GS 33Q07K20-31E
OVERVIEW
The Plant Resource Manager (hereinafter called PRM) for the eldbus era efciently handles eld device manage-
ment and maintenance work. This General Specications (GS) describes Yokogawa Electrics engineering work to
introduce PRM into the CS 3000 system.
Note: If the classication indicated is Essential, the corresponding item should be conducted without fail.
If the classication is Optional, it should be conducted according to customers needs.
Function Generation
Set-up
In function generation, we install Windows, Oracle,
and the PRM package in the customers PC at the
Yokogawa headquarters factory.
We also dene device paths and the message acqui-
sition source (HIS), according to the hardware and
functional specications.
Start-up
Device Registration Into the PRM Database
We register the eld devices into the PRM database on
site.
All Rights Reserved. Copyright 2004, Yokogawa Electric Corporation GS 33Q07K20-31E Mar. 1, 2004-00
Subject to change without notice.