. All according to detail Arch. drawings. -
5.1 WINDOWS -
Size1000x 1500 mm pcs 16 16.00 16.00 1,650.00 26,400.00 - 26,400.00
Size 2500x 700 mm pcs 2 2.00 2.00 1,925.00 3,850.00 - 3,850.00
5.2 DOORS -
Size 1000x 2700 mm pcs 3 3.00 3.00 2,970.00 8,910.00 - 8,910.00
Total to Summary.....Birr - 39,160.00 - 39,160.00
6. STRUCTURAL STEEL WORKS -
Supply and erect steel roof structure all as shown on -
the detail drawing. Apply two coats of antirust paint.
Price includes all necessary preparation work such as
cleaning, wire brushing and finally two coats of anti-rust
paint. -
6.1 Upper, lower, vertical & horizontal chords as specified
on the drawing. -
RHS size: 40 x 40 x 2.5mm kg 396 429.88 429.88 60.00 25,792.80 - 25,792.80
RHS size: 30 x 30 x 2.5mm kg 227 293.44 293.44 60.00 17,606.56 - 17,606.56
6.2 Lattice purlin - - - -
RHS size: 25 x 25 x 2.5mm kg 1078 1,186.79 1,186.79 60.00 71,207.24 - 71,207.24
RHS size: 20 x 20 x 2mm kg 273 309.81 309.81 60.00 18,588.73 - 18,588.73
6.3 100x200x5mm steel plate welded to truss and fixed to
anchor bolts as shown on the drawing. No. 24 - 375.00 - - -
- - - -
6.4 100x100x5mm steel plate welded to truss and fixed to
anchor bolts as shown on the drawing. No. 2 - 358.00 - - -
- - - -
6.5 150x100x5mm steel plate welded to truss and fixed to
anchor bolts as shown on the drawing. No. 4 - 366.00 - - -
- - - -
6.6 350x150x3mm thick steel gusset plate welded to truss
as shown on the drawing. No. 12 12.00 12.00 394.00 4,728.00 - 4,728.00
- - - -
6.7 Grade 4.8 M14 threaded anchor bolt L-300mm No. 28 - 80.00 - - -
- - - -
6.8 Dia.76mm and 3mm thick CHS post kg 98 - 60.00 - - -
-
Total to Summary.....Birr - 137,923.32 - 137,923.32
-
7. FINISHING WORK -
7.1 PLASTERING AND POINTING -
-
Finishing work shall include all surface pre-cleaning,
Preparation and application of the finish, polishing and
cleaning at the end of finished work. -
-
7.1.1 Apply two coats of plaster in cement mortar (1:3) & final
gypsum coating to internal wall , columns & beams.
Provide grooves recessed by 5mm between beams and
walls, columns and walls. m 296 277.75 277.75 140.00 38,885.00 - 38,885.00
- - - -
7.1.2 Apply two coats of external wall plaster in cement
mortar mix 1:3 and one coat of tyrolean rendering in
cement mortar mix 1:2. Provide grooves recessed by
5mm between beams and walls, columns and walls. m 256 267.40 267.40 154.00 41,179.99 - 41,179.99
-
7.2 FLOOR & WALL FINISHING -
-
7.2.1 Supply & fix 300x300x2mm asbestos free hard imported
PVC tiles flooring stuck to cement screed with approved
adhesive glue. Price shall includes 48mm thick cement
mortar backing. m 193 - 329.00 - - -
-
7.2.2 100mm high PVC skirting stuck to wall with proper
adhesive. ml 80 - 75.00 - - -
-
Window Sill - - - -
7.2.3 Marble window cill on and including cement mortar bed
jointed in cement mortar mix of 1:3. - - - -
-
Size 280 x 30mm ml 22 21.90 21.90 626.00 13,709.40 - 13,709.40
-
Door Threshold - - - -
7.2.4 Marble door thresholds on and including cement mortar
bed jointed in cement mortar mix of 1:3 - - - -
-
Size 200 x 20mm ml 3 - 487.00 - - -
-
7.2.5 1000mm wide well dressed stone pavement bedded on
150mm thick quarry waste and joints pointed in cement
mortar (1:3) mix around the building. m 139 - 475.00 - - -
- - -
7.2.5 1000mm wide Concrete pavement bedded on 150mm
thick quarry waste and joints pointed in cement mortar
(1:3) mix around the building. M2 78.95 78.95 199.90 15,782.11 - 15,782.11
Contractor Consultant
BOKRA CONSTRUCTION & TRADING PLC
PROJECT: MEKELLE UNIVERSITY TAKEOFF SHEET NO:01
LOCATION: AYNALEM B2 READING RM, BOOK STORE &
CLIENT:MEKELLE UNIVERSITY DEMONSTRATION ROOM
CONSULTANT :NOMY ENGINEERING PLC PAGE NO: 1
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING P
SUBSTRUCTURE BAR SCHEDULE SUMMARY
Descrption TOTAL Wt. OF BAR FOR DIA.
Diameter 8 10 12 14 16 20
Tot.wt. (kg) ### 54.54 347.47 290.59 - -
24
-
24
0
3.55
0
SHEET NO:01
BOOK STORE &
TION ROOM
24
0
3.55
0
SHEET NO:01
BOOK STORE &
TION ROOM
24
0
3.55
0
SHEET NO:01
BOOK STORE &
TION ROOM
24
0
3.55
0
SHEET NO:01
BOOK STORE &
TION ROOM
24
0
3.55
0
SHEET NO:01
BOOK STORE &
TION ROOM
24
0.00
24
0
3.55
0
SHEET NO:01
OOK STORE &
OOM
24
0
3.55
0
BOKRA CONSTRUCTION & TRADING PLC
Project:- MUBP86 Takeoff No 1
Location:-AYNALEM Block:- B2
Client:- MEKELLE UNIVERSTY Page No:- 1
Consultant:- NOMY ENGINEERING PLC
No L*W*D QTY Description No L*W*D QTY Description
Contractor Consultant
BOKRA CONSTRUCTION & TRADING PLC
MEKELLE UNIVERSTY COMMUNITY SCHOOL
B3 STORE
AT MEKELLE
SUMMARY
Previous Current Todate
NO. Description Amount Amount Amount
A-SUB STRUCTURE
B-SUPER STRUCTURE
8 PAINTING. BIRR - - -
9 GLAZING. BIRR - - -
Contractor Consultant
Excuted Quantity Excuted Amount
Contract Previous Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Bulk excavation in ordinary soil not exceeding
1500mm from NGL. m 149 126.18 126.18 55.00 6,939.90 - 6,939.90
1.2 Excavate in ordinary soil for isolated footing to a
depth exceeding 1500mm but not exceeding
3000mm from reduced level. m 11 4.21 4.21 75.00 315.75 - 315.75
1.3 Excavate in weathered rock for isolated footing to a
depth exceeding 1500mm but not exceeding
3000mm from reduced level. m 6 - 410.00 - - -
1.4 Excavate for trench foundation in ordinary soil to a
depth not exceeding 1500mm from stripped level. m 8 - 61.00 - - -
1.5 Fill around trench, isoleted foundation and under
hardcore to maintain the desired level with selected
borrowed material and compact in layers not
exceeding 200mm. m 249 113.59 113.59 156.00 17,720.51 - 17,720.51
1.6 Cart away surplus excavated material to a distance
not exceeding 2kms. m 201 130.39 130.39 85.00 11,083.15 - 11,083.15
1.7 250mm. thick sound basaltic or equivalent stone
hard-core finished and blinded with crushed stone. m 104 104.00 104.00 143.00 14,872.00 - 14,872.00
Total to Summary..Birr 50,931.31 - 50,931.31
2. CONCRETE WORK - - -
2.1 50mm thick lean concrete in C-5 with minimum
cement content of 150Kg/m3under: - - -
a. Footing pads m 4 2.94 2.94 75.00 220.19 - 220.19
b. Under grade beam m 0 - - - -
c. Under stone masonry wall m 23 24.24 24.24 75.00 1,818.00 - 1,818.00
d. Under ground floor Slab m 104 104.00 104.00 75.00 7,800.00 - 7,800.00
2.2 Reinforced concrete in class C-25 (with a 28-day
150mm cube crushing strength of 25MPa), cast into
formworks and vibrated around rod reinforcement
bars.( formwork & reinforcement bars are measured
separately.) in: "Type of cement to be ordinary
Portland cement (OPC)"
- - - -
a. In isolated footing pads m 1 0.54 0.54 2,539.00 1,371.06 - 1,371.06
b. In foundation column m 2 0.26 0.26 2,539.00 660.14 - 660.14
c. In grade beam m 5 3.42 3.42 2,539.00 8,683.38 - 8,683.38
e. Styrophome expansion joint ml 42 42.00 42.00 70.00 2,940.00 - 2,940.00
2.3 Reinforced concrete in class C-15 (with a 28-day
150mm cube crushing strength of 15MPa), cast into
formworks and vibrated around rod reinforcement
bars.( reinforcement bars are measured
separately.) in: "Type of cement to be ordinary
Portland cement (OPC)"
- - - -
In 100mm thick ground floor slab m 104 104.00 104.00 199.90 20,789.60 - 20,789.60
2.4 Provide, cut and fix in position sawn Zigba wood or
metal panel form work: - - - -
a. In isolated footing pad m 5 3.60 3.60 166.00 597.60 - 597.60
b. In foundation column m 15 5.12 5.12 166.00 849.92 - 849.92
c. In grade beam m 35 34.24 34.24 166.00 5,683.84 - 5,683.84
2.5 Reinforcement bar according to structural
drawings. Price includes cutting, bending, placing
in position & tying wires. - - - -
Diameter 6mm Kg 288.00 - 36.00 - - -
Diameter 8mm deformed bars Kg 105 459.66 459.66 36.00 16,547.81 - 16,547.81
Diameter 10mm deformed bars Kg 39 23.69 23.69 36.00 852.94 - 852.94
Diameter 12mm deformed bars Kg 191 132.77 132.77 36.00 4,779.86 - 4,779.86
Diameter 14mm deformed bars Kg 155 114.71 114.71 36.00 4,129.49 - 4,129.49
Total to Summary...Birr 77,723.83 - 77,723.83
3. MASONRY WORK - - -
3.1 500 mm thick hard trachytic or equivalent stone
peripheral foundation wall to a depth of 50cm
bedded in cement mortar 1:3 below natural ground m 16 17.64 17.64 1,233.00 21,750.12 - 21,750.12
level.
3.2 500 mm thick hard trachytic or equivalent stone
peripheral foundation wall to a depth of 100cm
bedded in cement mortar 1:3 above natural ground
level. m 4 - 1,253.00 - - -
Total to Summary.Birr 21,750.12 - 21,750.12
B. SUPER STRUCTURE - - -
1. CONCRETE WORK - - -
1.1 Reinforced concrete in class C-25 (with a 28-day
150mm cube crushing strength of 25MPa), cast into
formworks and vibrated around rod reinforcement
bars. (formwork & reinforcement bars are measured
separately.) in: "Type of cement to be ordinary
Portland cement (OPC)"
- - -
a. In elevation column m 2 1.29 1.29 2,539.00 3,275.31 - 3,275.31
b. In intermediate and top tie beams m 5 2.84 2.84 2,539.00 7,210.76 - 7,210.76
1.2 Provide, cut and fix in position metal panel or sawn
Zigba wood form work - - - -
a. To elevation column m 59 25.60 25.60 185.00 4,736.00 - 4,736.00
b. To intermediate and top tie beams m 79 36.66 36.66 208.00 7,625.28 - 7,625.28
1.3 Reinforcement bar according to structural
drawings. Price includes cutting, bending, placing
in position & tying wires. - - - -
Diameter 6mm deformed bars Kg 13 - 36.00 - - -
Diameter 8mm deformed bars Kg 250 188.97 188.97 36.00 6,802.85 - 6,802.85
Diameter 10mm deformed bars Kg 28 - - 36.00 - - -
Diameter 12mm deformed bars Kg 316 225.13 225.13 36.00 8,104.53 - 8,104.53
Diameter 14mm deformed bars Kg 165 120.23 120.23 36.00 4,328.12 - 4,328.12
Total to Summary....Birr 42,082.85 - 42,082.85
2. BLOCK WORK
2.1 200mm thick hollow concrete block wall of type
Class-C with 28 days minimum crushing strength of
18kg/cm2, bedded in cement mortar (1:3) mix, both
sides left for plastering. Price includes 2f6mm iron
bars laid horizontally every other course (spacing
400mm c/c).
m 127 110.90 110.90 466.00 51,679.87 - 51,679.87
- - -
3. ROOFING - - -
3.1 Roof cover in Pre-painted EGA 300, 0.5mm thick
fixed to RHS purlins with standard hooks and
washers. Roof cover measured in horizontal
projection. Price includes ridge cover. m 145 - - - 375.00 - - -
Roof cover in precoated EGA 400, t=0.4mm fixed
to RHS STEEL.Price shall include ridge cap. (Purlins
3.1* measured separately and roof measured in
horizontal projection) m 145 135.51 135.51 341.00 46,209.32 - 46,209.32
3.2 G-28 G.I.S roof gutter with development length of
1000mm welded at joint provided 2% slope towards
down pipe and Price includes painting of two coats
of antirust and one coat of metal paint. ml 28 - 348.00 - - -
Contractor Consultant
Excuted Quantity Excuted Amount
Contract Previous Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
3.3 G28 flat metal sheet flashing with development
length of 330mm and Price includes painting of two
coats of antirust and one coat of metal paint. m 23 - 135.00 - - -
3.4 G28 flat metal sheet copping with development
length of 330mm and Price includes painting of two
coats of antirust and one coat of metal paint. m 23 - 125.00 - - -
3.5 Supply and fix 8 mm thick ribbed sheet eave soffit
ceilings. Price include 40 x 50 mm zigba wood
battens with c/c spacing of 600 mm both ways,
corner list and all other necessary accessories to m 22 - 288.00 - - -
complete the work. ml 17 - 223.00 - - -
3.6 Dia. 110mm pvc down pipe
Total to SummaryBirr 46,209.32 - 46,209.32
4. CARPENTRY & JOINERY - - -
Carpentry - - -
4.1 Supply and fix 8 mm thick chip wood ceilings. Price
include 40 x 50 mm zigba wood battens with c/c
spacing of 600 mm both ways, corner list and all
other necessary accessories to complete the work. ml 104.00 104.00 288.00 29,952.00 - 29,952.00
4.2 supply & fix 300mmx25mm zigba wood fascia board
price include 3 coat of oil paint ml 26 - 168.00 - -
Total to SummaryBirr 29,952.00 - 29,952.00
5. METAL WORK - - -
Metal window and doors made of 38x1.5mm LTZ
profiles shown on the drawings, price include
approved quality locks and all iron mongery works,
two coats of anti rust, two coats of synthetic paint,
1mm thick ribbed sheet and door stopper. All
according to detail Arch. drawings.
- - -
5.1 WINDOWS - - -
- - -
Size 2500x900 mm pcs 5 5.00 5.00 2,475.00 12,375.00 - 12,375.00
- - - -
5.2 DOORS - - - -
- - - -
Size 2000x 2700 mm pcs 1 1.00 1.00 5,940.00 5,940.00 - 5,940.00
- - -
Total to Summary.....Birr 18,315.00 - 18,315.00
- - -
6. STRUCTURAL STEEL WORKS - - -
- - -
Supply and erect steel roof structure all as shown
on the detail drawing. Apply two coats of antirust
paint. Price includes all necessary preparation work
such as cleaning, wire brushing and finally two
coats of anti-rust paint. - - -
6.1 Upper, lower, vertical & horizontal chords as
specified on the drawing. - - -
RHS size: 40 x 40 x 2.5mm kg 67.00 255.61 255.61 60.00 15,336.59 - 15,336.59
- - - -
RHS size: 30 x 30 x 2mm kg 41.00 156.14 156.14 60.00 9,368.33 - 9,368.33
6.2 Lattice purlin - - - -
- - - -
RHS size: 25 x 25 x 2mm kg 532.00 563.50 563.50 60.00 33,809.72 - 33,809.72
- - - -
RHS size: 20 x 20 x 2mm kg 147.00 129.36 129.36 60.00 7,761.74 - 7,761.74
- - - -
6.3 200x150x5mm steel plate welded to truss and fixed
to anchor bolts as shown on the drawing. No. 20 - 391.00 - - -
- - - -
6.4 300x150x3mm Gusset Plate No. 8 8.49 8.49 394.00 3,344.59 - 3,344.59
- - - -
6.5 Grade 4.8 M14 threaded anchor bolt L-490mm No. 24 - 80.00 - - -
- - -
Total to Summary.....Birr 69,620.97 - 69,620.97
- - -
7. FINISHING WORK - - -
7.1 PLASTERING AND POINTING - - -
- - -
Finishing work shall include all surface pre-
cleaning, Preparation and application of the finish,
polishing and cleaning at the end of finished work. - - -
- - -
7.1.1 Apply three coats of plaster in cement mortar mix
1:3 up to fine finish to internal wall, beams and
columns surface. Mortar for fine finish shall be
cement-fine sand 1:2. Provide grooves recessed by
5mm between beams and walls, columns and walls. m 116 102.15 102.15 137.00 13,994.55 - 13,994.55
- - - -
7.1.2 Apply two coats of external wall plaster in cement
mortar mix 1:3 and one coat of tyrolean rendering
in cement mortar mix 1:2. Provide grooves recessed
by 5mm between beams and walls, columns and m 67 129.11 129.11 154.00 19,882.94 - 19,882.94
walls. - - - -
7.2 FLOOR & WALL FINISHING - - - -
- - - -
7.2.1 50mm thick power toweling the exposed concrete
slab surface when the concrete is fresh and making
surface joints with cutting machine after the
concrete hardens all according to the detail
drawing. Power toweling involve m 104.2 - 181.00 - - -
- - - -
Window Sill - - - -
7.2.2 Marble window cill on and including cement mortar
bed jointed in cement mortar mix of 1:3. - - - -
- - - -
Size 280 x 30mm ml 5 12.75 12.75 626.00 7,981.50 - 7,981.50
- - - -
Door Threshold - - - -
7.2.3 Marble door thresholds on and including cement
mortar bed jointed in cement mortar mix of 1:3 - - - -
- - - -
Size 200 x 20mm ml 2 - 487.00 - - -
- - - -
7.2.4 1000mm wide well dressed stone pavement bedded
on 150mm thick quarry waste and joints pointed in
cement mortar (1:3) mix around the building. m 44 - 475.00 - - -
- - - -
7.2.4 1000mm wide Concrete pavement bedded on
150mm thick quarry waste and joints pointed in
cement mortar (1:3) mix around the building. M2 45.60 45.60 199.90 9,115.44 - 9,115.44
- - - -
Contractor Consultant
Excuted Quantity Excuted Amount
Contract Previous Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
7.2.5 Supply and lay semi-circular open precast concrete
open channel on 50mm thick sand bedding. Unit
price shall include flat stone/concrete topping,
provision of metal grating at inlet to
manhole,excavation of the trench and cartaway. ml 52 - 274.00 - - -
Ditch dia.: 1/2 300 mm
- - -
Total to Summary..Birr 50,974.43 - 50,974.43
Contractor Consultant
BOKRA CONSTRUCTION & TRADING PLC
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM TAKEOFF SHEET NO:01
CLIENT:MEKELLE UNIVERSITY BLOCK: B 3 STORE
CONSULTANT :NOMY ENGINEERING PLC PAGE NO: 1
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
SUBSTRUCTURE BAR SCHEDULE SUMMARY
Descrption TOTAL Wt. OF BAR FOR DIA.
Diameter 8 10 12 14 16 20
Tot.wt. (kg) 459.66 23.69 132.77 114.71 0.00 0.00
A.
24
0.00
DIA.
24
0
3.55
0
F SHEET NO:01
B3 STORE
DIA.
24
0
3.55
0
F SHEET NO:01
B3 STORE
DIA.
24
0
3.55
0
F SHEET NO:01
B3 STORE
DIA.
24
0
3.55
0
F SHEET NO:01
B3 STORE
A.
24
0.00
DIA.
24
0
3.55
0
F SHEET NO:01
B3 STORE
DIA.
24
0
3.55
0
BOKRA CONSTRUCTION & TRADING PLC
AT MEKELLE
SUMMARY
A-SUB STRUCTURE
B-SUPER STRUCTURE
8 PAINTING. BIRR - - - -
Contractor Consultant
Excuted Quantity Excuted Amount
ContractPrevious Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Bulk excavation in ordinary soil not exceeding 1500mm
from NGL. m 158 42.17 42.17 55.00 2,319.35 - 2,319.35
1.2 Excavate in ordinary soil for isolated footing to a depth
exceeding 1500mm but not exceeding 3000mm from
reduced level. m 6 6.59 6.59 75.00 494.25 - 494.25
1.3 Excavate in weathered rock for isolated footing to a
depth exceeding 1500mm but not exceeding 3000mm
from reduced level. m 6 - 410.00 - - -
1.4 Excavate for trench foundation in ordinary soil to a depth
not exceeding 1500mm from stripped level. m 37 - 61.00 - - -
1.5 Fill around trench, isoleted foundation and under
hardcore to maintain the desired level with selected
borrowed material and compact in layers not exceeding m 203 53.72 53.72 156.00 8,379.62 - 8,379.62
1.6 200mm.
Cart away surplus excavated material to a distance not m 241 48.76 48.76 85.00 4,144.60 - 4,144.60
1.7 exceeding 2kms.
250mm. thick sound basaltic or equivalent stone hard-
core finished and blinded with crushed stone. m 102 104.00 104.00 143.00 14,872.00 - 14,872.00
Total to Summary..Birr - 30,209.82 - 30,209.82
2. CONCRETE WORK -
2.1 50mm thick lean concrete in C-5 with minimum cement
content of 150Kg/m3under: -
a. Footing pads m 5 4.86 4.86 75.00 364.50 - 364.50
b. Under grade beam m 0 - - - -
c. Under stone masonry wall m 21 23.76 23.76 75.00 1,782.00 - 1,782.00
d. Under ground floor Slab m 102 101.01 101.01 75.00 7,575.75 - 7,575.75
2.2 Reinforced concrete in class C-25 (with a 28-day 150mm
cube crushing strength of 25MPa), cast into formworks
and vibrated around rod reinforcement bars.( formwork
& reinforcement bars are measured separately.) in: "Type
of cement to be ordinary Portland cement (OPC)" -
a. In isolated footing pads m 1 0.96 0.96 ### 2,437.44 - 2,437.44
b. In foundation column m 1 0.25 0.25 ### 634.75 - 634.75
c. In grade beam m 5 4.02 4.02 ### 10,206.78 - 10,206.78
d. Styrophome expansion joint ml 41 40.40 40.40 70.00 2,828.00 - 2,828.00
e.Aclryic joint sealing ml 21 - 85.00 - - -
2.3 50mm thick lean concrete class C-15 only 280 kg
cement/m3 of concrete under: -
In ground floor slab (10cm thick) m 102 101.01 101.01 199.90 20,191.90 - 20,191.90
2.4 Provide, cut and fix in position sawn Zigba wood or metal
panel form work: - - - -
a. To isolated footTog pad m 5 4.80 4.80 166.00 796.80 - 796.80
b. To foundation column m 15 3.94 3.94 166.00 654.04 - 654.04
c. To grade beam m 34 32.96 32.96 166.00 5,471.36 - 5,471.36
2.5 Reinforcement bar according to structural drawings.
Price includes cutting, bending, placing in position & -
tying wires.
Diameter 8mm deformed bars Kg 515 443.04 443.04 36.00 15,949.44 - 15,949.44
Diameter 10mm deformed bars Kg 39.9 37.02 37.02 36.00 1,332.72 - 1,332.72
Diameter 12mm deformed bars Kg 200.2 117.59 117.59 36.00 4,233.24 - 4,233.24
Diameter 14mm deformed bars Kg 153.44 136.85 136.85 36.00 4,926.60 - 4,926.60
Total to Summary...Birr 79,385.32 - 79,385.32
3. MASONRY WORK -
3.1 500 mm thick hard trachytic or equivalent stone
peripheral foundation wall to a depth of 50cm bedded in
cement mortar 1:3 below natural ground level. m 17 4.30 4.30 ### 5,301.90 - 5,301.90
3.2 500 mm thick hard trachytic or equivalent stone
peripheral foundation wall to a depth of 100cm bedded in
cement mortar 1:3 above natural ground level. m 4 2.15 2.15 ### 2,693.95 - 2,693.95
Total to Summary.Birr 7,995.85 - 7,995.85
-
-
B. SUPER STRUCTURE -
1. CONCRETE WORK -
1.1 Reinforced concrete in class C-25 (with a 28-day 150mm
cube crushing strength of 25MPa), cast into formworks
and vibrated around rod reinforcement bars. (formwork
& reinforcement bars are measured separately.) in: "Type
of cement to be ordinary Portland cement (OPC)" -
a. In elevation column m 2 1.46 1.46 ### 3,706.94 - 3,706.94
b. In intermediate and top tie beams m 4 3.44 3.44 ### 8,734.16 - 8,734.16
1.2 Provide, cut and fix in position metal panel or sawn
Zigba wood form work - - - -
a. To elevation column m 23 25.08 25.08 185.00 4,639.80 - 4,639.80
b. To intermediate and top tie beams m 43 37.72 37.72 208.00 7,845.76 - 7,845.76
1.3 Reinforcement bar according to structural drawings.
Price includes cutting, bending, placing in position & - - - -
tying wires.
Diameter 8mm deformed bars Kg 181.28 192.25 192.25 36.00 6,921.00 - 6,921.00
Diameter 10mm deformed bars Kg 120.75 - - 36.00 - - -
Diameter 12mm deformed bars Kg 279.4 253.36 253.36 36.00 9,120.96 - 9,120.96
Diameter 14mm deformed bars Kg 161.28 143.43 143.43 36.00 5,163.48 - 5,163.48
Total to Summary....Birr 46,132.10 - 46,132.10
2. BLOCK WORK -
2.1 200mm thick hollow concrete block wall of type Class-C
with 28 days minimum crushing strength of 18kg/cm2,
bedded in cement mortar (1:3) mix, both sides left for
plastering. Price includes 26mm iron bars laid
horizontally every other course (spacing 400mm c/c). m 46 42.81 42.81 466.00 19,949.46 - 19,949.46
2.2 Ditto but 150mm thick HCB block. m 0 - - - -
2.3 Ditto but 100mm thick HCB block. m 79 - 326.00 - - -
2.4 300mm thick well dressed stone masonry wall bedded in
1:3 mortar mix. Price incluld pointing m 95 73.26 73.26 717.00 52,527.42 - 52,527.42
Total to Summary....Birr 72,476.88 - 72,476.88
-
3. ROOFING -
-
3.1 Roof cover in Pre-painted EGA 300, 0.5mm thick fixed to
RHS purlins with standard hooks and washers. Roof cover
measured in horizontal projection. Price includes ridge
cover & 50mm thick rock wool insulation. m 133 - - 375.00 - - -
3.1* Roof cover in precoated EGA 400, t=0.4mm fixed to RHS
STEEL.Price shall include ridge cap. (Purlins measured
separately and roof measured in horizontal projection) m 133 128.14 128.14 341.00 43,696.42 - 43,696.42
-
Contractor Consultant
Excuted Quantity Excuted Amount
ContractPrevious Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
3.2 G-28 G.I.S roof gutter with development length of
1000mm welded at joint provided 2% slope towards
down pipe and Price includes painting of two coats of
antirust and one coat of metal paint. ml 25 - 348.00 - - -
-
3.3 G28 flat metal sheet flashing with development length of
330mm and Price includes painting of two coats of
antirust and one coat of metal paint. m 24 - 135.00 - - -
-
3.4 G28 flat metal sheet copping with development length of
330mm and Price includes painting of two coats of
antirust and one coat of metal paint. m 3 - 125.00 - - -
-
3.5 Supply and fix 8 mm thick ribbed sheet eave soffit
ceilings. Price include 40 x 50 mm zigba wood battens
with c/c spacing of 600 mm both ways, corner list and all
other necessary accessories to complete the work. m 38 - 288.00 - - -
-
3.6 Dia 110mm PVC down pipe. ml 17 - 223.00 - - -
-
Total to SummaryBirr 43,696.42 - 43,696.42
-
4. CARPENTRY & JOINERY -
Carpentry -
4.1 Supply and fix 8 mm thick chip wood ceilings. Price
include 40 x 50 mm zigba wood battens with c/c spacing
of 600 mm both ways, corner list and all other necessary
accessories to complete the work. ml 102 101.01 101.01 288.00 29,090.88 - 29,090.88
Total to SummaryBirr 29,090.88 - 29,090.88
- - - -
5. METAL WORK - - - -
- - - -
Metal window and doors made of 38x1.5mm LTZ profiles
shown on the drawings, price include approved quality
locks and all iron mongery works, two coats of anti rust,
two coats of synthetic paint, 1mm thick ribbed sheet and
door stopper. All according to detail Arch. drawings. - - - -
- - - -
5.1 WINDOWS - - - -
- - - -
Size 1200x 900 mm pcs 6 - ### - - -
Size 2500x 900 mm pcs 0 6.00 6.00 ### 14,850.00 - 14,850.00
5.2 DOORS - - - -
- - - -
Size 1500x 2700 mm pcs 1 1.00 1.00 ### 3,712.50 - 3,712.50
- - - -
Total to SummaryBirr 18,562.50 - 18,562.50
-
6. STRUCTURAL STEEL WORKS -
-
Supply and erect steel roof structure all as shown on the
detail drawing. Apply two coats of antirust paint. Price
includes all necessary preparation work such as cleaning,
wire brushing and finally two coats of anti-rust paint. -
-
6.1 Upper, lower, vertical & horizontal chords as specified on
the drawing. -
-
-
RHS size: 40 x 40 x 2.5mm kg 145.37 212.19 212.19 60.00 12,731.33 - 12,731.33
- - - -
RHS size: 35 x 35x 2.5mm kg 73.01 108.94 108.94 60.00 6,536.59 - 6,536.59
- - - -
6.2 Lattice purlin - - - -
- - - -
RHS size: 25 x 25 x 2.5mm kg 448.97 485.97 485.97 60.00 29,158.07 - 29,158.07
- - - -
RHS size: 20 x 20 x 2mm kg 99.46 109.93 109.93 60.00 6,595.58 - 6,595.58
- - - -
6.3 (500x150x3mm) thick steel gusset plate welded to truss
as shown on the drawing. No. 6 11.32 11.32 416.00 4,708.45 - 4,708.45
- - - -
6.4 200x200x5mm steel plate welded to truss and fixed to
anchor bolts as shown on the drawing. No. 12 - 408.00 - - -
- - - -
6.5 Grade 4.8 M12 threaded anchor bolt L-300mm No. 12 - 80.00 - - -
- - - -
Total to Summary.....Birr 59,730.03 - 59,730.03
-
7. FINISHING WORK -
7.1 PLASTERING AND POINTING -
-
Finishing work shall include all surface pre-cleaning,
Preparation and application of the finish, polishing and
cleaning at the end of finished work. -
-
7.1.1 Apply two coats of plaster in cement mortar (1:3) & final
gypsum coating to internal wall , columns & beams.
Provide grooves recessed by 5mm between beams and
walls, columns and walls. m 104 43.89 43.89 140.00 6,144.60 - 6,144.60
7.1.2 Ditto item 7.1.2 but two coats to receive ceramic wall m 0 - - - -
tile. - - - -
7.1.3 Apply two coats of external wall plaster in cement mortar
mix 1:3 and one coat of tyrolean rendering in cement
mortar mix 1:2. Provide grooves recessed by 5mm
between beams and walls, columns and walls. m 100 47.13 47.13 154.00 7,258.02 - 7,258.02
- - - -
7.2 FLOOR & WALL FINISHING - - - -
- - - -
Contractor Consultant
Excuted Quantity Excuted Amount
ContractPrevious Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
Supply & fix 300x300x2mm asbestos free hard imported
PVC tiles flooring stuck to cement screed with approved
7.2.1 adhesive glue. Price shall includes 48mm thick cement m 102 - 329.00 - - -
mortar backing. - - - -
7.2.2 100mm high PVC skirting stuck to wall with proper ml 41 - 75.00 - - -
adhesive. - - - -
Window Sill - - - -
7.2.3 Marble window cill on and including cement mortar bed
jointed in cement mortar mix of 1:3. - - - -
Size 280 x 30mm ml 15 - 626.00 - - -
Door Threshold - - - -
Marble door thresholds on and including cement mortar
7.2.4 bed jointed in cement mortar mix of 1:3 - - - -
Contractor Consultant
BOKRA CONSTRUCTION & TRADING PLC
Project:- MUBP86
Location:- AYNALEM
Client:- MEKELLE UNIVERSTY Block:-B-4 Computer lab store
Consultant:- NOMY ENGINEERING PLC Page :- 1
SUB STRUCTURE BAR SCHEDULE SUMMARY
Descrption Total Length Of Bar for dia.
Diameter 8 10 12 14 16 20
Tot.wt. (kg) 443.04 37.02 117.59 136.85 0 0
BOKRA CONSTRUCTION & TRADING PLC
24
0
24
0
3.55
0
store
24
0
3.55
0
store
24
0
3.55
0
store
24
0
24
0
3.55
0
BOKRA CONSTRUCTION & TRADING PLC
Project:- MUBP86 Takeoff No 1
Location:-AYNALEM Block:- B4
Client:- MEKELLE UNIVERSTY Page No:- 1
Consultant:- NOMY ENGINEERING PLC
No L*W*D QTY Description No L*W*D QTY Description
Contractor Consultant
BOKRA CONSTRUCTION & TRADING PLC
MEKELLE UNIVERSTY COMMUNITY SCHOOL
B5-1 class room
AT MEKELLE
SUMMARY
Previous Current Todate
NO. Description
Amount Amount Amount
A-SUB STRUCTURE
B-SUPER STRUCTURE
8 PAINTING BIRR - - -
Contractor Consultant
Excuted Quantity Excuted Amount
Contract Previous Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Bulk excavation in ordinary soil not exceeding
1500mm from NGL. m 316 307.63 307.63 55 16,919.65 - 16,919.65
1.2 Excavate in ordinary soil for isolated footing to
a depth exceeding 1500mm but not exceeding
3000mm from reduced level. m 23 15.34 15.34 75 1,150.50 - 1,150.50
1.3 #VALUE! m 11 - 410 - - -
1.4 Excavate for trench foundation in ordinary soil
to a depth not exceeding 1500mm from m 36 3.66 3.66 61 223.26 - 223.26
1.5 stripped
Fill level.
around trench, isoleted foundation and
under hardcore to maintain the desired level
with selected borrowed material and compact
in layers not exceeding 200mm. m 525 224.49 224.49 156 35,020.44 - 35,020.44
1.6 Cart away surplus excavated material to a
distance not exceeding 2kms. m 447 326.63 326.63 85 27,763.55 - 27,763.55
1.7 250mm. thick sound basaltic or equivalent
stone hard-core finished and blinded with m 247 237.24 237.24 143 33,925.32 - 33,925.32
crushed
Total stone.
to Summary..Birr 115,002.72 - 115,002.72
2. CONCRETE WORK - -
2.1 50mm thick lean concrete in C-5 with minimum
cement content of 150Kg/m3under: - -
a. Footing pads m 8 9.76 9.76 75 732.00 - 732.00
b. Under grade beam m 19 14.34 14.34 75 1,075.50 - 1,075.50
c. Under stone masonry wall m 43 46.98 46.98 75 3,523.50 - 3,523.50
d. Under ground floor Slab m 247 237.24 237.24 75 17,793.00 - 17,793.00
2.2 Reinforced concrete in class C-25 (with a 28-
day 150mm cube crushing strength of 25MPa),
cast into formworks and vibrated around rod
reinforcement bars.( formwork &
reinforcement bars are measured separately.)
in: "Type of cement to be ordinary Portland - - - -
cement (OPC)"
a. In isolated footing pads m 2 1.86 1.86 2539 4,722.54 - 4,722.54
b. In foundation column m 2 0.77 0.77 2539 1,955.03 - 1,955.03
c. In grade beam m 11 10.51 10.51 2539 26,684.89 - 26,684.89
e. Styrophome expansion joint ml 173 139.60 139.60 70 9,772.00 - 9,772.00
2.3 Reinforced concrete in class C-15 (with a 28-day
150 mm cube crushing strength of 15MPa), cast
into form works and vibrated around rod
reinforcement bars.( reinforcement bars are
measured separately) in: "Type of cement to be
ordinary Portland cement (OPC)" - - - -
In 100mm thick ground floor slab m 247 237.24 237.24 199.9 47,424.28 - 47,424.28
2.4 Provide, cut and fix in position sawn Zigba
wood or metal panel form work: - - - -
a. In isolated footing pad m 11 10.80 10.80 166 1,792.80 - 1,792.80
b. In foundation column m 34 14.70 14.70 166 2,440.20 - 2,440.20
c. In grade beam m 100 97.15 97.15 166 16,126.90 - 16,126.90
2.5 Reinforcement bar according to structural
drawings. Price includes cutting, bending,
placing in position & tying wires. - - - -
Diameter 8mm deformed bars Kg 1477 ### ### 36 41,277.24 - 41,277.24
Diameter 10mm deformed bars Kg 81 76.51 76.51 36 2,754.36 - 2,754.36
Diameter 12mm deformed bars Kg 520 412.24 412.24 36 14,840.64 - 14,840.64
Diameter 14mm deformed bars Kg 316 352.71 352.71 36 12,697.56 - 12,697.56
Total to Summary...Birr 205,612.44 - 205,612.44
3. MASONRY WORK - -
3.1 500 mm thick hard trachytic or equivalent
stone peripheral foundation wall to a depth of
50cm bedded in cement mortar 1:3 below
natural ground level. m 29 35.62 35.62 1233 43,919.46 - 43,919.46
3.2 500 mm thick hard trachytic or equivalent
stone peripheral foundation wall to a depth of
100cm bedded in cement mortar 1:3 above
natural ground level. m 6 - 1253 - - -
Total to Summary.Birr 43,919.46 - 43,919.46
- - -
B. SUPER STRUCTURE - - - -
1. CONCRETE WORK - - - -
1.1 Reinforced concrete in class C-25 (with a 28-day
150mm cube crushing strength of 25MPa), cast
into formworks and vibrated around rod
reinforcement bars. (formwork & reinforcement
bars are measured separately.) in: "Type of
cement to be ordinary Portland cement (OPC)" -
a. In elevation column m 4 3.44 3.44 2539 8,734.16 - 8,734.16
b. In intermediate and top tie beams m 8 6.54 6.54 2539 16,605.06 - 16,605.06
1.2 Provide, cut and fix in position metal panel or
sawn Zigba wood form work - - - -
a. To elevation column m 62 58.59 58.59 185 10,839.15 - 10,839.15
b. To intermediate and top tie beams m 95 77.22 77.22 208 16,061.76 - 16,061.76
Contractor Consultant
Excuted Quantity Excuted Amount
Contract Previous Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
1.3 Reinforcement bar according to structural
drawings. Price includes cutting, bending,
placing in position & tying wires. - - - -
Diameter 6mm deformed bars Kg 13 - 36 - - -
Diameter 8mm deformed bars Kg 1183 392.12 392.12 36 14,116.32 - 14,116.32
Diameter 10mm deformed bars Kg 54 - - 36 - - -
Diameter 12mm deformed bars Kg 498 558.29 558.29 36 20,098.44 - 20,098.44
Diameter 14mm deformed bars Kg 146 278.11 278.11 36 10,011.96 - 10,011.96
Total to Summary....Birr 96,466.85 - 96,466.85
2. BLOCK WORK - - - -
2.1 200mm thick hollow concrete block wall of type Cl m 151 158.18 158.18 466 73,712.35 - 73,712.35
Ditto but
2.2 300mm 100mm
thick well thick solid
dressed block.
stone masonry wall m 69 - 326 - - -
2.3 bedded in 1:3 mortar mix. Price include
pointing m 97 65.29 65.29 717 46,814.36 - 46,814.36
Total to Summary....Birr 120,526.71 - 120,526.71
3. ROOFING - - - -
3.1 Roof cover in Pre-painted EGA 300, 0.5mm
thick fixed to RHS purlins with standard hooks
and washers. Roof cover measured in
horizontal projection. Price includes ridge
cover & 50mm thick rock wool insulation. m 318 - - - 375 - - -
3.1* Roof cover in precoated EGA 400, t=0.4mm
fixed to RHS STEEL.Price shall include ridge
cap. (Purlins measured separately and roof
measured in horizontal projection) m 318 313.93 313.93 341 107,050.13 - 107,050.13
3.2 G-28 G.I.S roof gutter with development length
of 1000mm welded at joint provided 2% slope
towards down pipe and Price includes painting
of two coats of antirust and one coat of metal
paint. ml 62 - 348 - - -
- - - -
3.3 G28 flat metal sheet flashing with development
length of 330mm and Price includes painting of
two coats of antirust and one coat of metal
paint. m 10 - 135 - - -
- - - -
3.4 G28 flat metal sheet copping with
development length of 330mm and Price
includes painting of two coats of antirust and m 22 - 125 - - -
one coat of metal paint. - - - -
3.5 Supply and fix 8 mm thick ribbed sheet eave
soffit ceilings. Price include 40 x 50 mm zigba
wood battens with c/c spacing of 600 mm both
ways, corner list and all other necessary
accessories to complete the work. m 55 60.40 60.40 288 17,395.20 - 17,395.20
3.6 Dia. 110mm Pvc down pipe ml 20.04 - 223 - - -
- - - -
Total to SummaryBirr 124,445.33 - 124,445.33
- - - -
4. CARPENTRY & JOINERY - - - -
- - - -
Carpentry - - - -
4.1 Supply and fix 8 mm thick chip wood ceilings.
Price include 40 x 50 mm zigba wood battens
with c/c spacing of 600 mm both ways, corner
list and all other necessary accessories to
complete the work. m 185 237.24 237.24 288 68,325.12 - 68,325.12
- - - -
4.2 Supply & fix 300x25mm ziga wood fascia board
price include 3 coatsof plastic paint ml 59 168 - - -
- - - -
Total to SummaryBirr 68,325.12 - 68,325.12
- - - -
5. METAL WORK - - - -
- - - -
Metal window and doors made of 38x1.5mm
LTZ profiles shown on the drawings, price
include approved quality locks and all iron
mongery works, two coats of anti rust, two
coats of synthetic paint, 1mm thick ribbed
sheet and door stopper. All according to detail - - - -
Arch. drawings.
- - - -
5.1 WINDOWS - - - -
- - - -
Size 1000x 1500 mm pcs 16 16.00 16.00 1650 26,400.00 - 26,400.00
- - - -
Size 2500x 900 mm pcs 7 8.00 8.00 2475 19,800.00 - 19,800.00
- - - -
Size 1500x 900 mm pcs 1 - 1485 - - -
- - - -
5.2 DOORS - - - -
- - - -
Size 1000x 2700 mm pcs 4 4.00 4.00 2970 11,880.00 - 11,880.00
- - - -
Contractor Consultant
Excuted Quantity Excuted Amount
Contract Previous Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
Total to Summary.....Birr 58,080.00 - 58,080.00
- - - -
6. STRUCTURAL STEEL WORKS - - - -
Supply and erect steel roof structure all as - - - -
shown on the detail drawing. Apply two coats
of antirust paint. Price includes all necessary
preparation work such as cleaning, wire
brushing and finally two coats of anti-rust
paint. - - - -
- - - -
6.1 Upper, lower, vertical & horizontal chords as
specified on the drawing. - - - -
Contractor Consultant
Excuted Quantity Excuted Amount
Contract Previous Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
- - - -
RHS size: 30 x 30 x 2mm kg 371.79 354.81 354.81 60 21,288.60 - 21,288.60
- - - -
RHS size: 40 x 40 x 2.5mm kg 232.32 638.55 638.55 60 38,313.22 - 38,313.22
- - - -
6.2 Lattice purlin - - - -
- - - -
RHS size: 70 x 50 x 2mm kg 1489.5 ### ### 60 90,002.84 - 90,002.84
- - - -
RHS size: 20 x 20 x 2mm kg 314.99 - 60 - - -
- - - -
6.5 200x150x5mm steel plate welded to truss and
fixed to anchor bolts as shown on the drawing. No. 39 31.83 31.83 391 12,446.70 - 12,446.70
- - - -
6.6 100x200x5mm steel plate welded to truss and
fixed to anchor bolts as shown on the drawing. No. 8 - 375 - - -
- - - -
6.7 Grade 4.8 M14 threaded anchor bolt L-490mm No. 40 - 80 - - -
- - - -
6.8 Dia. 76mm CHS post Kg 113.4 - 60 - - -
- - - -
Total to Summary.....Birr 162,051.36 - 162,051.36
- - - -
7. FINISHING WORK - - - -
7.1 PLASTERING AND POINTING - - - -
- - - -
Finishing work shall include all surface pre-
cleaning, Preparation and application of the
finish, polishing and cleaning at the end of - - - -
finished work. - - - -
.1.1 Apply three coats of plaster in cement mortar
mix 1:3 up to fine finish to internal wall,
beams and columns surface. Mortar for fine
finish shall be cement-fine sand 1:2. Provide
grooves recessed by 5mm between beams and m 258 153.32 153.32 137 21,004.84 - 21,004.84
walls, columns and walls. - - - -
.1.2 Apply two coats of external wall plaster in
cement mortar mix 1:3 and one coat of
tyrolean rendering in cement mortar mix 1:2.
Provide grooves recessed by 5mm between m 99 104.72 104.72 154 16,126.88 - 16,126.88
beams and walls, columns and walls. - - - -
7.2 FLOOR & WALL FINISHING - - - -
- - - -
Supply & fix 300x300x2mm asbestos free hard
imported PVC tiles flooring stuck to cement
screed with approved adhesive glue. Price shall
7.2. includes 48mm thick cement mortar backing. m 186 - 329 - - -
- - - -
.2.2 100mm high PVC skirting stuck to wall with
proper adhesive. ml 107 - 75 - - -
- - - -
Window Sill - - - -
.2.8 Marble window cill on and including cement
mortar bed jointed in cement mortar mix of - - - -
1:3. - - - -
Size 280 x 30mm ml 37 37.20 37.20 626 23,287.20 - 23,287.20
- - - -
Door Threshold - - - -
Marble door thresholds on and including
7.2. cement mortar bed jointed in cement mortar - - - -
mix of 1:3 - - - -
Size 200 x 20mm ml 4 - 487 - - -
- - - -
- - - -
2.11 1000mm wide well dressed stone pavement
bedded on 150mm thick quarry waste and
joints pointed in cement mortar (1:3) mix m 138.8 - 475 - - -
around the building. - - - -
2.11 1000mm wide Concrete pavement bedded on
150mm thick quarry waste and joints pointed
in cement mortar (1:3) mix around the M2 82.40 82.40 199.9 16,471.76 - 16,471.76
building. - - - -
2.11 Supply and lay semi-circular open precast
concrete open channel on 50mm thick sand
bedding. Unit price shall include flat
stone/concrete topping, provision of metal
grating at inlet to manhole,excavation of the
trench and cartaway. Ditch dia.: 1/2 300 mm ml 86.4 - 274 - - -
- - - -
Total to Summary..Birr 76,890.68 - 76,890.68
8. Painting - -
- -
Contractor Consultant
Excuted Quantity Excuted Amount
Contract Previous Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
8.1 Prepare the surface and apply three coats of
plastic emulsion paint of chosen type and color - -
to: - -
a. Internal wall, columns and beam side surface m 258 - - 36 - - -
- - - -
b. Ditto but to external wall surface m 99 - - 40 - - -
- - - -
8.2 c. Ditto but to chipwood ceiling. m 185 - - 40 - - -
- -
Total to SummaryBirr - - - -
- -
9. Glazing - -
- -
9.1 Supply and properly fix glass free from any
defects to doors and windows. Use proper
putty and adequately packed. - -
- -
a. 4mm thick clear glass m 42 40.89 40.89 403 16,479.31 - 16,479.31
- -
Total to Summary..Birr - 16,479.31 - 16,479.31
Contractor Consultant
BOKRA CONSTRUCTION & TRADING PLC
Project:- MUBP86
Location:- AYNALEM
Client:- MEKELLE UNIVERSTY Block:- B5-1
Consultant:- NOMY ENGINEERING PLC Page No:- 1
SUB STRUCTURE BAR SCHEDULE SUMMARY
Descrption
Diameter 8 10 12 14 16 20
Tot.wt. (kg) 1146.59 76.51 412.24 352.71 0 0
BOKRA CONSTRUCTION & TRADING PLC
C2 12 2.325 6 4 24 55.8
8 0.9 8 4 32 28.8
C3 12 2.265 6 2 12 27.18
8 0.9 7 2 14 12.6
GROUNG FLOOR S
MESH A-I/2-4 8 6.4 30 4 120 768
8 7.2 27 4 108 777.6
A-I/1-2 8 1.8 119 1 119 214.2
8 12 8 2 16 192
8 6.6 8 1 8 52.8
C2 12 3.125 6 4 24 75
8 0.9 20 4 80 72
C3 12 4.265 6 2 12 51.18
0.00 to +4.14M 8 0.9 29 2 58 52.2
C4 12 3.8 4 7 28 106.4
8 0.74 20 7 140 103.6
C5 12 3.84 6 2 12 46.08
8 0.56 20 2 40 22.4
Total length (m) 390.2 0 403.66 0 0 0
Unit wt. (kg/m) 0.395 0.617 0.888 1.21 1.579 2.467
Tot.wt. (kg) 154.13 0 358.45 0 0 0
BOKRA CONSTRUCTION & TRADING PLC
Project:- MUBP86
Location:- AYNALEM
Client:- MEKELLE UNIVERSTY Block:- B5-1
Consultant:- NOMY ENGINEERING PLC Page No:- 6
24
0
24
0
3.55
0
B5-1
24
0
3.55
0
B5-1
24
0
3.55
0
B5-1
24
0
3.55
0
B5-1
24
0
24
0
3.55
0
B5-1
24
0
3.55
0
BOKRA CONSTRUCTION & TRADING PLC
Project:- MUBP86 Takeoff No 1
Location:-AYNALEM Block:- B5-1A
Client:- MEKELLE UNIVERSTY Page No:- 1
Consultant:- NOMY ENGINEERING PLC
No L*W*D QTY Description No L*W*DQTY Description
Contractor Consultant
BOKRA CONSTRUCTION & TRADING PLC
MEKELLE UNIVERSTY COMMUNITY SCHOOL
B5-2 CLASS ROOM
AT MEKELLE
SUMMARY
A. SUB-STRUCTURE
2.CONCRETE WORKS
Birr
3. MASONRY WORKS
Birr
TOTAL A
B. SUPER-STRUCTURE
1. CONCRETE WORKS
Birr
2. BLOCK WORK
Birr
5. METAL WORK
Birr
TOTAL B
Birr
TOTAL A+B
Birr
ITEM DESCRIPTION UNIT Contract QTY
A. SUB-STRUCTURE
1.EXCAVATION & EARTH WORKS
m3 232.00
1.8 Cart away surplus excavated material to a
distance not exceeding 5kms at selected
damping site. Price includes spreading &
leveling.
m3 608.00
Total to Summary.....Birr
2. CONCRETE WORKS
3. MASONRY WORKS
Total to Summary.....Birr
TRADING PLC
Amount
- - Err:509
- - Err:509
- - Err:509
- - Err:509
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - Err:509
Excuted QTY Rate Amount
- 55.00 0.00
0.00
410.00 0.00
0.00
410.00 0.00
156.00 0.00
156.00 0.00
- 85.00 0.00
0.00
143.00 0.00
0.00
Err:509
0.00
0.00
0.00
Err:509 75.00 Err:509
Err:509 75.00 Err:509
0.00 75.00 0.00
75.00 0.00
0.00
Err:509 2,539.00 Err:509
Err:509 2,539.00 Err:509
2,539.00 0.00
70.00 0.00
0.00
199.90 0.00
0.00
Err:509 166.00 Err:509
0.00
Err:509 166.00 Err:509
0.00
166.00 0.00
0.00
219.85 36.00 7,914.60
349.10 36.00 12,567.60
1,051.75 36.00 37,863.00
812.82 36.00 29,261.52
104.88 36.00 3,775.68
Err:509
0.00
0.00
0.00
1,253.00 0.00
0.00
Err:509
B5-2 CLASS ROOM
AT MEKELLE
SUMMARY
A. SUB-STRUCTURE
1.EXCAVATION & EARTH WORKS
Birr
2.CONCRETE WORKS
Birr
3. MASONRY WORKS
Birr
TOTAL A
B. SUPER-STRUCTURE
1. CONCRETE WORKS
Birr
2. BLOCK WORK
Birr
3. ROOFING AND WATER PROOFING WORK
Birr
5. METAL WORK
Birr
8. PAINTING
Birr
9. GLAZING
Birr
10. ELECTRCAL INSTALLATION
Birr
TOTAL B
Birr
TOTAL A+B
Birr
ITEM DESCRIPTION UNIT Contract QTY
A. SUB-STRUCTURE
1.EXCAVATION & EARTH WORKS
m3 156.00
1.7 Fill under hard core with selected borrowed non
expansive granular material and compact in layers
not exceeding 200mm thick by sprinkling water to
insure 95% modified AASHTO dry density and final
rolling with 5-8 ton roller.
m3 232.00
1.8 Cart away surplus excavated material to a distance
not exceeding 5kms at selected damping site. Price
includes spreading & leveling.
m3 608.00
Total to Summary.....Birr
2. CONCRETE WORKS
3. MASONRY WORKS
3.2 Ditto, but for the part exposed above ground and
one side left for pointing well dressed. m3 24.00
Total to Summary.....Birr
OM
Amount
- - 169,263.43
- - 226,094.12
- - 66,069.07
- - 461,426.61
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - 461,426.61
Excuted QTY Rate Amount
410.00 0.00
0.00
410.00 0.00
143.00 0.00
0.00
169,263.43
0.00
0.00
0.00
78.21 75.00 5,865.38
29.04 75.00 2,178.00
18.58 75.00 1,393.31
75.00 0.00
0.00
34.72 2,539.00 88,161.70
5.25 2,539.00 13,319.21
2,539.00 0.00
70.00 0.00
0.00
199.90 0.00
0.00
97.22 166.00 16,138.52
0.00
71.90 166.00 11,936.00
0.00
166.00 0.00
0.00
185.25 36.00 6,669.00
349.10 36.00 12,567.60
1,051.75 36.00 37,863.00
741.03 36.00 26,677.08
92.37 36.00 3,325.32
226,094.12
0.00
0.00
0.00
1,253.00 0.00
0.00
66,069.07
0.00
BOKRA CONSTRUC
MEKELLE UNIVERSTY COMMUNITY SCHO
B5-2a
AT
S
A. SUB-STRUCTURE
2.CONCRETE WORKS
Birr
3. MASONRY WORKS
Birr
TOTAL A
B. SUPER-STRUCTURE
1. CONCRETE WORKS
Birr
2. BLOCK WORK
Birr
5. METAL WORK
Birr
8. PAINTING
Birr
9. GLAZING
Birr
TOTAL B
Birr
TOTAL A+B
Birr
ITEM DESCRIPTION Contract
UNIT QTY
A. SUB-STRUCTURE
1.EXCAVATION & EARTH WORKS
m3 232.00
1.8 Cart away surplus excavated material to a
distance not exceeding 5kms at selected
damping site. Price includes spreading &
leveling.
m3 608.00
3. MASONRY WORKS
Total to Summary.....Birr
B. SUPER-STRUCTURE
1. CONCRETE WORKS
Total to Summary.....Birr
2. BLOCK WORK
m2 575.00
Total to Summary.....Birr
3. ROOFING AND WATER PROOFING WORK
m 79.00
Total to Summary.....Birr
Total to Summary.....Birr
5. METAL WORK
METAL WINDOWS
m2 189.00
Total to Summary.....Birr
6. STRUCTURAL STEEL WORKS
6.7 Grade 4.8 M12 threaded anchor bolt L-75mm No. 108
Total to Summary.....Birr
Total to Summary.....Birr
m 738.00
Stair case
7.2.5 Marble on including cement sand screed
(1:3)mix and joints pointed in cement mortar
(1:3) mix. To stair case.
Door Threshold
7.2.8 250x20mm marble threshold bedded in cement
mortar (1:3) mix. m 18.00
Total to Summary.....Birr
8. PAINTING
Total to Summary.....Birr
9. GLAZING
Total to Summary.....Birr
1 Distribution Boards
1.1 Flush mounting distribution Board,LPP-2CG,
with lockable door and including bus bars of
63Amp/3Phase, all necessary fixing and
connecting accessories, complete and
consisting:-
CABLES
2.1 (4x6+1x6)mm sq. ml 150
PVC PIPES
2.5 PVC conduit of 50 mm diameter ml 180
3 Light Points
3.1 Flush mounted light points fed through PVC
insulated conductors of 2x2.5mm2 inside PVC
conduits of 16mm diameter, including junction
boxes with covers and insulating screw cap
connectors, complete
No 241
NOTE
I. Supply of Lighting fitting by the Client,
II. An average Unit price is considered for
cost estimation,
III. The price of fittings under this item to be
EXCLUDED in the contract agreement.
iv. Recommended types of fittings indicated
on the attached lighting fitting Schedule.
9.1 Lighting fittings and lamps complete NO 241
Type 3 NO 61
Type 3.1 NO 180
Total to Summary.....Birr
OKRA CONSTRUCTION & TRADING PLC
COMMUNITY SCHOOL
B5-2a CLASS ROOM
AT MEKELLE
SUMMARY
Amount
Previous Amount
- 207,355.20
- 366,166.00
- 85,577.36
- 659,098.56
- 1,590,090.36
- 459,707.20
- -
- -
- -
- -
- -
- -
- -
- -
- 41,184.00
- 2,090,981.56
- 2,264,299.65
Excuted Quantity Excuted Amount
Previous
Current QTY Todate QTY Rate Previous Amount
QTY
- - 410.00 -
- - -
- - 410.00 -
- - 156.00 -
- -
78.21 78.21 75.00 5,865.75
29.04 29.04 75.00 2,178.00
18.58 18.58 75.00 1,393.50
269.48 269.48 75.00 20,211.00
0.00 - -
34.72 34.72 2,539.00 88,154.08
6.36 6.36 2,539.00 16,148.04
12.58 12.58 2,539.00 31,940.62
302.20 302.20 70.00 21,154.00
0.00 - -
269.48 269.48 199.90 -
0.00 - -
97.22 97.22 166.00 16,138.52
0.00 - -
86.85 86.85 166.00 14,417.10
0.00 - -
96.38 96.38 166.00 15,999.08
0.00 - -
589.17 589.17 36.00 21,210.12
349.10 349.10 36.00 12,567.60
1,051.75 1,051.75 36.00 37,863.00
1,587.71 1,587.71 36.00 57,157.60
104.88 104.88 36.00 3,775.58
- 366,173.59
- -
- -
- -
- -
34.13 34.13 2,539.00 86,654.80
44.77 44.77 2,539.00 113,660.87
36.72 36.72 406.24 14,917.13
741.60 741.60 457.02 338,926.03
0.00 - 380.85 -
25.50 25.50 2,539.00 64,744.91
0.00 - 2,539.00 -
0.00 - -
0.00 - -
399.63 399.63 208.00 83,123.66
0.00 - -
0.00 - 208.00 -
0.00 - -
0.00 - -
468.50 468.50 185.00 86,672.50
749.95 749.95 208.00 155,990.02
138.26 138.26 208.00 28,758.50
0.00 - -
0.00 - -
0.00 - 36.00 -
0.00 - -
4,361.35 4,361.35 36.00 157,008.57
0.00 - -
5,564.96 5,564.96 36.00 200,338.74
0.00 - -
1,689.10 1,689.10 36.00 60,807.57
0.00 - -
5,513.53 5,513.53 36.00 198,487.05
0.00 - -
- - 1,590,090.36
- -
- -
- -
0.00 375.00 -
0.00 -
0.00 348.00 -
0.00 -
0.00 215.00 -
0.00 -
0.00 120.00 -
0.00 -
0.00 600.00 -
0.00 -
0.00 135.00 -
0.00 -
0.00 288.00 -
0.00 -
0.00 125.00 -
0.00 -
0.00 223.00 -
0.00 -
0.00 0.00
0.00 -
0.00 -
0.00 -
0.00 288.00 -
0.00 -
0.00 168.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
64.00 64.00 1,870.00 -
0.00 -
16.00 16.00 1,925.00 -
0.00 -
0.00 -
0.00 -
12.00 12.00 4,950.00 -
0.00 -
4.00 4.00 5,005.00 -
0.00 -
0.00 800.00 -
0.00 -
0.00 800.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
567.79 567.79 60.00 -
0.00 -
458.96 458.96 60.00 -
0.00 -
0.00 -
0.00 -
1,924.39 1,924.39 60.00 -
0.00 -
144.39 144.39 60.00 -
0.00 -
0.00 375.00 -
0.00 -
0.00 401.00 -
0.00 -
0.00 19.00 -
0.00 -
0.00 80.00 -
0.00 -
0.00 80.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 140.00 -
0.00 -
0.00 105.00 -
0.00 -
0.00 154.00 -
0.00 -
0.00 37.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 329.00 -
0.00 -
0.00 456.00 -
0.00 -
0.00 75.00
0.00
0.00 85.00
0.00
0.00
0.00
0.00
0.00 634.00
0.00
0.00 436.00
0.00
0.00 253.00
0.00
0.00
0.00 626.00
0.00
0.00
0.00 487.00
0.00
0.00 475.00
0.00
0.00 274.00
0.00
0.00
0.00
0.00
0.00
0.00 36.00
0.00
0.00 36.00
0.00
0.00 40.00
0.00
0.00 40.00
0.00
0.00
0.00
0.00
0.00
0.00 403.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 5,500.00
0.00
0.00
0.00 5,500.00
0.00
0.00
0.00
0.00 180.00
0.00
0.00 80.00
0.00
0.00
0.00 314.00 -
0.00 315.00 -
0.00 316.00 -
0.00 317.00 -
0.00 318.00 -
0.00 319.00 -
0.00 320.00 -
0.00 321.00 -
0.00 322.00 -
0.00 323.00 -
0.00 324.00 -
0.00 325.00 -
0.00 326.00 -
0.00 327.00 -
0.00 328.00 -
0.00 329.00 -
0.00 330.00 -
0.00 331.00 -
0.00 332.00 -
0.00 333.00 -
0.00 334.00 -
0.00 335.00 -
0.00 336.00 -
0.00 337.00 -
0.00 338.00 -
0.00 339.00 -
0.00 340.00 -
41,184.00
Amount
- 207,355.20
366,166.00
- 85,577.36
- 659,098.56
- 1,590,090.36
- 459,707.20
104,550.60 104,550.60
- -
229,900.00 229,900.00
185,731.73 185,731.73
- -
- -
- -
- -
- 41,184.00
520,182.33 2,611,163.89
520,182.33 2,784,481.98
Excuted Amount
Current Amount Todate Amount
- 28,851.35
- 0.00
- 7,095.00
- 0.00
- 0.00
- 0.00
- 185.44
- 0.00
- 0.00
- 0.00
- 79,800.24
- 52,887.85
- 0.00
- 38,535.64
0.00
207,355.52
0.00
0.00
0.00
5,865.75
2,178.00
1,393.50
20,211.00
0.00
88,154.08
16,148.04
31,940.62
21,154.00
0.00
53,869.05
0.00
16,138.52
0.00
14,417.10
0.00
15,999.08
0.00
21,210.12
12,567.60
37,863.00
57,157.60
3,775.58
420,042.64
0.00
0.00
0.00
78,043.20
0.00
7,534.16
0.00
85,577.36
0.00
0.00
0.00
0.00
0.00
- 86,654.80
- 113,660.87
- 14,917.13
- 338,926.03
- 0.00
- 64,744.91
- 0.00
- 0.00
- 0.00
- 83,123.66
- 0.00
- 0.00
- 0.00
- 0.00
- 86,672.50
- 155,990.02
- 28,758.50
- 0.00
- 0.00
- 0.00
- 0.00
- 157,008.57
- 0.00
- 200,338.74
- 0.00
- 60,807.57
- 0.00
- 198,487.05
- 0.00
0.00 1,590,090.36
0.00
0.00
0.00
- 255,964.48
- 0.00
- 0.00
- 0.00
- 203,742.72
- 0.00
- 459,707.20
0.00
0.00
0.00
- 0.00
- 0.00
104,550.60 104,550.60
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
104,550.60 104,550.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
- -
119,680.00 119,680.00
- -
30,800.00 30,800.00
- -
- -
- -
59,400.00 59,400.00
- -
20,020.00 20,020.00
- -
- -
- -
- -
- -
- -
- -
229,900.00 229,900.00
0.00
0.00
0.00
0.00
0.00
- 0.00
- 0.00
34,067.25 34,067.25
- 0.00
27,537.61 27,537.61
- 0.00
- 0.00
- 0.00
115,463.58 115,463.58
- 0.00
8,663.29 8,663.29
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
185,731.73 185,731.73
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
0.00
0.00
0.00
0.00
0.00
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
- 41,184.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 0.00
- 41,184.00
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
5. METAL WORK
METAL LOUVER WINDOWS
16 W2 size 2500X700mm
10.22
1 30.00 306.60 M2
306.60 M2 Total
TAKEOFF SHEET NO:01
BLOCK: B5-2a CLASS ROOM
PAGE NO: 01
DESCRIPTION
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM TAKEOFF SHEET NO:01
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC 0.00
BAR SCHEDULE SUMMARY
Description TOTAL Wt. OF BAR FOR DIA.
Diameter 8 10 12 14
Tot.wt. (kg) 0.00 0.00 0.00 0.00
Bar No in a No Total No TOTAL LENGTH OF BAR FOR DIA.
Location Shape Dia. Length
No Member Member of Bars 8 10 12 14
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total Length(m) 0 0 0 0
Unit Wt.(kg/m) 0.395 0.617 0.888 1.21
Tot.Wt.(kg) 0 0 0 0
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM TAKEOFF SHEET NO:01
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
BAR SCHEDULE SUMMARY
Descrption TOTAL Wt. OF BAR FOR DIA.
Diameter 6 8 10 12 14
Tot.wt. (kg)
Bar No in a No Total No TOTAL LENGTH OF BAR FOR DIA.
Location Shape Dia. Length
No Member Member of Bars 8 10 12 14
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total Length(m) 0 0 0 0
Unit Wt.(kg/m) 0.395 0.617 0.888 1.21
Tot.Wt.(kg) 0 0 0 0
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM TAKEOFF SHEET NO:01
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
BAR SCHEDULE SUMMARY
Descrption TOTAL Wt. OF BAR FOR DIA.
Diameter 6 8 10 12 14
Tot.wt. (kg)
Bar No in a No Total No TOTAL LENGTH OF BAR FOR DIA.
Location Shape Dia. Length
No Member Member of Bars 8 10 12 14
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total Length(m) 0 0 0 0
Unit Wt.(kg/m) 0.395 0.617 0.888 1.21
Tot.Wt.(kg) 0.00 0.00 0.00 0.00
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM TAKEOFF SHEET NO:01
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
BAR SCHEDULE SUMMARY
Descrption TOTAL Wt. OF BAR FOR DIA.
Diameter 6 8 10 12 14
Tot.wt. (kg)
Bar No in a No Total No TOTAL LENGTH OF BAR FOR DIA.
Location Shape Dia. Length
No Member Member of Bars 8 10 12 14
0
0
0
0
0
0
0
0
Total Length(m) 0 0 0 0
Unit Wt.(kg/m) 0.395 0.617 0.888 1.21
Tot.Wt.(kg) 0.00 0.00 0.00 0.00
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM TAKEOFF SHEET NO:01
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
BAR SCHEDULE SUMMARY
Descrption TOTAL Wt. OF BAR FOR DIA.
Diameter 6 8 10 12 14
Tot.wt. (kg)
Bar No in a No Total No TOTAL LENGTH OF BAR FOR DIA.
Location Shape Dia. Length
No Member Member of Bars 8 10 12 14
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total Length(m) 0 0 0 0
Unit Wt.(kg/m) 0.395 0.617 0.888 1.21
Tot.Wt.(kg) 0.00 0.00 0.00 0.00
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM TAKEOFF SHEET NO:01
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
BAR SCHEDULE SUMMARY
Descrption TOTAL Wt. OF BAR FOR DIA.
Diameter 6 8 10 12 14
Tot.wt. (kg)
Bar No in a No Total No TOTAL LENGTH OF BAR FOR DIA.
Location Shape Dia. Length
No Member Member of Bars 8 10 12 14
0 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total Length(m) 0 0 0 0
Unit Wt.(kg/m) 0.395 0.617 0.888 1.21
Tot.Wt.(kg) 0.00 0.00 0.00 0.00
TAKEOFF SHEET NO:01
BLOCK: B5-2a
PAGE NO: 1
0 0 0
1.58 2.45 3.55
0 0 0
0 0 0
1.58 2.45 3.55
0 0 0
0 0 0
1.58 2.45 3.55
0.00 0.00 0.00
0 0 0
1.58 2.45 3.55
0.00 0.00 0.00
0 0 0
1.58 2.45 3.55
0.00 0.00 0.00
A. SUB-STRUCTURE
Previous AmountCurrent AmountTodate Amount
1.EXCAVATION & EARTH WORKS
Birr - - 186,114.46 - 186,114.46
2.CONCRETE WORKS
Birr - - 415,157.16 - 415,157.16
3. MASONRY WORKS
Birr - - 80,434.67 - 80,434.67
TOTAL A
- - 681,706.29 - 681,706.29
B. SUPER-STRUCTURE
1. CONCRETE WORKS
Birr - - 1,973,738.30 - 1,973,738.30
2. BLOCK WORK
Birr - - 408,771.52 50,935.68 459,707.20
3. ROOFING AND WATER PROOFING
WORK Birr - - - 104,550.60 104,550.60
5. METAL WORK
Birr - - - 229,900.00 229,900.00
8. PAINTING
Birr - - - - -
9. GLAZING
Birr - - - - -
TOTAL B
Birr 132.00 - 2,423,693.82 571,118.01 2,994,811.83
TOTAL A+B
Birr 132.00 - 3,105,400.11 571,118.01 3,676,518.12
Contractor Consultant
Excuted Quantity Excuted Amount
ITEM DESCRIPTION Previous Previous Current
ract QTY Current QTYTodate QTY Rate Todate Amount
UNIT QTY Amount Amount
A. SUB-STRUCTURE
1.EXCAVATION & EARTH WORKS
Contractor Consultant
Excuted Quantity Excuted Amount
ITEM DESCRIPTION Previous Previous Current
ract QTY Current QTYTodate QTY Rate Todate Amount
UNIT QTY Amount Amount
3.1 500mm thick hard trachytic or equivalent
stone masonry foundation wall bedded in
cement sand mortar mix (1:3) m3 72.00 56.66 56.66 1,233.00 69,856.85 - 69,856.85
- - - 0.00
3.2 Ditto, but for the part exposed above ground
and one side left for pointing well dressed.
m3 24.00 8.44 8.44 1,253.00 10,577.83 - 10,577.83
- - - 0.00
Total to Summary.....Birr - 80,434.67 - 80,434.67
- - - 0.00
B. SUPER-STRUCTURE - - - 0.00
1. CONCRETE WORKS - - - 0.00
- - - 0.00
1.1 Reinforced concrete in class C-25 (with a 28-
day 150mm cube crushing strength of
25MPa), cast into formworks and vibrated
around rod reinforcement bars. (formwork &
reinforcement bars are measured
separately.) in: "Type of cement to be
ordinary Portland cement (OPC)"
- - - 0.00
a. In elevation column m3 43.00 34.13 34.13 2,539.00 86,654.80 - 86,654.80
b. In intermediate and top tie beams m3 55.00 57.09 57.09 2,539.00 144,961.67 - 144,961.67
c. In 160mm thick first - third floor slabs m2 37.00 36.72 36.72 406.24 14,917.13 - 14,917.13
d. In 180mm thick first - third floor slabs m2 748.00 741.60 741.60 457.02 338,926.03 - 338,926.03
e. In 150mm thick roof slab m2 55.00 53.57 53.57 380.85 20,401.37 - 20,401.37
f. In staircase m3 9.00 14.57 14.57 2,539.00 36,997.09 - 36,997.09
g. In copping beam m3 1.00 - 2,539.00 - - 0.00
.3(a) Provide, cut and fix in position sawn
seasoned timber or steel form work made up
of minimum 2mm thick sheet metal & folded
thickness of 50mm whichever is appropriate;
- - - 0.00
- - - 0.00
a. To floor & top tie beams m 2
676.00 545.57 545.57 208.00 113,479.18 - 113,479.18
- - - 0.00
b. To copping beam m2 3.00 - 208.00 - - 0.00
- - - 0.00
.3(b) Provide, cut and fix in position 19mm thick
plywood formwork to fair face concrete. - - - 0.00
a. To elevation columns m2 579.00 433.46 433.46 185.00 80,190.10 - 80,190.10
b. To floor, side of slab & roof slabs m2 869.00 808.04 808.04 208.00 168,072.32 - 168,072.32
c. To staircase m2 61.00 110.61 110.61 208.00 23,006.80 - 23,006.80
1.3 Reinforcement steel bars according to
structural drawing. Price includes cutting,
bending, placing in position and tying wires.
- - - 0.00
- - - 0.00
a) dia. 6mm plain bar kg 13.00 - 36.00 - - 0.00
- - - 0.00
b) dia. 8mm deformed bar kg 4,529.00 7,410.74 7,410.74 36.00 266,786.65 - 266,786.65
- - - 0.00
c) dia. 10mm deformed bar kg 9,721.00 8,969.94 8,969.94 36.00 322,917.88 - 322,917.88
- - - 0.00
d) dia. 12mm deformed bar kg 793.00 2,705.47 2,705.47 36.00 97,396.87 - 97,396.87
- - - 0.00
e) dia. 14mm deformed bar kg 7,811.00 7,195.29 7,195.29 36.00 259,030.41 - 259,030.41
- - - 0.00
Total to Summary.....Birr - 1,973,738.30 - 1,973,738.30
- - - 0.00
2. BLOCK WORK - - - 0.00
- - - 0.00
2.1 200mm thick hollow concrete block wall of
type Class-C with 28 days minimum crushing
strength of 18kg/cm2, bedded in cement
mortar (1:3) mix, both sides left for
plastering. Price includes 26mm iron bars m2 575.00 549.28 549.28 466.00 255,964.48 - 255,964.48
laid horizontally every other course (spacing - - - 0.00
400mm c/c).
2.2 Ditto but to 100mm thick internal wall. m 2
191.00 - 326.00 - - 0.00
- - - 0.00
2.3 300mm thick dressed stone cladding wall. m2 262.00 213.12 71.04 284.16 717.00 152,807.04 50,935.68 203,742.72
- - - 0.00
Total to Summary.....Birr - 408,771.52 50,935.68 459,707.20
- - - 0.00
3. ROOFING AND WATER PROOFING - - - 0.00
WORK - - - 0.00
3.1 Roof cover in Pre-painted EGA 300, 0.5mm
thick fixed to RHS purlins with standard
hooks and washers. Roof cover measured in
horizontal projection. Price includes ridge
cover, 50mm thick rock wool insulation and
two coats of anti-rust paint.
m 272.00 - 375.00 - - 0.00
- - - 0.00
3.1* Roof cover in precoated EGA 400,
t=0.4mm fixed to RHS STEEL.Price shall
include ridge cap. (Purlins measured
separately and roof measured in
horizontal projection) M2 272.00 306.60 306.60 341.00 - 104,550.60 104,550.60
- - - 0.00
3.2 G-28 G.I.S roof gutter with development
length of 1000mm welded at joint provided
2% slope towards down pipe and Price
includes painting of two coats of antirust and
one coat of metal paint. m 61.00 - 348.00 - - 0.00
- - - 0.00
3.3 Spread and level average thickness of 10cm
weight concrete on top of flot root 20% slop
towards down pipe. m 55.00 - 215.00 - - 0.00
- - - 0.00
Contractor Consultant
Excuted Quantity Excuted Amount
ITEM DESCRIPTION Previous Previous Current
ract QTY Current QTYTodate QTY Rate Todate Amount
UNIT QTY Amount Amount
3.4 3cm thick cement and screed on top of light
weight concrete over flat root area to obtain
agentic flow of storm water to down pipe.
m 55.00 - 120.00 - - 0.00
- - - 0.00
3.5 Supply and install Membrane type water
proofing roofing material to all rain exposed
slabs and roofs. Price includes primer and
Joint seal. According to manufacturers
instruction. (or similar product approved by
the Engineer)
m 79.00 - 600.00 - - 0.00
- - - 0.00
3.6 G28 flat metal sheet flashing with
development length of 330mm and Price
includes painting of two coats of antirust and
one coat of metal paint. m 21.00 - 135.00 - - 0.00
- - - 0.00
3.7 Supply and fix 8 mm thick ribbed sheet eave
soffit ceilings. Price include 40 x 50 mm
zigba wood battens with c/c spacing of 600
mm both ways, corner list and all other
necessary accessories to complete the work.
m 61.00 - 288.00 - - 0.00
- - - 0.00
3.8 G28 flat metal sheet copping with
development length of 330mm and Price
includes painting of two coats of antirust and
one coat of metal paint. m 22.00 - 125.00 - - 0.00
- - - 0.00
3.9 Dia 110mm PVC down pipe. m 111.00 - 223.00 - - 0.00
- - - 0.00
Total to Summary.....Birr - - 104,550.60 104,550.60
- - - 0.00
4. CARPENTRY & JOINERY - - - 0.00
- - - 0.00
4.1 Supply and fix 8 mm thick chip wood
ceilings. Price include 40 x 50 mm zigba
wood battens with c/c spacing of 600 mm
both ways, corner list and all other
necessary accessories to complete the work.
m2 185.00 - 288.00 - - 0.00
- - - 0.00
4.2
Supply and fix 300x25mm zigba wood fascia
board price include three coats of oil paint. m 82.00 - 168.00 - - 0.00
- - - 0.00
Total to Summary.....Birr - - - 0.00
5. METAL WORK - - - 0.00
- - - 0.00
Metal window and doors made of 38x1.5mm
LTZ profiles shown on the drawings, price
include approved quality locks and all iron
mongery works, two coats of anti rust, two
coats of synthetic paint, 1mm thick ribbed
sheet and door stopper. All according to
detail Arch. drawings.
- - - 0.00
- - - 0.00
METAL WINDOWS - - - 0.00
- - - 0.00
5.1 W1 size 1000X1700mm No 64.00 64.00 64.00 1,870.00 - 119,680.00 119,680.00
- - - 0.00
W2 size 2500X700mm No 16.00 16.00 16.00 1,925.00 - 30,800.00 30,800.00
- - - 0.00
METAL WINDOW DOORS - - - 0.00
- - - 0.00
5.2 WD1 size 2500x700 + 1000x2750mm No 12.00 12.00 12.00 4,950.00 - 59,400.00 59,400.00
- - - 0.00
5.3 WD1 size 2500x700 + 1000x2800mm No 4.00 4.00 4.00 5,005.00 - 20,020.00 20,020.00
- - - 0.00
5.4 50mm,2.5mm thick furniture pipe hand rail
fixed to metal balustrade with welding and
all other necessary accessories for
completing the work. All according drawing
and shall be approved by the engineer.
m2 48.00 - 800.00 - - 0.00
- - - 0.00
5.5 Supply and fix guard rail made of S.H.S
40x40x2.5mm, S.H.S 30x30x2.5mm, R.H.S
40x20x1.5mm as shown on the drawing.
Price shall include one coat of anti-rust, two
coats of synthetic enamel paint, 1mm thick
plate & all the necessary accessories to
complete the work.
m2 189.00 - 800.00 - - 0.00
- - - 0.00
5.6 Supply & fix insect screen for open windows.
Price shall include all supporting accessories.
m2 - - - 0.00
- - - 0.00
Total to Summary.....Birr - - ### 229,900.00
- - - 0.00
6. STRUCTURAL STEEL WORKS - - - 0.00
- - - 0.00
Supply and erect steel roof structure all as
shown on the detail drawing. Apply two
coats of antirust paint. Price includes all
necessary preparation work such as
cleaning, wire brushing and finally two coats
of anti-rust paint.
- - - 0.00
- - - 0.00
6.1 Upper, lower, vertical & horizontal chords as
specified on the drawing. - - - 0.00
Contractor Consultant
Excuted Quantity Excuted Amount
ITEM DESCRIPTION Previous Previous Current
ract QTY Current QTYTodate QTY Rate Todate Amount
UNIT QTY Amount Amount
- - - 0.00
RHS size: 40 x 40 x 2.5mm kg 365.00 567.79 567.79 60.00 - 34,067.25 34,067.25
- - - 0.00
RHS size: 30 x 30 x 2.5mm kg 300.00 458.96 458.96 60.00 - 27,537.61 27,537.61
- - - 0.00
6.2 Lattice purlin - - - 0.00
- - - 0.00
RHS size: 70 x 50 x 2.5mm kg 1692.00 1,924.39 1,924.39 60.00 - 115,463.58 115,463.58
- - - 0.00
RHS size: 25 x 25 x 2.5mm kg 91.00 144.39 144.39 60.00 - 8,663.29 8,663.29
- - - 0.00
6.3 100x200x5mm steel plate welded to truss
and fixed to anchor bolts as shown on the
drawing. No. 36 - 375.00 - - 0.00
- - - 0.00
6.4 300x200x3mm gusset steel plate welded to
truss. As shown on the drawing. No. 18 - 401.00 - - 0.00
- - - 0.00
6.5 Angle iron 50x50x5mm L = 40mm to support
lattice purlin No. 108 - 19.00 - - 0.00
- - - 0.00
6.6 Grade 4.8 M12 threaded anchor bolt L-
300mm No. 36 - 80.00 - - 0.00
- - - 0.00
6.7 Grade 4.8 M12 threaded anchor bolt L-75mm
No. 108 - 80.00 - - 0.00
- - - 0.00
Total to Summary.....Birr - - ### 185,731.73
- - - 0.00
7.1 PLASTERING AND POINTING - - - 0.00
- - - 0.00
Finishing work shall include all surface pre-
cleaning, Preparation and application of the
finish, polishing and cleaning at the end of
finished work. - - - 0.00
- - - 0.00
7.1.1 Apply two coats of plaster in cement mortar
(1:3) & final gypsum coating to internal wall ,
columns & beams. m 1,103.00 - 140.00 - - 0.00
- - - 0.00
7.1.2 Ditto item 7.1.1 but to concrete ceiling and
stair-case soffit. m 874.00 - 105.00 - - 0.00
- - - 0.00
7.1.3 Ditto item 7.1.1 but up to fine finish to
external wall. m 405.00 - 154.00 - - 0.00
- - - 0.00
7.1.4 Apply pointing for external stone wall
surface. m 262.00 - 37.00 - - 0.00
- - - 0.00
Total to Summary.....Birr - - - 0.00
- - - 0.00
7.2 FLOOR & WALL FINISHING - - - 0.00
- - - 0.00
7.2.1 Supply & fix 300x300x2mm asbestos free
hard imported PVC tiles flooring stuck to
cement screed with approved adhesive glue.
Price shall includes 48mm thick cement
mortar backing. m 738.00 - 329.00 - - 0.00
- - - 0.00
7.2.2 20mm thick terrazzo floor tiles on and
including 30mm cement sand screed (1:3)
mix price including grinding and polishing. m 324.00 - 456.00 - - 0.00
- - - 0.00
7.2.3 70mm high imported plastic tile skirting
stuck to wall with approved type adhesive
glue. m 420.00 - 75.00 - - 0.00
- - - 0.00
7.2.4 100mm high terrazzo tile skirting stuck to
wall with cement mortar (1:3)mix. m 105.00 - 85.00 - - 0.00
- - - 0.00
Stair case - - - 0.00
7.2.5 Marble on including cement sand screed
(1:3)mix and joints pointed in cement mortar
(1:3) mix. To stair case. - - - 0.00
- - - 0.00
a) Tread 340x30mm m 120.00 - 634.00 - - 0.00
- - - 0.00
b) Risers 130x20mm m 120.00 - 436.00 - - 0.00
- - - 0.00
7.2.6 c) Skirting along flight size 130X20mm m 14.00 - 253.00 - - 0.00
- - - 0.00
Window Sill - - - 0.00
7.2.7 300x30mm throated and weathered marble
window cill bedded in cement mortar (1:3)
mix. m 154.00 - 626.00 - - 0.00
- - - 0.00
Door Threshold - - - 0.00
7.2.8 250x20mm marble threshold bedded in
cement mortar (1:3) mix. m 18.00 - 487.00 - - 0.00
- - - 0.00
7.2.9 1000mm width well dressed stone pavement
bedded on 150mm thick quarry waste and
joints pointed in cement mortar (1:3) mix
around the building. m2 96.00 - 475.00 - - 0.00
- - - 0.00
.2.10 Supply and lay semi-circular open precast
concrete open channel on 50mm thick sand
bedding. Unit price shall include flat
stone/concrete topping, provision of metal
grating at inlet to manhole, excavation of the
trench and cart away.
Ditch dia.: 1/2
300 mm m 100.00 - 274.00 - - 0.00
- - - 0.00
Contractor Consultant
Excuted Quantity Excuted Amount
ITEM DESCRIPTION Previous Previous Current
ract QTY Current QTYTodate QTY Rate Todate Amount
UNIT QTY Amount Amount
Total to Summary.....Birr - - - 0.00
- - - 0.00
8. PAINTING - - - 0.00
- - - 0.00
8.1 Apply three coats of plastic emulsion paint to
internal plastered wall, beam and column
surfaces. m2 1,103.00 - 36.00 - - 0.00
- - - 0.00
8.2 Apply three coats of plastic emulsion paint to
external plastered wall, beam and column
surfaces. m2 405.00 - 36.00 - - 0.00
- - - 0.00
8.3 Ditto but to plastered concrete ceiling &
staircase ceiling. m2 874.00 - 40.00 - - 0.00
- - - 0.00
8.4 Ditto but tochipwood ceiling. m2 185.00 - 40.00 - - 0.00
- - - 0.00
Total to Summary.....Birr - - - 0.00
- - - 0.00
9. GLAZING - - - 0.00
- - - 0.00
9.1 Supply and fix 4 mm thick clear sheet glass
to metal beads and puttied with approved
quality of putty. m 196.00 - 403.00 - - 0.00
- - - 0.00
Total to Summary.....Birr - - - 0.00
- - - 0.00
10. ELECTRICAL INSTALLATION - - - 0.00
Supply and install :- - - - 0.00
- - - 0.00
1 Distribution Boards - - - 0.00
- - - 0.00
1.1 Flush mounting distribution Board,LPP-2CG,
with lockable door and including bus bars of
63Amp/3Phase, all necessary fixing and
connecting accessories, complete and
consisting:- - - - 0.00
9 pcs 16A, MCB, 1Phase - - - 0.00
3 pcs 25A, MCB, 3Phase - - - 0.00
1 pc 50A, MCB, 3Phase No 1 - ### - - 0.00
1.2 Ditto,but LPP-2C1,2C2 & 2C3 and consisting:-
- - - 0.00
12 pcs 16A, MCB, 1Phase - - - 0.00
1 pc 25A, MCB, 3Phase No 3 - ### - - 0.00
2 POWER CABLE - - - 0.00
Multi-core power cable copper conductor,
PVC/PVC, colour coded, in CABLE SHAFT and
PVC conduits, connected and tested, all as
specified and as shown on drawings
- - - 0.00
CABLES - - - 0.00
2.1 (4x6+1x6)mm sq. ml 150 - 180.00 - - 0.00
PVC PIPES - - - 0.00
2.5 PVC conduit of 50 mm diameter ml 180 - 80.00 - - 0.00
- - - 0.00
3 Light Points - - - 0.00
3.1 Flush mounted light points fed through PVC
insulated conductors of 2x2.5mm2 inside PVC
conduits of 16mm diameter, including
junction boxes with covers and insulating
screw cap connectors, complete
No 241 132.00 132.00 312.00 41,184.00 - 41,184.00
- - - 0.00
4 Extra Over Light Points for Flush
Mounted Switches - - - 0.00
4.2 Flush mounting double switch No 40 - 442.00 - - 0.00
5 Flush Mounted Socket Outlet Points - - - 0.00
- - - 0.00
5.1 10-16A/1P socket outlet points fed through
PVC insulated conductors of 3x2.5mm2 inside
PVC conduit of 16mm diameter including
junction boxes with covers and insulating
screw cap connectors.
No 55 - 615.00 - - 0.00
6 Flush Mounted Socket Outlets with
Earth Contact - - - 0.00
6.1 Flush mounting socket outlet of 10A/16A
1Phase. No 30 - 140.00 - - 0.00
- - - 0.00
6.2 Flush mounting twin socket outlet of
10A/16A 1Phase. No 25 - 180.00 - - 0.00
7 Telephone/Data System - - - 0.00
7.1 Telephone/Data system only conduits of
50/32 mm and 25mm diameter, pulling wire,
boxes, terminals all as shown on the
drawings. No 20 - 403.00 - - 0.00
8 TV System - - - 0.00
8.1 TV system only conduits of 50/32 mm
diameter, pulling wire, boxes, terminals all as
shown on the drawings. No 20 450.00 - - 0.00
9 Lighting fitting - 0.00
Connected and tested including lamps and
accessories complete, all as specified or
described in lighting fittings schedule and as
shown on the drawings. - 0.00
NOTE - - 0.00
I. Supply of Lighting fitting by the Client, - - 0.00
II. An average Unit price is considered for - - 0.00
cost estimation, - - 0.00
III. The price of fittings under this item to be - - 0.00
EXCLUDED in the contract agreement. - 0.00
iv. Recommended types of fittings indicated - 0.00
Contractor Consultant
Excuted Quantity Excuted Amount
ITEM DESCRIPTION Previous Previous Current
ract QTY Current QTYTodate QTY Rate Todate Amount
UNIT QTY Amount Amount
on the attached lighting fitting Schedule. - 0.00
9.1 Lighting fittings and lamps complete NO 241 ### - 0.00
Type 3 NO 61 ### - 0.00
Type 3.1 NO 180 ### - 0.00
- 0.00
Total to Summary.....Birr 132.00 41,184.00 0.00 41,184.00
Contractor Consultant
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY TAKEOFF SHEET NO:01
CONSULTANT :NOMY ENGINEERING PLC BLOCK: B5-2b CLASS ROOM
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING PAGE NO: 01
NO L*W*D QTY DESCRIPTION NO L*W*D QTY DESCRIPTION
5. METAL WORK
METAL LOUVER WINDOWS
2. BLOCK WORK
64.00 W1 size 1000X1700mm
2.3- Dressed stone masonury
16 W2 size 2500X700mm for 3rd floor
10.22
1 30.00 306.60 M2
306.60 M2 Total
Contractor Consultant
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY TAKEOFF SHEET NO: 01
CONSULTANT :NOMY ENGINEERING PLC BLOCK: B5-2b CLASS ROOM
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING PAGE NO: 02
NO L*W*D QTY DESCRIPTION NO L*W*D QTY DESCRIPTION
Contractor Consultant
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY TAKEOFF SHEET NO: 01
CONSULTANT :NOMY ENGINEERING PLC BLOCK: B5-2b CLASS ROOM
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING PAGE NO: 02
NO L*W*D QTY DESCRIPTION NO L*W*D QTY DESCRIPTION
Contractor Consultant
BOKRA CONSTRUCT
SUMMARY OF BILL OF QUAN
FO
B5-3 G+2 CLASS
8 JOINERY. . . . . . . . . . . . . . . . . . . . BIRR
10 FINISHING BIRR
11 PAINTING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . BIRR
12 GLAZING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BIRR
32 Diameter 24mm kg
Super structure
32 Diameter, 8mm kg 11928.3
38 Diameter 24mm kg
TOTAL CARRIED TO SUMMARY
Total to Summary.....Birr
08. JOINERY
_Wooden door shall be made of MDF (medium
density fiber board ),
_1.5 mm thick black steel frame,
_ All wooden door locks & handles should be
ASSA and comply with internationally
accepted standard
All complete work according to detail
1 a. D3 90x260cm pcs 4
2 D3 90x260cm pcs
3 D2 150x260cm pcs
Previous
Amount
0 871,293.30
- 9,383,416.02
- 1,419,456.16
- -
633,264.17
- -
- -
- -
- -
- -
- -
- 116,376.00
12,423,805.65
Current
Previous QTY QTY Todate QTY
QTY RATE Previous Amount
- -
2,066.80 2,066.80 156.00 322,420.72
2,812.57 2,812.57 85.00 239,068.37
1,079.91 1,079.91 143.00 154,427.13
- 871,293.30
- -
- -
76.47 76.47 75.00 5,735.18
- -
86.92 86.92 ### 220,689.88
10.23 10.23 ### 25,973.97
- -
54.60 54.60 ### 138,629.40
52.927 52.93 ### 134,381.65
- -
77.26 77.26 ### 196,151.40
248.71 248.71 ### 631,465.17
435.81 435.81 ### 1,106,515.65
32.21 32.21 ### 81,778.65
- -
- -
- -
- -
- 253.90 -
- -
- -
189.29 189.29 166.00 31,422.14
94.22 94.22 166.00 15,640.52
- -
425.22 425.22 166.00 70,586.52
- -
- -
696.11 696.11 185.00 128,780.35
1,464.22 1,464.22 208.00 304,558.28
- -
- -
- -
2,412.55 2,412.55 208.00 501,810.48
182.42 182.42 208 37,942.94
- -
- -
6,338.62 6,338.62 36.00 228,190.47
- - -
447.55 447.55 36.00 16,111.87
808.89 808.89 36.00 29,119.86
9,225.84 9,225.84 36.00 332,130.40
7,975.89 7,975.89 36.00 287,131.86
- -
- -
6,890.48 6,890.48 36.00 248,057.38
9,730.55 9,730.55 36.00 350,299.68
34,249.39 34,249.39 36.00 1,232,977.95
20,726.86 20,726.86 36.00 746,167.12
7,772.23 7,772.23 36.00 279,800.38
55,593.52 55,593.52 36.00 2,001,366.87
- - -
- 9,383,416.02
- -
- -
- -
113.11 113.11 ### 139,464.63
0.78 0.78 ### 977.34
- -
- -
2,480.06 2,480.06 466.00 1,155,708.43
315.36 315.36 391.00 123,305.76
- -
- 1,419,456.16
- -
- -
- -
- -
- -
- -
- -
- -
- 600 -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 350 -
- -
- -
- -
- -
- -
- -
- -
2,486.43 2,486.43 60.00 149,185.67
- -
- - 60.00 -
- -
- 60.00 -
- -
- 60.00 -
- -
- 60.00 -
- -
2,074.74 2,074.74 60.00 124,484.17
- -
- -
- -
- 60.00 -
- -
5,993.24 5,993.24 60.00 359,594.33
- -
- 60.00 -
- -
- 375.00 -
- -
- -
- -
- 416.00 -
- -
- 401.00 -
- -
- 80.00 -
- -
- 633,264.17
- -
- -
- 375.00 -
- -
- -
- 348.00 -
- 223.00 -
- 40.00 -
- 40.00 -
- 47.00 -
- 450.00 -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- ### -
- -
- -
- -
- -
- -
- -
- -
31.00 31.00 ### -
3.00 3.00 ### -
- - ### -
15.00 15.00 ### -
6.00 6.00 ### -
18.00 18.00 ### -
3.00 3.00 ### -
6.00 6.00 ### -
3.00 3.00 2178 -
3.00 3.00 1650 -
22.00 22.00 5313 -
3.00 3.00 4554 -
4.00 4.00 5338.3 -
- -
- -
- -
- -
- -
- -
- 800.00 -
- 800.00 -
- -
- -
- -
- 137.00 -
- -
- 108.00 -
- 137.00 -
- 137.00 -
- 37.00 -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 181.00 -
- -
- -
- -
- 329.00 -
- 75.00 -
- 456 -
- 85 -
- -
- -
- -
- -
- -
- 396.00 -
- -
334.28 334.28 626.00 -
- -
- -
- 36.00 -
- 40.00 -
- 36.00 -
- 140.00 -
- -
- -
- 403.00 -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 7500 -
- -
- -
- -
- -
- -
- -
- -
- 6000 -
- -
- -
- -
- -
- -
- -
- -
- 6000 -
- -
- -
- -
373.00 373.00 312 116,376.00
- -
- 406 -
- 442 -
- 442 -
- 442 -
- -
- -
- -
- 615 -
- -
- -
- -
- 650 -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 595 -
- -
- -
- -
- -
- -
- -
- -
- -
- 595 -
- -
- 500 -
- 280 -
- 200 -
- -
- -
- -
- -
- -
- 450 -
- -
- -
- -
- 180 -
- -
- -
- -
- -
- -
- -
- -
- -
- 2500 -
- -
- -
- -
- 5000 -
- 400 -
- -
- -
- -
- -
- 400 -
- 250 -
- 8000 -
116,376.00
Current Todate
Amount Amount
- 871,293.30
- 9,383,416.02
- 1,419,456.16
- -
- 633,264.17
295,868.65 295,868.65
646,384.20 646,384.20
- -
209,259.28 209,259.28
- -
- -
- 116,376.00
### ###
Current
Amount Todate Amount
- 29,811.68
- -
- -
- -
- 119,500.15
- -
- 6,065.25
- -
- -
- -
- 322,420.72
- 239,068.37
- 154,427.13
- 871,293.30
- -
- -
- 5,735.18
- -
- 220,689.88
- 25,973.97
- -
- 138,629.40
- 134,381.65
- -
- 196,151.40
- 631,465.17
- 1,106,515.65
- 81,778.65
- -
- -
- -
- -
- -
- -
- -
- 31,422.14
- 15,640.52
- -
- 70,586.52
- -
- -
- 128,780.35
- 304,558.28
- -
- -
- -
- 501,810.48
- 37,942.94
- -
- -
- 228,190.47
- -
- 16,111.87
- 29,119.86
- 332,130.40
- 287,131.86
- -
- -
- 248,057.38
- 350,299.68
- 1,232,977.95
- 746,167.12
- 279,800.38
- 2,001,366.87
- -
- 9,383,416.02
- -
- -
- -
- 139,464.63
- 977.34
- -
- -
- 1,155,708.43
- 123,305.76
- -
- 1,419,456.16
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 149,185.67
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 124,484.17
- -
- -
- -
- -
- -
- 359,594.33
- -
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 633,264.17
- -
- -
- -
- -
295,868.65 295,868.65
- -
- -
- -
- -
- -
- -
- -
295,868.65 295,868.65
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
124,124.00 124,124.00
27,951.00 27,951.00
- -
132,825.00 132,825.00
45,540.00 45,540.00
122,958.00 122,958.00
15,939.00 15,939.00
13,662.00 13,662.00
6,534.00 6,534.00
4,950.00 4,950.00
116,886.00 116,886.00
13,662.00 13,662.00
21,353.20 21,353.20
- -
- -
- -
- -
- -
- -
- -
- -
646,384.20 646,384.20
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
209,259.28 209,259.28
209,259.28 209,259.28
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 116,376.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 116,376.00
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY TAKEOFF SHEET NO: 01
CONSULTANT :NOMY ENGINEERING PLC BLOCK: B5-3 CLASS ROOM
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING PAGE NO: 01
NO L*W*D QTY DESCRIPTION NO L*W*D QTY DESCRIPTION
Contractor Consultant
BOKRA CONSTRUCTION & TRADING PLC
MEKELLE UNIVERSTY COMMUNITY SCHOOL
B6-2A TOILET
AT MEKELLE
Previous Current Todate
NO. Description
Amount Amount Amount
A-SUB STRUCTURE
B-SUPER STRUCTURE
2 BLOCK WORK...
BIRR 28,066.25 - 28,066.25
3 ROOFING.
BIRR 13,734.00 - 13,734.00
8 PAINTING. BIRR - - -
9 GLAZING. BIRR - - -
Contractor Consultant
Excuted Quantity Excuted Amount
Contract Previous Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
Bulk excavation in ordinary soil not exceeding
1.1 1500mm from NGL. m3 47 42.48 42.48 55.0 2,336.40 - 2,336.40
Excavate in ordinary soil for isolated footing to
a depth exceeding 1500mm but not exceeding
1.2 3000mm from reduced level. m3 11 4.28 4.28 75.0 321.00 - 321.00
Excavate in weathered rock for isolated footing
to a depth exceeding 1500mm but not
1.3 Excavate
exceedingfor
3000mm
trench from reduced
foundation in level.
ordinary soil m3 6 - 410.0 - - -
to a depth not exceeding 1500mm from
1.4 stripped level. m3 3 4.03 4.03 61.0 245.83 - 245.83
Fill around trench, isoleted foundation and
under hardcore to maintain the desired level
with selected borrowed material and compact
1.5 in layers not exceeding 200mm. m3 82 40.30 40.30 156.0 6,286.02 - 6,286.02
Cart away surplus excavated material to a
1.6 250mm.
distance thick
not exceeding 2kms.or equivalent
sound basaltic m3 65 50.79 50.79 85.0 4,317.15 - 4,317.15
stone hard-core finished and blinded with
1.7 crushed stone. m 27 26.928 26.93 143.0 3,850.70 - 3,850.70
Total to Summary..Birr 17,357.10 - 17,357.10
2. CONCRETE WORK - -
2.1 50mm thick lean concrete in C-5 with minimum - -
cement content of 150Kg/m3under: -
a. Footing pads m 4 2.94 2.94 75.0 220.50 - 220.50
b. Under grade beam m 1 1.19 1.19 75.0 89.25 - 89.25
c. Under stone masonry wall m 11 12.12 12.12 75.0 909.00 - 909.00
d. Under ground
Reinforced floor
concrete Slab C-25 (with a 28-
in class m 27 26.928 26.93 75.0 2,019.60 - 2,019.60
2.2 day
150mm cube crushing strength of 25MPa), - - - -
cast - - - -
into formworks and vibrated around rod
reinforcement - - - -
bars.( formwork & reinforcement bars are
measured - - - -
separately.) in: "Type of cement to be ordinary - - - -
Portland cement (OPC)" - - - -
a. In isolated footing pads m3 1 0.54 0.54 2539.0 1,371.06 - 1,371.06
b. In foundation column m3 1 0.26 0.26 2539.0 660.14 - 660.14
c. In grade beam m3
3 2.13 2.13 2539.0 5,408.07 - 5,408.07
d. Styrophome expansion join ml 30 29.44 29.44 70.0 2,060.80 - 2,060.80
Reinforced concrete in class C-15 only 280 kg
2.3 cement/m3 of concrete: - - - -
In ground
Provide, cutfloor
andslab
fix in(10cm thick)
position sawn Zigba m 27 26.928 26.93 199.9 5,382.91 - 5,382.91
2.4 wood - - - -
or metal panel form work: - - - -
a. To isolated footing pad m 5 3.60 3.60 166.0 597.60 - 597.60
b. To foundation column m 15 5.07 5.07 166.0 841.62 - 841.62
c. To grade beam m 22 21.19 21.19 166 3,517.54 - 3,517.54
Reinforcement bar according to structural
2.5 drawings. - - - -
Price includes cutting, bending, placing in - - - -
position & tying wires. - - - -
Diameter 6mm deformed bars Kg 0 - - - -
Diameter 8mm deformed bars Kg 322 79.12 79.12 36.0 2,848.27 - 2,848.27
Diameter 10mm deformed bars Kg 39 23.69 23.69 36.0 852.94 - 852.94
Diameter 12mm deformed bars Kg 179 102.78 102.78 36.0 3,700.23 - 3,700.23
Diameter 14mm deformed bars Kg 108 75.33 75.33 36.0 2,712.05 - 2,712.05
Total to Summary...Birr 33,191.57 - 33,191.57
3. MASONRY
500 mm thickWORK
hard trachytic or equivalent - - - -
3.1 stone
peripheral foundation wall to a depth of 50cm - - - -
bed - - - -
ded in cement mortar 1:3 below natural
ground
500 mmlevel.
thick hard trachytic or equivalent m 9 11.17 11.17 1233.0 13,772.61 - 13,772.61
3.2 stone m 2 - 1253.0 - - -
peripheral foundation wall to a depth of 100cm
bed - - - -
ded in cement mortar 1:3 above natural
ground level. - - - -
Total to Summary.Birr 13,772.61 - 13,772.61
B. SUPER STRUCTURE - - - -
1. CONCRETE
Reinforced WORK in class C-25 (with a 28-
concrete - - - -
1.1 day
150mm cube crushing strength of 25MPa), cast - - - -
into
formworks and vibrated around rod - - - -
reinforcement - - - -
bars. (formwork & reinforcement bars are
measured - - - -
separately.) in: "Type of cement to be ordinary - - - -
Portland cement (OPC)" - - - -
a. In elevation column m 2 0.69 0.69 2539.0 1,751.91 - 1,751.91
b. In intermediate
Provide, cut and fixand top tie beams
in position metal panel or m 3 1.60 1.60 2539.0 4,062.40 - 4,062.40
1.2 sawn - - - -
Zigba wood form work - - - -
a. To elevation column m 18 13.74 13.74 185.0 2,541.90 - 2,541.90
b. To intermediate and top tie beams m 30 20.99 20.99 208.0 4,365.92 - 4,365.92
Reinforcement bar according to structural
1.3 drawings. - - - -
Price includes cutting, bending, placing in
position & tying wires. - - - -
Diameter 8mm deformed bars Kg 162 118.03 118.03 36.0 4,249.08 - 4,249.08
Diameter 10mm deformed bars Kg 51 - 36.0 - - -
Diameter 12mm deformed bars Kg 199 120.93 120.93 36.0 4,353.48 - 4,353.48
Diameter 14mm deformed bars Kg 120 72.91 72.91 36.0 2,624.76 - 2,624.76
Total to Summary....Birr 23,949.45 - 23,949.45
2. BLOCK WORK
Contractor Consultant
Excuted Quantity Excuted Amount
Contract Previous Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
200mm thick hollow concrete block wall of type
Class-C with 28 days minimum crushing
strength of 18kg/cm2, bedded in cement
mortar (1:3) mix, both sides left for plastering.
Price includes 26mm iron bars laid
horizontally every other course (spacing
2.1 400mm c/c). m 71 60.23 60.23 466 28,066.25 - 28,066.25
2.2 Ditto but 100mm thick HCB block. m 24 - 326 - - -
Total to Summary....Birr 28,066.25 - 28,066.25
3. ROOFING - -
Roof cover in G-28 roofing including roof ridge
cover fixed to zigba wood purlins at c/c 90cms
(roof cover measured in horizontal projection
3.1 purlin m/s) m 65 36.62 36.62 375 13,734.00 - 13,734.00
G-28 G.I.S roof gutter with development length - - - -
of 1000mm welded at joint provided 2% slope
towards down pipe and Price includes painting
of two coats of antirust and one coat of metal
3.2 paint. ml 15 - 348 - - -
G28 flat metal sheet flashing with development - - - -
length of 330mm and Price includes painting of
two coats of antirust and one coat of metal
3.3 paint. m 20 - 135 - - -
G28 flat metal sheet copping with - - - -
development length of 330mm and Price
includes painting of two coats of antirust and
3.4 one coat of metal paint. m 20 - 125 - - -
- - - -
Supply and fix 8 mm thick ribbed sheet eave
soffit ceilings. Price include 40 x 50 mm zigba
wood battens with c/c spacing of 600 mm both
ways, corner list and all other necessary
3.5 accessories to complete the work. m 26 - 288 - - -
- - - -
3.6 Dia 110mm PVC down pipe. m 22 - 223 - - -
Carpentry
Supply and fix 8 mm thick chip wood ceilings.
Price include 40 x 50 mm zigba wood battens
with c/c spacing of 600 mm both ways, corner
list and all other necessary accessories to
4.1 complete the work. m 27 26.93 26.93 288 7,755.26 - 7,755.26
- - - -
Supply and fix 300x25mm zigba wood fascia
4.2 board price include three coats of oil paint. ml 15 168 - -
- - - -
Supply and fix PVC approved quality doors all
according to manufacturer instruction. Price
shall include ASSA or equivalent (Knob type for
toilet doors) safety locks, hinges, and other
4.3 necessary accessories. - - - -
a. Size - 700x2700mm [Toilets] pcs 8 - 2835 - - -
- - - -
Eucalyptus wood upper & lower
4.4 members.Dia.100mm. ml 113 - 40 - - -
- - - -
Eucalyptus wood vertical & diagonal members
4.5 Dia.80mm. ml 78 - 40 - - -
- - - -
Sawn Zigba wood roof purlins40x50mm placed
4.6 at c/c 900mm. ml 89 - 47 - - -
- - - -
Total to SummaryBirr 7,755.26 - 7,755.26
5. METAL WORK
Metal window and doors made of 38x1.5mm
LTZ profiles shown on the drawings, price
include approved quality locks and all iron
mongery works, two coats of anti rust, two
coats of synthetic paint, 1mm thick ribbed
sheet and door stopper. All according to detail
Arch. drawings.
5.1 WINDOWS
Supply & fix insect screen for open windows.
Price shall include all supporting accessories.
5.2 DOORS
7. FINISHING WORK
7.1 PLASTERING AND POINTING
Finishing work shall include all surface pre-
cleaning, Preparation and application of the
finish, polishing and cleaning at the end of
finished work.
Contractor Consultant
Excuted Quantity Excuted Amount
Contract Previous Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
Apply three coats of plaster in cement mortar
mix 1:3 up to fine finish to internal wall,
beams and columns surface. Mortar for fine
finish shall be cement-fine sand 1:2. Provide
grooves recessed by 5mm between beams and
7.1.1 walls, columns and walls. m 137 70.92 70.92 137 9,716.04 - 9,716.04
- - - -
Ditto item 7.1.2 but two coats to receive
7.1.3 ceramic wall tile. m 7 - 105 - - -
- - - -
Apply two coats of external wall plaster in
cement mortar mix 1:3 and one coat of
tyrolean rendering in cement mortar mix 1:2.
Provide grooves recessed by 5mm between
7.1.4 beams and walls, columns and walls. m 82 54.94 54.94 154 8,460.14 - 8,460.14
- - - -
7.2 FLOOR & WALL FINISHING - - - -
- - - -
20mm thick terrazzo floor tiles on and
including 30mm cement sand screed (1:3) mix
7.2.4 price including grinding and polishing. m 26 23.05 23.05 456 10,508.79 - 10,508.79
- - - -
100mm high terrazzo tile skirting stuck to wall
7.2.5 with cement mortar (1:3)mix. ml 49 - 85 - - -
Marble thread and risers including cement - - - -
mortar and joined in cement mortar mix of 1:3
to - - - -
- - - -
Window
Marble Sill
window cill on and including cement - - - -
mortar bed jointed in cement mortar mix of
7.2.8 1:3. - - - -
- - - -
Size 280 x 30mm ml 9 - 626 - - -
- - - -
Door Threshold
Marble door thresholds on and including - - - -
cement mortar bed jointed in cement mortar
7.2.9 mix of 1:3 - - - -
- - - -
Size 200 x 20mm ml 2 - 487 - - -
- - - -
Supply 300x200x6mm glazed ceramic wall tile
to a height of 1800mm with cement mortar
7.2.1 backing and joints grouted in white cement. m 7 - 732 - - -
- - - -
1000mm wide well dressed stone pavement
bedded on 150mm thick quarry waste and
joints pointed in cement mortar (1:3) mix
7.2.1 around the building. m 28 - 475 - - -
1000mm wide Concrete pavement bedded on - - - -
150mm thick quarry waste and joints pointed
in cement mortar (1:3) mix around the
building. M2 27.52 27.52 199.9 5,501.25 - 5,501.25
- - - -
Supply and lay semi-circular open precast
concrete open channel on 50mm thick sand
bedding. Unit price shall include flat
stone/concrete topping, provision of metal
grating at inlet to manhole,excavation of the
7.2.1 trench and cartaway. Ditch dia.: 1/2 300 mm ml 36 - 274 - - -
- - - -
Total to Summary..Birr 34,186.23 - 34,186.23
Contractor Consultant
BOKRA CONSTRUCTION & TRADING PLC
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM TAKEOFF SHEET NO:01
CLIENT:MEKELLE UNIVERSITY BLOCK: 6-2A TOILET
CONSULTANT :NOMY ENGINEERING PLC PAGE NO:
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
SUBSTRUCTURE BAR SCHEDULE SUMMARY
Descrption TOTAL Wt. OF BAR FOR DIA.
Diameter 8 10 12 14 16
Tot.wt. (kg) 197.14 23.69 223.71 148.25 0.00
C2 12 2.478 4 4 16 39.648
8 0.7 9 4 36 25.2
C1 12 4.015 4 2 8 32.12
8 0.9 27 2 54 48.6
C2 12 2.925 4 4 16 46.8
8 0.9 19 4 76 68.4
R FOR DIA.
20 24
0.00 0.00
AR FOR DIA.
20 24
0 0
2.467 3.55
0 0
TAKEOFF SHEET NO:01
BLOCK: 6-2A TOILET
2
AR FOR DIA.
20 24
0 0
2.467 3.55
0 0
TAKEOFF SHEET NO:01
BLOCK: 6-2A TOILET
3
AR FOR DIA.
20 24
0 0
2.467 3.55
0 0
TAKEOFF SHEET NO:01
BLOCK: 6-2A TOILET
4
R FOR DIA.
20 24
0.00 0.00
AR FOR DIA.
20 24
0 0
2.467 3.55
0 0
TAKEOFF SHEET NO:01
BLOCK: 6-2A TOILET
5
AR FOR DIA.
20 24
0 0
2.467 3.55
0 0
BOKRA CONSTRUCTION & TRADING PLC
Project:- MUBP86 Takeoff No 1
Location:-AYNALEM Block:- B6-2a
Client:- MEKELLE UNIVERSTY Page No:- 1
Consultant:- NOMY ENGINEERING PLC
No L*W*D QTY Description No L*W*D QTY Description
Contractor Consultant
BOKRA CONSTRUCTION & TRADING PLC
B6-2B TOILET
AT MEKELLE
2 CONCRETE WORK..
BIRR 33,419.70 - 33,419.70
B-SUPER STRUCTURE
1 CONCRETE WORK.
BIRR 23,579.73 - 23,579.73
2 BLOCK WORK...
BIRR 28,066.25 - 28,066.25
3 ROOFING.
BIRR 13,734.00 - 13,734.00
5 METAL WORK.
BIRR 10,450.00 - 10,450.00
8 PAINTING. BIRR - - -
9 GLAZING. BIRR - - -
Contractor Consultant
Excuted Quantity Excuted Amount
Contract Previous Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
Bulk excavation in ordinary soil not exceeding
1.1 1500mm from NGL. m3 47 32.09 32.09 55.00 1,764.95 - 1,764.95
Excavate in ordinary soil for isolated footing to
a depth exceeding 1500mm but not exceeding
1.2 3000mm from reduced level. m3 11 4.43 4.43 75.00 332.25 - 332.25
Excavate in weathered rock for isolated
footing to a depth exceeding 1500mm but not
1.3 exceeding 3000mm from reduced level. m3 6 - 410.00 - - -
Excavate for trench foundation in ordinary soil
to a depth not exceeding 1500mm from
1.4 stripped level. m3 3 5.24 5.24 61.00 319.64 - 319.64
Fill around trench, isoleted foundation and
under hardcore to maintain the desired level
with selected borrowed material and compact
1.5 in layers not exceeding 200mm. m3 82 31.73 31.73 156.00 4,949.10 - 4,949.10
Cart away surplus excavated material to a
1.6 distance not exceeding 2kms. m 3
65 41.76 41.76 85.00 3,549.60 - 3,549.60
250mm. thick sound basaltic or equivalent
stone hard-core finished and blinded with
1.7 crushed stone. m 27 26.93 26.93 143.00 3,850.70 - 3,850.70
Total to Summary..Birr 14,766.24 - 14,766.24
2. CONCRETE WORK - -
50mm thick lean concrete in C-5 with minimum
2.1 cement - -
content of 150Kg/m3under: -
a. Footing pads m 4 2.94 2.94 75.00 220.50 - 220.50
b. Under grade beam m 1 1.19 1.19 75.00 89.25 - 89.25
c. Under stone masonry wall m 11 12.91 12.91 75.00 968.25 - 968.25
d. Under ground
Reinforced floor
concrete Slab C-25 (with a 28-
in class m 27 26.93 26.93 75.00 2,019.60 - 2,019.60
2.2 day -
150mm cube crushing strength of 25MPa), cast
into form -
works and vibrated around rod reinforcement
bars.( -
formwork & reinforcement bars are measured
separately.) -
in: "Type of cement to be ordinary Portland
cement (OPC)" -
a. In isolated footing pads m3 1 0.54 0.54 2,539.00 1,371.06 - 1,371.06
b. In foundation column m3 1 0.22 0.22 2,539.00 558.58 - 558.58
c. In grade beam m3 3 2.13 2.13 2,539.00 5,408.07 - 5,408.07
d. Styrophome expansion join ml 30 29.44 29.44 70.00 2,060.80 - 2,060.80
2.3 Reinforced concrete in class C-15 only - - - -
280 kg cement/m3 of concrete: - - - -
In ground floor slab (10cm thick) m 27 26.93 26.93 199.90 5,382.91 - 5,382.91
Provide, cut and fix in position sawn Zigba
2.4 wood or - - - -
metal panel form work: - - - -
a. To isolated footTog pad m 5 3.60 3.60 166.00 597.60 - 597.60
b. To foundation column m 15 4.31 4.31 166.00 715.46 - 715.46
c. To grade beam m 22 24.68 24.68 166.00 4,096.88 - 4,096.88
Reinforcement bar according to structural
2.5 drawings. - - - -
Price includes cutting, bending, placing in - - - -
position & tying wires. - - - -
Diameter 6mm deformed bars Kg 0 - - - -
Diameter 8mm deformed bars Kg 322 77.46 77.46 36.00 2,788.54 - 2,788.54
Diameter 10mm deformed bars Kg 39 23.69 23.69 36.00 852.94 - 852.94
Diameter 12mm deformed bars Kg 179 99.37 99.37 36.00 3,577.22 - 3,577.22
Diameter 14mm deformed bars Kg 108 75.33 75.33 36.00 2,712.05 - 2,712.05
Total to Summary...Birr 33,419.70 - 33,419.70
3. MASONRY WORK -
500 mm thick hard trachytic or equivalent
stone peripheral foundation wall to a depth of
50cm bedded in cement mortar 1:3 below
3.1 natural ground level. m 9 9.98 9.98 1,233.00 12,305.34 - 12,305.34
500 mm thick hard trachytic or equivalent
stone peripheral foundation wall to a depth of
100cm bedded in cement mortar 1:3 above
3.2 natural ground level. m 2 - 1,253.00 - - -
Total to Summary.Birr 12,305.34 - 12,305.34
B. SUPER STRUCTURE - -
1. CONCRETE WORK - -
Reinforced concrete in class C-25 (with a 28-
1.1 day 150mm - -
cube crushing strength of 25MPa), cast into
formworks -
and vibrated around rod reinforcement bars.
(formwork -
& reinforcement bars are measured
separately.) in: -
"Type of cement to be ordinary Portland
cement (OPC)" -
a. In elevation column m 2 0.69 0.69 2,539.00 1,751.91 - 1,751.91
b. In intermediate and top tie beams m 3 1.60 1.60 2,539.00 4,062.40 - 4,062.40
Provide, cut and fix in position metal panel or
1.2 sawn - - - -
Zigba wood form work - - - -
a. To elevation column m 18 13.74 13.74 185.00 2,541.90 - 2,541.90
b. To intermediate and top tie beams m 30 20.99 20.99 208.00 4,365.92 - 4,365.92
Reinforcement bar according to structural
1.3 drawings. - - - -
Price includes cutting, bending, placing in
position - - - -
& tying wires. - - - -
Diameter 8mm deformed bars Kg 162 107.76 107.76 36.00 3,879.36 - 3,879.36
Diameter 10mm deformed bars Kg 51 - 36.00 - - -
Diameter 12mm deformed bars Kg 199 120.93 120.93 36.00 4,353.48 - 4,353.48
Diameter 14mm deformed bars Kg 120 72.91 72.91 36.00 2,624.76 - 2,624.76
Total to Summary....Birr 23,579.73 - 23,579.73
2. BLOCK WORK - -
Contractor Consultant
Excuted Quantity Excuted Amount
Contract Previous Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
200mm thick hollow concrete block wall of
type Class-C with 28 days minimum crushing
strength of 18kg/cm2, bedded in cement
mortar (1:3) mix, both sides left for plastering.
Price includes 26mm iron bars laid
horizontally every other course (spacing
2.1 400mm c/c). m 71 60.23 60.23 466.00 28,066.25 - 28,066.25
- - - -
2.2 Ditto but 100mm thick HCB block. m 24 - 326.00 - - -
- - - -
Total to Summary....Birr 28,066.25 - 28,066.25
- -
3. ROOFING - -
- -
Roof cover in G-28 roofing including roof ridge
cover fixed to zigba wood purlins at c/c 90cms
(roof cover measured in horizontal projection
3.1 purlin m/s) m 65 36.62 36.62 375.00 13,734.00 - 13,734.00
- - - -
G-28 G.I.S roof gutter with development length
of 1000mm welded at joint provided 2% slope
towards down pipe and Price includes painting
of two coats of antirust and one coat of metal
3.2 paint. ml 15 - 348.00 - - -
G28 flat metal sheet flashing with - - - -
development length of 330mm and Price
includes painting of two coats of antirust and
3.3 one coat of metal paint. m 20 - 135.00 - - -
G28 flat metal sheet copping with - - - -
development length of 330mm and Price
includes painting of two coats of antirust and
3.4 one coat of metal paint. m 20 - 125.00 - - -
- - - -
Supply and fix 8 mm thick ribbed sheet eave
soffit ceilings. Price include 40 x 50 mm zigba
wood battens with c/c spacing of 600 mm both
ways, corner list and all other necessary
3.5 accessories to complete the work. m 26 - 288.00 - - -
- - - -
3.6 Dia 110mm PVC down pipe. m 22 - 223.00 - - -
- -
Total to SummaryBirr 13,734.00 - 13,734.00
4. CARPENTRY & JOINERY - -
-
Carpentry - -
Supply and fix 8 mm thick chip wood ceilings.
Price include 40 x 50 mm zigba wood battens
with c/c spacing of 600 mm both ways, corner
list and all other necessary accessories to
4.1 complete the work. m 27 26.93 26.93 288.00 7,755.26 - 7,755.26
-
Supply and fix 300x25mm zigba wood fascia
4.2 board price include three coats of oil paint. ml 15 168.00 - - -
-
Supply and fix PVC approved quality doors all
according to manufacturer instruction. Price
shall include ASSA or equivalent (Knob type for
toilet doors) safety locks, hinges, and other
necessary accessories.
4.3 - - - -
a. Size - 700x2700mm [Toilets] pcs 8 - 2,835.00 - - -
-
Eucalyptus wood upper & lower
4.4 members.Dia.100mm. ml 113 - 40.00 - - -
-
Eucalyptus wood vertical & diagonal members
4.5 Dia.80mm. ml 78 - 40.00 - - -
-
Sawn Zigba wood roof purlins40x50mm placed
4.6 at c/c 900mm. ml 89 - 47.00 - - -
- -
Total to SummaryBirr - 7,755.26 - 7,755.26
-
5. METAL WORK - - - -
-
Metal window and doors made of 38x1.5mm
LTZ profiles shown on the drawings, price
include approved quality locks and all iron
mongery works, two coats of anti rust, two
coats of synthetic paint, 1mm thick ribbed
sheet and door stopper. All according to detail
Arch. drawings. - - - -
-
5.1 WINDOWS - - - -
Supply & fix insect screen for open windows.
Price shall include all supporting accessories. - - - -
-
Size2500x 900 mm pcs 4 2.00 2.00 2,475.00 4,950.00 - 4,950.00
-
-
5.2 DOORS - - - -
-
Size 1000mmx2500mm pcs 2 2.00 2.00 2,750.00 5,500.00 - 5,500.00
- -
Total to Summary.....Birr - 10,450.00 - 10,450.00
-
7. FINISHING WORK - - - -
7.1 PLASTERING AND POINTING - - - -
-
Finishing work shall include all surface pre-
cleaning, Preparation and application of the
finish, polishing and cleaning at the end of
finished work. - - - -
-
Contractor Consultant
Excuted Quantity Excuted Amount
Contract Previous Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
Apply three coats of plaster in cement mortar
mix 1:3 up to fine finish to internal wall,
beams and columns surface. Mortar for fine
finish shall be cement-fine sand 1:2. Provide
grooves recessed by 5mm between beams and
7.1.1 walls, columns and walls. m 137 70.92 70.92 137.00 9,716.04 - 9,716.04
-
Ditto item 7.1.2 but two coats to receive
7.1.3 ceramic wall tile. m 7 - 105.00 - - -
-
Apply two coats of external wall plaster in
cement mortar mix 1:3 and one coat of
tyrolean rendering in cement mortar mix 1:2.
Provide grooves recessed by 5mm between
7.1.4 beams and walls, columns and walls. m 82 54.94 54.94 154.00 8,460.14 - 8,460.14
- - - -
7.2 FLOOR & WALL FINISHING - - - -
-
20mm thick terrazzo floor tiles on and
including 30mm cement sand screed (1:3) mix
7.2.4 price including grinding and polishing. m 26 23.05 23.05 456.00 10,508.79 - 10,508.79
-
100mm high terrazzo tile skirting stuck to wall
7.2.5 with cement mortar (1:3)mix. ml 49 - 85.00 - - -
Marble thread and risers including cement -
mortar and joined in cement mortar mix of 1:3
to - - - -
- - - -
Window
Marble Sill
window cill on and including cement - - - -
mortar bed jointed in cement mortar mix of
7.2.8 1:3. - - - -
-
Size 280 x 30mm ml 9 - 626.00 - - -
-
Door Threshold
Marble door thresholds on and including - - - -
cement mortar bed jointed in cement mortar
7.2.9 mix of 1:3 - - - -
-
Size 200 x 20mm ml 2 - 487.00 - - -
-
Supply 300x200x6mm glazed ceramic wall tile
to a height of 1800mm with cement mortar
7.2.10 backing and joints grouted in white cement. m 7 - 732.00 - - -
-
1000mm wide well dressed stone pavement
bedded on 150mm thick quarry waste and
joints pointed in cement mortar (1:3) mix
7.2.11 around the building. m 28 - 475.00 - - -
- - - -
1000mm wide Concrete pavement bedded on
150mm thick quarry waste and joints pointed
in cement mortar (1:3) mix around the
building. M2 27.52 27.52 199.90 5,501.25 - 5,501.25
- - - -
Supply and lay semi-circular open precast
concrete open channel on 50mm thick sand
bedding. Unit price shall include flat
stone/concrete topping, provision of metal
grating at inlet to manhole,excavation of the
7.2.12 trench and cartaway. Ditch dia.: 1/2 300 mm ml 36 - 274.00 - - -
-
Total to Summary..Birr - 34,186.23 - 34,186.23
-
8. Painting -
-
Prepare the surface and apply three coats of
plastic emulsion paint of chosen type and color
8.1 to: -
a. Internal wall, columns and beam side -
surface m 137 - 36.00 - - -
- - - -
b. Ditto but to external wall surface m 82 - 40.00 - - -
- - - -
8.2 c. Ditto but to chipwood ceiling. m 27 - 40.00 - - -
- - - -
Total to SummaryBirr - - - -
Contractor Consultant
BOKRA CONSTRUCTION & TRADING PLC
SUMMARY OF BILL OF QUANTITIES AND SPECIFICATIONS
FOR
B6-3A G+0 LADIES' AND GENTS' TOILET BUILDING
07 JOINERY. . . . . . . . . . . . . . . . . . . . BIRR
11 FINISHING
12 PAINTING. . . . . . . . . . . . . . . . . . . . . . . . . . . . BIRR
13 GLAZING BIRR
ET BUILDING
Amount
- 21,189.57
- 52,522.04
- 48,731.37
- 28,232.90
- -
- -
- -
- -
- -
- -
- -
- 150,677.28
Executed
QTY. RATE AMOUNT
52,522.04
4.12
75.65
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
03) Concrete work
In situ concrete
1) Plain blinding concrete C-5
Reinforced sub structure concrete
a) To footing pad
4 1.1 4F1
1.1 4.84 m2 total 4 0.2
b) under Grade Beam 0.2
1 3.01 on axis A 2.6 0.42
0.3 0.90 m2 total
c) Under stone 0.42
masonry wall
1 3.18 on axis A, L=7.2-0.2*2=6.8m
0.6 1.91 m2
1 1.8 1 0.20
0.6 1.08 m2 0.40
1 3.21 6.06 0.48
0.6 1.93 m2
1 5.66 on axis 1/A 1 0.20
0.6 3.40 m2 0.40
1 5.9 on axis B/1-2 7.26 0.58
0.6 3.54 m2
1 4.86 on axis 2/A-B 2 0.20
0.6 2.92 m2 0.30
14.78 m2 6.70 0.80
20.52 m2 total
1 0.20
1.03 m3 total 0.30
2.80 0.17
5) C-25 in grade beam
c) In grade beam 1 0.20
2 6.70 GB on axis A&B/1-2 0.30
0.40 1.30 0.08
0.20 1.07 m3
2 6.06 GB on axis A-B/1&2 2.11
0.20
0.40 0.97 m3
2 1.20
0.20
0.40 0.19 m3
1 3.01
0.20
0.40 0.24 m3
2.47 m3 total
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
Form work
16) Grade beam 2 6.2
1 7.1 on axis B/1-2/ext. 0.4 4.96
1 0.4 2.84 m2 2 6.7
1 6.7 on axis B/1-2/int. 0.4 5.36
2 0.4 5.36 m2 2 6.7
1 3.89 on axis A/EXT. 0.2 2.68
1 0.4 1.56 m2
2 2.91 on axis A/int. 1 3.2
1 0.4 2.33 m2 0.4 1.28
1 3.21 on axis beyond A/ext.. 1 2.8
1 0.4 1.28 m2 0.4 1.12
1 1.2 on axis beyond A/int. 1 2.8
1 0.4 0.48 m2 0.4 1.12
7.16 on axis 1/A-B ext.
0.4 2.86 m2 1 1.3
6.56 on axis 1/A-B int. 0.4 0.52
0.4 2.62 m2 1 1.1
6.06 on axis 2/A-B ext. 0.4 0.44
0.4 2.42 m2 1 1.1
5.66 on axis 2/A-B int. 0.2 0.22
0.4 2.26 m2 30.40
24.01 m2 TOTAL
Super structure Normal Finish to:
18) Elevation column
4C2,P=0.2*4=0.8m
4 2.6
0.8 8.32 m2
8.32 m2 total
19) Beam & lintel
m3
L=2.21 W=0.6
Davg=1.34m
m3
m3 total
m3
L=6.9+1+1=8.9m
Bulk avg=0.9m
m3
ddt ,L=3.28m
w=0.3m
m3
m3 sub total
M3 TOTAL a+b+c
7) Disposal
TOTAL EXCAVATION
1) site clearing
m3
1.1) bulk excavation
m3
1.2) pit excavation
m3
m3 Total
TAKEOFF SHEET NO:01
BLOCK: 6-3A TOILET
PAGE NO: 02
DESCRIPTION
Reinforced super
structure concrete
7) C-25 in elevation column
a) In elevation column
4C2
m3
m3 total
8)C-25 in beams & lintel
TB on axis 2/A-B
m3
TB on axis 1/A-B cantilever
m3
TB on axis A&B/1-2
m3
TB on axis cantileve TB3
m3
TB on axis cantileve TB4
m3
m3 total
TAKEOFF SHEET NO:01
BLOCK: 6-3A TOILET
PAGE NO: 03
DESCRIPTION
TB on axis A&B/1-2 ext.
m2
TB on axis A&B/1-2 int.
m2
TB on axis A&B/1-2 soffit.
m2
TB on axis TB3 EXT
m2
TB on axis TB3 INT
m2
TB on axis TB3 soffit
m2
TB on axis TB4 ext
m2
TB on axis TB4 int
m2
TB on axis TB4 soffit
m2 Total
TAKEOFF SHEET NO:01
BLOCK: 6-3A TOILET
PAGE NO: 04
DESCRIPTION
5/Block work
DDT
TW3
DDT
D1
M2 Total
TAKEOFF SHEET NO:01
BLOCK: 6-3A TOILET
PAGE NO: 03
DESCRIPTION
BOKRA CONSTRUCTION & TRADING PLC
SUMMARY OF BILL OF QUANTITIES AND SPECIFICATIONS
FOR
BUILDING
Amount
25,084.68
53,975.79
Err:509
27,527.90
-
-
-
-
-
-
164,314.26
RATE AMOUNT
16.00 953.86
-
-
-
55.00 3,321.26
61.00 -
-
-
156.00 13,823.86
85.00 6,985.71
143.00 -
25,084.68
75.00 1,539.00
-
### 6,271.33
### -
-
### 1,066.38
### 5,357.29
166.00 -
166.00 -
166.00 3,977.36
-
185.00 1,539.20
208.00 6,323.20
-
36.00 2,670.52
36.00 1,848.04
36.00 1,094.58
36.00 9,409.18
-
36.00 3,188.12
36.00 3,383.49
36.00 6,308.10
53,975.79
### 20,480.13
### 9,247.14
-
-
466.00 Err:509
391.00 -
Err:509
470.00 27,527.90
-
348.00 -
223.00 -
40.00 -
40.00 -
47.00 -
288.00 -
27,527.90
MEKELLE UNIVERSITY COMMUNITY SCHOOL
AT MEKELLE
GRAND SUMMARY (Commulative)
BLOCK No. Contract Todate Excuted
No NAME
Name Block Amount AMOUNT
13 B6-3 a 1 194,113.52
Toilets
14 B6-3 b 1 222,740.53
15 B13 Sport Office 1 712,945.56
16 M2 Multi-purpose hall Building 1 1,340,830.73
Total - 2,470,630.34
BOKRA CONSTRUCTION & TRADING PLC
SUMMARY OF BILL OF QUANTITIES AND SPECIFICATIONS
FOR
B6-3A G+0 LADIES' AND GENTS' TOILET BUILDING
07 JOINERY. . . . . . . . . . . . . . . . . . . . BIRR
11 FINISHING
12 PAINTING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BIRR
13 GLAZING BIRR
ET BUILDING
Amount
. 8,345.13
- 47,828.17
- 56,523.12
- 31,192.40
- 18,198.75
- 21,595.35
- -
- -
- -
- 4,019.00
- 6,411.60
- 194,113.52
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
A) SUB STRUCTURE
1)Remove top soil 30cm thick
L=5.86+0.5+1.0=7.36m
7.36 L=6.9+0.2+1=8.10m 1 5.5
8.1 59.62 m2 6.1
2) Bulk Excavation in 1.34 44.63
Ordinary Soil up to 1.5m
L=5.86+0.5+1.0=7.36m
7.36 L=6.9+0.2+1=8.10m 1 2.2
8.1 Bulk avg=0.9m 0.6
0.9 53.65 m3 1.34 1.78
ddt
3.28 46.41
0.3
1.195 (1.18) m3
52.47 m3 total
1.2) Excavate in ordinary soil
for isolated footing to a depth 2 7.36
exceeding 1500mm but not 0.90
exceeding 3000mm from 0.90 11.92
reduced level.
4F1 2 4.36
4 1.50 Davg =0.59m 0.90
1.50 0.90 7.06
0.458 4.12 m3 total
3.28
6) Selected borrowed fill 0.3
0.9 (0.89)
a)*fill=total pit-concrete works 18.09
1.2) pit
4.12 m3 68.38
deduct concrete works
lean concrete
0.24 m3
concrete pad
m3
foundation column
17.88
3.88 m3 sub total
53.65
4.12
75.65
1 5.5
6.1 33.31
1 2.2
1.3 2.96
36.27
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
03) Concrete work
In situ concrete
1) Plain blinding concrete C-5
Reinforced sub structure concrete
a) To footing pad
4 1.1 4F1
1.1 4.84 m2 total 4 0.2
b) under Grade Beam 0.2
1 3.01 on axis A 2.6 0.42
0.3 0.90 m2 total
c) Under stone 0.42
masonry wall
1 3.18 on axis A, L=7.2-0.2*2=6.8m
0.6 1.91 m2
1 1.8 1 0.20
0.6 1.08 m2 0.40
1 3.21 6.06 0.48
0.6 1.93 m2
1 5.66 on axis 1/A 1 0.20
0.6 3.40 m2 0.40
1 5.9 on axis B/1-2 7.26 0.58
0.6 3.54 m2
1 4.86 on axis 2/A-B 2 0.20
0.6 2.92 m2 0.30
14.78 m2 6.70 0.80
20.52 m2 total
1 0.20
1.03 m3 total 0.30
2.80 0.17
5) C-25 in grade beam
c) In grade beam 1 0.20
2 6.70 GB on axis A&B/1-2 0.30
0.40 1.30 0.08
0.20 1.07 m3
2 6.06 GB on axis A-B/1&2 2.11
0.20
0.40 0.97 m3
2 1.20
0.20
0.40 0.19 m3
1 3.01
0.20
0.40 0.24 m3
2.47 m3 total
4C2,P=0.2*4=0.8m
4 2.6
0.8 8.32 m2
8.32 m2 total
19) Beam & lintel
m3
L=2.21 W=0.6
Davg=1.34m
m3
m3 total
m3
L=6.9+1+1=8.9m
Bulk avg=0.9m
m3
ddt ,L=3.28m
w=0.3m
m3
m3 sub total
M3 TOTAL a+b+c
7) Disposal
TOTAL EXCAVATION
1) site clearing
m3
1.1) bulk excavation
m3
1.2) pit excavation
m3
m3 Total
L=5.46 W=6.1
L=2.21 W=0.6
M2 Total
TAKEOFF SHEET NO:01
BLOCK: 6-3A TOILET
PAGE NO: 02
DESCRIPTION
Reinforced super
structure concrete
7) C-25 in elevation column
a) In elevation column
4C2
m3
m3 total
8)C-25 in beams & lintel
TB on axis 2/A-B
m3
TB on axis 1/A-B cantilever
m3
TB on axis A&B/1-2
m3
TB on axis cantileve TB3
m3
TB on axis cantileve TB4
m3
m3 total
TAKEOFF SHEET NO:01
BLOCK: 6-3A TOILET
PAGE NO: 03
DESCRIPTION
TB on axis A&B/1-2 ext.
m2
TB on axis A&B/1-2 int.
m2
TB on axis A&B/1-2 soffit.
m2
TB on axis TB3 EXT
m2
TB on axis TB3 INT
m2
TB on axis TB3 soffit
m2
TB on axis TB4 ext
m2
TB on axis TB4 int
m2
TB on axis TB4 soffit
m2 Total
TAKEOFF SHEET NO:01
BLOCK: 6-3A TOILET
PAGE NO: 04
DESCRIPTION
5/Block work
DDT
TW3
DDT
D1
M2 Total
M2
M2 Total
10. METAL WORK
a ) D1-700x210cm
b ) D2-120x260cm
c ) D2-90x260cm
d ) W1-150x150cm
e ) W2-390x60cm
f ) W3-670x60cm
g ) W4-215x60cm
BOKRA CONSTRUCTION & TRADING PLC
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM TAKEOFF SHEET NO:01
CLIENT:MEKELLE UNIVERSITY BLOCK: 6-3A TOILET
CONSULTANT :NOMY ENGINEERING PLC PAGE NO: 1
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
SUBSTRUCTURE BAR SCHEDULE SUMMARY
Descrption TOTAL Wt. OF BAR FOR DIA.
Diameter 8 10 12 14 16 20
Tot.wt. (kg) 74.18 51.33 30.41 261.37 0.00 0.00
A.
24
0.00
DIA.
24
0
3.55
0
F SHEET NO:01
6-3A TOILET
DIA.
24
0
3.55
0
F SHEET NO:01
6-3A TOILET
DIA.
24
0
3.55
0
F SHEET NO:01
6-3A TOILET
A.
24
0.00
DIA.
24
-
3.55
-
BOKRA CONSTRUCTION & TRADING PLC
SUMMARY OF BILL OF QUANTITIES AND SPECIFICATIONS
FOR
B6-3B G+0 LADIES' AND GENTS' TOILET BUILDING
07 JOINERY. . . . . . . . . . . . . . . . . . . . BIRR
11 FINISHING
12 PAINTING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . BIRR -
13 GLAZING BIRR -
B. SUPER-STRUCTURE
1. CONCRETE WORKS Birr 18,039.77 - 18,039.77
8. PAINTING Birr - - -
9. GLAZING Birr - - -
Contractor Consultant
Excuted Quantity Excuted Amount
ITEM DESCRIPTION UNIT Contract Previous Current Todate Previous Current Todate
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
A. SUB-STRUCTURE
1.EXCAVATION & EARTH WORKS
- - - -
Total to Summary.....Birr - 13,038.30 - 13,038.30
-
-
2.CONCRETE WORKS -
-
2.1 50mm thick lean concrete in C-5 with minimum cement
content of 150kg/m3 of concrete under: - - - -
- - - -
a) footing pad m2 3.00 1.96 1.96 75.00 147.00 - 147.00
- - - -
b) stone masonry m2 11.00 8.20 8.20 75.00 615.00 - 615.00
- - - -
c) 100mm thick ground floor slab m2 20.00 20.00 20.00 75.00 1,500.00 - 1,500.00
- - - -
2.2 Reinforced concrete in class C-25 (with a 28-day
150mm cube crushing strength of 25MPa), cast into
formworks and vibrated around rod reinforcement
bars.( formwork & reinforcement bars are measured
separately.) in: "Type of cement to be ordinary - - - -
Portland cement (OPC)"
- - - -
a. In isolated footing pads m 1.00 0.36 0.36 2,539.00 914.04 - 914.04
- - - -
b. In foundation column m 1.00 0.33 0.33 2,539.00 850.06 - 850.06
- - - -
c. In grade beam m 2.00 1.50 1.50 2,539.00 3,818.66 - 3,818.66
- - - -
2.3 Reinforced concrete in class C-15 (with a 28-day
150mm cube crushing strength of 15MPa), cast into
formworks and vibrated around rod reinforcement
bars.( reinforcement bars are measured separately.)
in: "Type of cement to be ordinary Portland cement - - - -
(OPC)"
In 100mm thick ground floor slab m2 20.00 - 199.90 - - -
- - - -
2.4(a) Provide, cut and fix in position sawn seasoned timber
or steel form work made up of minimum 2mm thick
sheet metal & folded thickness of 50mm whichever is
appropriate; - - - -
- - - -
a. To isolated footing pad m2 3.00 2.40 2.40 166.00 398.40 - 398.40
- - - -
2.4(b) Provide, cut and fix in position 19mm thick plywood
formwork to fair face concrete. - - - -
- - - -
a. To foundation column m 2
9.00 6.70 6.70 166.00 1,111.54 - 1,111.54
2.4(c) Provide, cut and fix in position 19mm thick plywood
formwork or steel form work made up of minimum
2mm thick sheet metal & folded thickness of 50mm
Both sides of forms shall be fixed with bolts.
Contractor to sublimit formwork design for approval - - - -
whichever is appropriate;
- - - -
a. To grade beam m2 16.00 15.04 15.04 166.00 2,496.64 - 2,496.64
- - - -
2.4 Reinforcement steel bars according to structural
drawing. Price includes cutting, bending, placing in
position and tying wires. - - - -
- - - -
a) dia. 8mm deformed bar kg 157.00 65.54 65.54 36.00 2,359.38 - 2,359.38
- - - -
b) dia. 10mm deformed bar kg 17.00 15.80 15.80 36.00 568.63 - 568.63
- - - -
c) dia. 12mm deformed bar kg 100.00 85.21 85.21 36.00 3,067.65 - 3,067.65
- - - -
d) dia. 14mm deformed bar kg 75.00 53.72 53.72 36.00 1,934.06 - 1,934.06
- - - -
Total to Summary.....Birr - 19,781.05 - 19,781.05
-
3. MASONRY AND BRICK WORKS - - - -
- - - -
3.1 500mm thick hard trachytic or equivalent stone
masonry foundation wall bedded in cement sand m3 14.00 6.70 6.70 1,233.00 8,256.17 - 8,256.17
mortar mix (1:3)
- - - -
3.2 Ditto, but for the part exposed above ground and one
side left for pointing well dressed. m3 5.00 1.30 1.30 1,253.00 1,623.89 - 1,623.89
Contractor Consultant
Excuted Quantity Excuted Amount
ITEM DESCRIPTION UNIT Contract Previous Current Todate Previous Current Todate
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
-
Total to Summary.....Birr - 9,880.06 - 9,880.06
-
B. SUPER-STRUCTURE -
-
1. CONCRETE WORKS -
-
1.1 Reinforced concrete in class C-25 (with a 28-day
150mm cube crushing strength of 25MPa), cast into
formworks and vibrated around rod reinforcement
bars. (formwork & reinforcement bars are measured
separately.) in: "Type of cement to be ordinary - - -
Portland cement (OPC)"
- - - -
a. In elevation column m3 1.00 0.48 0.48 2,539.00 1,218.72 - 1,218.72
- - - -
b. In top tie beams m3 2.00 1.22 1.22 2,539.00 3,107.74 - 3,107.74
- - - -
c. In copping beam m3 1.00 - 2,539.00 - - -
- - - -
1.3(a) Provide, cut and fix in position sawn seasoned timber
or steel form work made up of minimum 2mm thick
sheet metal & folded thickness of 50mm whichever is
appropriate; - - - -
- - - -
a. To top tie beams m2 16.00 16.20 16.20 208.00 3,369.60 - 3,369.60
- - - -
b. To copping beam m2 2.00 - 208.00 - - -
- - - -
1.3(b) Provide, cut and fix in position 19mm thick plywood
formwork to fair face concrete. - - - -
- - - -
a. To elevation columns m2 15.00 9.60 9.60 185.00 1,776.00 - 1,776.00
- - - -
1.3 Reinforcement steel bars according to structural
drawing. Price includes cutting, bending, placing in
position and tying wires. - - - -
- - - -
a) dia. 6mm plain bar kg 7.00 - 36.00 - - -
- - - -
b) dia. 8mm deformed bar kg 107.00 85.87 85.87 36.00 3,091.43 - 3,091.43
- - - -
c) dia. 10mm deformed bar kg 7.00 - 36.00 - - -
- - - -
d) dia. 12mm deformed bar kg 117.00 95.98 95.98 36.00 3,455.10 - 3,455.10
- - - -
e) dia. 14mm deformed bar kg 78.00 56.14 56.14 36.00 2,021.18 - 2,021.18
- - - -
Total to Summary.....Birr - 18,039.77 - 18,039.77
-
2. BLOCK WORK -
-
2.1 200mm thick hollow concrete block wall of type Class-C
with 28 days minimum crushing strength of 18kg/cm2,
bedded in cement mortar (1:3) mix, both sides left for
plastering. Price includes 26mm iron bars laid
horizontally every other course (spacing 400mm c/c).
m2 51.00 - 466.00 - - -
- - - -
Total to Summary.....Birr - - - -
-
3. ROOFING AND WATER PROOFING WORK -
-
3.1 Roof cover in Pre-painted EGA 300, 0.5mm thick fixed
to RHS purlins with standard hooks and washers. Roof
cover measured in horizontal projection. Price includes
ridge cover and two coats of anti-rust paint. m 29.00 375.00 - - -
Roof cover in Pre-painted EGA 400, 0.5mm thick fixed
to RHS purlins with standard hooks and washers. Roof
3.1* cover measured in horizontal projection. Price includes
ridge cover m 29.00 27.04 27.04 341.00 9,220.64 - 9,220.64
- - - -
3.2 G-28 G.I.S roof gutter with development length of
1000mm welded at joint provided 2% slope towards
down pipe and Price includes painting of two coats of
antirust and one coat of metal paint. m 5.00 - 259.00 - - -
- - - -
3.3 G28 flat metal sheet flashing with development length
of 330mm and Price includes painting of two coats of
antirust and one coat of metal paint. m 16.00 - 112.00 - - -
- - - -
3.4 G28 flat metal sheet copping with development
length of 330mm and Price includes painting of two
coats of antirust and one coat of metal paint. m 16.00 - 112.00 - - -
- - - -
3.5 Dia 110mm PVC down pipe. m 8.00 - 752.00 - - -
- - - -
Total to Summary.....Birr - 9,220.64 - 9,220.64
-
4. CARPENTRY & JOINERY -
-
4.1 Supply and fix 300x25mm zigba wood fascia board
price include three coats of oil paint. m 5.00 - 125.00 - - -
- - - -
Total to Summary.....Birr - - - -
5. METAL WORK -
-
Metal window and doors made of 38x1.5mm LTZ
profiles shown on the drawings, price include
approved quality locks and all iron mongery works,
two coats of anti rust, two coats of synthetic paint,
1mm thick ribbed sheet and door stopper. All -
according to detail Arch. drawings.
-
METAL LOUVER WINDOWS -
-
5.1 W1 size 5000X600mm No 4.00 - 4,500.00 - - -
- - - -
METAL DOORS - - - -
- - - -
5.2 WD1 size 1500x2700mm No 1.00 - 6,747.00 - - -
- - - -
Total to Summary.....Birr - - - -
-
6. STRUCTURAL STEEL WORKS -
-
Contractor Consultant
Excuted Quantity Excuted Amount
ITEM DESCRIPTION UNIT Contract Previous Current Todate Previous Current Todate
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
Supply and erect steel roof structure all as shown on
the detail drawing. Apply two coats of antirust paint.
Price includes all necessary preparation work such as
cleaning, wire brushing and finally two coats of anti-
rust paint. -
-
6.1 Upper, lower, vertical & horizontal chords as specified
on the drawing. -
-
RHS size: 40 x 40 x 2.5mm kg 70.00 65.01 65.01 60.00 3,900.74 - 3,900.74
- - - -
RHS size: 30 x 30 x 2.5mm kg 32.00 35.97 35.97 60.00 2,158.30 - 2,158.30
- - - -
6.2 Lattice purlin - - - -
- - - -
RHS size: 25 x 25 x 2.5mm kg 110.00 96.66 96.66 60.00 5,799.70 - 5,799.70
- - - -
RHS size: 20 x 20 x 2mm kg 38.00 21.29 21.29 60.00 1,277.24 - 1,277.24
6.3 100x200x5mm steel plate welded to truss and fixed to
anchor bolts as shown on the drawing. No. 8 - 66.00 - - -
- - - -
6.4 Grade 4.8 M12 threaded anchor bolt L-300mm No. 8 - 61.00 - - -
- - - -
Total to Summary.....Birr - 13,135.97 - 13,135.97
Contractor Consultant
MEKELLE UNIVERSTY COMMUNITY SC
AT MEKELLE
SUMMARY
NO. Description
A. SUB-STRUCTURE
2.CONCRETE WORKS
Birr
TOTAL A
B. SUPER-STRUCTURE
1. CONCRETE WORKS
Birr
2. BLOCK WORK
Birr
8. PAINTING
Birr
9. GLAZING
Birr
TOTAL B
Birr
TOTAL A+B
Birr
Excuted Quantity
Contract Previous
ITEM DESCRIPTION UNIT
QTY. QTY
A. SUB-STRUCTURE
1.EXCAVATION & EARTH WORKS
m 3.00
m 15.00 5.57
m3 12.00 18.79
Excuted Quantity
Contract Previous
ITEM DESCRIPTION UNIT
QTY. QTY
m2 20.00 20.00
Total to Summary.....Birr
2.CONCRETE WORKS
Total to Summary.....Birr
Total to Summary.....Birr
B. SUPER-STRUCTURE
1. CONCRETE WORKS
Total to Summary.....Birr
2. BLOCK WORK
Excuted Quantity
Contract Previous
ITEM DESCRIPTION UNIT
QTY. QTY
2.1 200mm thick hollow concrete block wall of
type Class-C with 28 days minimum
crushing strength of 18kg/cm2, bedded in
cement mortar (1:3) mix, both sides left
for plastering. Price includes 26mm iron
bars laid horizontally every other course
(spacing 400mm c/c).
m2 51.00
Total to Summary.....Birr
m 5.00
m 16.00
Excuted Quantity
Contract Previous
ITEM DESCRIPTION UNIT
QTY. QTY
3.4 G28 flat metal sheet copping with
development length of 330mm and Price
includes painting of two coats of antirust
and one coat of metal paint.
m 16.00
Total to Summary.....Birr
4.1
Supply and fix 300x25mm zigba wood
fascia board price include three coats of
oil paint. m 5.00
Total to Summary.....Birr
5. METAL WORK
METAL DOORS
Total to Summary.....Birr
Total to Summary.....Birr
VERSTY COMMUNITY SCHOOL
B GENERATOR ROOM
AT MEKELLE
SUMMARY
10,074.81 - 10,074.81
18,048.35 - 18,048.35
9,358.92 - 9,358.92
37,482.09 - 37,482.09
16,018.59 - 16,018.59
- - -
9,220.64 - 9,220.64
- -
18,000.00 - 18,000.00
13,012.24 - 13,012.24
- - -
- - -
- - -
- - -
- - -
56,251.47 - 56,251.47
93,733.55 - 93,733.55
Excuted Quantity Excuted Amount
Current Todate Previous Current Todate
QTY QTY Rate Amount Amount AMOUNT
- 400.00 - - 0.00
- - 0.00
- 273.00 - - 0.00
- - 0.00
- 81.00 - - 0.00
- - - 0.00
- 10,074.81 - 10,074.81
-
-
-
-
-
-
1.96 75.00 147.00 - 147.00
- - - 0.00
8.20 75.00 615.00 - 615.00
- - - 0.00
20.00 75.00 1,500.00 - 1,500.00
-
- - - 0.00
- - - 0.00
0.36 2,539.00 914.04 - 914.04
- - - 0.00
0.18 2,539.00 446.86 - 446.86
- - - 0.00
1.50 2,539.00 3,818.66 - 3,818.66
Excuted Quantity Excuted Amount
Current Todate Previous Current Todate
QTY QTY Rate Amount Amount AMOUNT
- - - 0.00
- - - 0.00
- 199.90 - - 0.00
- - - 0.00
- - - 0.00
- - - 0.00
2.40 166.00 398.40 - 398.40
- - - 0.00
- - - 0.00
- - - 0.00
3.52 166.00 584.32 - 584.32
- - - 0.00
- - - 0.00
15.04 166.00 2,496.64 - 2,496.64
- - - 0.00
- - - 0.00
- - - 0.00
Excuted Quantity Excuted Amount
Current Todate Previous Current Todate
QTY QTY Rate Amount Amount AMOUNT
57.35 36.00 2,064.74 - 2,064.74
- - - 0.00
15.80 36.00 568.63 - 568.63
- - - 0.00
71.11 36.00 2,560.00 - 2,560.00
- - - 0.00
53.72 36.00 1,934.06 - 1,934.06
- - - 0.00
- 18,048.35 - 18,048.35
-
-
-
-
-
0.48 2,539.00 1,218.72 - 1,218.72
- - - 0.00
1.22 2,539.00 3,107.74 - 3,107.74
- - - 0.00
Excuted Quantity Excuted Amount
Current Todate Previous Current Todate
QTY QTY Rate Amount Amount AMOUNT
- 2,539.00 - - 0.00
- - - 0.00
- - - 0.00
- - - 0.00
16.20 208.00 3,369.60 - 3,369.60
- - - 0.00
- 208.00 - - 0.00
- - - 0.00
- - - 0.00
- - - 0.00
9.60 185.00 1,776.00 - 1,776.00
- - - 0.00
- - - 0.00
- - - 0.00
- 36.00 - - 0.00
- - - 0.00
85.87 36.00 3,091.43 - 3,091.43
- - - 0.00
- 36.00 - - 0.00
- - - 0.00
95.98 36.00 3,455.10 - 3,455.10
- - - 0.00
- 36.00 - - 0.00
-
- 16,018.59 - 16,018.59
-
-
-
Excuted Quantity Excuted Amount
Current Todate Previous Current Todate
QTY QTY Rate Amount Amount AMOUNT
- 466.00 - - 0.00
-
- - - -
-
-
-
- - 375.00 - - 0.00
- 259.00 - - 0.00
-
- 112.00 - - 0.00
-
Excuted Quantity Excuted Amount
Current Todate Previous Current Todate
QTY QTY Rate Amount Amount AMOUNT
- 112.00 - - 0.00
- 752.00 - - 0.00
-
- 9,220.64 - 9,220.64
-
-
-
125.00 - - 0.00
-
- - - -
-
-
-
-
-
-
4.00 4,500.00 18,000.00 - 18,000.00
-
-
-
- 6,747.00 - - 0.00
-
- 18,000.00 - 18,000.00
-
-
-
Excuted Quantity Excuted Amount
Current Todate Previous Current Todate
QTY QTY Rate Amount Amount AMOUNT
-
-
-
-
65.01 56.00 3,640.69 - 3,640.69
-
35.97 56.00 2,014.41 - 2,014.41
-
-
-
96.66 56.00 5,413.05 - 5,413.05
-
21.29 56.00 1,192.09 - 1,192.09
3. ROOFING
5. METAL WORK
Contractor Consultant
Contractor Consultant
Takeoff No 1
Block:- B7-b
Page No:- 1
Description
Contractor Consultant
Contractor Consultant
BOKRA CONSTRUCTION & TRADING PLC
MEKELLE UNIVERSTY COMMUNITY SCHOOL
B6-2A TOILET
AT MEKELLE
A-SUB STRUCTURE
B-SUPER STRUCTURE
3 ROOFING..... BIRR
8 PAINTING.. BIRR
9 GLAZING.. BIRR
Total to SummaryBirr
4. CARPENTRY & JOINERY
Carpentry
Supply and fix 8 mm thick chip wood ceilings. Price include 40 x 50 mm
zigba wood battens with c/c spacing of 600 mm both ways, corner list
4.1 and all other necessary accessories to complete the work. m
Supply and fix 300x25mm zigba wood fascia board price include three
4.2 coats of oil paint. ml
Supply and fix PVC approved quality doors all according to
manufacturer instruction. Price shall include ASSA or equivalent (Knob
type for toilet doors) safety locks, hinges, and other necessary
4.3 accessories.
a. Size - 700x2700mm [Toilets] pcs
Total to SummaryBirr
5. METAL WORK
Metal window and doors made of 38x1.5mm LTZ profiles shown on the
drawings, price include approved quality locks and all iron mongery
works, two coats of anti rust, two coats of synthetic paint, 1mm thick
ribbed sheet and door stopper. All according to detail Arch. drawings.
5.1 WINDOWS
Supply & fix insect screen for open windows. Price shall include all
supporting accessories.
5.2 DOORS
Total to Summary.....Birr
7. FINISHING WORK
7.1 PLASTERING AND POINTING
Finishing work shall include all surface pre-cleaning, Preparation and
application of the finish, polishing and cleaning at the end of finished
work.
Apply three coats of plaster in cement mortar mix 1:3 up to fine finish
to internal wall, beams and columns surface. Mortar for fine finish
shall be cement-fine sand 1:2. Provide grooves recessed by 5mm
7.1.1 between beams and walls, columns and walls. m
7.1.3 Ditto item 7.1.2 but two coats to receive ceramic wall tile. m
Apply two coats of external wall plaster in cement mortar mix 1:3 and
one coat of tyrolean rendering in cement mortar mix 1:2. Provide
grooves recessed by 5mm between beams and walls, columns and
7.1.4 walls. m
20mm thick terrazzo floor tiles on and including 30mm cement sand
7.2.4 screed (1:3) mix price including grinding and polishing. m
7.2.5 100mm high terrazzo tile skirting stuck to wall with cement mortar (1:3) ml
Marble thread and risers including cement mortar and joined in cement
mortar mix of 1:3 to
Window Sill
Marble window cill on and including cement mortar bed jointed in
7.2.8 cement mortar mix of 1:3.
Door Threshold
Marble door thresholds on and including cement mortar bed jointed in
7.2.9 cement mortar mix of 1:3
Total to Summary..Birr
8. Painting
Prepare the surface and apply three coats of plastic emulsion paint of
8.1 chosen type and color to:
Total to SummaryBirr
9. Glazing
Supply and properly fix glass free from any defects to doors and
9.1 windows. Use proper putty and adequately packed.
Total to Summary..Birr
1 Light Points
3 Lighting fitting
Type 4 NO
Type 5.1 NO
Total to Summary..Birr
Supply ,fix, test & commission hand wash basins made of White
Vitreous China Standard white hand Wash basin with opening of dia.
16mm for faucet access to acceptable standard with a pair of white
painted cast iron screw to wall brackets, 32mm slotted basin waste &
overflow, chromium plated basin chain & rubber plug, complete with
fixing devices, Complete with plug , P-smell trap with connection pipes
and all other necessary accessories .
1.2 Accessories
a) Supply and fix crystal glass mirrors for hand wash basins with copper
back protection, size 500/400 mm including chrome plated brass
mirror clips with chrome plated screws. Price shall also include
approved quality shelves. No
b) Supply and fix soap holder made of white vitreous china for
handwash basins , Complete with the necessary fixing and other
accessories (For location or place for fixing refer to architectural
schedule drawing or consult the architect)
Size : 185X95mm No
a) dia.15mm Pipe ml
Supply, fix, test, and commission angle service valves on the cold & hot
water supply pipes before sanitary appliances including appliances
2.2 including all accessories, as shown on the drawings.
a) dia.15mm No
c) dia.20mm No
3.1 Pipes shall be uniform in colour, density and other physical, properties.
uPVC pipes to be PN-4 with minimum thickness of 3.2mm for dia.
160mm, 2.2mm for dia. 110mm, 1.8mm for dia. 75mm and 1.8mm for
dia. 50mm pipes. Dia. 110mm Elbow, Y, Tee & Reducers to be PN-4 with
minimum thickness of 3.3mm and Dia. 50 & 75 Elbow, Y, Tee & Reducer
to be PN-4 with minimum thickness of 2.7mm.
All fittings to have double ring non stopper socket system.
" 80 " ml
Supply and fix approved quality screw type floor clean outs on the
waste water drainage line as where shown on the drawing. Price shall
3.2 include all the necessary gasket and conecting pieces.
Dia. 80 mm No
Total to Summary..Birr
ADING PLC
SCHOOL
Amount
0 16,927.79
0 33,191.57
0 13,772.61
0 63,891.97
0 23,949.45
0 28,066.25
0 13,734.00
0 -
0 -
0 18,176.18
0 -
0 -
0 -
0 -
0 83,925.88
0 147,817.86
Contract Executed
QTY. QTY. Rate Amount
6 410.0 -
0 -
322 79.12 36.0 2,848.27
39 23.69 36.0 852.94
179 102.78 36.0 3,700.23
108 75.33 36.0 2,712.05
33,191.57
-
-
9 11.17 1233.0 13,772.61
2 1253.0 -
13,772.61
-
-
-
15 348 -
-
20 135 -
-
20 125 -
-
26 288 -
-
22 223 -
-
13,734.00
-
-
-
27 288 -
-
15 168 -
-
-
8 2835 -
-
113 40 -
-
78 40 -
-
89 47 -
-
-
-
-
-
-
-
-
-
-
4 2475 -
-
-
-
-
2 2750 -
-
-
-
-
-
-
-
-
137 70.92 137 9,716.04
-
7 105 -
-
26 456 -
-
49 85 -
-
-
-
-
-
-
9 626 -
-
-
-
-
2 487 -
-
7 732 -
-
28 475 -
-
36 274 -
-
18,176.18
-
-
-
-
-
137 36 -
-
82 40 -
-
27 40 -
-
-
-
-
-
-
-
1 403 -
-
-
-
-
-
-
-
-
9 312 -
-
-
-
1 406 -
-
2 442 -
-
-
-
-
-
-
-
-
-
-
-
-
9 2000 -
-
7 2000 -
2 2000 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
6 6732 -
-
-
-
-
6 650 -
-
-
-
-
6 1699 -
-
-
-
-
-
6 522 -
-
-
-
-
-
-
-
4 107 -
-
10 112 -
-
-
-
6 338 -
-
-
-
1 449 -
-
-
-
-
-
-
-
-
14 90 -
-
-
-
2 450 -
-
BOKRA CONSTRUCTION & TRADING PLC
MEKELLE UNIVERSTY COMMUNITY SCHOOL
B6-2B TOILET
AT MEKELLE
A-SUB STRUCTURE
2 CONCRETE WORK..
BIRR
B-SUPER STRUCTURE
1 CONCRETE WORK..
BIRR
2 BLOCK WORK....
BIRR
3 ROOFING.
BIRR
5 METAL WORK.
BIRR
8 PAINTING.BIRR
9 GLAZING. BIRR
Total to Summary....Birr
3. ROOFING
Total to SummaryBirr
4. CARPENTRY & JOINERY
Carpentry
4.1 Supply and fix 8 mm thick chip wood ceilings. Price m 27
4.2 Supply and fix 300x25mm zigba wood fascia board pric
ml 15
Total to SummaryBirr
5. METAL WORK
5.1 WINDOWS
Supply & fix insect screen for open windows. Price
shall include all supporting accessories.
5.2 DOORS
7. FINISHING WORK
7.1 PLASTERING AND POINTING
Window Sill
Marble window cill on and including cement mortar
7.2.8 bed jointed in cement mortar mix of 1:3.
Door Threshold
Marble door thresholds on and including cement
7.2.9 mortar bed jointed in cement mortar mix of 1:3
Total to Summary..Birr
8. Painting
Total to SummaryBirr
9. Glazing
Total to Summary..Birr
1 Light Points
1.1 Flush mounted light points fed through PVC insulated conductors
No of 2x2.5mm
9 2
inside PVC
3 Lighting fitting
Connected and tested including lamps and accessories complete, all as specified or descri
NOTE
I. Supply of Lighting fitting by the Client,
II. An average Unit price is considered for
cost estimation,
III. The price of fittings under this item to be
EXCLUDED in the contract agreement.
iv. Recommended types of fittings indicated
on the attached lighting fitting Schedule.
3.1 Lighting fittings and lamps complete NO 9
Type 4 NO 7
Type 5.1 NO 2
Total to Summary..Birr
1.2 Accessories
Type : : R.A.K.
Model orient Ceramics or built
accessories equivalent
in medium soap
holder
Size : 185X95mm No 6
Supply, install, test disinfect and commission domestic water supply G.S.P, including pipe
Galvanised mild steel pipes and fittings shall comply with BS1387 Class B or "Medium Gra
a) dia.15mm Pipe ml 4
2.2 Supply, fix, test, and commission angle service valves on the cold & hot water supply pipe
a) dia.15mm No 6
c) dia.20mm No 1
3.1 Pipes shall be uniform in colour, density and other physical, properties.
uPVC pipes to be PN-4 with minimum thickness of 3.2mm for dia. 160mm, 2.2mm for dia.
All fittings to have double ring non stopper socket system.
" 80 " ml 14
Total to Summary..Birr
PLC
Amount
0 14,336.93
0 33,419.70
0 12,305.34
0 60,061.98
0 23,579.73
0 28,066.25
0 13,734.00
0 -
0 -
0 18,176.18
0 -
0 -
0 -
0 -
0 83,556.16
0 143,618.14
Rate Amount
55.00 1,764.95
75.00 332.25
410.00 -
61.00 319.64
156.00 4,519.79
85.00 3,549.60
143.00 3,850.70
14,336.93
-
-
75.00 220.50
75.00 89.25
75.00 968.25
75.00 2,019.60
-
2,539.00 1,371.06
2,539.00 558.58
2,539.00 5,408.07
70.00 2,060.80
-
-
199.90 5,382.91
-
166.00 597.60
166.00 715.46
166.00 4,096.88
-
-
36.00 2,788.54
36.00 852.94
36.00 3,577.22
36.00 2,712.05
33,419.70
-
1,233.00 12,305.34
1,253.00 -
12,305.34
-
-
-
2,539.00 1,751.91
2,539.00 4,062.40
-
185.00 2,541.90
208.00 4,365.92
-
36.00 3,879.36
36.00 -
36.00 4,353.48
36.00 2,624.76
23,579.73
-
466.00 28,066.25
-
326.00 -
-
28,066.25
-
-
-
375.00 13,734.00
-
348.00 -
-
135.00 -
-
125.00 -
-
288.00 -
-
223.00 -
-
13,734.00
-
-
-
288.00 -
-
168.00 -
-
-
2,835.00 -
-
40.00 -
-
40.00 -
-
47.00 -
-
-
-
-
-
-
-
-
-
-
2,475.00 -
-
-
-
-
2,750.00 -
-
-
-
-
-
-
-
-
137.00 9,716.04
-
105.00 -
-
154.00 8,460.14
-
-
-
456.00 -
-
85.00 -
-
-
-
-
-
-
626.00 -
-
-
-
-
487.00 -
-
732.00 -
-
475.00 -
-
274.00 -
-
18,176.18
-
-
-
-
-
36.00 -
-
40.00 -
-
40.00 -
-
-
-
-
-
-
-
403.00 -
-
-
-
-
-
-
-
-
312 -
-
-
-
406 -
-
442 -
-
-
-
specified or described -
-
-
-
-
-
-
-
-
2000 -
-
2000 -
2000 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
6732 -
-
-
-
-
650 -
-
-
-
-
1699 -
-
ash basins , Complete with the necessary fixing and other accessories (For location or place for fixing refer to
-
-
-
-
522 -
-
-
-
S.P, including pipe fi -
s B or "Medium Grade -
-
-
-
107 -
-
112 -
-
t water supply pipes be -
-
338 -
-
-
-
449 -
-
-
s and shall be provided -
-
-
m, 2.2mm for dia. 11 -
-
-
90 -
-
-
-
450.00 -
-
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
A) SUB STRUCTURE
1)Remove top soil 30cm thick
L=5.86+0.5+1.0=7.36m
7.36 L=6.9+0.2+1=8.10m 1 5.5
8.1 59.62 m2 6.1
2) Bulk Excavation in 1.34 44.63
Ordinary Soil up to 1.5m
L=5.86+0.5+1.0=7.36m
7.36 L=6.9+0.2+1=8.10m 1 2.2
8.1 Bulk avg=0.9m 0.6
0.9 53.65 m3 1.34 1.78
ddt
3.28 46.41
0.3
1.195 (1.18) m3
52.47 m3 total
1.2) Excavate in ordinary
soil for isolated footing 2 7.36
to a depth exceeding 0.90
1500mm but not 0.90 11.92
exceeding 3000mm from
reduced level.
4F1 2 4.36
4 1.50 Davg =0.59m 0.90
1.50 0.90 7.06
0.458 4.12 m3 total
3.28
6) Selected borrowed fill 0.3
0.9 (0.89)
a)*fill=total pit-concrete works 18.09
1.2) pit
4.12 m3 68.38
deduct concrete works
lean concrete
0.24 m3
concrete pad
m3
foundation column
17.88
3.88 m3 sub total
53.65
4.12
75.65
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
03) Concrete work
In situ concrete
1) Plain blinding concrete C-5
Reinforced sub structure concrete
a) To footing pad
4 1.1 4F1
1.1 4.84 m2 total 4 0.2
b) under Grade Beam 0.2
1 3.01 on axis A 2.6 0.42
0.3 0.90 m2 total
c) Under stone 0.42
masonry wall
1 3.18 on axis A, L=7.2-0.2*2=6.8m
0.6 1.91 m2
1 1.8 1 0.20
0.6 1.08 m2 0.40
1 3.21 6.06 0.48
0.6 1.93 m2
1 5.66 on axis 1/A 1 0.20
0.6 3.40 m2 0.40
1 5.9 on axis B/1-2 7.26 0.58
0.6 3.54 m2
1 4.86 on axis 2/A-B 2 0.20
0.6 2.92 m2 0.30
14.78 m2 6.70 0.80
20.52 m2 total
1 0.20
1.03 m3 total 0.30
2.80 0.17
5) C-25 in grade beam
c) In grade beam 1 0.20
2 6.70 GB on axis A&B/1-2 0.30
0.40 1.30 0.08
0.20 1.07 m3
2 6.06 GB on axis A-B/1&2 2.11
0.20
0.40 0.97 m3
2 1.20
0.20
0.40 0.19 m3
1 3.01
0.20
0.40 0.24 m3
2.47 m3 total
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
Form work
16) Grade beam 2 6.2
1 7.1 on axis B/1-2/ext. 0.4 4.96
1 0.4 2.84 m2 2 6.7
1 6.7 on axis B/1-2/int. 0.4 5.36
2 0.4 5.36 m2 2 6.7
1 3.89 on axis A/EXT. 0.2 2.68
1 0.4 1.56 m2
2 2.91 on axis A/int. 1 3.2
1 0.4 2.33 m2 0.4 1.28
1 3.21 on axis beyond A/ext.. 1 2.8
1 0.4 1.28 m2 0.4 1.12
1 1.2 on axis beyond A/int. 1 2.8
1 0.4 0.48 m2 0.4 1.12
7.16 on axis 1/A-B ext.
0.4 2.86 m2 1 1.3
6.56 on axis 1/A-B int. 0.4 0.52
0.4 2.62 m2 1 1.1
6.06 on axis 2/A-B ext. 0.4 0.44
0.4 2.42 m2 1 1.1
5.66 on axis 2/A-B int. 0.2 0.22
0.4 2.26 m2 30.40
24.01 m2 TOTAL
Super structure Normal Finish to:
18) Elevation column
4C2,P=0.2*4=0.8m
4 2.6
0.8 8.32 m2
8.32 m2 total
19) Beam & lintel
m3
L=2.21 W=0.6
Davg=1.34m
m3
m3 total
m3
L=6.9+1+1=8.9m
Bulk avg=0.9m
m3
ddt ,L=3.28m
w=0.3m
m3
m3 sub total
M3 TOTAL a+b+c
7) Disposal
TOTAL EXCAVATION
1) site clearing
m3
1.1) bulk excavation
m3
1.2) pit excavation
m3
m3 Total
TAKEOFF SHEET NO:01
BLOCK: 6-3A TOILET
PAGE NO: 02
DESCRIPTION
Reinforced super
structure concrete
7) C-25 in elevation column
a) In elevation column
4C2
m3
m3 total
8)C-25 in beams & lintel
TB on axis 2/A-B
m3
TB on axis 1/A-B cantilever
m3
TB on axis A&B/1-2
m3
TB on axis cantileve TB3
m3
TB on axis cantileve TB4
m3
m3 total
TAKEOFF SHEET NO:01
BLOCK: 6-3A TOILET
PAGE NO: 03
DESCRIPTION
TB on axis A&B/1-2 ext.
m2
TB on axis A&B/1-2 int.
m2
TB on axis A&B/1-2 soffit.
m2
TB on axis TB3 EXT
m2
TB on axis TB3 INT
m2
TB on axis TB3 soffit
m2
TB on axis TB4 ext
m2
TB on axis TB4 int
m2
TB on axis TB4 soffit
m2 Total
TAKEOFF SHEET NO:01
BLOCK: 6-3A TOILET
PAGE NO: 04
DESCRIPTION
5/Block work
DDT
TW3
DDT
D1
M2 Total
6-Roofing work
M2 Total area
BOKRA CONSTRUCTION & TRADING PLC
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM TAKEOFF SHEET NO:01
CLIENT:MEKELLE UNIVERSITY BLOCK: 6-3B TOILET
CONSULTANT :NOMY ENGINEERING PLC PAGE NO:
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
SUBSTRUCTURE BAR SCHEDULE SUMMARY
Descrption TOTAL Wt. OF BAR FOR DIA.
Diameter 8 10 12 14 16
Tot.wt. (kg) 74.18 51.33 30.41 261.37 -
ARY
R FOR DIA.
20 24
- -
20 24
0 0
2.467 3.55
0 0
TAKEOFF SHEET NO:01
BLOCK: 6-3B TOILET
2
20 24
0 0
TAKEOFF SHEET NO:01
BLOCK: 6-3B TOILET
3
20 24
0 0
2.467 3.55
- -
TAKEOFF SHEET NO:01
BLOCK: 6-3B TOILET
4
MMARY
R FOR DIA.
20 24
0.00 0.00
20 24
- -
2.467 3.55
- -
MEKELLE UNIVERSTY COMMUNITY SCHOOL
B7-A GENERATOR ROOM
AT MEKELLE
SUMMARY
A. SUB-STRUCTURE
1.EXCAVATION & EARTH WORKS Birr
TOTAL A
B. SUPER-STRUCTURE
1. CONCRETE WORKS Birr
8. PAINTING Birr
9. GLAZING Birr
TOTAL B Birr
A. SUB-STRUCTURE
1.EXCAVATION & EARTH WORKS
1.6 Fill side of footing to maintain the desired level with selected
non expansive excavated material from site and compact in
layers not exceeding 200mm.
m3 15.00
1.7 Fill under hard core with selected borrowed non expansive
granular material and compact in layers not exceeding
200mm thick by sprinkling water to insure 95% modified
AASHTO dry density and final rolling with 5-8 ton roller.
m3 12.00
2.CONCRETE WORKS
.4(a) Provide, cut and fix in position sawn seasoned timber or steel
form work made up of minimum 2mm thick sheet metal &
folded thickness of 50mm whichever is appropriate;
Total to Summary.....Birr
3.2 Ditto, but for the part exposed above ground and one side left
for pointing well dressed. m3 5.00
Total to Summary.....Birr
B. SUPER-STRUCTURE
1. CONCRETE WORKS
1.1 Reinforced concrete in class C-25 (with a 28-day 150mm cube
crushing strength of 25MPa), cast into formworks and
vibrated around rod reinforcement bars. (formwork &
reinforcement bars are measured separately.) in: "Type of
cement to be ordinary Portland cement (OPC)"
.3(a) Provide, cut and fix in position sawn seasoned timber or steel
form work made up of minimum 2mm thick sheet metal &
folded thickness of 50mm whichever is appropriate;
.3(b) Provide, cut and fix in position 19mm thick plywood formwork
to fair face concrete.
2. BLOCK WORK
2.1 200mm thick hollow concrete block wall of type Class-C with 28
days minimum crushing strength of 18kg/cm2, bedded in cement
mortar (1:3) mix, both sides left for plastering. Price includes
26mm iron bars laid horizontally every other course (spacing
400mm c/c).
m2 51.00
Total to Summary.....Birr
3.1 Roof cover in Pre-painted EGA 300, 0.5mm thick fixed to RHS
purlins with standard hooks and washers. Roof cover
measured in horizontal projection. Price includes ridge cover
and two coats of anti-rust paint.
m 29.00
Total to Summary.....Birr
Total to Summary.....Birr
5. METAL WORK
METAL DOORS
Total to Summary.....Birr
Total to Summary.....Birr
Y SCHOOL
Amount
13,038.30
19,781.05
9,880.06
42,699.41
18,039.77
13,135.97
31,175.74
73,875.15
Excuted
QTY
RATE AMOUNT
273.00 0.00
0.00
81.00 0.00
0.00
0.00
199.90 0.00
0.00
0.00
0.00
2.40 166.00 398.40
0.00
0.00
0.00
6.70 166.00 1,111.54
0.00
0.00
15.04 166.00 2,496.64
0.00
0.00
0.00
65.54 36.00 2,359.38
0.00
15.80 36.00 568.63
0.00
85.21 36.00 3,067.65
0.00
53.72 36.00 1,934.06
0.00
19,781.05
0.00
0.00
0.00
0.00
0.00
0.48 2,539.00 1,218.72
0.00
1.22 2,539.00 3,107.74
0.00
2,539.00 0.00
0.00
0.00
0.00
16.20 208.00 3,369.60
0.00
208.00 0.00
0.00
0.00
0.00
9.60 185.00 1,776.00
0.00
0.00
0.00
36.00 0.00
0.00
85.87 36.00 3,091.43
0.00
36.00 0.00
0.00
95.98 36.00 3,455.10
0.00
56.14 36.00 2,021.18
0.00
18,039.77
0.00
0.00
0.00
466.00 0.00
0.00
-
0.00
0.00
0.00
259.00 0.00
0.00
112.00 0.00
0.00
112.00 0.00
0.00
752.00 0.00
0.00
-
0.00
0.00
0.00
125.00 0.00
0.00
-
0.00
0.00
0.00
0.00
4,500.00 0.00
0.00
0.00
0.00
6,747.00 0.00
0.00
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
65.01 60.00 3,900.74
0.00
35.97 60.00 2,158.30
66.00 0.00
0.00
61.00 0.00
0.00
13,135.97
BOKRA CONSTRUCTION & TRADING PLC
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING PLC
SUBSTRUCTURE BAR SCHEDULE SUMMARY
Descrption TOTAL Wt. OF BAR FOR DIA.
Diameter 8 10 12 14
Tot.wt. (kg) 65.54 15.80 85.21 53.72
Foundation Column
C1 Aver=3.705 12 3.705 4 2 8 29.64
ST-1 8 0.74 18 2 36 26.64
C2 Aver=3.24 12 3.24 4 2 8 25.92
ST-1 8 0.74 14 2 28 20.72
Grade beam 0
Beam on Axis 1&2 14 6.05 2 2 4 24.2
12 5.55 2 2 4 22.2
ST-1 8 1.14 29 2 58 66.12
Beam on Axis A&B 14 5.05 2 2 4 20.2
12 4.55 2 2 4 18.2
ST-1 8 1.14 23 2 46 52.44
Gorund floor slab
Mesh
0
Truss 1 0
Top member 40*40*2.5 5.357 1 2 2 10.714
Bottom member 40*40*25 5.201 1 2 2 10.402
0 0 0 0
Vertical member 30*30*2.5 1.125 1 2 2 2.25
30*30*2.5 1.08 1 2 2 2.16
30*30*2.5 1.04 1 2 2 2.08
30*30*2.5 0.78 1 2 2 1.56
30*30*2.5 0.52 1 2 2 1.04
30*30*2.5 0.26 1 2 2 0.52
30*30*2.5 0.11 1 2 2 0.22
Diagonal member 30*30*2.5 1.39 1 2 0
30*30*2.5 1.39 1 2 2 2.78
30*30*2.5 1.4 1 2 2 2.8
30*30*2.5 1.1 1 2 2 2.2
30*30*2.5 0.45 1 2 2 0.9
30*30*2.5 0.26 1 2 2 0.52
Purlins 0 0 0 0 0
P1
Top member 25*25*2.5 5.4 1 5 5 27
Vertical member 20*20*2 2.73 10 5 50 136.5
Bottom member 25*25*2.5 4.34 1 5 5 21.7
EP1 0
Top member 25*25*2.5 5.4 1 1 1 5.4
Vertical member 20*20*2 1.73 8 1 8 13.84
Bottom member 25*25*2.5 4.84 1 1 1 4.84
Purlin bracer 20*20*2 5.2 1 2 2 10.4
UMMARY
OF BAR FOR DIA.
16 20 24
0.00 0.00 0.00
UMMARY
OF BAR FOR DIA.
16 20 24
0.00 0.00 0.00
different sizes
Anchor bolt Plate
8.00 4.00
OR DIFF. SIZES
50*70*2.5 Plate
8 pcs 4 pcs
0 0
0 0
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
A) SUB STRUCTURE
32.73
0.508
6.70
6.8 D ave=0.42 24.83
5.8
0.42 16.56
16.56 Total M2
0.00
1.1 1.3) Pit not exceeding 1.5m 16.56
4 1.1 D ave-1.50 8.91
1.5 7.26 M3 F1 7.26
7.26 Total M3 32.73
2 3.6
0.5 3.6
2 4.6
0.5 4.6
8.20
5
4 20
20
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
1.1) Reinforced sub
structure concrete Sub structure normal fini
A) C-25 in footing pad
0.6 4/4 0.6
4 0.6 0.25 2.4
0.25 0.36 F1
0.36 M3 TOTAL
2.4
4/2 2.33
B) C-25 in Foundation column 0.2 3.72
4/2 1.86
2.33 0.2 2.98
2 0.2 Aver H =2.3+2.35/2=2.325m 6.70
0.2 0.186 M3 C1
1.86
2 0.2 Aver H =1.92+1.8/2=1.86m 2 5.40
0.2 0.149 M3 C2 0.40 4.32
0.33 M3 TOTAL 2 5.00
0.40 4.00
2 4.40
0.40 3.52
C) C-25 in Grade beam 2 4.00
5.40 0.40 3.20
2 0.40 15.04
0.20 0.864 Beam on Axis 1 & 2 b/n A-B
4.00
2 0.40
0.20 0.64 Beam on Axis A-B b/n 1-2 5.00
1.504 M3 Total 2 0.40
0.93 3.72
4.00
2 0.40
0.93 2.98
6.70
5.00
2 0.40
0.18 0.72
4.00
2 0.40
0.18 0.58
1.30
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
B-Super Structure
1-Concrete works
A/C-25 Elevation column's
3
2 0.2
0.2 0.24 C1
3
2 0.2
0.2 0.24 C2
0.48 M3 Total
Form work
B/C-25 Elevation column's
4/2 3
0.2 4.8 C1
4/2 3
0.2 4.8 C2
9.60 M2 Total
1.8) Disposal
TOTAL EXCAVATION
m3 1) site clearing
m3 2) bulk excavation
m3 4) pit excavation
m3 5) Trench excavation
m3 Total
Area
M2 Total
F1
Total M2
M2 F1
M2 TOTAL
B/Foundation column's
aver=0.2m
M2 C1
aver=0.2m
M3 C2
M2 TOTAL
Aver= 0.93m
Axis 1& 2 b/n A-B
Aver= 0.93m
Axis A & B b/n 1-2
M3 Total
Aver= 0.18m
Axis 1& 2 b/n A-B
Aver= 0.18m
Axis A & B b/n 1-2
M3 Total
TAKEOFF SHEET NO: 01
BLOCK: B7a
PAGE NO: 05
DESCRIPTION
MEKELLE UNIVERSTY COMMUNITY SCHOOL
B7-B GENERATOR ROOM
AT MEKELLE
SUMMARY
A. SUB-STRUCTURE
1.EXCAVATION & EARTH WORKS Birr
TOTAL A
B. SUPER-STRUCTURE
1. CONCRETE WORKS Birr
8. PAINTING Birr
9. GLAZING Birr
TOTAL B Birr
A. SUB-STRUCTURE
1.EXCAVATION & EARTH WORKS
m 3.00 400.00
Total to Summary.....Birr
2.CONCRETE WORKS
Total to Summary.....Birr
Total to Summary.....Birr
B. SUPER-STRUCTURE
1. CONCRETE WORKS
Total to Summary.....Birr
2. BLOCK WORK
m2 51.00 466.00
Total to Summary.....Birr
m 5.00 259.00
3.3 G28 flat metal sheet flashing with
development length of 330mm and Price
includes painting of two coats of antirust
and one coat of metal paint.
m 16.00 112.00
m 16.00 112.00
Total to Summary.....Birr
4.1
Supply and fix 300x25mm zigba wood
fascia board price include three coats of
oil paint. m 5.00 125.00
Total to Summary.....Birr
5. METAL WORK
METAL DOORS
5.2 WD1 size 1500x2700mm No 1.00 6,747.00
Total to Summary.....Birr
Total to Summary.....Birr
L
Amount
10,074.81
18,048.35
9,358.92
37,482.09
16,018.59
13,012.24
29,030.83
66,512.91
AMOUNT
1,681.72
0.00
588.93
0.00
579.57
0.00
0.00
0.00
0.00
3,719.71
0.00
1,224.88
0.00
2,280.00
0.00
10,074.81
0.00
0.00
0.00
0.00
0.00
0.00
147.00
0.00
615.00
0.00
1,500.00
0.00
0.00
0.00
914.04
0.00
446.86
0.00
3,818.66
0.00
0.00
0.00
0.00
0.00
0.00
398.40
0.00
0.00
0.00
584.32
0.00
0.00
2,496.64
0.00
0.00
0.00
2,064.74
0.00
568.63
0.00
2,560.00
0.00
1,934.06
0.00
18,048.35
0.00
0.00
0.00
7,013.30
0.00
2,345.62
0.00
9,358.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,218.72
0.00
3,107.74
0.00
0.00
0.00
0.00
0.00
3,369.60
0.00
0.00
0.00
0.00
0.00
1,776.00
0.00
0.00
0.00
0.00
0.00
3,091.43
0.00
0.00
0.00
3,455.10
0.00
0.00
0.00
16,018.59
0.00
0.00
0.00
0.00
0.00
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
0.00
0.00
0.00
0.00
0.00
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,640.69
0.00
2,014.41
0.00
0.00
0.00
5,413.05
0.00
1,192.09
264.00
0.00
488.00
0.00
13,012.24
BOKRA CONSTRUCTION & TRADING PLC
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM TAKEOFF SHEET NO
CLIENT:MEKELLE UNIVERSITY BLOCK: B7 b CLASS
CONSULTANT :NOMY ENGINEERING PLC PAGE NO
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING PL
SUBSTRUCTURE BAR SCHEDULE SUMMARY
Descrption TOTAL Wt. OF BAR FOR DIA.
Diameter 8 10 12 14 16
Tot.wt. (kg) 57.35 15.80 71.11 53.72 0.00
Foundation Column
C1 Aver=2.57 12 2.57 4 2 8 20.56
8 0.74 10 2 20 14.8
C2 Aver=2.39 12 2.39 4 2 8 19.12
8 0.74 8 2 16 11.84
Grade beam
Beam on Axis 1&2 14 6.05 2 2 4 24.2
12 5.55 2 2 4 22.2
8 1.14 29 2 58 66.12
Beam on Axis A&B 14 5.05 2 2 4 20.2
12 4.55 2 2 4 18.2
8 1.14 23 2 46 52.44
Truss 1 0
Top member 40*40*2 5.357 1 2 2 10.714 8 pcs
Bottom member 40*40*2 5.201 1 2 2 10.402
0 0 0 0
Vertical member 30*30*2 1.125 1 2 2 2.25
30*30*2 1.08 1 2 2 2.16
30*30*2 1.04 1 2 2 2.08
30*30*2 0.78 1 2 2 1.56
30*30*2 0.52 1 2 2 1.04
30*30*2 0.26 1 2 2 0.52
30*30*2 0.11 1 2 2 0.22
Diagonal member 30*30*2 1.39 1 2 0
30*30*2 1.39 1 2 2 2.78
30*30*2 1.4 1 2 2 2.8
30*30*2 1.1 1 2 2 2.2
30*30*2 0.45 1 2 2 0.9
30*30*2 0.26 1 2 2 0.52
Purlins 0 0 0 0 0
P1
Top member 25*25*2 5.4 1 5 5 27
Vertical member 20*20*2 2.73 10 5 50 136.5
Bottom member 25*25*2 4.34 1 5 5 21.7
EP1 0
Top member 25*25*2 5.4 1 1 1 5.4
Vertical member 20*20*2 1.73 8 1 8 13.84
Bottom member 25*25*2 4.84 1 1 1 4.84
Purlin bracer 20*20*2 5.2 1 2 2 10.4
FOR DIA.
20 24
0.00 0.00
AR FOR DIA.
20 24
0 0
2.467 3.55
0 0
TAKEOFF SHEET NO:01
BLOCK: B7 b CLASS ROOM
2
FOR DIA.
20 24
0.00 0.00
AR FOR DIA.
20 24
0 0
2.467 3.55
0 0
SHEET NO:01
: 01
sizes
Plate
4.00
SIZES
Plate
4 pcs
0
0
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
A) SUB STRUCTURE
25.52
0.508
5.69
6.8 D ave=0.41m 18.79
5.8
0.41 16.17
16.17 Total M2
0.00
1.1 1.3) Pit not exceeding 1.5m 16.17
4 1.1 D ave-0.78 3.78
0.78 3.78 M3 F1 5.57
3.78 Total M3 25.52
5
4 20
20
5
4 20
20
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
Reinforced sub
structure concrete Sub structure normal fini
1) C-25 in footing pad
0.6 4/4 0.6
4 0.6 0.25 2.4
0.25 0.36 F1
0.36 M3 TOTAL
2.4
4/2 1.01
2) C-25 in Foundation column 0.2 1.62
4/2 1.19
1.01 0.2 1.90
2 0.2 Aver H =0.97+1.05/25=1.01m 3.52
0.2 0.081 M3 C1
1.19
2 0.2 Aver H =1.1+1.28/2=1.19m 2 5.40
0.2 0.095 M3 C2 0.40 4.32
0.18 M3 TOTAL 2 5.00
0.40 4.00
2 4.40
0.40 3.52
3) C-25 in Grade beam 2 4.00
5.40 0.40 3.20
2 0.40 15.04
0.20 0.864 Beam on Axis 1 & 2 b/n A-B
4.00
2 0.40
0.20 0.64 Beam on Axis A-B b/n 1-2 5.00
1.504 M3 Total 2 0.40
0.79 3.16
4.00
2 0.40
0.79 2.53
5.69
5.00
2 0.40
0.26 1.04
4.00
2 0.40
0.26 0.83
1.87
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
Super Structure
1.8) Disposal
TOTAL EXCAVATION
m3 1) site clearing
m3 2) bulk excavation
m3 4) pit excavation
m3 5) Trench excavation
m3 Total
1.9) 250mm thick Hard core
Area
M2 Total
2) Concrete work
2.1) In situ concrete
Plain blinding concrete C-5
a) To footing pad
F1
Total M2
Area
M2 Total
TAKEOFF SHEET NO: 01
BLOCK: B7b
PAGE NO: 02
DESCRIPTION
Form work
Sub structure normal finish to:
A) Footing pads
M2 F1
M2 TOTAL
B/Foundation column's
aver=0.2m
M2 C1
aver=0.2m
M3 C2
M2 TOTAL
Aver= 0.79m
Axis 1& 2 b/n A-B
Aver= 0.79m
Axis A & B b/n 1-2
M3 Total
Aver= 0.26m
Axis 1& 2 b/n A-B
Aver= 0.26m
Axis A & B b/n 1-2
M3 Total
TAKEOFF SHEET NO: 01
BLOCK: B7b
PAGE NO: 03
DESCRIPTION
MEKELLE UNIVERSTY COMMUNITY SCHOOL
AT MEKELLE
SUMMARY
Previous Current Todate
NO. Description
Amount Amount Amount
A-SUB STRUCTURE
B-SUPER STRUCTURE
2 BLOCK WORK...BIRR - - -
3 ROOFING.
BIRR - - -
5 METAL WORK.BIRR - -
8 PAINTING. BIRR - - -
9 GLAZING. BIRR - - -
1.1 Bulk excavation in ordinary soil not exceeding m 25.00 58.89 58.89 55.00 3,239.19 - 3,239.19
1500mm from NGL. - - - -
1.2 Excavate in ordinary soil for isolated footing to a
depth exceeding 1500mm but not exceeding
3000mm from reduced level.
m 8.00 - 75.00 - - -
- - - -
1.3 Excavate in weathered rock for isolated footing to a
depth exceeding 1500mm but not exceeding
3000mm from reduced level.
m 4.00 - 410.00 - - -
- - - -
1.4 Excavate for trench foundation in ordinary soil to a
depth not exceeding 1500mm from stripped level.
m 2.00 - 61.00 - - -
- - - -
1.5 Fill around trench, isoleted foundation and under
hardcore to maintain the desired level with
selected borrowed material and compact in layers
not exceeding 200mm.
m 34.00 54.79 54.79 156.00 8,547.31 - 8,547.31
- - - -
1.6 Cart away surplus excavated material to a distance
not exceeding 2kms. m 37.00 58.89 58.89 85.00 5,006.02 - 5,006.02
- - - -
1.7 250mm. thick sound basaltic or equivalent stone m 10.00
hard-core finished and blinded with crushed stone. 8.89 8.89 143.00 1,271.27 - 1,271.27
-
Total to Summary..Birr - 18,063.79 - 18,063.79
-
2. CONCRETE WORK -
-
2.1 50mm thick lean concrete in C-5 with minimum
cement content of 150Kg/m3under: -
-
a. Footing pads m 3.00 3.43 3.43 75.00 257.25 - 257.25
- - - -
b. Under grade beam m - - - -
- - - -
c. Under stone masonry wall m 7.00 5.00 5.00 75.00 375.00 - 375.00
- - - -
d. Under ground floor Slab m 10.00 15.44 15.44 75.00 1,158.34 - 1,158.34
- - - -
2.2 Reinforced concrete in class C-25 (with a 28-day
150mm cube crushing strength of 25MPa), cast into
formworks and vibrated around rod reinforcement
bars.( formwork & reinforcement bars are
measured separately.) in: "Type of cement to be
ordinary Portland cement (OPC)"
- - - -
- - - -
a. In isolated footing pads m 1.00 0.63 0.63 2,539.00 1,599.57 - 1,599.57
- - - -
b. In foundation column m 1.00 0.40 0.40 2,539.00 1,010.84 - 1,010.84
- - - -
c. In grade beam m 2.00 1.09 1.09 2,539.00 2,762.43 - 2,762.43
- - - -
e. Styrophome expansion joint ml 13.00 12.30 12.30 70.00 861.00 - 861.00
- - -
2.3 Reinforced concrete in class C-15 (with a 28-day
150mm cube crushing strength of 15MPa), cast into
formworks and vibrated around rod reinforcement
bars.( reinforcement bars are measured
separately.) in: "Type of cement to be ordinary
Portland cement (OPC)"
- - -
- - -
In 100mm thick ground floor slab m 10.00 8.89 8.89 199.90 1,777.74 - 1,777.74
- - -
2.4 Provide, cut and fix in position sawn Zigba wood or
metal panel form work: - - -
- - -
a. To isolated footing pad m 4.00 3.60 3.60 166.00 597.60 - 597.60
- - -
b. To foundation column m 12.00 14.82 14.82 166.00 2,460.12 - 2,460.12
- - -
c. To grade beam m 11.00 10.88 10.88 166.00 1,806.08 - 1,806.08
- - -
2.5 Reinforcement bar according to structural
drawings. Price includes cutting, bending, placing
in position & tying wires.
- - -
- - -
Diameter 8mm deformed bars Kg 122.00 100.98 100.98 36.00 3,635.20 - 3,635.20
- - - -
Diameter 10mm deformed bars Kg 23.69 23.69 36.00 852.94 - 852.94
- - - -
Diameter 12mm deformed bars Kg 118.00 26.64 26.64 36.00 959.04 - 959.04
- - - -
Diameter 14mm deformed bars Kg 222.00 152.94 152.94 36.00 5,505.98 - 5,505.98
Excuted Quantity Excuted Amount
Contract Previous Current Todate Previous Current Todate
ITEM DESCRIPTION UNIT
QTY. QTY QTY QTY Rate Amount Amount AMOUNT
3. MASONRY WORK
B. SUPER STRUCTURE
1. CONCRETE WORK
Total to Summary....Birr - - -
3. ROOFING
m 13.00 - 125.00 - - -
Total to SummaryBirr - - -
5. METAL WORK
5.1 WINDOWS -
5.2 DOORS -
Total to Summary.....Birr - - - -
BOKRA CONSTRUCTION & TRADING PLC
Project:- MUBP86 Takeoff No
Location:-AYNALEM Block:- B8-a
Client:- MEKELLE UNIVERSTY
Consultant:- NOMY ENGINEERING PLC
No L*W*D QTY Description No L*W*D QTY
Contractor Consultant
Contractor Consultant
Takeoff No 1
Block:- B8-a
Page No:- 1
Description
Contractor Consultant
Contractor Consultant
MEKELLE UNIVERSTY CO
B8-B GUARD
AT MEKE
SUMMA
NO. Description
A-SUB STRUCTURE
2 CONCRETE WORK..BIRR
B-SUPER STRUCTURE
2 BLOCK WORK...BIRR
3 ROOFING.BIRR
Contractor Consultant
7 FINISHING WORK. BIRR
8 PAINTING. BIRR
9 GLAZING. BIRR
Contractor Consultant
ITEM DESCRIPTION UNIT
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
Total to Summary..Birr
2. CONCRETE WORK
a. Footing pads m
Contractor Consultant
ITEM DESCRIPTION UNIT
b. In foundation column m
c. In grade beam m
b. To foundation column m
c. To grade beam m
Contractor Consultant
ITEM DESCRIPTION UNIT
Total to Summary...Birr
3. MASONRY WORK
Contractor Consultant
ITEM DESCRIPTION UNIT
Total to Summary.Birr
B. SUPER STRUCTURE
1. CONCRETE WORK
a. In elevation column m
a. To elevation column m
Contractor Consultant
ITEM DESCRIPTION UNIT
Total to Summary....Birr
2. BLOCK WORK
Total to Summary....Birr
3. ROOFING
Contractor Consultant
ITEM DESCRIPTION UNIT
Total to SummaryBirr
5. METAL WORK
Metal window and doors made of 38x1.5mm LTZ
profiles shown on the drawings, price include
approved quality locks and all iron mongery works,
two coats of anti rust, two coats of synthetic paint,
1mm thick ribbed sheet and door stopper. All
according to detail Arch. drawings.
5.1 WINDOWS
Size 600x 800 mm pcs
5.2 DOORS
Size 700 x 2100 mm pcs
Total to Summary.....Birr
Contractor Consultant
MEKELLE UNIVERSTY COMMUNITY SCHOOL
AT MEKELLE
SUMMARY
Previous
Amount
- 5,679.74
- 23,403.35
- 5,674.56
- 34,757.64
- 35,915.86
- -
- -
- 2,145.00
Contractor Consultant
- -
- -
- -
- 38,060.86
- 72,818.50
Contractor Consultant
Excuted Quantity Excuted Amount
Contract Previous Current Todate Previous
QTY. QTY QTY QTY Rate Amount
4.00 - 410.00 -
- -
-
-
3.00 3.43 3.43 75.00 257.25
- -
Contractor Consultant
Excuted Quantity Excuted Amount
Contract Previous Current Todate Previous
QTY. QTY QTY QTY Rate Amount
- -
- -
7.00 5.00 5.00 75.00 375.00
- -
10.00 15.44 15.44 75.00 1,158.34
- -
- -
- -
1.00 0.63 0.63 2,539.00 1,599.57
- -
1.00 0.40 0.40 2,539.00 1,010.84
- -
2.00 1.09 1.09 2,539.00 2,762.43
- -
13.00 12.30 12.30 70.00 861.00
- -
- -
- -
10.00 9.68 9.68 199.90 1,934.53
- -
- -
- -
4.00 4.20 4.20 166.00 697.20
- -
12.00 6.37 6.37 166.00 1,057.42
- -
11.00 10.88 10.88 166.00 1,806.08
- -
Contractor Consultant
Excuted Quantity Excuted Amount
Contract Previous Current Todate Previous
QTY. QTY QTY QTY Rate Amount
- -
- -
122.00 116.57 116.57 36.00 4,196.61
- -
23.69 23.69 36.00 852.94
- -
118.00 26.64 26.64 36.00 959.04
- -
222.00 107.64 107.64 36.00 3,875.10
-
23,403.35
Contractor Consultant
Excuted Quantity Excuted Amount
Contract Previous Current Todate Previous
QTY. QTY QTY QTY Rate Amount
5,674.56
- -
11.00 18.90 18.90 185.00 3,496.50
- -
9.00 10.79 10.79 208.00 2,244.32
- -
10.00 23.23 23.23 208.00 4,831.82
- -
-
39.00 - 36.00 -
- -
165.00 227.45 227.45 36.00 8,188.16
- -
- - -
- -
Contractor Consultant
Excuted Quantity Excuted Amount
Contract Previous Current Todate Previous
QTY. QTY QTY QTY Rate Amount
27.00 39.07 39.07 36.00 1,406.59
- -
128.00 132.37 132.37 36.00 4,765.46
- -
- 35,915.86
5.00 - 466.00 -
- -
- - -
- -
19.00 - 326.00 -
- -
23.00 - 717.00 -
-
-
10.00 - 215.00 -
- -
10.00 - 120.00 -
- -
12.00 - 600.00 -
Contractor Consultant
Excuted Quantity Excuted Amount
Contract Previous Current Todate Previous
QTY. QTY QTY QTY Rate Amount
- -
13.00 - 125.00 -
2,145.00
Contractor Consultant
Current Todate
Amount Amount
- 5,679.74
- 23,403.35
- 5,674.56
- 34,757.64
- 35,915.86
- -
- -
- 2,145.00
Contractor Consultant
- -
- -
- -
- 38,060.86
- 72,818.50
Contractor Consultant
Excuted Amount
Current Todate
Amount AMOUNT
- 524.18
- -
- 431.97
- -
- -
- -
- 138.35
- -
- 1,821.51
- -
- 1,492.45
- -
- 1,271.27
-
- 5,679.74
- 257.25
- -
Contractor Consultant
Excuted Amount
Current Todate
Amount AMOUNT
- -
- -
- 375.00
- -
- 1,158.34
- -
- -
- -
- 1,599.57
- -
- 1,010.84
- -
- 2,762.43
- -
- 861.00
- -
- -
- -
- 1,934.53
- -
- -
- -
- 697.20
- -
- 1,057.42
- -
- 1,806.08
- -
Contractor Consultant
Excuted Amount
Current Todate
Amount AMOUNT
- -
- -
- 4,196.61
- -
- 852.94
- -
- 959.04
- -
- 3,875.10
- 23,403.35
- 4,512.78
- -
Contractor Consultant
Excuted Amount
Current Todate
Amount AMOUNT
- 1,161.78
- 5,674.56
- 2,999.19
- -
- 2,079.44
- -
- 5,904.37
- -
- -
- 3,496.50
- -
- 2,244.32
- -
- 4,831.82
- -
- -
- -
- -
- 8,188.16
- -
- -
- -
Contractor Consultant
Excuted Amount
Current Todate
Amount AMOUNT
- 1,406.59
- -
- 4,765.46
- -
- 35,915.86
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Contractor Consultant
Excuted Amount
Current Todate
Amount AMOUNT
- -
- -
-
-
- 528.00
-
- 1,617.00
-
- 2,145.00
Contractor Consultant
BOKRA CONSTRUCTION & TRADING PLC
Project:- MUBP86 Takeoff No
Location:-AYNALEM Block:- B8-b
Client:- MEKELLE UNIVERSTY
Consultant:- NOMY ENGINEERING PLC
No L*W*D QTY Description No L*W*D QTY
5. METAL WORK
Metal window and doors made of 38x1.5mm
LTZ profiles shown on the drawings
5.1. METAL WINDOWS
On Axis 1
TW1=Size 600x 800 mm
1 1.00 No.
1.00 No. Total item 5.1a
On Axis 1 & 2
W2=Size 1200 x1250mm
2 2.00 No.
2.00 No. Total item 5.1b
On Axis A
W1=Size 1200 x1250mm
1 1.00 No.
1.00 No. Total item 5.1b
Contractor Consultant
Contractor Consultant
Takeoff No 1
Block:- B8-b
Page No:- 1
Description
Contractor Consultant
Contractor Consultant
BOKRA CONSTRUCTION & TRA
MEKELLE UNIVERSTY CO
B9 WORKSHOP
AT MEKELLE
SUMMARY
NO. Description
A-SUB STRUCTURE
B-SUPER STRUCTURE
1 CONCRETE WORK.BIRR
2 BLOCK WORK...BIRR
Contractor Consultant
3 ROOFING. BIRR
8 PAINTING. BIRR
9 GLAZING. BIRR
Contractor Consultant
Excuted Qua
Contract Previous
ITEM DESCRIPTION UNIT
QTY. QTY
1. EXCAVATION & EARTH WORK
Bulk excavation in ordinary soil not exceeding 1500mm
1.1 from NGL. m3 127 90.07
Excavate in ordinary soil for isolated footing to a depth
exceeding 1500mm but not exceeding 3000mm from
reduced level.
1.2 m3 11 5.81
Excavate in weathered rock for isolated footing to a depth
exceeding 1500mm but not exceeding 3000mm from
reduced level.
1.3 m3 6
Excavate for trench foundation in ordinary soil to a depth
1.4 not exceeding 1500mm from stripped level. m3 6 6.10
Fill around trench, isoleted foundation and under hardcore
to maintain the desired level with selected borrowed
material and compact in layers not exceeding 200mm.
1.5 m3 154 95.02
Cart away surplus excavated material to a distance not
1.6 exceeding 2kms. m3 149 101.98
250mm. thick sound basaltic or equivalent stone hard-core
1.7 finished and blinded with crushed stone. m 96 96.00
Total to Summary..Birr
2. CONCRETE WORK
50mm thick lean concrete in C-5 with minimum cement
2.1 content of 150Kg/m3under:
a. Footing pads m 4 2.94
b. Under grade beam m 0
c. Under stone masonry wall m 16 23.76
d. Under ground floor Slab m 96 96.00
Reinforced concrete in class C-25 (with a 28-day 150mm
cube crushing strength of 25MPa), cast into formworks and
vibrated around rod reinforcement bars.( formwork &
reinforcement bars are measured separately.) in: "Type of
cement to be ordinary Portland cement (OPC)"
2.2
a. In isolated footing pads m3 1 0.54
b. In foundation column m3 1 0.29
c. In grade beam m3 3 3.26
d. Styrophome expansion join ml 40 40.00
e. Acrylic joint sealing ml 28
Reinforced concrete in class C-15 only 280 kg cement/m3
2.3 of concrete:
In ground floor slab (10cm thick) m 96 96.00
2.4 Provide, cut and fix in position sawn Zigba wood or metal panel form work:
a. To isolated footTog pad m 5 3.60
b. To foundation column m 15 5.83
c. To grade beam m 33 32.64
Reinforcement bar according to structural drawings. Price
2.5 includes cutting, bending, placing in position & tying
wires.
Diameter 8mm deformed bars Kg 514 430.04
Contractor Consultant
Excuted Qua
Contract Previous
ITEM DESCRIPTION UNIT
QTY. QTY
Diameter 10mm deformed bars Kg 39 23.69
Diameter 12mm deformed bars Kg 289 129.22
Diameter 14mm deformed bars Kg 76 109.87
Total to Summary...Birr
3. MASONRY WORK
500 mm thick hard trachytic or equivalent stone peripheral
foundation wall to a depth of 50cm bedded in cement
mortar 1:3 below natural ground level.
3.1 m 16 15.44
500 mm thick hard trachytic or equivalent stone peripheral
foundation wall to a depth of 100cm bedded in cement
mortar 1:3 above natural ground level.
3.2 m 4 2.02
Total to Summary.Birr
B. SUPER STRUCTURE
1. CONCRETE WORK
Reinforced concrete in class C-25 (with a 28-day 150mm
cube crushing strength of 25MPa), cast into formworks and
vibrated around rod reinforcement bars. (formwork &
reinforcement bars are measured separately.) in: "Type of
cement to be ordinary Portland cement (OPC)"
1.1
a. In elevation column m 2 1.29
b. In intermediate and top tie beams m 4 2.67
Provide, cut and fix in position metal panel or sawn Zigba
1.2 wood form work
a. To elevation column m 30 25.60
b. To intermediate and top tie beams m 48 35.28
Reinforcement bar according to structural drawings. Price
1.3 includes cutting, bending, placing in position & tying
wires.
Diameter 8mm deformed bars Kg 253 186.12
Diameter 10mm deformed bars Kg 56 -
Diameter 12mm deformed bars Kg 310 221.64
Diameter 14mm deformed bars Kg 160 110.55
Total to Summary....Birr
2. BLOCK WORK
2.1 200mm thick hollow concrete block wall of type Class-C
with 28 days minimum crushing strength of 18kg/cm2,
bedded in cement mortar (1:3) mix, both sides left for
plastering. Price includes 26mm iron bars laid
horizontally every other course (spacing 400mm c/c).
m 128 106.94
Total to Summary....Birr
Contractor Consultant
Excuted Qua
Contract Previous
ITEM DESCRIPTION UNIT
QTY. QTY
3. ROOFING
3.1 Roof cover in Pre-painted EGA 300, 0.5mm thick fixed to
RHS purlins with standard hooks and washers. Roof cover
measured in horizontal projection. Price includes ridge
cover & 50mm thick rock wool insulation.
m 127 -
3.1* Roof cover in precoated EGA 400, t=0.4mm fixed to RHS
STEEL.Price shall include ridge cap. (Purlins measured
separately and roof measured in horizontal projection)
m 127 125.34
3.5 Supply and fix 8 mm thick ribbed sheet eave soffit ceilings.
Price include 40 x 50 mm zigba wood battens with c/c
spacing of 600 mm both ways, corner list and all other
necessary accessories to complete the work.
m 24
Total to SummaryBirr
4. CARPENTRY & JOINERY
Carpentry
4.1 Supply and fix 8 mm thick chip wood ceilings. Price include
40 x 50 mm zigba wood battens with c/c spacing of 600
mm both ways, corner list and all other necessary
accessories to complete the work.
m 96 96.00
4.2 Supply and fix 300x25mm zigba wood fascia board price
include three coats of oil paint. ml 24
Total to SummaryBirr
5. METAL WORK
Contractor Consultant
Excuted Qua
Contract Previous
ITEM DESCRIPTION UNIT
QTY. QTY
Metal window and doors made of 38x1.5mm LTZ profiles
shown on the drawings, price include approved quality
locks and all iron mongery works, two coats of anti rust,
two coats of synthetic paint, 1mm thick ribbed sheet and
door stopper. All according to detail Arch. drawings.
5.1 WINDOWS
5.2 DOORS
Total to Summary.....Birr
Total to Summary.....Birr
Contractor Consultant
Excuted Qua
Contract Previous
ITEM DESCRIPTION UNIT
QTY. QTY
7. FINISHING WORK
7.1 PLASTERING AND POINTING
7.1.1 Apply two coats of plaster in cement mortar (1:3) & final
gypsum coating to internal wall , columns & beams.
Provide grooves recessed by 5mm between beams and
walls, columns and walls. m 152 113.25
Window Sill
7.2.2 Marble window cill on and including cement mortar bed
jointed in cement mortar mix of 1:3.
Door Threshold
7.2.3 Marble door thresholds on and including cement mortar
bed jointed in cement mortar mix of 1:3
Contractor Consultant
Excuted Qua
Contract Previous
ITEM DESCRIPTION UNIT
QTY. QTY
7.2.5 Supply and lay semi-circular open precast concrete open
channel on 50mm thick sand bedding. Unit price shall
include flat stone/concrete topping, provision of metal
grating at inlet to manhole,excavation of the trench and
cartaway. Ditch dia.: 1/2 300 mm
ml 54
Total to Summary..Birr
Contractor Consultant
RUCTION & TRADING PLC
9 WORKSHOP
AT MEKELLE
SUMMARY
Previous Current Todate
42,981.59 - 42,981.59
73,502.52 - 73,502.52
21,568.58 - 21,568.58
138,052.68 - 138,052.68
40,788.00 - 40,788.00
49,834.51 - 49,834.51
Contractor Consultant
42,740.94 - 42,740.94
27,648.00 - 27,648.00
17,325.00 - 17,325.00
103,845.62 - 103,845.62
42,933.00 - 42,933.00
- - -
- - -
- - -
325,115.07 - 325,115.07
463,167.75 - 463,167.75
Contractor Consultant
Excuted Quantity Excuted Amount
Current Todate Previous Current Todate
Rate
QTY QTY Amount Amount AMOUNT
- 410 - - -
-
2.94 75 220.50 - 220.50
- - - -
23.76 75 1,782.00 - 1,782.00
96.00 75 7,200.00 - 7,200.00
- - - -
0.54 2539 1,371.06 - 1,371.06
0.29 2539 736.31 - 736.31
3.26 2539 8,277.14 - 8,277.14
40.00 70 2,800.00 - 2,800.00
- 85 - - -
- - - -
96.00 199.9 19,190.40 - 19,190.40
- - - -
3.60 166 597.60 - 597.60
5.83 166 967.78 - 967.78
32.64 166 5,418.24 - 5,418.24
- - - -
430.04 36 15,481.31 - 15,481.31
Contractor Consultant
Excuted Quantity Excuted Amount
Current Todate Previous Current Todate
Rate
QTY QTY Amount Amount AMOUNT
23.69 36 852.94 - 852.94
129.22 36 4,651.98 - 4,651.98
109.87 36 3,955.25 - 3,955.25
- 73,502.52 - 73,502.52
- -
- - - -
1.29 2539 3,275.31 - 3,275.31
2.67 2539 6,779.13 - 6,779.13
- - - -
25.60 185 4,736.00 - 4,736.00
35.28 208 7,338.24 - 7,338.24
- - - -
186.12 36 6,700.46 - 6,700.46
- 36 - - -
221.64 36 7,979.21 - 7,979.21
110.55 36 3,979.64 - 3,979.64
- 40,788.00 - 40,788.00
- -
Contractor Consultant
Excuted Quantity Excuted Amount
Current Todate Previous Current Todate
Rate
QTY QTY Amount Amount AMOUNT
- -
- - 375 - - -
- 348 - - -
- - - -
- 135 - - -
- - - -
- 125 - - -
- - - -
- 288 - - -
- - - -
- 223 - - -
-
- 42,740.94 - 42,740.94
-
-
-
- 168 - - -
-
- 27,648.00 - 27,648.00
-
-
-
Contractor Consultant
Excuted Quantity Excuted Amount
Current Todate Previous Current Todate
Rate
QTY QTY Amount Amount AMOUNT
-
-
-
-
5.00 2475 12,375.00 - 12,375.00
-
-
-
1.00 4950 4,950.00 - 4,950.00
-
- 17,325.00 - 17,325.00
-
-
-
-
-
-
- -
243.93 60 14,635.68 - 14,635.68
- - - -
148.37 60 8,901.99 - 8,901.99
- - - -
- - - -
521.11 60 31,266.68 - 31,266.68
- - - -
123.07 60 7,383.96 - 7,383.96
- - - -
- 421 - - -
- - - -
- 80 - - -
- -
- 103,845.62 - 103,845.62
Contractor Consultant
Excuted Quantity Excuted Amount
Current Todate Previous Current Todate
Rate
QTY QTY Amount Amount AMOUNT
- -
- -
- -
- -
- -
- -
- 181 - - -
- - - -
- - - -
- - - -
- - - -
- 626 - - -
- - - -
- - - -
- - - -
- - - -
- 487 - - -
- - - -
- 475 - - -
- - - -
Contractor Consultant
Excuted Quantity Excuted Amount
Current Todate Previous Current Todate
Rate
QTY QTY Amount Amount AMOUNT
- 274 - - -
- - - -
- 42,933.00 - 42,933.00
Contractor Consultant
BOKRA CONSTRUCTION & TRADING PLC
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM TAKEOFF SHEET NO:01
CLIENT:MEKELLE UNIVERSITY BLOCK: B 9 WORKSHOP
CONSULTANT :NOMY ENGINEERING PLC PAGE NO: 1
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
SUBSTRUCTURE BAR SCHEDULE SUMMARY
Descrption TOTAL Wt. OF BAR FOR DIA.
Diameter 8 10 12 14 16 20
Tot.wt. (kg) 430.04 23.69 129.22 109.87 0.00 0.00
A.
24
0.00
IA.
24
0
3.55
0
F SHEET NO:01
B 9 WORKSHOP
IA.
24
0
3.55
0
F SHEET NO:01
B 9 WORKSHOP
IA.
24
0
3.55
0
F SHEET NO:01
B 9 WORKSHOP
IA.
24
0
3.55
0
F SHEET NO:01
B 9 WORKSHOP
A.
24
0.00
IA.
24
0
3.55
0
F SHEET NO:01
B 9 WORKSHOP
IA.
24
0
3.55
0
BOKRA CONSTRUCTION & TRADING PLC
Project:- MUBP86
Location:-AYNALEM
Client:- MEKELLE UNIVERSTY
Consultant:- NOMY ENGINEERING PLC
No L*W*D QTY Description No L*W*D
Contractor Consultant
Contractor Consultant
PLC
Takeoff No 1
Block:- B9
Page No:- 1
QTY Description
Contractor Consultant
Contractor Consultant
BOKRA CONSTRUCTION &
MEKELLE UNIVERSTY COMMUNITY SCHOOL
B10A DINING HA
AT MEKELLE
SUMMARY
A-SUB STRUCTURE
B-SUPER STRUCTURE
2 BLOCK WORK...BIRR
3 ROOFING.
BIRR
5 METAL WORK.BIRR
8 PAINTING. BIRR
9 GLAZING. BIRR
3. ROOFING
3.1 Roof cover in Pre-painted EGA 300, 0.5mm thick
fixed to RHS purlins with standard hooks and
washers. Roof cover measured in horizontal
projection. Price includes ridge cover & 50mm
thick rock wool insulation. m 282.00
3.1* Roof cover in precoated EGA 400, t=0.4mm
fixed to RHS STEEL.Price shall include ridge cap.
(Purlins measured separately and roof
measured in horizontal projection) m 282.00
Total to SummaryBirr
Carpentry
4.1 Supply and fix 8 mm thick chip wood ceilings.
Price include 40 x 50 mm zigba wood battens
with c/c spacing of 600 mm both ways, corner
list and all other necessary accessories to ml 227.00
complete the work.
4.2 Supply and fix flush wooden doors both sides
covered with 4mm thick good quality kerrero ply
wood with sides, top and bottom lipped and
edged with hard wood complete work with all
the necessary accessories. Price includes three
coats of varnish paint, best quality locks, hinges
& stopper.
a. Size - 900x2700mm pcs 3.00
Total to SummaryBirr
5. METAL WORK
Metal window and doors made of 38x1.5mm LTZ
profiles shown on the drawings, price include
approved quality locks and all iron mongery
works, two coats of anti rust, two coats of
synthetic paint, 1mm thick ribbed sheet and
door stopper. All according to detail Arch.
drawings.
5.1 Doors
5.2 WINDOWS
Total to Summary.....Birr
6.5 Grade 4.8 M16 threaded anchor bolt L-300mm No. 24.00
Total to Summary.....Birr
7. FINISHING WORK
7.1 PLASTERING AND POINTING
Window Sill
7.2.8 Marble window cill on and including cement
mortar bed jointed in cement mortar mix of 1:3.
Door Threshold
7.2.9 Marble door thresholds on and including cement
mortar bed jointed in cement mortar mix of 1:3
AT MEKELLE
SUMMARY
Previous Current
Amount Amount
149,276.62 -
251,485.83 -
59,491.41 -
460,253.86 -
75,105.88 -
60,710.48 -
89,819.40 -
- -
52,866.00 -
100,311.00 -
- -
- -
- -
- -
378,812.76 -
839,066.62 -
Executed Qty Executed Amount
Previous Current Todate Previous Current
QTY QTY QTY Rate Amount Amount
- 0.0 0.0
15.73 15.73 75.0 1,179.8 0.0
33.57 33.57 75.0 2,517.8 0.0
41.88 41.88 75.0 3,141.0 0.0
271.36 271.36 75.0 20,352.0 0.0
- 0.0 0.0
3.90 3.90 2,539.0 9,902.1 0.0
1.35 1.35 2,539.0 3,427.7 0.0
11.94 11.94 2,539.0 30,315.7 0.0
- 2,539.0 0.0 0.0
215.00 215.00 70.0 15,050.0 0.0
- 0.0 0.0
271.36 271.36 199.9 54,244.9 0.0
- 0.0 0.0
15.60 15.60 166.0 2,589.6 0.0
19.81 19.81 166.0 3,288.5 0.0
114.72 114.72 166.0 19,043.5 0.0
- 166.0 0.0 0.0
- 0.0 0.0
1,313.38 1,313.38 36.0 47,281.7 0.0
125.13 125.13 36.0 4,504.7 0.0
291.62 291.62 36.0 10,498.3 0.0
670.80 670.80 36.0 24,148.8 0.0
- 251,485.8 0.0
- 0.0 0.0
- 0.0 0.0
3.28 3.28 2,539.0 8,327.9 0.0
4.00 4.00 2,539.0 10,156.0 0.0
- 2,539.0 0.0 0.0
- 0.0 0.0
48.12 48.12 185.0 8,902.2 0.0
51.53 51.53 208.0 10,718.2 0.0
- 208.0 0.0 0.0
- 0.0 0.0
- 36.0 0.0 0.0
277.49 277.49 36.0 9,989.6 0.0
- 36.0 0.0 0.0
121.83 121.83 36.0 4,385.9 0.0
628.50 628.50 36.0 22,626.0 0.0
- 75,105.9 0.0
-
- 0.0 0.0
- 6,075.0 0.0 0.0
- 0.0 0.0
-
- 0.0 0.0
- 0.0 0.0
- 0.0 0.0
2.00 2.00 4,158.0 8,316.0 0.0
- 0.0 0.0
- 0.0 0.0
- 0.0 0.0
15.00 15.00 2,970.0 44,550.0 0.0
- 0.0 0.0
- 52,866.0 0.0
-
-
-
- 0.0
- 0.0 0.0
- 0.0 0.0
- 0.0 0.0
- 60.0 0.0
- 0.0 0.0
318.28 318.28 60.0 19,096.8 0.0
- 0.0 0.0
- 60.0 0.0 0.0
- 0.0 0.0
- 0.0 0.0
- 0.0 0.0
852.62 852.62 60.0 51,157.2 0.0
- 0.0 0.0
310.95 310.95 60.0 18,657.0 0.0
- 0.0 0.0
- 0.0 0.0
- 0.0 0.0
- 0.0 0.0
- 0.0 0.0
- 0.0 0.0
- 634.0 0.0 0.0
- 0.0 0.0
- 436.0 0.0 0.0
- 0.0 0.0
- 0.0 0.0
- 0.0 0.0
- 0.0 0.0
- 626.0 0.0 0.0
- 0.0 0.0
- 0.0 0.0
- 0.0 0.0
- 0.0 0.0
- 0.0 0.0
- 487.0 0.0 0.0
- 0.0 0.0
- 732.0 0.0 0.0
- 0.0 0.0
Amount
149,276.62
251,485.83
59,491.41
460,253.86
75,105.88
60,710.48
89,819.40
52,866.00
100,311.00
378,812.76
839,066.62
ed Amount
Todate
AMOUNT
19,323.15
1,425.75
979.05
55,901.04
32,843.15
38,804.48
149,276.6
-
-
1,179.75
2,517.75
3,141.00
20,352.00
-
9,902.10
3,427.65
30,315.66
-
15,050.00
-
54,244.86
-
2,589.60
3,288.46
19,043.52
-
-
47,281.68
4,504.68
10,498.32
24,148.80
251,485.8
-
53,364.24
6,127.17
59,491.4
-
-
-
8,327.92
10,156.00
-
-
8,902.20
10,718.24
-
-
-
9,989.64
-
4,385.88
22,626.00
75,105.9
-
60,710.48
60,710.5
-
-
-
-
89,819.40
-
-
-
-
-
-
-
-
-
89,819.4
-
-
-
-
-
-
-
-
-
-
-
-
0.0
-
-
-
-
-
-
8,316.00
-
-
-
44,550.00
-
52,866.0
-
-
-
-
-
-
-
-
-
19,096.80
-
-
-
-
-
51,157.20
-
18,657.00
-
4,500.00
-
4,500.00
-
-
2,400.00
-
100,311.0
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
DESCRIPTION
BOKRA CONSTRUCTION & TRADING PLC
MEKELLE UNIVERSTY COMMUNITY SCHOOL
B10 DINING HALL
AT MEKELLE
SUMMARY
Previous Current Todate
Amount Amount Amount
A-SUB STRUCTURE
CONCRETE
WORK..
2 ... BIRR 249,334.99 - 249,334.99
MASONRY
WORK...
3 . BIRR 49,405.57 - 49,405.57
B-SUPER STRUCTURE
CONCRETE
WORK.
1 .... BIRR 74,364.00 - 74,364.00
BLOCK
WORK.
2 ....... BIRR 60,709.13 - 60,709.13
ROOFING.
3 .... BIRR 101,463.24 - 101,463.24
CARPENTRY AND
JOINERY.
4 .. BIRR 63,650.76 - 63,650.76
METAL
WORK.
5 ..... BIRR 52,866.00 - 52,866.00
STRUCTURAL STEEL
WORK.
6 . BIRR 100,311.24 - 100,311.24
FINISHING
WORK.
7 BIRR 183,998.62 - 183,998.62
PAINTING
..
8 .. BIRR - - -
GLAZING.
.
9 BIRR 24,000.21 - 24,000.21
ELECTRICAL
INSTALLATION.
10 .. BIRR - - -
SANITARY
INSTALLATION.
11 . BIRR - - -
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
NO. Description
A-SUB STRUCTURE
1 EXCAVATION AND EARTH WORK BIRR
SUB TOTAL----------------------------A
B-SUPER STRUCTURE
1 CONCRETE WORK.. BIRR
3 ROOFING.BIRR
8 PAINTING. BIRR
9 GLAZING. BIRR
TOTAL---------------------A+B
Executed Qt
ContractPrevious
ITEM DESCRIPTION UNIT
QTY. QTY
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
TOTAL TO SUMMARY--------------------BIRR
B. SUPER STRUCTURE
1. CONCRETE WORK
Reinforced concrete in class C-25 (with a 28-day
150mm cube crushing strength of 25MPa), cast
into formworks and vibrated around rod
reinforcement bars. (formwork & reinforcement
bars are measured separately.) in: "Type of
cement to be ordinary Portland cement (OPC)"
1.1
a. In elevation column m 2 1.92
b. In intermediate and top tie beams m 6 10.32
Provide, cut and fix in position metal panel or
1.2 sawn Zigba wood form work
a. To elevation column m 39 38.4
b. To intermediate and top tie beams m 53 148.43
Reinforcement bar according to structural
drawings. Price includes cutting, bending,
1.3 placing in position & tying wires.
Diameter 8mm deformed bars Kg 665 608
Diameter 12mm deformed bars Kg 409 386.19
Diameter 14mm deformed bars Kg 252 226.4
**Diameter 6mm deformed bars Kg 85.15
TOTAL TO SUMMARY--------------------BIRR
2. BLOCK WORK
Total to Summary....Birr
3. ROOFING
Total to SummaryBirr
RSTY COMMUNITY SCHOOL
ECTORS RESIDENCE
AT MEKELLE
SUMMARY
Previous Current Todate
Amount Amount Amount
50,522.48 - 50,522.48
115,218.37 - 115,218.37
18,026.46 - 18,026.46
183,767.31 - 183,767.31
116,061.44 - 116,061.44
79,660.76 - 79,660.76
60,768.75 - 60,768.75
- - -
- - -
- - -
- - -
- - -
- - -
256,490.95 - 256,490.95
440,258.26 - 440,258.26
Executed Qty Executed Amount
Current Todate Previous Current Todate
QTY QTY Rate Amount Amount AMOUNT
- 410.00 - - -
- - - -
2.40 166.00 398.40 - 398.40
3.10 166.00 514.60 - 514.60
66.64 166.00 11,062.24 - 11,062.24
- 166.00 - - -
- - - -
641.65 36.00 23,099.40 - 23,099.40
15.80 36.00 568.80 - 568.80
211.51 36.00 7,614.36 - 7,614.36
251.69 36.00 9,060.84 - 9,060.84
115,218.37 - 115,218.37
-
- 1,253.00 - - -
-
18,026.46 - 18,026.46
- - - -
38.40 185.00 7,104.00 - 7,104.00
148.43 208.00 30,873.44 - 30,873.44
- - - -
608.00 36.00 21,888.00 - 21,888.00
386.19 36.00 13,902.84 - 13,902.84
226.40 36.00 8,150.40 - 8,150.40
85.15 36.00 3,065.40 - 3,065.40
116,061.44 - 116,061.44
- 348.00 - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- 223.00 - - -
- - - -
- 60,768.75 - 60,768.75
BOKRA CONSTRUCTION & TRADING PLC
Project:- MUBP86
Location:- AYNALEM
Client:- MEKELLE UNIVERSTY Block:-B11
Consultant:- NOMY ENGINEERING PLC Page No:- 1
SUBSTRUCTURE BAR SCHEDULE SUMMARY
Descrption Total length of bar for dia.
Diameter 6 8 10 12 14 16 20
Tot.wt. (kg) 0 641.65 15.8 211.51 251.69 0 0
BOKRA CONSTRUCTION & TRADING PLC
Bar No Location Dia. Length No in a No Total No TOTAL LENGTH OF BAR FOR DIA.
Member Member of Bars 6 8 10 12 14 16 20
SUB-STRUCTURE
FOOTING
FOOING -F1
10 0.8 8 4 32 25.6
Bar No Location Dia. Length No in a No Total No TOTAL LENGTH OF BAR FOR DIA.
Member Member of Bars 6 8 10 12 14 16 20
SUB-STRUCTURE
FOUNDATION COLUMN
C1 12 2.715 4 2 8 21.72
at 3C&3D 8 0.7 8 2 16 11.2
C1 12 2.81 4 2 8 22.48
at 4B&4E 8 0.7 8 2 16 11.2
Bar No Location Dia. Length No in a No Total No TOTAL LENGTH OF BAR FOR DIA.
Member Member of Bars 6 8 10 12 14 16 20
SUPER -STRUCTURE
Column
Ground Floor
C1 12 3.425 4 4 16 54.8
8 0.7 22 4 88 61.6
C2 12 4.1 4 12 48 196.8
8 0.7 22 12 264 184.8
TOP TIE BEAM
on axis 5 top 14 6.225 2 2 4 24.9
btm 12 8.325 2 1 2 16.65
12 4.325 2 1 2 8.65
8 0.85 90 1 90 76.5
on axis A top 14 5.875 2 1 2 11.75
14 6.975 2 1 2 13.95
btm 12 8.225 2 1 2 16.45
12 4.325 2 1 2 8.65
8 0.85 89 1 89 75.65
on axis 4 top 14 6.225 2 1 2 12.45
14 5.725 2 1 2 11.45
btm 12 8.225 2 1 2 16.45
12 4.325 2 1 2 8.65
8 0.85 90 1 90 76.5
0
Total length (m) 0 323 0 107.8 112.6 0 0
Unit wt. (kg/m) 0.222 0.395 0.617 0.888 1.21 1.579 2.467
Tot.wt. (kg) 0 127.59 0 95.73 136.25 0 0
BOKRA CONSTRUCTION & TRADING PLC
Project:- MUBP86
Location:- AYNALEM
Client:- MEKELLE UNIVERSTY Block:-B11
Consultant:- NOMY ENGINEERING PLC Page No:- 8
Bar No Location Dia. Length No in a No Total No TOTAL LENGTH OF BAR FOR DIA.
Member Member of Bars 6 8 10 12 14 16 20
TOP TIE BEAM
cont-------Gutter
horizontal
on axis A/1-5 6 13.49 6 1 6 80.94
8 1.7 91 1 91 154.7
on axis 1/A-C 6 6.54 6 1 6 39.24
8 1.7 45 1 45 76.5
.
24
0
3.55
0
.
24
0
3.55
0
.
24
0
3.55
0
.
24
0
3.55
0
.
24
0
3.55
0
ARY
24
-
.
24
0
3.55
0
.
24
0
3.55
0
.
24
0
3.55
0
BOKRA CONSTRUCTION & TRADING PLC
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING PLC
SUBSTRUCTURE BAR SCHEDULE SUMMARY
Descrption TOTAL Wt. OF BAR FOR DIA.
Diameter 8 10 12 14
Tot.wt. (kg) 387.76 0.00 128.54 865.42
14 2.892 1 1 1 2.892
12 6.825 2 1 2 13.65
12 6.825 2 1 2 13.65
14 2.895 1 1 1 2.895
St-1 8 0.94 96 1 96 90.24
on axis 1&5 14 7.975 2 2 4 31.9
12 10.325 2 2 4 41.3
14 10.3 2 2 4 41.2
12 5.3 2 2 4 21.2
14 7.975 2 2 4 31.9
12 10.325 2 2 4 41.3
St-1 8 0.94 190 2 380 357.2
0
0
0
0
0
0
0
0
Total Length(m) 447.44 0 117.45 107.895
Unit Wt.(kg/m) 0.395 0.617 0.888 1.21
Tot.Wt.(kg) 176.7388 0 104.2956 130.553
TAKEOFF SHEET NO:01
BLOCK: B12 CLASS ROOM
PAGE NO 1
SCHEDULE SUMMARY
F BAR FOR DIA.
16 20 24
0.00 0.00 0.00
0 0 0
1.579 2.467 3.55
0 0 0
MEKELLE UNIVERSTY COMMUNITY SCHOOL
B12 LOUNGE (CAFETERIA)
AT MEKELLE
SUMMARY
2. CONCRETE WORK.
BIRR - 185,377.68 - 185,377.68
B-SUPER STRUCTURE
8. PAINTING Birr - - - -
9. GLAZING Birr - - - -
ITEM Contract Previous QTY Current QTY Todate QTY RATE Previous Amount Current Amount Todate Amount
DESCRIPTION UNIT QTY.
QTY
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK
.
24
-
24
0
3.55
0
F SHEET NO:01
6-3B TOILET
24
0
3.55
0
F SHEET NO:01
6-3B TOILET
24
0
3.55
-
F SHEET NO:01
6-3B TOILET
.
24
0.00
24
-
3.55
-
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
A) SUB STRUCTURE
1) Remove top soil 30cm thick
L=5.86+0.5+1.0=7.36m 2 7.36
7.36 L=6.9+0.2+1=8.1m 0.90
8.1 59.616 m2 1.030 13.65
1.1) Bulk Excavation in 2 4.36
Ordinary Soil up to 1.5m 0.90
L=5.86+0.5+1.0=7.36m 1.030 8.08
7.36 L=6.9+0.2+1=8.1m 3.28
8.1 Bulk avg=1.03m 0.3
1.03 61.4 m3 1.03 -1.01
ddt free area 20.72
3.28 not bulk excavated 88.61
0.3
1.03 -1.0135 m3
60.3865 m3 total
1.2) Excavate in ordinary
soil for isolated footing to
a depth exceeding 1500mm 17.88
but not exceeding 3000mm
from reduced level. 61.4
4F1
4 1.50 Davg =0.322m 2.90
1.50 82.18
0.322 2.90 m3 total
Compaction fill shall be every
20cm thick until it attains a
minimum of 95% proctor density
6) Selected borrowed fill
65.24 m3 total
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
03. Concrete work
In situ concrete
1) Plain blinding concrete C-5
a) To footing pad 4 0.2
4 1.1 4F1 0.2
1.1 4.84 m2 total 2.6 0.42
b) under Grade Beam 0.42
1 3.01 on axis A
0.3 0.9 m2 total 1 0.20
c) Under stone masonry wall 0.40
on axis A 6.06 0.48
1 3.18 L=7.2-0.2*2=6.8m 1 0.20
0.6 1.91 m2 0.40
1 1.8 7.26 0.58
0.6 1.08 m2 2 0.2
1 3.21 0.30
0.6 1.93 m2 6.70 0.80
1 5.66 on axis 1/A 1 0.20
0.6 3.4 m2 0.30
1 5.9 on axis B/1-2 2.80 0.17
0.6 3.54 m2 1 0.20
1 4.86 on axis 2/A-B 0.30
0.6 2.92 m2 1.30 0.08
2.11
14.78 m2
20.52 m2 total
23.96
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
Super structure Normal Finish to:
18) Elevation column
4C1, P=0.2*4=0.8m
4 2.6
0.8 8.32 m2 1 7.1
8.32 m2 total 1.28
0.5 4.55
19) Beam & lintel
1 6.06 TB on axis 2/A-B ext. 1 5.06
0.4 2.42 m2 1.282
1 5.66 TB on axis 2/A-B int. 0.5 3.24
0.4 2.26 m2
1 5.66 TB on axis 2/A-B soffit 1 6.26
0.2 1.13 m2 1.282
1 7.26 TB on axis 1/A-B ext 0.5 4.01
0.4 2.9 m2
1 6.66 TB on axis 1/A-B int. 1 2.71
0.4 2.66 m2 1.282
1 6.66 TB on axis 1/A-B soffit 0.5 1.74
0.2 1.33 m2
2 6.2 TB on axis A&B/1-2 ext. 1 0.9
0.4 4.96 m2 1.282
2 6.7 TB on axis A&B/1-2 int. 0.5 0.58
0.4 5.36 m2
2 6.7 TB on axis A&B/1-2 soffit. 1 3.88
0.2 2.68 m2 1.282
1 3.2 TB on axis TB3 EXT 0.5 2.49
0.4 1.28 m2
1 2.8 TB on axis TB3 INT 16.61
0.4 1.12 m2
1 2.8 TB on axis TB3 soffit
0.4 1.12 m2 1 7.1
1 1.3 TB on axis TB4 ext 0.57
0.4 0.52 m2 0.5 2.02
1 1.1 TB on axis TB4 int 1 5.06
0.4 0.44 m2 0.57
1 1.1 TB on axis TB4 soffit 0.5 1.44
0.2 0.22 1 6.26
30.4 m2 Total 0.57
0.5 1.78
1 2.71
0.57
0.5 0.77
1 0.9
0.57
0.5 0.26
1 3.88
0.57
0.5 1.11
7.38
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
5/Block work
6.85
2.7 18.50 Axis 1 b/n A-B
-0.7 DDT
3.91 (2.74) TW3
5.66
2.7 15.28 Axis 2 b/n A-B
-0.7 DDT 1.65
3.91 (2.74) TW4 10 2 33
6.7 0.27
2.7 18.09 Axis B b/n 1-2 6 2.000 3.24
-0.7 DDT 36.24
6.7 (4.69) TW1
6.9
2.7 18.63 Axis A b/n 1-2 12.000
-0.7 DDT
3.68 (2.58) TW2
1 Axis 1-2 b/n A-B 1
2.7 2.70 1.000
-0.7 DDT 1
2.7 (1.89) D1 1
58.57 M2 Total
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
1 25.00 25
1 12 12
TAKEOFF SHEET NO:01
BLOCK: 6-3B TOILET
PAGE NO: 01
DESCRIPTION
c)around external stone
masonary
L=5.86+0.5+1.0=7.36m
Bulk avg=1.03m
m3
L=6.9+1+1=8.9m
Bulk avg=1.03m
m3
ddt
m3
m3 sub total
M3 TOTAL a+b+c
7) Disposal
TOTAL EXCAVATION
1) site clearing
m3
1.1) bulk excavation
m3
1.2) pit excavation
m3
m3 Total
TAKEOFF SHEET NO:01
BLOCK: 6-3B TOILET
PAGE NO: 02
DESCRIPTION
Reinforced super structure
concrete
7) C-25 in elevation column
4C1
m3
m3 total
8) C-25 in beams & lintel
TB on axis 2/A-B
m3
TB on axis 1/A-B cantilever
m3
TB on axis A&B/1-2
m3
TB on axis cantileve TB3
m3
TB on axis cantileve TB4
m3
m3 total
Form work
16) Grade beam
on axis B/1-2/ext.
m2
on axis B/1-2/int.
m2
on axis A/EXT.
m2
on axis A/int.
m2
on axis beyond A/ext..
m2
on axis beyond A/int.
m2
on axis 1/A-B ext.
m2
on axis 1/A-B int.
m2
on axis 2/A-B ext.
m2
on axis 2/A-B int.
m2
m2 TOTAL
TAKEOFF SHEET NO:01
BLOCK: 6-3B TOILET
PAGE NO: 03
DESCRIPTION
04) MASONRY WORK
stoe wall
1)concealed view
on axis B/1-2
Davg=1.282m
m3
on axis 2/A-B
Davg=1.282m
m3
on axis 1/A-B
Davg=1.282m
m3
on axis beyond A
Davg=1.282m
m3
Davg=1.282m
m3
Davg=1.282m
m3
m3 total
2) Exposed face left for
further finish
on axis B/1-2
Davg=0.57m
m3
on axis 2/A-B
m3
on axis 1/A-B
Davg=1.16m
m3
on axis beyond A
Davg=1.16m
m3
Davg=1.16m
m3
Davg=1.16m
m3
m3 total
TAKEOFF SHEET NO:01
BLOCK: 6-3B TOILET
PAGE NO: 03
DESCRIPTION
M2
M2 Total
10. METAL WORK
a ) D1-700x210cm
b ) D2-120x260cm
c ) D2-90x260cm
d ) W1-150x150cm
e ) W2-390x60cm
f ) W3-670x60cm
g ) W4-215x60cm
TAKEOFF SHEET NO:01
BLOCK: 6-3A TOILET
PAGE NO: 03
DESCRIPTION
DDT
TW3
DDT
D1
Electrical works
Light points
Light points in thermoplastic
conduit of diameter 13.5 mm
fed through PVC conductor of
2x2.5 sq mm
Pcs Total
14 SANITARY INSTALLATION
Supply, lay and connect
Galvanized steel pipe for cold
and hot water distribution
system
Dia. 15mm
Dia. 20mm
SUMMARY OF BILL OF QUANTITIES AND SPECIFICATIONS
FOR
B13 G+0 SPORT OFFICE BUILDING
11 FINISHING
11.1 PLASTER & POINTING. . . . . . . . . . . . . . . .
.. BIRR 40,481.37
11.2 . FLOOR & WALL FINISH. . . . . . . . . . . . . .
.. BIRR
PAINTING. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
12 . . BIRR
13 GLAZING BIRR
TOTAL TO GRAND
SUMMARY . . BIRR 712,945.56
Contract Previous Todate
ITEM DESCRIPTION UNIT RATE Todate Amount
QTY. QTY QTY
A-SUB STRUCTURE
02. Excavation & Earth work
Excavation & Get out
1 Remove top soil 30cm thick m2 376.29 332.69 332.69 -
Excavation - -
In according to the attched soil type - -
Pit and Trench Excavation - -
2 Bulk Excavation in Ordinary Soil up to 1.5m m3 150.516 234.21 234.21 -
3 Bulk Excavation in soft Rock 1.5m to 3m m3 0 - -
4 Pit not exceeding 1.5m m3 41.616 25.65 25.65 -
5 Trench not exceeding 1.5m m3 291.09 - -
Fill - -
Compaction fill shall be every 20cm thick until - -
it attains a minimum of 95% proctor density - -
6 Selected borrowed fill m3 291.586 324.89 324.89 69 22,417.69
7 Disposal m3 596.109 359.67 359.67 -
8 Hard core 25cm thick m2 249.04 256.65 256.65 100 25,665.00
- -
TOTAL CARRIED TO SUMMARY - 48,082.69
- -
03. Concrete work - -
In situ concrete - -
1 Plain blinding concrete C-5 m3 4.3365 16.73 16.73 1100 18,407.40
Reinforced sub structure concrete - -
2 C-25 in footing m3 8.64 3.60 3.60 2174 7,826.40
3 C-25 in sub grade column m3 1.944 2.10 2.10 2174 4,565.40
4 Shear wall m3 0 - -
5 C-25 in grade beam m3 8.655 14.12 14.12 2174 30,696.88
6 C-20 in ground slab & step m3 332.04 25.67 25.67 1896 48,670.32
Reinforced super structure concrete - -
7 C-25 in elevation column m3 3.888 3.09 3.09 2174 6,717.66
8 C-25 in beams & lintel m3 6.912 13.83 13.83 2174 30,066.42
9 C-25 in suspended slab m3 - -
10 C-25 in stair case & landing m3 - -
11 C-25 in shear
water wallconcrete in average 10 cm
tight m3 - -
12 thick
over flat roof slab to be finished with smooth - -
trowel - -
finish to the given slope and prepare to apply
water - -
proofing material m 0 - -
Form work - -
Sub structure normal finish to: - -
13 Footing m2 28.8 14.40 14.40 110 1,584.00
14 Sub grade column m2 25.92 20.01 20.01 110 2,201.10
15 Shear wall m2 0 - -
16 Grade beam m2 69.24 137.64 137.64 110 15,140.40
17 Steps m2 24.15 - 110 -
Super structure Normal Finish to: - -
18 Elevation column m2 51.84 32.08 32.08 120 3,849.60
19 Beam & lintel m2 92.16 161.36 161.36 120 19,363.20
20 Balcony & stair baluster m2 0 - -
21 Parapet m2 0 - -
22 Sun breaker m2 0 - -
23 Suspended slab m2 0 - -
24 Stair case & landing m2 0 - -
25 Shear wall m2 0 - -
Reinforcement Sub structure - -
26 Diameter 8mm kg 1988.15 ### ### 28 35,875.32
27 Diameter 10mm kg 134.75 134.75 28 3,773.08
28 Diameter 12mm kg 397.54 397.54 28 11,131.12
29 Diameter 14mm kg 394.4 331.54 331.54 28 9,283.12
30 Diameter 16mm kg 586.76 586.76 31 18,189.45
31 Diameter 20mm kg 1865.75 - - 31 -
32 Diameter 24mm kg 0 - - -
Super structure - -
32 Diameter, 8mm kg 349.5795 379.20 379.20 28 10,617.60
33 Diameter 10mm kg - - 28 -
34 Diameter 12mm kg 363.72 363.72 28 10,184.29
35 Diameter 14mm kg 178.60 178.60 28 5,000.69
36 Diameter 16mm kg 60.95 60.95 31 1,889.43
37 Diameter 20mm kg 3152.65 - - -
38 Diameter 24mm kg 0 - - -
TOTAL CARRIED TO SUMMARY - 295,032.88
- -
04. Masonry work - -
Stone wall - -
1 concealed form view m3 32.48 37.88 37.88 1080 40,910.40
2 Exposed face left for further finish m3 28.42 1.53 1.53 1150 1,759.50
Concrete block works - -
Class 'B' in cement mortar - -
3 20 cm thick both faces for plaster m 214.4 147.35 147.35 330 48,626.82
4 15 cm thick both faces for plaster m 47 27.44 27.44 285 7,820.40
- -
- -
05. ROOF
Apply APP WATER PROOFING
modified & thickness not less than - -
1 4mm
slated Bituminous finish water proofing - -
membrane
or equivalent material for concrete roof slab - -
as per - -
the manufacturer's instruction. The cost shall
include
cleaning of all darts and dust materials. The - -
work - -
shall be done on sub contractual base with the - -
supplier of the material which will give
material and - -
warranty for the material and application to
0
the client. m - -
- -
Apply Cementious water proofing material
2 which shall
seal void by crystallization for upper floor wet - -
areas
Toilet rooms floor & to a height of 50cm on - -
walls.
To Gutters ,columns , masonry & concrete - -
retaining - -
walls, and all basement stores as per the
manufacturer's - -
instruction. Price shall include cleaning of all
dirt's, trace - -
of grease, oil and loose particles. - -
The work shall be done on sub contractual
bases with - -
the supplier of the material which will give
material & - -
construction guarantee to the client. - -
m 0 - -
TOTAL CARRIED TO SUMMARY ...... - -
07. JOINERY - -
_Wooden door shall be made of MDF (medium - -
density fiber board ), - -
_1.5 mm thick black steel frame, - -
_ All wooden door locks & handles should be - -
ASSA and comply with internationally - -
accepted standard - -
All complete work according to detail - -
1 D5 70x260cm pcs 0 - -
2 D3 90x260cm pcs 0 - -
3 D2 150x260cm pcs 0 - -
- -
TOTAL CARRIED TO SUMMARY ...... - -
6. ROOFING & CLADDING - -
Roof cover in precoated EGA 300, t=0.5mm
fixed to RHS STEEL.Price shall include ridge 332 3183
cap. (Purlins measured separately and roof
1 measured in horizontal projection) m - -
Roof cover in precoated EGA 400, t=0.4mm fixed to - -
RHS STEEL.Price shall include ridge cap. (Purlins
measured separately and roof measured in
1* horizontal projection) M2 332.00 280 -
- -
Supply and fix G-28 galvanized flat metal
sheet on gutter per the detail drawing. Price
shall include all necessary accessories
2 including metal bracket holder. - -
Development length =1000mm ml 85 - -
Rain water down pipe in 110dia. Pvc pipe
secured in approved part of building with 56
metal strops at 100cm c/c with screws &
3 fishers price include metal lath & ploster. ml - -
7 Chipwood ceilling(horizontal projection) ml 249.04 - -
TOTAL CARRIED TO SUMMARY - -
9.STRUCTURAL STEEL - -
Supply and fix the fabrcated steel truss in RHS
1 profile as per - -
detail drawing . Price shall inculde two coats
of anti rust & - -
two coats of oil paint for all steel work. - -
a. 80x80x3mm Kg 910.36387 - 51 -
b. 60x60x3mm Kg 612.43942 686.16 686.16 51 34,994.07
c. 50x50x3mm Kg 365.1192 - 51 -
d. 40x40x3mm Kg 177.11484 273.29 273.29 51 13,937.98
e. 30x30x3mm Kg 312.70538 ### ### 51 93,378.96
2 plates - -
a) Base plate size 300 x 300 x 8 mm No 10 12.00 12.00 400 4,800.00
- -
b) Connections plate size 300 x 200 x 8 mm No 10 10.00 10.00 390 3,900.00
c) Lapping plate size 100 x 60 x 8 mm No 68 - 280 -
3 Bolts - -
a) Anchor J. bolt Dia. 20mm - L. 750mm No 41 48.00 48.00 400 19,200.00
b) Connections bolt plate dia. 16 mm No 27 - 75 -
4 Cleats - -
a) Angel iron cleat, size 40 x 40 x 3mm No 133 60.00 60.00 46 2,760.00
b) Dia. 14mm deformed bars diagonal & wind
220 31
bracing. Kg 979.29 979.29 30,357.99
- -
TOTAL CARRIED TO SUMMARY ...... - 203,329.00
- -
10. METAL WORK - -
Metal window and doors made of 38x1.5mm
LTZ profiles shown on the drawings, price
include approved quality locks and all iron
mongery works, two coats of anti rust, two
coats of synthetic paint, 1mm thick ribbed
sheet and door stopper. All according to detail
Arch. drawings. - -
- -
1 a ) D1-85x260cm pcs 4 4.00 4.00 1491.8 5,967.00
2 b ) D2-120x260cm pcs - -
3 c ) D2-90x260cm pcs - -
2 b ) W1-180x180cm pcs 5 5.00 5.00 2065.5 10,327.50
5 e ) W2-120x150cm pcs - -
6 f ) W3-100x150cm pcs - -
7 g ) W4-60x50cm pcs - -
8 h ) W5-330x200cm pcs - -
9 i) W6-330x60cm pcs - -
10 j) W7-250x60cm pcs - -
Supply and install structural curtain wall
made of powder coated aluminum vertical
(mullions) and horizontal transoms fitted with
single glass. Bolts and nuts of aluminum
brackets connect the vertical mullions and also
the aluminum brackets are connected (price
11 shall include 5mm thick solar glass) - -
CW1 m2 - -
CW2 m2 - -
CW3 m2 - -
12 Aluminum hand rail & guard rail - -
Complete work All according to detail drawing - -
a) Aluminium steel circle post ml - -
b) Aluminium verandha m2 - -
TOTAL CARRIED TO SUMMARY ...... 16,294.50
11 FINISHING
11.1 PLASTER & POINTING
Apply three coats of internal wall plastering
308.4 137
1 with cement mortar 1:3 mix ratio m2 174.06 174.06 23,846.22
Apply two coats of internal wall plastering
with cement mortar 1:3 mix ratio to recevied 0 105
2 ceramic tile m2 - -
Apply two coats of plastering with cement
mortar 1:3 mix ratio to receive Quartiz paint to 214.4 105
3 external HCB walls. m2 158.43 158.43 16,635.15
Apply three coats of plastering with cement
mortar 1:3 mix ratio to concrete ceiling, 144
5 landing ,stair case beams & columns. m2 - -
Apply three coats of external balcony wall
0
6 plastering with cement mortar 1:3 mix ratio m2 - -
pointing with cement mortar (1:3) for
56.84
7 basement
well Dressedstone masonry
stone wall mortar (1:3)
with cement m2 - -
for front side HCB wall ( Ground -Mazzenine
0
8 floor )
15x15x.6cm white glazed ceramic wall tile for m
2
- -
toilet stuck to wall with cement mortar 1:3
0
9 ratio m2 - -
- -
TOTAL CARRIED TO SUMMARY ...... - 40,481.37
11.2 FLOOR AND WALL FINISH - -
Shall be in compliance with ASTM /EN - -
Quality standard - -
Marble floor tile & skirting - -
Shall be in compliance with ES C.D2,003 - -
ETH.standard
30mm thick marble floor tile to verendas, stair - -
case Landing and Balcony on and including
cement mortar 1:3 bedding and joints grouted 281.79
in white cement. Price include fine finish
1 polishing. m2
- -
2 10
48 mmx 2 cm thick
thick marble
smooth skirting
finished cement sand ml 93.4 - -
screed (1:3) to receive PVC floor tile and
0
3 carpet. m - -
Ceramic floor tile - -
Ceramic tiles flooring on inculding cement
0
4 sand screed ratio (1:3) mix m2 - -
PVC floor tile & skirting - -
5 2mm thick PVC tiles flooring m2 0 - -
6 PVC skirting ml 0 - -
Office and other Terrazo tiles flooring on
0
7 inculding cement sand screed ratio (1:3) mix m2 - -
Office and other Terrazo skirting on inculding
0
8 cement sand screed ratio (1:3) mix ml - -
Copping & Sill - -
ES C.D2,003 Ethiopian standard - -
Shaped and throated white marble - -
Copping - -
9 Size:- 30 x 3 cm m 0 - -
10 Size:- 20 x 3 cm m 63 - 396 -
Sill - -
11 Size:- 28 x 3cm m 9 - 628 -
Supply and lay carpet flooring comprising of
5mm thick carpet flooring, 20 mm thick foam 0
cusioning layer and , all as per the drawing
12 and approved by the Engineer. m2 - -
TOTAL CARRIED TO SUMMARY - -
12. PAINTING - -
Apply three coats of approved type plastic
308.4 36
1 panit for internal wall surfaces m2 - -
Apply three coats of approved type plastic
panit for internal wall surfaces of concrete 144 40
2 ceiling, landing ,stair case beams & columns. m2 - -
Apply three coats of approved type plastic
0
3 panit
Applyfor internal
Quartiz wallto
paint surfaces
external( HCB
balcony )
walls. m2 - -
4 m2 214.4 - 140 -
TOTAL CARRIED TO SUMMARY ...... - -
12. GLAZING - -
1 4mm thick clear Glass m2 8.55 - 403 -
2 4mm thick figured Glass m2 0 - -
3 Reflective Glass for Aluminium profile frame . m2 0 - -
TOTAL CARRIED TO SUMMARY ...... - -
- -
15. ELECTRICAL WORKS - -
All electrical materials shall be 3rd party - -
Certified, all boards shall be type tested - -
Distribution boards - -
Note:-mounted metal enclosures sub
Flush - -
1 distribution - -
board cable
Lead, SDB- GF-with lockable
terminal, door,
labeling, earthingand
connectors - -
all - -
The necessary accessories consisting of:- - -
1 pc main MCCB of 40A, 1ph, icu=6KA - -
1 pc main MCCB of 32A, 1ph, icu=6KA - -
5 pcs MCB of 10A, 1ph, Icu = 6KA - -
4 pcs MCB of 16A, 1ph, Icu = 6KA - -
With bus bar 40A and ample reserve space No 1 - 5000 -
Light points in thermoplastic conduit of - -
14 diameter - -
13.5 mm fed through PVC conductor of 2x2.5
sq mm - -
Color coded and labled No 34 - 34.00 312 10,608.00
Switch with detachable frames & - -
Corersponding box 3rd party certified - -
15 Single pole No 10 - 406 -
16 Double pole No 5 - 442 -
17 Two way No 0 - -
Socket
16A out2p+e
240V lets socket out let type in - -
20 thermoplastic
Conduit of diameter 16mm fed by PVC - -
conductor - -
Of 3xsq mm color coded labeled No 8 - 615 -
Extra over - -
Socket out letswith detachable frames & - -
Corresponding box 3rd party certified - -
23 16A, 1ph No 8 - 140 -
Type of light fittings - -
Supply and install the light fitting with under - -
Mentionedspecificaiton - -
Alllight fixtures shall behtierd party certified - -
26 Mounting Ceiling surface - -
Lamp type fluorescent - -
Number of lamps-4 - -
Optics- Closed louver High glossy - -
Lamp wattage 18 watts - -
Luminary material- Steel sheet 0.7 mm - -
Ingress
Size protection
Length -20 width 596 mm and 100
596 mm, - -
mm
height control gear 220V/50HZ, electronics - -
ballast No 12 - 595 -
27 Mounting celling surface - -
Lamp type flourescent - -
Number of Lamps -2 - -
Optics- Closed louver high glossy - -
Lamp wattage 36 watts - -
Luminare material steel sheet 0.7 mm - -
Ingress protection 40 - -
Size length 1230 mm width 220 mm and 115
mm height - -
Control gear 220V/50HZ, electronics ballat No 4 - 595 -
27 Mounting celling surface - -
Lamp type flourescent - -
Number of Lamps -1 - -
Optics- Closed louver high glossy - -
Lamp wattage 36 watts - -
Luminare material steel sheet 0.7 mm - -
Ingress protection 40 - -
Size length 1230 mm width 220 mm and 115
mm height - -
Control gear 220V/50HZ, electronics ballat No 8 - 595 -
28 Mounting ceiling surface - -
Lamp type compact fluorescent - -
Numbr of Lamps 1 - -
Lamp wattage 13 watts - -
Optics Opal direct light - -
Luminare material Polycarbonate, steel sheet
base - -
Ingress protctin 43 - -
Size- diameter
Control 201 mm, 115
gear 220V/50HZ, mm height
eldctronics ballast - -
(HF) No 6 - 595 -
Power cable 0.6/1KV (NYY) - -
33 5x6 sq mm PVC dia 50 mm No 6 - 280 -
34 5x4 sq mm PVC dia. 36mm No 4 - 200 -
Lightning preventer - -
Air termination
terminals H=network
1.5 meters with base and - -
18 complete - -
Accessories
1 5000
2 No - -
19 30x3 mm Galvanized steel strip m 60 - 400 -
Down conductors - -
30x3mm galvanized steel strip with vertical
20 supporting - -
Every 1m to the wall & all the necessary
accessories
Coordinate the routing of down conductors - -
with the external skin and architectural
Building - -
features m 16 - 400 -
21 1x70 sq mm bare copper wire m 7 - 250 -
22 Diameter 16mm & 2400 mm long copper rod No 2 - 8000 -
Data system - -
Horizontal cabling - -
43 RJ 45 8
Flush contact data
mounting soket out letconduit
in thermoplastic points to
of for - -
19mm - -
With apopropriate type junction box fed by
standard - -
CAT 6e UTP data cable No 4 - 450 -
Extra over data socket out lets - -
with detachable
Single module RJframes & corresponding
45 8 contact data socket out - -
46 lets No 4 - 180 -
Data Cable patch panel - -
48 24 port data switch - -
Telephone
The systemsystem
shall be installed as per - -
ETCstandard
All system cables shall be labeled in all rooms - -
and
terminal blocks and complete analysis of - -
labeling
shall be submitted to the client for future - -
reference.
4 contact telephone points in thermoplastic - -
52 conduit
of 19mm with standard 4 pair CAT 3UTP - -
telephone
Cable with junction boxes as ETC standards - -
and - -
Regulatins and as No 4 - 403 -
Extra telephone out lets - -
54 Single moudule RJ 11xRJ11) telephone out - -
Let of 4 contact for flush mountingwith lebling No 4 - 403 -
TOTAL TO SUMMARY . .. . . . . . - 10,608.00
BOKRA CONSTRUCTION & TRADING PLC
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM TAKEOFF SHEET NO:01
CLIENT:MEKELLE UNIVERSITY Block: B13- SPORT OFFICE
CONSULTANT :NOMY ENGINEERING PLC PAGE NO:
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
SUBSTRUCTURE BAR SCHEDULE SUMMARY
Descrption TOTAL Wt. OF BAR FOR DIA.
Diameter 8 10 12 14 16
Tot.wt. (kg) 1281.26 134.75 397.54 331.54 586.76
SUB
STRUCTURE
Foundation Column
C1 12 3.41 12 8 96 327.36
8 1.1 16 8 128 140.8
C2 12 3.76 8 4 32 120.32
8 1.1 21 4 84 92.4
GROUND FLOOR SLAB
b/n axis A-F/1-2 8 8.7 119 1 119 1035.3
8 12 36 2 72 864
8 6.7 36 1 36 241.2
ARY
R FOR DIA.
20 24
0.00 0.00
AR FOR DIA.
20 24
0 0
2.467 3.55
0 0
F SHEET NO:01
13- SPORT OFFICE
2
AR FOR DIA.
20 24
0 0
2.467 3.55
0 0
F SHEET NO:01
13- SPORT OFFICE
3
MMARY
R FOR DIA.
20 24
0.00 0.00
AR FOR DIA.
20 24
0 0
2.467 3.55
0 0
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
A) SUB STRUCTURE
02. Excavation & Earth work
Excavation & Get out 99.807
1) Remove top soil 30cm thick
L=31+0.3+1.0=32.3m 234.21
32.3 L=9.0+0.3+1.0=10.3m
10.30 332.69 m2 total 25.65
2) Bulk Excavation in
Ordinary Soil up to 1.5m 359.667
L=31+0.3+1.0=32.3m
32.3 L=9.0+0.3+1.0=10.3m
10.3 Bulk avg=0.704m
0.70 234.21 m3 total 1 29.5
4)Pit not exceeding 1.5m 8.7 256.65
12F1
12 1.50 Davg =0.95m
1.50
0.95 25.65 m3 total
Fill
Compaction fill shall be 12 1.1
every 20cm thick until it 1.1 14.52
attains a minimum of 95%
proctor density 4 8.3
6) Selected borrowed fill 0.3 9.96
A)*fill=total pit-concrete works c) Under stone mas
1.2) pit 2 29.8
25.65 m3 0.6 35.76
deduct concrete works 2 8.7
lean concrete 0.6 10.44
0.726 m3 46.2
concrete pad
3.60 m3
13.83 M3 TOTAL
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
04) Masonry work Stone wall
1) concealed form view
NB: Davg=0.992m
2 29.50 on axis A&B/1-6 ,L=29.5m
0.50 28 days min. crushin
0.992 29.25 m3 of 18kg/cm2, bedded
2 8.70 on axis 1&6/A-B, L=8.7m mortar (1:3) mix, bot
0.50
0.992 8.63 m3
37.88 M3 TOTAL
2) Exposed face left for
further finish
NB: Davg=0.04m 2 8.7
2 29.50 on axis A&B/1-6 ,L=29.5m 2.4 41.76
0.50 5 1.80
0.040 1.18 m3 1.5 13.5
2 8.70 on axis 1&6/A-B, L=8.7m 4 4.70
0.50 2.4 45.12
0.040 0.35 m3 4 4.70
2.4 45.12
1.53 M3 TOTAL 1 8.7
2.4 20.88
1 0.8
2.1 1.68
1 3.88
2.7 10.476
1 8.7
2.7 23.49
2 0.8
2.1 3.36
205.39
2 4.9
2.8 27.44
27.44
1
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
15. ELECTRICAL WORKS
Light points
4.95
Light points in thermoplastic conduit
of diameter 13.5 mm fed through
2 3 29.7
PVC conductor of 2x2.5 sq mm 8.8
1 34.00 34.00 2 3.00 52.8
34.00 Pcs Total -1.80
5 1.50 -13.5
4.75
2 3.00 28.5
9.30
2 3.00 55.8
-0.80
4 2.70 -8.64
4.90
2 3.00 29.4
174.06
9.3
2 3.3 61.38
-1.8
5 1.5 -13.5
5.2
4 3.3 68.64
25.79
2 0.5 25.79
9.2
2 0.7 12.88
2.7
4 0.3 3.24
158.43
TAKEOFF SHEET NO:01
Block: B13- SPORT OFFICE
PAGE NO: 01
DESCRIPTION
7) Disposal
TOTAL EXCAVATION
1) Site clearing
m3
2) bulk excavation
m3
1.2) pit excavation
m3
m3 Total
8) Hard core 25 cm thick
m2 total
3) CONCRETE WORKS
In situ concrete
1) Plain blinding concrete C-5
a) To footing pad
12F1
m2 total
b) under Grade Beam
on axis 2,3,4,5 /A-B
m2 total
c) Under stone masonry wall
on axis A&B/1-6 ,L=29.5m
m2
on axis 1&6/A-B, L=8.7m
m2
m2 total
d) Under ground
floor Slab
on axis b/n (1-2)&(5-6) /A-B
L=5.0-0.2=4.8m, L=9.0-0.2=8.8m
m2
on axis b/n (2-5)/A-B
L=7.0-0.2=6.8m ,L=9.0-0.2=8.8m
m2
m2 total
M2 TOTAL OF A+B+C+D
m3 TOTAL OF A+B+C+D
TAKEOFF SHEET NO:01
Block: B13- SPORT OFFICE
PAGE NO: 02
DESCRIPTION
FORM WORK
Sub structure normal finish to:
13) FOOTING
12F1
Perimeter=4*1.0=4m
m2
14) Sub grade column
8C1, P=4*0.3=1.2
m2
4C2/ P=3.14*0.3=0.942
m2
m2 Total
16) Grade beam
on axis A&B/ext.
m2
on axis A&B/int.
m2
on axis 1&6/ext.
m2
on axis 1,2,3,4,5 &6/int.
m2
m2 TOTAL
SUPER STRUCTURE NORMAL
Finish to:
18) ELEVATION COLUMN
8C1, P=4*0.3=1.2
m2
4C2/ P=3.14*0.3=0.942
m2
m2 Total
19) beam and linteln
on axis 1&6/ext.
m2
on axis 1,2,3,4,5,6/A-B int. side
m2
on axis 1,2,3,4,5,6/A-B soffit
m2
on axis A&B/ext.
m2
on axis A&B/int.
m2
on axis A&B/ soffit
m2
m2 total
TAKEOFF SHEET NO:01
Block: B13- SPORT OFFICE
PAGE NO: 03
DESCRIPTION
2. BLOCK WORK
2.1) 200mm thick hollow concrete
block wall of type Class-C with
28 days min. crushing strength
of 18kg/cm2, bedded in cement
mortar (1:3) mix, both sides left
for plastering. Price includes
26mm iron bars laid horizon
tally every other course
(spacing 400mm c/c).
Oppening
15 cm thick HCB
B-13
Apply three coats of approved
type plastic panit for internal
wall surfaces
On Axis A & B b/n 1-2
On Axis 2 & 5
DDT
D1
Gable side
C1
M2 Total
MEKELLE UNIVERSTY COMMUNITY SCHOOL
LAB-1 PHYSICS LABORATORY
AT MEKELLE
SUMMARY
B-SUPER STRUCTURE
2 BLOCK WORK.
BIRR - 73,324.30 - 73,324.30
8 PAINTING. BIRR - - - -
9 GLAZING. BIRR - - - -
2 CONCRETE WORK
BIRR - 114,022.56 - 114,022.56
B-SUPER STRUCTURE
1 CONCRETE WORK
BIRR - 58,030.55 - 58,030.55
2 BLOCK WORK
BIRR - 73,324.30 - 73,324.30
8 PAINTING BIRR - - - -
9 GLAZING BIRR - - - -
0
0
0
0
0
0
0
0
0
Total Length(m) 1146.365 0 0 0 0 0
Unit Wt.(kg/m) 0.395 0.617 0.888 1.21 1.579 2.467
Tot.Wt.(kg) 452.8142 0 0 0 0 0
SHEET NO:01
OCK LAB-2
A.
24
0.00
DIA.
24
0
3.55
0
MEKELLE UNIVERSTY COMMUNITY SCHOOL
LAB-3 BOILOGY LABORATORY
AT MEKELLE
SUMMARY
Previous Current Todate
A. SUB-STRUCTURE Amount Amount Amount
1.EXCAVATION & EARTH WORKS Birr - - 75,287.80 - 75,287.80
B. SUPER-STRUCTURE
1. CONCRETE WORKS Birr - - 87,591.39 - 87,591.39
8. PAINTING Birr - - - - -
9. GLAZING Birr - - - - -
- - - 0.00
- - - 0.00
a. In isolated footing pads m 2.00 1.26 1.26 2,539.00 3,199.14 - 3,199.14
- - - 0.00
b. In foundation column m 1.00 0.51 0.51 2,539.00 1,291.84 - 1,291.84
- - - 0.00
c. In grade beam m 6.00 5.67 5.67 2,539.00 14,401.21 - 14,401.21
- - - 0.00
d. To be filled with acrylic joint sealing ml 39.00 - 85.00 - - 0.00
- - - 0.00
2.3 Reinforced concrete in class C-15 (with a 28-day
150mm cube crushing strength of 15MPa), cast
into formworks and vibrated around rod
reinforcement bars.( reinforcement bars are
measured separately.) in: "Type of cement to be
ordinary Portland cement (OPC)"
- - - 0.00
In 100mm thick ground floor slab m2 126.00 124.76 124.76 199.90 24,939.52 - 24,939.52
- - - 0.00
2.4(a) Provide, cut and fix in position sawn seasoned
timber or steel form work made up of minimum
2mm thick sheet metal & folded thickness of
50mm whichever is appropriate;
- - - 0.00
- - - 0.00
a. To isolated footing pad m2 7.00 6.48 6.48 166.00 1,075.68 - 1,075.68
- - - 0.00
2.4(b) Provide, cut and fix in position 19mm thick
plywood formwork to fair face concrete. - - - 0.00
- - - 0.00
a. To foundation column m2 14.00 19.36 19.36 166.00 3,213.76 - 3,213.76
2.4(c) Provide, cut and fix in position 19mm thick
plywood formwork or steel form work made up of
minimum 2mm thick sheet metal & folded
thickness of 50mm Both sides of forms shall be
fixed with bolts. Contractor to sublimit formwork
design for approval whichever is appropriate;
- - - 0.00
- - - 0.00
a. To grade beam m2 49.00 50.64 50.64 166.00 8,406.24 - 8,406.24
- - - 0.00
2.4 Reinforcement steel bars according to structural
drawing. Price includes cutting, bending, placing
in position and tying wires.
- - - 0.00
- - - 0.00
a) dia. 8mm deformed bar kg 663.00 607.55 607.55 36.00 21,871.92 - 21,871.92
- - - 0.00
b) dia. 10mm deformed bar kg 56.00 53.31 53.31 36.00 1,919.12 - 1,919.12
- - - 0.00
c) dia. 12mm deformed bar kg 202.00 225.96 225.96 36.00 8,134.58 - 8,134.58
- - - 0.00
d) dia. 14mm deformed bar kg 289.00 195.42 195.42 36.00 7,034.94 - 7,034.94
- - - 0.00
Total to Summary.....Birr - 107,355.95 - 107,355.95
- - - 0.00
3. MASONRY AND BRICK WORKS - - - 0.00
- - - 0.00
3.1 500mm thick hard trachytic or equivalent stone
masonry foundation wall bedded in cement sand
mortar mix (1:3)
m3 31.00 23.53 23.53 1,233.00 29,014.96 - 29,014.96
- - - 0.00
3.2 Ditto, but for the part exposed above ground and
one side left for pointing well dressed. m3 11.00 - 1,253.00 - - 0.00
- - - 0.00
Total to Summary.....Birr - 29,014.96 - 29,014.96
- - - 0.00
B. SUPER-STRUCTURE - - - 0.00
1. CONCRETE WORKS - - - 0.00
- - - 0.00
1.1 Reinforced concrete in class C-25 (with a 28-day
150mm cube crushing strength of 25MPa), cast
into formworks and vibrated around rod
reinforcement bars. (formwork & reinforcement
bars are measured separately.) in: "Type of
cement to be ordinary Portland cement (OPC)"
- - - 0.00
- - - 0.00
a. In elevation column m3 2.00 2.24 2.24 2,539.00 5,687.36 - 5,687.36
- - - 0.00
b. In top tie beams m3 5.00 4.01 4.01 2,539.00 10,181.39 - 10,181.39
- - - 0.00
c. In copping beam m3 1.00 - 2,539.00 - - 0.00
- - - 0.00
1.3(a) Provide, cut and fix in position sawn seasoned
timber or steel form work made up of minimum
2mm thick sheet metal & folded thickness of
50mm whichever is appropriate;
- - - 0.00
- - - 0.00
a. To top tie beams m2 50.00 29.82 29.82 208.00 6,202.56 - 6,202.56
- - - 0.00
b. To copping beam m2 2.00 - 208.00 - - 0.00
- - - 0.00
1.3(b) Provide, cut and fix in position 19mm thick
plywood formwork to fair face concrete. - - - 0.00
- - - 0.00
a. To elevation columns m2 35.00 28.79 28.79 185.00 5,326.15 - 5,326.15
- - - 0.00
1.3 Reinforcement steel bars according to structural
drawing. Price includes cutting, bending, placing
in position and tying wires.
- - - 0.00
- - - 0.00
a) dia. 6mm plain bar kg 11.00 860.60 860.60 36.00 30,981.54 - 30,981.54
- - - 0.00
b) dia. 8mm deformed bar kg 305.00 - 36.00 - - 0.00
- - - 0.00
c) dia. 10mm deformed bar kg 45.00 0.00 - 36.00 - - 0.00
- - - 0.00
d) dia. 12mm deformed bar kg 392.00 423.77 423.77 36.00 15,255.77 - 15,255.77
- - - 0.00
e) dia. 14mm deformed bar kg 256.00 387.68 387.68 36.00 13,956.62 - 13,956.62
- - - 0.00
Total to Summary.....Birr - 87,591.39 - 87,591.39
- - - 0.00
2. BLOCK WORK - - - 0.00
- - - 0.00
2.1 200mm thick hollow concrete block wall of type
Class-C with 28 days minimum crushing strength
of 18kg/cm2, bedded in cement mortar (1:3) mix,
both sides left for plastering. Price includes
26mm iron bars laid horizontally every other
course (spacing 400mm c/c).
m2 85.00 95.76 95.76 466.00 44,624.16 - 44,624.16
- - - 0.00
2.2 Ditto but to 150mm thick internal wall. m2 22.00 21.72 21.72 391.00 8,492.52 - 8,492.52
- - - 0.00
2.3 Ditto but to 100mm thick internal wall. m2 33.00 - 326.00 - - 0.00
- - - 0.00
2.4 300mm thick dressed stone cladding wall. m2 59.00 46.24 46.24 717.00 33,154.08 - 33,154.08
- - - 0.00
Total to Summary.....Birr - 86,270.76 - 86,270.76
3. ROOFING AND WATER PROOFING WORK - - - 0.00
- - - 0.00
3.1 Roof cover in Pre-painted EGA 300, 0.5mm thick
fixed to RHS purlins with standard hooks and
washers. Roof cover measured in horizontal
projection. Price includes ridge cover, 50mm thick
rock wool insulation and two coats of anti-rust
paint.
m 140.00 0.00 0.00 - 375.00 - - 0.00
3.1* Roof cover in precoated EGA 400, t=0.4mm
fixed to RHS STEEL.Price shall include ridge cap.
(Purlins measured separately and roof measured
in horizontal projection)
m 140.00 173.84 173.84 341.00 59,279.44 - 59,279.44
- - - 0.00
3.2 G-28 G.I.S roof gutter with development length of
1000mm welded at joint provided 2% slope
towards down pipe and Price includes painting of
two coats of antirust and one coat of metal paint.
- - - 0.00
- - - 0.00
METAL WINDOWS - - - 0.00
- - - 0.00
5.1 W1 size 1500X1800mm No 14.00 0.00 - 2,970.00 - - 0.00
- - - 0.00
METAL DOORS - - - 0.00
- - - 0.00
5.2 WD1 size 1500x2700mm No 1.00 0.00 - 4,455.00 - - 0.00
- - - 0.00
Total to Summary.....Birr - - - - -
- - - 0.00
6. STRUCTURAL STEEL WORKS - - - 0.00
- - - 0.00
Supply and erect steel roof structure all as shown
on the detail drawing. Apply two coats of antirust
paint. Price includes all necessary preparation
work such as cleaning, wire brushing and finally
two coats of anti-rust paint.
- - - 0.00
- - - 0.00
6.1 Upper, lower, vertical & horizontal chords as
specified on the drawing. - - - 0.00
- - - 0.00
RHS size: 40 x 40 x 2.5mm kg 265.00 269.96 269.96 60.00 16,197.89 - 16,197.89
- - - 0.00
RHS size: 30 x 30 x 2.5mm kg 181.00 161.02 161.02 60.00 9,660.96 - 9,660.96
- - - 0.00
6.2 Lattice purlin - - - 0.00
- - - 0.00
RHS size: 25 x 25 x 2.5mm kg 886.00 712.23 712.23 60.00 42,733.67 - 42,733.67
- - - 0.00
RHS size: 20 x 20 x 2mm kg 196.00 165.75 165.75 60.00 9,944.90 - 9,944.90
- - - 0.00
6.3 100x200x5mm steel plate welded to truss and
fixed to anchor bolts as shown on the drawing. No. 20 20.00 20.00 375.00 7,500.00 - 7,500.00
- - - 0.00
6.4 300x200x3mm gusset steel plate welded to truss.
As shown on the drawing. No. 10 10.00 10.00 401.00 4,010.00 - 4,010.00
- - - 0.00
6.5 Grade 4.8 M12 threaded anchor bolt L-300mm No. 20 20.00 20.00 80.00 1,600.00 - 1,600.00
- - - 0.00
Total to Summary.....Birr - 91,647.42 - 91,647.42
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY TAKEOFF SHEET NO: 01
CONSULTANT :NOMY ENGINEERING PLC BLOCK: Lab-3
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING PAGE NO: 01
NO L*W*D QTY DESCRIPTION NO L*W*D QTY DESCRIPTION
MEKELLE UNIVERSTY COMMUNITY SCHOOL
LAB-4 COMPUTER LABORATORY
AT MEKELLE
SUMMARY
Previous Current
Amount Amount Todate Amount
A-SUB STRUCTURE
B-SUPER STRUCTURE
8 PAINTING... BIRR - - - -
9 GLAZING BIRR - - - -
- - - 0.00
- - - 0.00
a. In isolated footing pads m 3
1 0.11 0.11 2,539.00 279.29 - 279.29
- - - 0.00
b. In foundation column m 3
1 0.09 0.09 2,539.00 228.51 - 228.51
- - - 0.00
c. In grade beam m3 6 5.98 5.98 2,539.00 15,183.22 - 15,183.22
- - - 0.00
d. Styrophome expansion join ml 74 86.60 86.60 70.00 6,062.00 - 6,062.00
- - - 0.00
2.3 Reinforced concrete in class C-15 only 280 kg cement/m3
of concrete: - - - 0.00
- - - 0.00
In ground floor slab (10cm thick) m 200 197.81 197.81 199.90 39,542.22 - 39,542.22
- - - 0.00
2.4 Provide, cut and fix in position sawn Zigba wood or metal
panel form work: - - - 0.00
- - - 0.00
a. To isolated footTog pad m 1 0.72 0.72 166.00 119.52 - 119.52
- - - 0.00
b. To foundation column m 2 1.76 1.76 166.00 292.16 - 292.16
- - - 0.00
c. To grade beam m 60 65.00 65.00 166.00 10,790.00 - 10,790.00
- - - 0.00
2.5 Reinforcement bar according to structural drawings. Price
includes cutting, bending, placing in position & tying
wires.
- - - 0.00
- - - 0.00
Diameter 6mm deformed bars Kg 4 - 36.00 - - 0.00
- - - 0.00
Diameter 8mm deformed bars Kg 890 738.44 738.44 36.00 26,584.01 - 26,584.01
- - - 0.00
Diameter 10mm deformed bars Kg 7 6.66 6.66 36.00 239.89 - 239.89
- - - 0.00
Diameter 12mm deformed bars Kg 169 164.92 164.92 36.00 5,937.10 - 5,937.10
- - - 0.00
Diameter 14mm deformed bars Kg 222 162.38 162.38 36.00 5,845.75 - 5,845.75
- - - 0.00
Total to Summary...Birr - 129,435.91 - 129,435.91
- - - 0.00
- - - 0.00
3. MASONRY WORK - - - 0.00
- - - 0.00
3.1 500 mm thick hard trachytic or equivalent stone
peripheral foundation wall to a depth of 50cm bedded in
cement mortar 1:3 below natural ground level.
- - - 0.00
- - - 0.00
a. In elevation column m 3 2.01 2.01 2,539.00 5,103.39 - 5,103.39
- - - 0.00
b. In intermediate and top tie beams m 6 5.14 5.14 2,539.00 13,050.46 - 13,050.46
- - - 0.00
1.2 Provide, cut and fix in position metal panel or sawn
Zigba wood form work - - - 0.00
a. To elevation column m 41 40.17 40.17 185.00 7,431.45 - 7,431.45
- - - 0.00
b. To intermediate and top tie beams m 76 67.08 67.08 208.00 13,952.64 - 13,952.64
- - - 0.00
1.3 Reinforcement bar according to structural drawings. Price
includes cutting, bending, placing in position & tying
wires.
- - - 0.00
Diameter 6mm deformed bars Kg 75 - 36.00 - - 0.00
- - - 0.00
Diameter 8mm deformed bars Kg 285 331.01 331.01 36.00 11,916.36 - 11,916.36
- - - 0.00
Diameter 12mm deformed bars Kg 544 397.77 397.77 36.00 14,319.75 - 14,319.75
- - - 0.00
Diameter 14mm deformed bars Kg 264 177.87 177.87 36.00 6,403.32 - 6,403.32
- - - 0.00
Total to Summary....Birr - 72,177.37 - 72,177.37
2. BLOCK WORK - - - 0.00
- - - 0.00
2.1 200mm thick hollow concrete block wall of type Class-C
with 28 days minimum crushing strength of 18kg/cm2,
bedded in cement mortar (1:3) mix, both sides left for
plastering. Price includes 26mm iron bars laid
horizontally every other course (spacing 400mm c/c).
- - - 0.00
- - - 0.00
5.1 WINDOWS - - - 0.00
Size1000x 1700 mm pcs 18 18.00 18.00 1,870.00 33,660.00 - 33,660.00
- - - 0.00
5.2 DOORS - - - 0.00
Size 2000x 2700 mm pcs 2 2.00 2.00 5,940.00 11,880.00 - 11,880.00
- - - 0.00
Total to Summary.....Birr - - 45,540.00 - 45,540.00
- - - 0.00
6. STRUCTURAL STEEL WORKS - - - 0.00
- - - 0.00
FOR
LAB-5 G+1 LABORATORY BUILDING
Previous Current
ITEM DESCRIPTION UNIT Todate Amount
Amount Amount
04 MASONRY WORK. . . . . . . . . . . . . . . . . . B
. IRR 206,782.90 - 206,782.90
07 JOINERY. . . . . . . . . . . . . . . . . . . . BIRR
11 FINISHING
12 PAINTING. . . . . . . . . . . . . . . . . . . . . . . .BIRR
13 GLAZING
2 Bulk Excavation in Ordinary Soil up to 1.5m m3 329.47 77.42 77.42 55.00 4,258.10 - 4,258.10
Bulk Excavation in Weathered Rock 1.5m to
3 3m m3 0 0.00 - - -
4 Pit not exceeding 1.5m m3 46.66 60.02 60.02 410.00 24,608.20 - 24,608.20
5 Trench not exceeding 1.5m m3 140.40 0.00 0.00 61.00 - - -
Fill 0.00 - - -
Compaction fill shall be every 20cm
thick until it attains a minimum of
95% proctor density 0.00 - - -
6 Selected borrowed fill m3 115.27 232.99 232.99 156.00 36,346.28 - 36,346.28
7 Disposal m3 681.26 292.27 292.27 85.00 24,842.95 - 24,842.95
8 Hard core 25cm thick m2 405.00 377.19 377.19 143.00 53,938.17 - 53,938.17
0.00 - - -
TOTAL CARRIED TO SUMMARY 0.00 152,251.34 - 152,251.34
0.00 - - -
03. Concrete work 0.00 - - -
In situ concrete 0.00 - - -
1 Plain blinding concrete C-5 m3 41.68 23.32 23.32 75.00 1,748.95 - 1,748.95
Reinforced sub structure concrete 0.00 - - -
2 C-25 in footing m3 17.13 14.80 14.80 2,539.00 37,567.63 - 37,567.63
3 C-25 in sub grade column m3 8.30 3.08 3.08 2,539.00 7,822.53 - 7,822.53
4 Shear wall m3 0 0.00 - - -
5 C-25 in grade beam m3 20.87 18.84 18.84 2,539.00 47,834.76 - 47,834.76
6 C-20 in ground slab & step m3 40.5 37.7 37.72 2,539.00 95,768.54 - 95,768.54
Reinforced super structure concrete 0.00 - - -
7 C-25 in elevation column m3 16.60 13.63 13.63 2,539.00 34,597.68 - 34,597.68
8 C-25 in beams & lintel m3 41.74 47.0795 47.08 2,539.00 119,534.85 - 119,534.85
9 C-25 in suspended slab m3 162 51.77 51.77 2,539.00 131,444.03 - 131,444.03
10 C-25 in stair case & landing m3 6.45 0.00 2,539.00 - - -
11 C-25 in shear wall m3 0 0.00 - - -
C-25 water tight concrete in average 10
12 cm thick 0.00 - - -
over flat roof slab to be finished with
smooth trowel 0.00 - - -
finish to the given slope and prepare to
apply water 0.00 - - -
proofing material m 0 0.00 - - -
Form work 0.00 - - -
Sub structure normal finish to: 0.00 - - -
13 Footing m2 47.52 41.78 41.78 166.00 6,935.88 - 6,935.88
14 Sub grade column m2 91.14 34.01 34.01 166.00 5,645.99 - 5,645.99
15 Shear wall m2 0 0.00 - - -
16 Grade beam m2 166.96 116.552 116.55 166.00 19,347.63 - 19,347.63
17 Steps m2 0 0.00 - - -
Super structure Normal Finish to: 0.00 - - -
18 Elevation column m2 182.28 158.76 158.76 185.00 29,370.60 - 29,370.60
19 Beam & lintel m2 292.18 363.8025 363.80 208.00 75,670.92 - 75,670.92
20 Balcony & stair baluster m2 0 0.00 208.00 - - -
21 Parapet m2 0 0.00 208.00 - - -
22 Sun breaker m2 0 0.00 - - -
23 Suspended slab m2 1080.0 345.1 345.09 208.00 71,778.72 - 71,778.72
24 Stair case & landing m2 43.0 0.00 208.00 - - -
25 Shear wall m2 0 0.00 - - -
Reinforcement Sub structure 0.00 - - -
26 Diameter 8mm kg 1587.83 1560.76 1560.76 36.00 56,187.49 - 56,187.49
27 Diameter 10mm kg 0.00 0.00 - - -
28 Diameter 12mm kg 119.48 238.69 238.69 36.00 8,593.00 - 8,593.00
29 Diameter 14mm kg 1087.40 986.80 986.80 36.00 35,524.92 - 35,524.92
30 Diameter 16mm kg 6311.60 187.84 187.84 36.00 6,762.16 - 6,762.16
31 Diameter 20mm kg 2346.54 1315.60 1315.60 36.00 47,361.66 - 47,361.66
32 Diameter 24mm kg 0.00 0.00 - - -
Super structure 0.00 - - -
32 Diameter, 8mm kg 2146.51 1992.85 1992.85 35.00 69,749.75 - 69,749.75
33 Diameter 10mm kg 726.06 388.71 388.71 35.00 13,604.85 - 13,604.85
34 Diameter 12mm kg 5924.30 10239.62 10239.62 35.00 358,386.59 - 358,386.59
35 Diameter 14mm kg 2205.79 3049.08 3049.08 35.00 106,717.77 - 106,717.77
36 Diameter 16mm kg 1129.29 1308.06 1308.06 35.00 45,782.08 - 45,782.08
37 Diameter 20mm kg 15332.66 9953.85 9953.85 35.00 348,384.81 - 348,384.81
38 Diameter 24mm kg 0.00 0.00 - - -
TOTAL CARRIED TO SUMMARY 0.00 1,782,123.79 - 1,782,123.79
0.00 - - -
04. Masonry work 0.00 - - -
Stone wall 0.00 - - -
1 concealed form view m3 135.66 19.90 19.90 1,233.00 24,536.70 - 24,536.70
2 Exposed face left for further finish m3 52.18 13.75 13.75 1,253.00 17,228.75 - 17,228.75
Concrete block works 0.00 - - -
Class 'B' in cement mortar 0.00 - - -
3 20 cm thick both faces for plaster m 473.27 293.60 293.60 466.00 136,818.53 - 136,818.53
4 15 cm thick both faces for plaster m 263.32 72.12 72.12 391.00 28,198.92 - 28,198.92
0.00 - - -
TOTAL CARRIED TO SUMMARY 0.00 206,782.90 - 206,782.90
0.00 - - -
05. ROOF WATER PROOFING 0.00 - - -
Apply APP modified & thickness not less
1 than 4mm 0.00 - - -
slated Bituminous finish water proofing
membrane 0.00 - - -
or equivalent material for concrete roof
slab as per 0.00 - - -
the manufacturer's instruction. The cost
shall include 0.00 - - -
cleaning of all darts and dust materials.
The work 0.00 - - -
shall be done on sub contractual base with
the 0.00 - - -
supplier of the material which will give
material and 0.00 - - -
warranty for the material and application
to the client. m 0 0.00 - - -
0.00 - - -
Apply Cementious water proofing material
2 which shall 0.00 - - -
seal void by crystallization for upper floor
wet areas 0.00 - - -
Toilet rooms floor & to a height of 50cm on
walls. 0.00 - - -
To Gutters ,columns , masonry & concrete
retaining 0.00 - - -
walls, and all basement stores as per the
manufacturer's 0.00 - - -
instruction. Price shall include cleaning of
all dirt's, trace 0.00 - - -
of grease, oil and loose particles. 0.00 - - -
The work shall be done on sub contractual
bases with 0.00 - - -
the supplier of the material which will give
material & 0.00 - - -
construction guarantee to the client. m 0 0.00 - - -
0.00 - - -
TOTAL CARRIED TO SUMMARY ...... 0.00 - - -
6. ROOFING 0.00 - - -
Roof cover in precoated EGA 400,
t=0.4mm fixed to RHS STEEL.Price shall
include ridge cap. (Purlins measured
separately and roof measured in
3 horizontal projection) m 505.33 507.87 507.87 341.00 - 173,183.53 173,183.53
With bus bar 80A and ample reserve space No 1 0.00 9300 - - -
Light points 0.00 - - -
Light points in thermoplastic conduit of
14 diameter 0.00 - - -
13.5 mm fed through PVC conductor of
2x2.5 sq mm 0.00 - - -
Color coded and labled No 87 0.00 473 - - -
Switch with detachable frames & 0.00 - - -
Corersponding box 3rd party certified 0.00 - - -
15 Single pole No 1 0.00 150 - - -
16 Double pole No 6 0.00 187 - - -
17 Two way No 8 0.00 165 - - -
Socket out lets 0.00 - - -
16A 240V 2p+e socket out let type in
20 thermoplastic 0.00 - - -
Conduit of diameter 16mm fed by PVC
conductor 0.00 - - -
Of 3xsq mm color coded labeled No 5 0.00 603 - - -
21 Ditto but for twin outlet No 66 0.00 603 - - -
22 Ditto but for fan units No 30 0.00 603 - - -
Extra over 0.00 - - -
Socket out letswith detachable frames & 0.00 - - -
Corresponding box 3rd party certified 0.00 - - -
23 16A, 1ph No 5 0.00 150 - - -
24 16A, 1ph twin No 66 0.00 390 - - -
Type of light fittings 0.00 - - -
Supply and install the light fitting with
under 0.00 - - -
Mentionedspecificaiton 0.00 - - -
Alllight fixtures shall behtierd party
certified 0.00 - - -
26 Mounting celling surface 0.00 - - -
Lamp type fluorescent 0.00 - - -
Number of lamps -2 0.00 - - -
Optis closed louver high glossy 0.00 - - -
Lamp wattage -36 watts 0.00 - - -
Luminare material steel sheet0.7 mm 0.00 - - -
Ingress protectin -40 0.00 - - -
Size length 1230 mm width 220 mm and
115 mm height 0.00 - - -
2 CONCRETE WORK
BIRR - 503,226.77 - 503,226.77
B-SUPER STRUCTURE
1 CONCRETE WORK
BIRR - 350,701.27 - 350,701.27
3 ROOFING.
BIRR - 286,201.49 - 286,201.49
8 PAINTING. BIRR - - - -
9 GLAZING. BIRR - - - -
A-Internal plastering
2 31.1 62.2
31.15 2 18 36
2 4.975 309.94 Axis 1 & 4 b/n B-H 2 6.08 12.16
-1.00 DDT 20 0.4 8
4 1.10 -4.40 W2 1 3.25 3.25
-0.94 121.61
5 1.10 -5.17 TW1
-2.00
2 2.50 -10.00 D1 3.4-G28 flat metal
-1.50
17 2.00 -51.00 W1 2 21.5 43
16.8 2 5.28 10.56
2 4.975 167.16 Axis B & H b/n 1-4 1 12.60 12.6
-1.5 DDT 1 28.32 28.32
2 2.50 -7.50 D2 1 13.26 13.26
-2 1 2.98 2.98
1 2.50 -5.00 D1 1 3.30 3.3
10.82 114.02
1 3.275 35.44 Axis A
4.8
2 3.3 31.31 Axis b/n 1-4 Function room
-1 DDT
6 1.1 -6.60 W2
2.76
10 1.2 33.12 Intermidiate beams on varandah's
487.30 M2 Total
A-External plastering
31.15
2 4.975 309.94 Axis 1 & 4 b/n B-H
-1.00 DDT
4 1.10 -4.40 W2
-0.94
5 1.10 -5.17 TW1
-2.00
2 2.50 -10.00 D1
-1.50
17 2.00 -51.00 W1
16.8
2 4.975 167.16 Axis B & H b/n 1-4
-1.5 DDT
2 2.50 -7.50 D2
-2
1 2.50 -5.00 D1
10.82
1 3.275 35.44 Axis A
4.8
2 3.3 31.31 Axis b/n 1-4 Function room
-1 DDT
6 1.1 -6.60 W2
28.2
2 4.73 266.8 Axis 1' C-H' 2 face plastered
-3.97 DDT
5 2.65 -52.6 Arch holes (3+2.30)/2= 2.65m
13.07
1 4.73 61.8 Axis H' b/n 1'-4 2 face plastered
-3.97 DDT
2 2.65 -21.0 Arch holes (3+2.30)/2= 2.65m
709.13 M2 Total
TAKEOFF SHEET NO: 01
BLOCK: M1
PAGE NO: 01
DESCRIPTION
3. ROOFING
3.2- G-28 G.I.S roof gutter
Axis 1 & 4
Axis B & H
Axis 1' & 3'
circular holes
Axis c
ML Total
Axis H & B
axis 2 & 5
Axis A
Axis 1'
Axis H'
Axis 3'
Axis c
ML Total
SUMMARY OF BILL OF QUANTITIES AND SPECIFICATIONS
FOR
07 JOINERY. . . . . . . . . . . . . . . . . . . . BIRR 0
11 FINISHING
12 PAINTING. . . . . . . . . . . . . . . . . . . . . BIRR 0
13 GLAZINGBIRR 0
15 ELECTRICAL INSTALLATION. . . . . . . . B
. IRR 0
TOTAL. TO GRANDBIRR 0
CONTRACTEXECUTED
ITEM DESCRIPTION UNIT QTY. QTY RATE
A-SUB STRUCTURE
02. Excavation & Earth work
Excavation & Get out
1 Remove top soil 30cm thick m2 732.81 621.99 16
Excavation
In according to the attched soil type
Pit and Trench Excavation
1 Bulk Excavation in Ordinary Soil up to 1.5m m3 366.41 753.29 55
3 Bulk Excavation in soft Rock 1.5m to 3m m3 0
2 Pit not exceeding 1.5m m3 52.02 6.90 75
3 Trench not exceeding 1.5m m3 48.27 11.98 61
Fill
Compaction fill shall be every 20cm
thick until it attains a minimum of 95% proctor density
6 Selected borrowed fill m3 67.52 ### 156
7 Disposal m3 686.54 958.76 85
8 Hard core 25cm thick m2 522.93 143
TOTAL CARRIED TO SUMMARY
03. Concrete work
In situ concrete
1 Plain blinding concrete C-5 m3 8.10 3.50 75
Reinforced sub structure concrete
2 C-25 in footing m3 8.64 3.89 2539
3 C-25 in sub grade column m3 1.92 4.01 2539
4 Shear wall m3 -
5 C-25 in grade beam m3 11.58 7.79 2539
6 C-20 in ground slab & step m3 52.29 2539
Reinforced super structure concrete
7 C-25 in elevation column m3 8.64 8.94 2539
8 C-25 in beams & lintel m3 7.69 Err:509 2539
9 C-25 in suspended slab m3 -
10 C-25 in stair case & landing m3 -
11 C-25 in shear wall m3 -
12 C-25 water tight concrete in average 10 cm thick
over flat roof slab to be finished with smooth trowel
finish to the given slope and prepare to apply water
proofing material m -
Form work
Sub structure normal finish to:
13 Footing m2 28.80 17.28 166
14 Sub grade column m2 19.20 44.37 166
15 Shear wall m2 -
16 Grade beam m2 77.23 77.90 166
17 Steps m2 -
Super structure Normal Finish to:
18 Elevation column m2 86.40 99.76 185
19 Beam & lintel m2 96.26 Err:509 208
20 Balcony & stair baluster m2 -
21 Parapet m2 -
22 Sun breaker m2 -
23 Suspended slab m2 -
24 Stair case & landing m2 -
25 Shear wall m2 -
Reinforcement Sub structure
26 Diameter 8mm kg ### Err:509 36
27 Diameter 10mm kg - Err:509 36
28 Diameter 12mm kg - Err:509 36
29 Diameter 14mm kg 464.00 Err:509 36
30 Diameter 16mm kg - Err:509 36
31 Diameter 20mm kg ### Err:509 36
32 Diameter 24mm kg -
Super structure
32 Diameter, 8mm kg 411.27 Err:509 36
33 Diameter 10mm kg - -
34 Diameter 12mm kg - Err:509 36
35 Diameter 14mm kg - Err:509
36 Diameter 16mm kg - Err:509 36
37 Diameter 20mm kg ### -
38 Diameter 24mm kg - -
TOTAL CARRIED TO SUMMARY
04. Masonry work
Stone wall
1 concealed form view m3 24.14 88.25 1233
2 Exposed face left for further finish m3 9.65 14.99 1253
Concrete block works
Class 'B' in cement mortar
3 20 cm thick both faces for plaster m 426.19 466
4 15 cm thick both faces for plaster m 103.20 391
Amount
308,294.92
Err:509
127,594.72
Err:509
AMOUNT
9,951.84
-
-
-
41,430.81
-
517.50
730.78
-
-
174,169.01
81,494.98
-
308,294.92
-
-
262.58
-
9,876.71
10,181.39
-
19,778.81
-
-
22,698.66
Err:509
-
-
-
-
-
-
-
-
-
2,868.48
7,365.42
-
12,931.40
-
-
18,455.60
Err:509
-
-
-
-
-
-
-
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
-
-
Err:509
-
Err:509
Err:509
Err:509
-
-
Err:509
-
-
108,812.25
18,782.47
-
-
-
-
-
127,594.72
SUMMARY OF BILL OF QUANTITIES AND SPECIFICATIONS
FOR M2
07 JOINERY. . . . . . . . . . . . . . . . . . . . BIRR 0 -
11 FINISHING
12 PAINTING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BIRR 0
13 GLAZING. BIRR 0
RB-2 16 4.45 2 2 4
16 11.85 2 2 4
16 11.30 2 2 4
16 4.5 2 2 4
16 2.88 1 2 2
16 3.68 1 2 2
16 3.68 1 2 2
16 3.68 1 2 2
16 3.68 1 2 2
16 2.88 1 2 2
14 11.46 3 2 6 68.76
14 7.4 3 2 6 44.4
14 7.4 3 2 6 44.4
14 7.4 3 2 6 44.4
ST-1 8 1.1 155 2 310 341
0
0
ARY
t. OF BAR FOR DIA.
16 20 24
558.71 591.78 0.00
0 0 0
1.579 2.467 3.55
0 0 0
TAKEOFF SHEET NO:01
BLOCK: M2
PAGE NO: 2
300
300 0 0
1.579 2.467 3.55
473.7 0 0
TAKEOFF SHEET NO:01
BLOCK: M2
PAGE NO: 3
37
35.4
4.5
4.9
7.56
7.36
35.6
47.4
62.4
18.24
14.72
18.64
53.84 239.88 0
1.579 2.467 3.55
85.0134 591.784 0
TAKEOFF SHEET NO:01
BLOCK: M1
PAGE NO: 4
MMARY
t. OF BAR FOR DIA.
16 20 24
886.07 0.00 0.00
392
392 0 0
1.579 2.467 3.55
618.968 0 0
TAKEOFF SHEET NO:01
BLOCK: M1
PAGE NO: 4
MMARY
16 20 24
267.10364 0 0
17.8
47.4
45.2
17.8
5.76
7.36
7.36
7.36
7.36
5.76
169.16 0 0
1.579 2.467 3.55
267.104 0 0
BOKRA CONSTRUCTION & TRADING PLC
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING PLC 7543.19
RHS SUMMARY
Descrption TOTAL Wt. OF RHS FOR
Size 20*20*2 25*25*2.5 30*30*3 40*40*2.5
Tot.wt. (kg) 1458.65 3296.73 524.21 0.00
no of no of Total No TOTAL LENGTH OF RHS FOR DIFF.
No Location size Length
members elements of RHS 20*20*2 25*25*2.5 30*30*2.5 40*40*2.5
T1
Top member 60*60*3 17.806 1 4 4
bottom member 60*60*3 17.41 1 4 4
Vertical 30*30*2.5 1.8 1 4 4 7.2
30*30*2.5 1.12 2 4 8 8.96
30*30*2.5 1.09 2 4 8 8.72
30*30*2.5 0.8 2 4 8 6.4
30*30*2.5 0.62 2 4 8 4.96
30*30*2.5 0.45 2 4 8 3.6
30*30*2.5 0.39 2 4 8 3.12
30*30*2.5 0.24 2 4 8 1.92
30*30*2.5 0.21 2 4 8 1.68
30*30*2.5 0.16 2 4 8 1.28
30*30*2.5 0.1 2 4 8 0.8
Diagonal members 30*30*2.5 1.76 2 4 8 14.08
30*30*2.5 1.54 2 4 8 12.32
30*30*2.5 1.42 2 4 8 11.36
30*30*2.5 1.3 2 4 8 10.4
30*30*2.5 1.21 2 4 8 9.68
30*30*2.5 1.03 2 4 8 8.24
30*30*2.5 0.92 2 4 8 7.36
30*30*2.5 0.73 2 4 8 5.84
30*30*2.5 0.49 2 4 8 3.92
30*30*2.5 0.33 2 4 8 2.64
Total Length(m) 0.00 0.00 134.48 0.00
Unit Wt.(kg/m) 1.13 1.766 2.159 2.944
Tot.Wt.(kg) 0.00 0.00 290.34 0.00
BOKRA CONSTRUCTION & TRADING PLC
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING PLC
RHS SUMMARY
Descrption TOTAL Wt. OF RHS FOR differen
Size 20*20*2 25*25*2.5 30*30*2.5 40*40*2.5
Tot.wt. (kg) 0.00 0.00 88.56 0.00
T2
Top member 80*80*3 18 1 2 2
bottom member 80*80*3 12.34 1 2 2
Vertical 30*30*2.5 1.8 1 2 2 3.6
30*30*2.5 1.41 1 2 2 2.82
30*30*2.5 1.22 1 2 2 2.44
30*30*2.5 1.02 1 2 2 2.04
30*30*2.5 0.95 1 2 2 1.9
30*30*2.5 0.74 1 2 2 1.48
30*30*2.5 0.62 1 2 2 1.24
30*30*2.5 0.49 1 2 2 0.98
30*30*2.5 0.34 1 2 2 0.68
30*30*2.5 0.22 1 2 2 0.44
30*30*2.5 0.1 1 2 2 0.2
Diagonal members 30*30*2.5 1.74 1 2 2 3.48
30*30*2.5 1.74 1 2 2 3.48
30*30*2.5 1.45 1 2 2 2.9
30*30*2.5 1.45 1 2 2 2.9
30*30*2.5 1.36 1 2 2 2.72
30*30*2.5 1.36 1 2 2 2.72
30*30*2.5 0.8 1 2 2 1.6
30*30*2.5 0.8 1 2 2 1.6
30*30*2.5 0.61 1 2 2 1.22
30*30*2.5 0.29 1 2 2 0.58
Total Length(m) 0.00 0.00 41.02 0.00
Unit Wt.(kg/m) 1.13 1.766 2.159 2.944
Tot.Wt.(kg) 0.00 0.00 88.56 0.00
BOKRA CONSTRUCTION & TRADING PLC
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING PLC
RHS SUMMARY
Descrption TOTAL Wt. OF RHS FOR differen
Size 20*20*2 25*25*2.5 30*30*2.5 40*40*2.5
Tot.wt. (kg) 0.00 0.00 88.56 0.00
T3
Top member 80*80*3 18 1 2 2
bottom member 80*80*3 12.34 1 2 2
Vertical 30*30*2.5 1.8 1 2 2 3.6
30*30*2.5 1.41 1 2 2 2.82
30*30*2.5 1.22 1 2 2 2.44
30*30*2.5 1.02 1 2 2 2.04
30*30*2.5 0.95 1 2 2 1.9
30*30*2.5 0.74 1 2 2 1.48
30*30*2.5 0.62 1 2 2 1.24
30*30*2.5 0.49 1 2 2 0.98
30*30*2.5 0.34 1 2 2 0.68
30*30*2.5 0.22 1 2 2 0.44
30*30*2.5 0.1 1 2 2 0.2
Diagonal members 30*30*2.5 1.74 1 2 2 3.48
30*30*2.5 1.74 1 2 2 3.48
30*30*2.5 1.45 1 2 2 2.9
30*30*2.5 1.45 1 2 2 2.9
30*30*2.5 1.36 1 2 2 2.72
30*30*2.5 1.36 1 2 2 2.72
30*30*2.5 0.8 1 2 2 1.6
30*30*2.5 0.8 1 2 2 1.6
30*30*2.5 0.61 1 2 2 1.22
30*30*2.5 0.29 1 2 2 0.58
Total Length(m) 0.00 0.00 41.02 0.00
Unit Wt.(kg/m) 1.13 1.766 2.159 2.944
Tot.Wt.(kg) 0.00 0.00 88.56 0.00
BOKRA CONSTRUCTION & TRADING PLC
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING PLC
RHS SUMMARY
Descrption TOTAL Wt. OF RHS FOR differen
Size 20*20*2 25*25*2.5 30*30*2.5 40*40*2.5
Tot.wt. (kg) 409.39 122.46 56.74 0.00
T4
Top member 80*80*3 9.27 1 4 4
bottom member 80*80*3 12.34 1 4 4
Vertical 30*30*2.5 0.9 1 4 4 3.6
30*30*2.5 0.71 1 4 4 2.84
30*30*2.5 0.6 1 4 4 2.4
30*30*2.5 0.41 1 4 4 1.64
30*30*2.5 0.32 1 4 4 1.28
30*30*2.5 0.21 1 4 4 0.84
Diagonal members 30*30*2.5 0.79 1 4 4 3.16
30*30*2.5 0.79 1 4 4 3.16
30*30*2.5 0.82 1 4 4 3.28
30*30*2.5 0.61 1 4 4 2.44
30*30*2.5 0.41 1 4 4 1.64
Lattice purline
P-1a 0
Top member 20*20*2 7.75 1 4 4 31
Bottom member 20*20*2 6.85 1 4 4 27.4
Vertical members 20*20*2 0.273 13 4 52 14.196
Diagonal members 20*20*2 0.34 4 4 16 5.44
Bracer 25*25*2.5 8.668 4 1 4 34.67
P-1 0
Top member 20*20*2 7 1 20 20 140.00
Bottom member 20*20*2 6.6 1 20 20 132.00
Vertical members 20*20*2 0.273 1 20 20 5.46
Diagonal members 20*20*2 0.34 1 20 20 6.80
Bracer 25*25*2.5 8.668 4 1 4 34.67
0 -
Total Length(m) 362.30 69.34 26.28 0.00
Unit Wt.(kg/m) 1.13 1.766 2.159 2.944
Tot.Wt.(kg) 409.39 122.46 56.74 0.00
BOKRA CONSTRUCTION & TRADING PLC
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING PLC
RHS SUMMARY
Descrption TOTAL Wt. OF RHS FOR differen
Size 20*20*2 25*25*2.5 30*30*2.5 40*40*2.5
Tot.wt. (kg) 230.59 177.69 0.00 0.00
71.224
69.64
0.00 140.86 0.00 0.00
3.729 5.369 7.253
0.00 756.36 0.00 0.00
36
24.68
0.00 0.00 60.68 0.00
3.729 5.369 7.253
0.00 0.00 440.14 0.00
36
24.68
0.00 0.00 60.68 0.00
3.729 5.369 7.253
0.00 0.00 440.14 0.00
37.08
49.36
0.00 0.00 86.44 0.00
3.729 5.369 7.253
0.00 0.00 626.98 0.00
753.29 m3 total
2)Pit not exceeding 1.5m
16F2 186.60
16 1.40 Davg =0.22m
1.40 753.29
0.22 6.90 m3 total
3) Trench not exceeding 1.5m 6.90
on axis 2/N-J
L=32.06-((0.9+0.5)*5)=25.06M 11.98
1 25.06 Davg =0.478m
1.00 958.76
0.48 11.98 m3 total
Fill
Compaction fill shall be
every 20cm thick until it
attains a minimum of 95%
proctor density 16 0.95
6) Selected borrowed fill 0.95 14.44
A)*fill=total pit-concrete works
1.2) pit
6.90 m3 2 30.7
deduct concrete works 0.6 36.84
lean concrete
0.72 m3 1 15.81
concrete pad 0.6 9.49
3.89 m3
1 15.41
2.29 m3 sub total-----a 0.6 9.25
b) under hard core 55.58
1 15.7 L=15.71m, W=31.56m, Davg=2.01m
31.6 70.02
2.01 996.57 m3
996.57 m3 total----b 3.50
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
REINFORCED SUB
structure concrete
2) C-25 in footing 2 32.47
16F1 , D =0.3m 0.4 25.98
16 0.90 2 32.07
0.90 0.4 25.66
0.30 3.89 m3 total 2 16.61
3) C-25 in sub grade column 0.4 13.29
10 0.40 10C1, Davg =1.978m 2 16.21
0.40 0.4 12.97
1.978 3.16 m3 77.90
6 0.20 6C2, Davg =1.766m
0.40
1.766 0.85 m3
4.01 m3 total
5) C-25 in grade beam 10 4.30
2 0.20 GB on axis 1&2/N-J 1.6 68.80
0.40 6 4.30
32.47 5.2 m3 1.2 30.96
2 0.20 GB on axis N & J/1-2 99.76
0.40
16.21 2.59 m3
m3 total
d) around external stone
masonary wall
L=32.07+0.9+1.0=33.97m
Bulk avg=1.65-0.3=1.35m
m3
L=16.41+0.9+1.0=18.31m
Bulk avg=1.65-0.3=1.35m
m3 total-----c
M3 TOTAL a+b+c+d
7) Disposal
TOTAL EXCAVATION
1) Site clearing
m3
2) bulk excavation
m3
1.2) pit excavation
m3
3) trench excavation
m3
m3 Total
3) CONCRETE WORKS
In situ concrete
1) Plain blinding concrete C-5
a) To footing pad
16F2
m2 total
c) Under stone masonry wall
on axis 1&2/N-J ,L=30.7m
m2
on axis N/1-2, L=15.81m
m2
on axis J/1-2, L=15.41m
m2
m2 total
M2 TOTAL OF A+B+C+D
m3 TOTAL OF A+B+C+D
TAKEOFF SHEET NO:01
Block: M2
PAGE NO: 01
DESCRIPTION
16) Grade beam
GB on axis 1&2/N-J ext
m2
GB on axis 1&2/N-J int
m2
GB on axis N & J/1-2 ext
m2
GB on axis N & J/1-2 int.
m2
m2 TOTAL
SUPER STRUCTURE NORMAL
Finish to:
18) ELEVATION COLUMN
10C1, P=4*0.4=1.6m
m2
4C2/ P=2*0.4+2*0.2=1.2m
m2
m2 Total
04. Masonry work
Stone wall
1) concealed form view
on axis 1&2/N-J
m3
on axis N & J/1-2
m3
around foundation column
m3
around foundation column
m3
m3 total
m3
on axis N & J/1-2
m3
around foundation column
m3
around foundation column
m3
m3 total
TAKEOFF SHEET NO:01
Block: M2
PAGE NO: 01
DESCRIPTION
15. ELECTRICAL WORKS
Light points
Pcs Total
On Axis J
DDT
W2
On Axis N
DDT
W1
On Axis K 2faced
On Axis J
DDT
W2
On Axis N
DDT
DW1
DW1
W1
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
10. METAL WORK
4.00 W1-350x160cm
2.00 W2-355x160cm
3.00 W3-160x160cm
1.00 W4-190x160cm
2.00 FW1-5080x300cm
TAKEOFF SHEET NO:01
Block: M2
PAGE NO: 01
DESCRIPTION
MEKELLE UNIVERSTY COMMUNITY SCHOOL
LIBRARY
AT MEKELLE
SUMMARY
Previous
A-SUB STRUCTURE Amount Current Amount Todate Amount
CONCRETE WORK..
2 ... BIRR - 93,871.87 - 93,871.87
MASONRY WORK....
3 BIRR - 27,750.25 - 27,750.25
B-SUPER STRUCTURE
8 PAINTING. BIRR - - - -
A-SUB STRUCTURE
02. Excavation & Earth work
Excavation & Get out
1 Remove top soil 30cm thick m2 858
Excavation
In according to the attched soil type
Pit and Trench Excavation
2 Bulk Excavation in Ordinary Soil up to 1.5m m3 429
3 Bulk Excavation in soft Rock 1.5m to 3m m3 0
4 Pit not exceeding 1.5m m3 36.125
5 Trench not exceeding 1.5m m3 50.6
Fill
Compaction fill shall be every 20cm thick until it attains a minimum of 95%
proctor density
6 Selected borrowed fill m3 43.425
7 Disposal m3 773.125
8 Hard core 25cm thick m2 639.6
- -
- -
- -
- -
- -
- -
- -
- -
- -
- Err:509
Excuted QTY RATE AMOUNT
766.8 16 12,268.80
-
-
-
598.10 55 32,895.72
-
76.65 75 5,748.48
34.73 61 2,118.70
-
-
651.45 156 101,626.44
747.82 85 63,564.97
143 -
218,223.11
436,446.21
-
-
-
147.98 75 11,098.13
-
23.85 2539 60,555.78
4.15 2539 10,540.28
-
2539 -
2539 -
-
2539 -
2539 -
2539 -
2539 -
-
-
-
-
-
-
-
63.74 166 10,580.84
39.00 166 6,473.34
-
166 -
-
-
185 -
208 -
-
-
-
208 -
208 -
-
-
Err:509 36 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 36 Err:509
Err:509 36 Err:509
-
-
36 -
-
36 -
36 -
-
36 -
-
Err:509
-
-
-
58.2034 1233 71,764.79
1253 -
-
-
466 -
391 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
58.20 71,764.79
SUMMARY OF BILL OF QUANTITIES AND SPECIFICATIONS
FOR
07 JOINERY. . . . . . . . . . . . . . . . . . . . BIRR - -
11 FINISHING
12 PAINTING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BIRR - -
13 GLAZING BIRR - -
Supply and install structural curtain wall made of powder coated aluminum
vertical (mullions) and horizontal transoms fitted with single glass. Bolts and
nuts of aluminum brackets connect the vertical mullions and also the
aluminum brackets are connected (price shall include 5mm thick solar
glass). 0 0 0 -
CW1 m2 0 0 0 -
CW2 m 2
0 0 0 -
CW3 m2 0 0 0 -
Supply and fix guard rail made of S.H.S
40x40x2.5mm, S.H.S 30x30x2.5mm, R.H.S
40x20x1.5mm as shown on the drawing. Price shall
include one coat of anti-rust, two coats of synthetic
enamel paint, 1mm thick plate & all the necessary
accessories to complete the work. m2 15 0 800 0 0 -
50mm,2.5mm thick furniture pipe hand rail fixed to
metal balustrade with welding and all other necessary
accessories for completing the work. All according
drawing and shall be approved by the engineer. m2 10 0 800 0 0 -
TOTAL CARRIED TO SUMMARY ...... 0 0.00 199,232.00 199,232.00
11 FINISHING 0 0 0 -
11.1 PLASTER & POINTING 0 0 0 -
Apply three coats of internal wall plastering with
1 cement mortar 1:3 mix ratio. m2 819.872 0 137 0 0 -
Apply two coats of internal wall plastering with
2.2 cement mortar
Apply two coats1:3
of mix ratio to with
plastering recevied ceramic
cement tile.
mortar m2 0 0 0 0 -
1:3 mix ratio to receive Quartiz paint to external HCB
3.4 walls.
Apply three coats of plastering with cement mortar m2 714.272 0 108 0 0 -
1:3 mix ratio to concrete ceiling, landing ,stair case
4.6 beams & columns. m2 1402.695 0 137 0 0 -
Apply three coats of external balcony wall plastering
5.8 with cement mortar 1:3 mix ratio m2 0 0 0 0 -
pointing with cement mortar (1:3) for basement
7 stone masonry wall. m2 20.24 0 37 0 0 -
well Dressed stone with cement mortar (1:3) for front
8.2 side HCB wall ( Ground -Mazzenine floor ). m2 0 0 0 0 -
15x15x.6cm white glazed ceramic wall tile for toilet
9.4 stuck to wall with cement mortar 1:3 ratio m2 0 0 0 0 -
0 0 0 -
TOTAL CARRIED TO SUMMARY ...... 0 0 0 -
11.2 FLOOR AND WALL FINISH 0 0 0 -
Shall be in compliance with ASTM /EN 0 0 0 -
Quality standard 0 0 0 -
Marble floor tile & skirting 0 0 0 -
Shall be in compliance with ES C.D2,003 0 0 0 -
ETH.standard 0 0 0 -
1 30mm thick marble floor tile to verendas, stair case Landing and Balcony on a m2 1206.95 0 1867 0 0 -
2 10 x 2 cm thick marble skirting ml 360 0 253 0 0 -
3 48 mm thick smooth finished cement sand screed (1:3) to receive PVC floor ti m 0 0 0 0 -
Ceramic floor tile 0 0 0 -
Ceramic tiles flooring on inculding cement sand
4 screed ratio (1:3) mix m2 0 0 0 0 -
PVC floor tile & skirting 0 0 0 -
5 2mm thick PVC tiles flooring m 2
0 0 0 0 -
6 PVC skirting ml 0 0 0 0 -
Office and other Terrazo tiles flooring on inculding
7 cement sand screed ratio (1:3) mix m2 0 0 0 0 -
Office and other Terrazo skirting on inculding cement
8 sand screed ratio (1:3) mix ml 0 0 0 0 -
Copping & Sill 0 0 0 -
ES C.D2,003 Ethiopian standard 0 0 0 -
Shaped and throated white marble 0 0 0 -
Copping 0 0 0 -
9 Size:- 30 x 3 cm m 0 0 0 0 -
10 Size:- 20 x 3 cm m 140 0 396 0 0 -
Sill 0 0 0 -
11 Size:- 28 x 3cm m 120 0 626 0 0 -
12 Supply and lay carpet flooring comprising of 5mm thick carpet flooring, 20 m m 2
0 0 0 0 -
TOTAL CARRIED TO SUMMARY - 0 0 0 -
12. PAINTING 0 0 0 -
Apply three
Apply three coats
coats of
of approved
approved type
type plastic
plastic panit
panit for
for
1 internal
internal wall
wall surfaces
surfaces of concrete ceiling, landing m2 819.872 0 36 0 0 -
2 ,stair case beams & columns. m2 1200.295 0 40 0 0 -
Apply three coats of approved type plastic panit for
3 internal wall surfaces ( balcony ) m2 0 0 0 0 -
4 Apply Quartiz paint to external HCB walls. m2 795.232 0 140 0 0 -
TOTAL CARRIED TO SUMMARY ...... - 0 0 0 -
12. GLAZING 0 0 0 -
1 4mm thick clear Glass m2 0 0 0 0 -
2 4mm thick figured Glass m2 0 0 0 0 -
3 Reflective Glass for Aluminium profile frame . m 2
42.9875 0 1000 0 0 -
TOTAL CARRIED TO SUMMARY ...... 0 0 0 -
15. ELECTRICAL WORKS 0 0 0 -
Distribution boards 0 0 0 -
1 Flush mounted metal enclosures sub distribution 0 0 0 -
board SDB-GF-LIB with lockable door, earthing lead 0 0 0 -
cable terminal, labeling, connectors and all the necessary 0 0 0 -
accessories consisting of:- 0 0 0 -
1 pc main MCB of 40 A, 3-ph, Icu=10KA 0 0 0 -
1 pc main MCB of 32 A, 3-ph, Icu=10KA 0 0 0 -
8 pcs MCB of 16A, 1-ph, Icu=6KA 0 0 0 -
11 pcs MCB of 10A, 1-ph, Icu=6KA 0 0 0 -
with phase bar 50 a and 25% reserve space No 1 0 15000 0 0 -
3 Flush mounted metal enclosures sub distribution 0 0 0 -
board SDB-FF-LIB with lockable door, earthing lead 0 0 0 -
cable terminal, labeling, connectors and all the necessary 0 0 0 -
accessories consisting of:- 0 0 0 -
1 pc main MCB of 32 A, 3-ph, Icu=10KA 0 0 0 -
8 pcs MCB of 16A, 1-ph, Icu=6KA 0 0 0 -
5 pcs MCB of 10A, 1-ph, Icu=6KA 0 0 0 -
with phase bar 50 A and 25% reserve space No 1 0 8000 0 0 -
Light points 0 0 0 -
4 Light points in thermoplastic conduit of diameter 0 0 0 -
13.5mm fed through PVC donductor of 0 0 0 -
2x2.5.sq mm color coded and labled No 141 72 72 312 22464 - 22,464.00
Switch with detachable frames &Corresponding box 3rd party certified 0 0 0 -
5 Single Switch No 0 0 0 -
6 Double Switch No 13 0 442 0 0 -
7 Two way Switch No 0 0 0 -
8 Intermediate No 0 0 0 -
Socket out lets 0 0 0 -
9 1A 240V 2p+e socket out let type in thermoplastic 0 0 0 -
conduit of diameter 16mm fed by PVC conductor 0 0 0 -
Of 3x2.5 sq.mm color coded and labeled No 70 0 615 0 0 -
Extra over 0 0 0 -
Socket outlets with detachable frames & 0 0 0 -
Corresponding box 3rd party certified 0 0 0 -
10 16A, 1ph No 70 0 140 0 0 -
Type of light fittings 0 0 0 -
Supply and install the light fittings with under 0 0 0 -
mentioned specification 0 0 0 -
All light fixtures shall be third party certified 0 0 0 -
11 Mounting-celling surface 0 0 0 0 -
Lamp type fluorescent 0 0 0 0 -
Number of lamps -2 0 0 0 -
Optics Closed louver high glossy 0 0 0 -
Lamp wattage -36 watts 0 0 0 -
Luminare material steel sheet 0.7 0 0 0 -
Ingress protection -20 0 0 0 -
Size length 1230mm, width 220mm and 115mm 0 0 0 -
Height control gear 220V/50HZ, electronics balla No 16 0 595 0 0 -
12 Mounting Ceiling surface 0
Lamp type fluorescent 0
Number of lamps-4 0
Optics- Closed louver medium glossy 0
Lamp wattage 18 watts 0
Luminary material- Steel sheet 0.7 mm
Ingress protection -20
Size Length 596 mm, width 596 mm and 100 mm
height control gear 220V/50HZ, electronics ballast No 122 595
13 Mounting Ceiling surface
Lamp type fluorescent
Number of Lamps-2
Optics -Down Light
Lamp wattage-26 watts
Luminare material steel sheet 0.7
ingress protection-54
size length 260mm and 150mm height
control gear 220v/50HZ electronics ballast No 3 595
Power cable 0.6 /KV (NYY)
13 5x6 sq mm in PVC dia. 29mm ml 65 280
14 5x4 sq mm in PVC dia. 29mm ml 10 200
Data system
horizontal cabling
15 RJ 45 8 contact data socket out let points to for
flush mounting in thermoplastic conduit of 13mm
with appropriate type junction box fed by standard
Cat 6E UTP data cable and the necessary Accessories to make the systemNo 3 403
Extra over data socket outlets
With detachable frames& corresponding
Box 3rd party certified
16 RJ 45 8 Contact data soket outlets No 3 180
Data cables patch panel
17 24 port 3U RJ 45, 8 contacts patch panel with
corresponding power supply unit with power plug
and standard pivoting cabinet with rack for a wall
mounting, knock-out holes for cable entrance and
Conduct connection, ventilation ports, standard
Patch cords and 25% reserve space for hubs and
Switches, with fiber to copper converter, all he
Necessary accessories to make the system complete No 1 180
Lightning preventer
Air termination network
18 Air terminals H= 1.5 meters with base and complete
Accessories No 1 5000
19 30x3 mm Galvanized steel strip m 100 400
Down conductors
20 30x3mm galvanized steel strip with vertical supporting
Evry 1m to the wall & all the necessary accessories
Coordinate the routing of down conductors with the
Building external skin and architectural features m 40 400
21 1x70 sq mm bare copper wire m 15 250
22 Diameter 16mm & 2400 mm long copper rod No 4 8000 0
TOTAL TO SUMMARY . .. . . . . . 22,464.00 - 22,464.00
BOKRA CONSTRUCTION & TRADING PLC
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM TAKEOFF SHEET NO:0
CLIENT:MEKELLE UNIVERSITY BLOCK:
CONSULTANT :NOMY ENGINEERING PLC PAGE NO:
CONTRACTOR: BOKRA CONSTRUCTION AND TRADIN 0.00
0.00 0.00 0.00 0.00 0.00
no of no of Total No TOTAL LENGTH OF RHS FOR DIFF. SIZES
No Location size Length
members elements of RHS 20*20*2 25*25*2.530*30*2.540*40*2.5 50*50*3
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Total Length(m) 0.00 0.00 0.00 0.00 0.00
Unit Wt.(kg/m) 1.13 1.766 2.159 2.944 4.427
Tot.Wt.(kg) 0.00 0.00 0.00 0.00 0.00
AKEOFF SHEET NO:01
Lib-2
1
0.00 0.00
R DIFF. SIZES
60*60*3 Plate
0.00 0.00
5.369
0.00 0.00
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
A) SUB STRUCTURE
1) Remove top soil 30cm thick 709.48
27
28.4 766.8
766.8 M2 Total 30.03
2 19.2
0.6 23.04
2 20.8
0.6 24.96
48.00
147.98
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
Reinforced sub
structure concrete Sub structure normal finis
1) C-25 in footing pad
1.75 6/4 1.75
6 1.75 0.55 23.1
0.55 10.11 F1 16/4 1.4
1.4 0.4 35.84
16 1.4 4/4 1
0.4 12.54 F2 0.3 4.8
1.00 63.74
4 1.00
0.3 1.20 F3
23.85 M3 TOTAL
4/7 0.58
0.5 8.12
4/12 1.06
0.4 20.35
4/2 0.87
0.4 2.78
2) C-25 in Foundation column 4 0.75
0.58 Aver H =0.58 0.5 1.50
7 0.5 4/2 0.95
0.5 1.015 M3 C1 0.4 3.04
1.06 4 1.05
12 0.4 Aver H =1.06 0.5 2.10
0.4 2.035 M3 C2 4 1.1
0.87 0.25 1.10
2 0.4 Aver H =0.87 39.00
0.4 0.278 M3 C3
0.75
1 0.5 Aver H =0.75
0.5 0.188 M3 C4
0.95
2 0.4 Aver H =0.95
0.4 0.304 M3 C5
1.05
1 0.5 Aver H =1.05 22.6
0.5 0.263 M3 C6 2 0.5
1.1 1.249 28.2274
1 0.25 Aver H =1.10 24
0.25 0.069 M3 C7 2 0.5
4.15 M3 TOTAL 1.249 29.976
58.2034
PROJECT: MEKELLE UNIVERSITY
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING
NO L*W*D QTY DESCRIPTION NO L*W*D QTY
TAKEOFF SHEET NO:01
BLOCK: Library -2
PAGE NO: 01
DESCRIPTION
6) Selected borrowed fill
m3 Total excavation
deduct concrete works
lean concrete
m3
concrete pad
m3
Foundation column's
M3
m3 sub total
7) Disposal
TOTAL EXCAVATION
m3 1) site clearing
m3 2) bulk excavation
m3 4) pit excavation
m3 5)Trench excavation
m3 Total
03) Concrete work
3.1) In situ concrete
Plain blinding concrete C-5
a) To footing pad
F1
F2
F3
Total M2
b) To grade beam
M2 TOTAL
TAKEOFF SHEET NO: 01
BLOCK: Library -2
PAGE NO: 04
DESCRIPTION
Form work
Sub structure normal finish to:
A) Footing pads
M2 F1
M2 F2
M2 F3
M2 TOTAL
B/Foundation column's
M2 C1
M2 C2
M3 C3
M2 C4
M2 C5
M2 C6
M2 C7
M2 TOTAL
Ave D=1.249m
Axis A & E b/n 1-5
M3
Ave D=1.249m
Axis 1 & 5 b/n A-E
M3
M3 TOTAL
TAKEOFF SHEET NO: 01
BLOCK: Library -2
PAGE NO: 05
DESCRIPTION
MEKELLE UNIVERSTY COMMUNITY SCHOOL
PEDG:- PEDAGOGY
AT MEKELLE
Previous Current Todate
A-SUB STRUCTURE Amount Amount Amount
B-SUPER STRUCTURE
2 BLOCK WORK
BIRR 0 77,819.67 - 77,819.67
8 PAINTING BIRR 0 - - -
9 GLAZING BIRR 0 - - -
MEKELLE UNIVERSTY CO
Fence w
AT MEKE
Fill under hard core with imported selected materials from out side well
1.04 rolled and compacted in layers not exceeding 200mm thick M3 423.2
Total to Summary..Birr
2. CONCRETE WORK
Total to Summary..Birr
3. MASONRY WORK
Total to Summary..Birr
4. METAL WORK
Supply and fix 30*30*2.5mm RHS c/c 20cm to all fence walls to a height
of 120cm as shown in architectural detail.Price shall include 2 coats of
4.01 painting. Kg 18109.22
Total to Summary..Birr
5. BLOCK WORK
20cm thick class 'B' HCB wall beddedand jointed in cement mortar (1:3)
5.01 both side left for appropriate finishing. M2 424.8
120 cm thick, 270cm tall wall dressed stone column c/c 300cm bedded
and jointed in cement mortar (1:3) both sides left for finishing.price
includes dressing good quality stone ,cement and all the necessary
5.02 equipments. M2 238.95
Total to Summary..Birr
6.FINISHING
6.1.WALL FINISH
PAINTING M2 846.4
Total to Summary..Birr
UNIVERSTY COMMUNITY SCHOOL
Fence work
AT MEKELLE
Previous
Amount Current Amount
25,444.32 32,726.50
855,562.25 253,878.08
328,767.12 337,595.40
0 410538.168
98,496.09 187,401.90
- -
1,308,269.78 1,222,140.04
Previous Current Todate
QTY Amount Amount RATE Previous Amount Current Amount
0 2 0 0
0 0 0
0 55 0 0
0 0 0
0 156 0 0
0 0 0
- 0 85 0 -
0 0
25,444.32 32,726.50
- 0 -
- 0 -
88.95 16.32 105.27 2539 225844.05 41,436.48
- 0 -
37.856 12.99 50.85 2539 96116.384 32,986.69
- 0 -
- 0 -
- 0 -
355.8 108.80 464.60 166 59062.8 18,060.80
- 0 -
567.84 194.88 762.72 208 118110.72 40,535.04
- 0 -
- 0 -
- 0 -
2313.02 243.76 2,556.77 36 83268.648 8,775.22
- 0 -
1320.88 651.75 1,972.63 36 47551.68 23,463.00
- 0 -
5661.89 767.23 6,429.12 36 203827.968 27,620.35
- 0 -
1270.50 1,270.50 36 0 45,738.00
0 -
855,562.25 253,878.08
0 0
0 0
- 784 0 -
-
328,767.12 337,595.40
0 410538.17
0 120 0 0
98,496.09 187,401.90
0 140
0
0 40
0
Todate
Amount
58,170.82
1,109,440.33
666,362.52
410538.168
285,897.99
2,530,409.82
Todate Amount
0.00
0.00
0.00
0.00
58,170.82
0.00
0.00
0.00
0.00
0.00
58,170.82
37,042.50
0.00
0.00
0.00
267,280.53
0.00
129,103.07
0.00
0.00
0.00
77,123.60
0.00
158,645.76
0.00
0.00
0.00
92,043.86
0.00
71,014.68
0.00
231,448.32
0.00
45,738.00
0.00
1,109,440.33
0.00
0.00
666,362.52
0.00
0.00
666,362.52
410,538.17
410538.17
285,897.99
0.00
0.00
0.00
0.00
285,897.99
BOKRA CONSTRUCTION & TRADING PLC
Project:- MUBP86 Takeoff No 1
Location:-AYNALEM Block:- Fence wor
Client:- MEKELLE UNIVERSTY
Consultant:- NOMY ENGINEERING PLC
No L*W*D QTY Description No L*W*D QTY
A. SUB STRUCTURE
1. EXCAVATION & EARTH WORK 136
2 0.4 108.80
1.03-Excavate for trench 108.80
foundation in ordinary soil to a
depth not exceeding 1500mm
from reduced level.
370.00 Aver Depth = 1.45 ml 2.8
1.00 TL= 370 ml 58/4 0.3 194.88
1.45 536.5 M3 194.88
536.5 M3 Total
370
0.5
1.48 273.8
273.80
2. CONCRETE WORK
Description
Form work
A. To grade beam
M2
M2 Total
B. Elevation Column
Aver=0.4+0.2/2=0.3m
C1
M2 Total
3.MASONRY WORK
3.01-500mm thick basaltic or
equivalent type stone
masonury
Aver Height= 1.48m
M3
M3 Total
5. BLOCK WORK
M2
M2 Total
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING PLC
SUPER STRUCTURE BAR SCHEDULE SUMMARY
Descrption TOTAL Wt. OF BAR FOR DIA.
Diameter 6 8 10 12 14
Tot.wt. (kg) 243.76 651.75 0.00 767.23 1270.50
Bar e No in a No Total No TOTAL LENGTH OF BAR FOR DIA.
Location Dia. Length
ap
A-SUB STRUCTURE
2 CONCRETE WORK
BIRR
B-SUPER STRUCTURE
1 CONCRETE WORK
BIRR
2 METAL WORK.BIRR
- - 20,031.35 17,658.45
- - 143,533.20 143,533.20
- ### ###
- - 188,911.53 188,911.53
### ###
### ###
Current Todate Previous
QTY QTY RATE Amount Current Amount Todate Amoun
- 75.00 - - -
- 61.00 - - -
- - 85.00 - - -
- 143.00 - - -
- - 20,031.35 17,658.45
- - - -
- - -
21.01 21.01 75.00 - 1,575.94 1,575.94
5.43 5.43 75.00 - 406.88 406.88
- 75.00 - - -
- 75.00 - - -
- - - -
10.00 10.00 ### - 25,390.00 25,390.00
2.80 2.80 ### - 7,109.20 7,109.20
3.40 3.40 ### - 8,637.68 8,637.68
- 70.00 - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- 199.90 - - -
- - - -
20.00 20.00 166.00 - 3,320.00 3,320.00
22.40 22.40 166.00 - 3,718.40 3,718.40
21.07 21.07 166.00 - 3,497.62 3,497.62
- - - -
156.89 156.89 36.00 - 5,648.18 5,648.18
- 36.00 - - -
2,339.70 2,339.70 36.00 - 84,229.30 84,229.30
- 143,533.20 143,533.20
- - -
- - -
- - -
14.13 14.13 ### - 35,863.38 35,863.38
6.80 6.80 ### - 17,275.36 17,275.36
- - - -
113.00 113.00 185.00 - 20,905.00 20,905.00
42.14 42.14 208.00 - 8,765.12 8,765.12
- - - -
- 36.00 - - -
400.81 400.81 36.00 - 14,429.03 14,429.03
- 36.00 - - -
340.99 340.99 36.00 - 12,275.71 12,275.71
- 36.00 - - -
2,205.50 2,205.50 36.00 - 79,397.93 79,397.93
- 188,911.53 188,911.53
BOKRA CONSTRUCTION & TRADING PLC
Project:- MUBP86 Takeoff No 1
Location:-AYNALEM Block:- Elevated Water R
Client:- MEKELLE UNIVERSTY
Consultant:- NOMY ENGINEERING PLC
No L*W*D QTY Description No L*W*D QTY
A.SUB STRUCTURE
1. EXCAVATION & EARTH WORK
Bulk excavation in ordinary soil
not exceeding 1500mm from 22.68
NGL.
Aver Depth = 1.50 m 0.5
Using the Formula 2p R *H 1 0.3 3.402
3.14 p =3.14 3.402
4.58 R = 4.58
2 1.50 43.14 M3 Total
1.03-Excavate for Pit 2.00
foundation in ordinary soil to a
depth exceeding 1500mm but 4/5 0.5 20.00
not 3000mm. 20.00
2.50 Aver Depth = 0.74m
2.50 2.24
5 0.74 23.125 M3 4/5 0.5 22.40
23.125 M3 Total 22.40
1.5- Back Fill around Footing pads
66.27 Total Bulk & pit excavation
Deduct 21.07
1.05 Lean concrete 2 0.5 21.07
10.00 Footing pad concrete work 21.07
2.80 Foundation column
52.42 M3 Total
3.5
2. CONCRETE WORK 0.5
5 0.5 4.38
2.1) 50mm thick lean concrete in C-
5 3.9
2.05 A. Under Footing pads 0.5
5 2.05 21.01 M2 5/2 0.5 9.75
21.01 M2 Total 14.13
Description
M3
M3 Total
Form work
A. To Footing pads
M2
M2 Total
B-To Foundation Column's
C1
M2 Total
C- To Grade beam
External-22.68m, Internal 19.46m
Aver=22.68+19.46/2=21.07m
M2 Total
B. SUPER STRUCTURE
1. CONCRETE WORK
1.1-Elevation Column's
M3
M3 Total
Form work
*Ground Floor Column
M2
*1st and 2nd Floor column's
M2
M2 Total
1.2-In Intermidiate Beams @
3.90m & 8.20m
External 22.68m, Internal 19.46m
Aver=22.68+19.46/2=21.07m
M2 Total
LOCATION: AYNALEM
CLIENT:MEKELLE UNIVERSITY BLOCK: Elevated Wat
CONSULTANT :NOMY ENGINEERING PLC
CONTRACTOR: BOKRA CONSTRUCTION AND TRADING PLC
SUPER STRUCTURE BAR SCHEDULE SUMMARY
Descrption TOTAL Wt. OF BAR FOR DIA.
Diameter 6 8 10 12 14
Tot.wt. (kg) 0.00 156.89 0.00 0.00 0.00
Bar No in a No Total No TOTAL LENGTH OF BAR FOR DIA.
Location Shape Dia. Length
No Member Member of Bars 8 10 12 14
Sub-structure
Footing pads
F1 20 2.7 28 5 140
Foundation column 0 0
C1 20 4.04 12 5 60
Stirrup 8 1.9 13 5 65 123.5
Grade beam @ 0.00m 20 12 24 1 24
Negative bars 20 2 4 5 20
ST-1 8 1.7 161 1 161 273.7
Super-structure 0
Elevation column's 20 4.7 12 5 60
ST-1 8 1.9 24 5 120 228
Intermidiate beams @
12 12 16 2 32 384
3.90m & 8.20m
ST-1 8 1.7 161 1 161 273.7
1st @ 2nd floor Elevation
20 5.1 12 10 120
column's
St-1 8 1.9 27 10 270 513
378
242.4
288
40
0 948.4 0
1.579 2.467 3.552
0.00 2339.70 0.00
TAKEOFF SHEET NO:01
LOCK: Elevated Water Reserviour
PAGE NO--2
282
612
0 894 0
1.579 2.467 3.552
0.00 2205.50 0.00
MEKELLE UNIVERSTY COMMUNITY SCHOOL
SUMMARY
Amount
TOTAL . BIRR -
1 MV Utility Supply
Manhole
3.1
Manhole in bricks and with concrete base
internally of 900x900x700mm including
concrete cover with lifting hole. No 5,457.00
PVC pipes.
5.1
Main Distribution Board (MSB1) in sheet
steel enclosure, floor standing with lockable
door including bus bars of 320 Amp, 3 Phase
rating, neutral and earth bars, connection
terminals, complete and consisting of:-
1 pc 20A, MCB,1 Phase
1 pc 25A, MCB,1 Phase
1 pc 16A, MCB,31 Phase
6 pcs 25A, MCB,3 Phase
2 pcs 32A, MCB,3 Phase
3 pcs 50A, MCB,3 Phase
1 pc 250A, MCCB,3 Phase
1 pc 24 Hour programmable timer switch,
complete with all accessories
3 pcs ammeter of (0-320A) with current
transformer
1 pc volt meter (0-500 V), with selector
switch
3 pcs pilot lamps. No 32,000.00
5.2
Main Distribution Board (MSB2) in sheet
steel enclosure, floor standing with lockable
door including bus bars of 320 Amp, 3 Phase
rating, neutral and earth bars, connection
terminals, complete and consisting of:-
2 pcs 25A, MCB,1 Phase
1 pc 16A, MCB,31 Phase
7 pcs 25A, MCB,3 Phase
3 pcs 32A, MCB,3 Phase
2 pcs 50A, MCB,3 Phase
1 pc 250A, MCCB,3 Phase
1 pc 24 Hour programmable timer switch,
complete with all accessories
3 pcs ammeter of (0-320A) with current
transformer
1 pc volt meter (0-500 V), with selector
switch
3 pcs pilot lamps. No 35,000.00
6 Feeder Power Cables
Multi-core power cable copper conductor,
PVC/PVC, colour coded, in 50 mm diameter
PVC Pipes, connected and tested, all as
specified and as shown on drawings
CABLES
6.1 (4x16+1x16)mm sq. ml 500.00
7 External Lighting
NO 25,000.00
Total to Summary....Birr
SITE SANITARY WORKS
1 WATER SUPPLY
1.1 Pipe work
a) Dia.25mm ml 60.00
b) Dia.25mm ml 60.00
c) Dia.32mm ml 100.00
d) Dia.40mm ml 150.00
e) Dia.50mm ml 200.00
f) Dia.63mm ml 250.00
g) Dia.75mm ml 350.00
b) Dia.40mm No 500.00
c) Dia.50mm No 800.00
d) Dia.65mm No 1000.00
2 SITE WASTE AND STORM WATER
DRAINAGE SYSTEM
iii) Load and cartaway surplus ecavated
material from t
2.1 Pipe work
Supply,lay,test & commission uPVC,PN-6 waste
drainage pipes to an average depth of 800mm
according to the drawing shown with a minimum
slope of 1% or as inicated on the sanitary site work
on a firm bed granular material of 100mm below
and 200mm above the crown of pipe as shown on
the detail drawing.The joints shall be made tight
and installation shall make the best condition for
cleaning and maintenance.For pipe laying follow
manufacturer's instruction & technical specification.
a) Dia.110 mm ml 100.00
b) Dia.160 mm ml 150.00
Dia.600 mm No 8000.00
2.6.1 Ditch/Channels
a - open ditch
b - grilled ditch
Accessories
No 1200.00
c- Level control switch to start & stop the
transfer pump at the given water
level.Price shall include all necessary
electric wiring to the pumps. No 3500.00
4 Pumps
Capacity: Q= 3 liter/Second
H= 14 meter No 25000
Total to Summary.....Birr
RY
Amount
80,000.00
80,000.00
AMOUNT
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
80,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
80,000.00