Sie sind auf Seite 1von 4

QUALITY CONTROL PROGRAM

Project : Network Development - Off- Carriageway Improvement Including Drainage,


Secondary Roads, Paniqui-Camiling-Wawa Road, Tarlac 1st Legislative District,
Province of Tarlac
Limits : KO 150+849.00 - KO 151+356.00= 507.00 lm
KO 152+866.00 - KO 153+146.00= 280.00 lm
KO 153+171.57 - KO 153+601.00= 429.43 lm
KO 156+241.00 - KO 157+650.00= 1409.00 lm
KO 158+002.00 - KO 158+320.00= 318.00 lm
Location : Province of Tarlac
Appropiation : P 66,857,000.00
Contractor : LSD CONSTRUCTION AND SUPPLIES

A. TEST TO BE PERFORMED :
Item No. Description Unit Quantity
PART A. FACILITIES FOR THE ENGINEERS
A.1.1(8) Office and Laboratories for the Engineers mo. 6.33
A.1.2.(2) Service Vehicle for the Engineers mo. 6.33

PART B. OTHER GENERAL REQUIREMENTS


B.5.1 Project Billboard/Signboard (DPWH) pcs. 2.00
B.5.2 Project Billboard/Signboard (COA) pcs. 1.00
B.7 Occupational Safety and Health Program mo. 6.33
B.8 Traffic Management mo. 6.33
B.9 Mobilization/Demobilization l.s. 1.00

PART C. EARTHWORKS
102(2) Surplus Common Excavation cu.m 3,004.00
104(1)a Embankment cu.m 770.00
105(1) Subgrade Preparation sq.m 10,534.00

PART D. SUB-BASE AND BASE COURSE


200(1) Aggregate Subbase Course (t=200mm) cu.m 2,112.00

PART E. SURFACE COURSE


311(a) PCCP (Unreinforced) ( t=230mm) sq.m 10,443.00
a. Cement bags 22,817.96
b. Fine Aggregates cu.m 1,297.02
c. Coarse Aggregates cu.m 1,633.29
d. RSB kgs. 1,633.29
e. Joint Sealant
f.Concrete cu.m 2,401.89

g. Pavement sq.m 10,443.00

PART H. MISCELLANEOUS STRUCTURES


603(3)a Metalbeam Guardrail incl. Post lm 998.00
603(3)b Metalbeam End Piece pcs 4.00
612(1) Reflectorized Thermoplastic Pavement Markings (White) sq.m. 589.00
620(a) Chevron Signs pcs 67.00

PART G. DRAINAGE AND SLOPE PROTECTION STRUCTURES


505 (5) Grouted Riprap cu.m 228.00
a.Cement bags 456.00
b.Fine Aggregates cu.m 38.76
c.Stone cu.m 228.00
103-1a Structural Excavation cu.m 4,120.00
103-3 Foundation Fill bags 257.00
404(1)a Reinforcing Steel kg 177,015.00
405(1)a3 Structural Concrete cu.m 1,448.00
a. Cement bags 13,032.00
b. Fine Aggregates cu.m 781.92
c. Coarse Aggregates cu.m 984.64
d. Concrete cu.m 1,448.00

a) Serv./Field Test (65%)(C-1) 0.00 3. Apportionment (For Admin. Proj.)-for Dist


b) Q. Test (15%)(C-1) 0.00 Proj. Lab. (C-1)
c) Misc. & other (20%)(C-1) 0.00 Regional Lab. (43%)(C-1)
d) Total Cost P 0.00 Total
ROGRAM
Including Drainage,
c 1st Legislative District,

Min. Test Requirements

P.E. Certificate
P.E. Certificate

P.E. Certificate
P.E. Certificate
P.E. Certificate
P.E. Certificate
P.E. Certificate

P.E. Certificate
1-GPC,24-FDT
2-GPC,66-FDT

8-GP, 2-QT,4-C,66-FDT,1-CBR

12-QT
1-QT, 18-G
2-QT, 22-G
1-QT for every 10,000kgs for each size
1-set of conc. cylinder sample for each
day's pouring but not more than 75 cum.
5-holes per km.per lane

1-QT
1-QT, 1-G
1-Sp. Gr./I.R.
P.E. Certificate
P.E. Certificate
1-QT for every 10,000kgs for each size

7-QT
1-QT, 11-G
1-QT, 14-G
1-set of conc. cylinder sample for each
day's pouring but not more than 75 cum.