Prepared by :
Detailed Estimate for Construction of Vertical extension of Armed Veng Branch YMA
Building. (Rate are based on SOR 2007 plus Cost index of 26.06% )
Earthwork in excavation
in foundation trenches or
drains etc. (not exceeding
1.5m in width or 10sqm
on plan) including
dressing of sides and
1/2.07 ramming of bottoms, lift
upto 1.5m including
getting out excavated soil
and disposal of surplus
excavated soil as directed
within a lead of 50 metres.
Filling available
excavated earth
(excluding rock) in
trenches, plinth, sides of
3/2.18 foundations etc. in layers
not exceeding 20cm in
depth, consolidating each
deposited layer by
ramming and watering,
lead up to 50 m and lift
upto 1.5 m.
Column Cum 9 1.20 1.20 0.90 11.70 58.87 688.78
HYSD bars like
TATA/SAIL (ISI/ISO
certified) or equivalent
reinforcement for RCC
1/5.07 work including
straighthening, cutting,
bending, placing in
position and binding all
complete.
Column Footing :
12mm @ 200c/c 18 1.00 0.89 16.00
Length Breath Height Rate Amount
Sl No. Description Unit Nos. Quantity
in (m) in (m) in (m) in INR in INR
Column:
20mm vertical bar 24 10.65 2.47 631.30
24 9.77 2.47 579.20
24 8.58 2.47 508.60
8mm stirrup @ 120c/c 80 1.10 0.39 34.30
73 1.10 0.39 31.30
63 1.10 0.39 27.00
Stairs:
Waist slab 1 3.45 1.00 0.125 0.40
1 1.65 1.00 0.125 0.20
Landing 3 1.00 1.00 0.125 0.40
Steps 0.5 16 1.00 0.185 0.25 0.40
27.10
Deduct Staircase 1 7.57 1.00 0.125 0.90
26.20 7081.17 185526.61
(a) 40 mm thick.
D 1 1.05 1.95 2.05
D1 4 0.75 1.95 5.85
D2 4 0.6 1.95 4.68
Sqm 12.58 1495.58 18810.61
Providing and fixing 1st
class local wood panelled
and glazed shutters using
3mm thick plate sheet
glass for doors and
7/9.13 windows etc. including
M.S. butt hinges with
necessary screws, etc.
complete.
(a) 40 mm thick.
W/V 8 1.65 1.73 22.84
W1/V1 6 0.75 1.73 7.79
V3 4 0.45 0.3 0.54
Sqm 31.16 1546.38 48186.69