Trademaster Tower

A100, A200, A300, A400, A500, A600, A700


BASIC SAFETY
Before using this equipment and to avoid personal injury, carefully read and understand these instructions. If there is
anything you do not understand, DO NOT use this equipment, contact your local supplier for advice.
Make sure you are aware of all safety requirements and that this equipment is suitable for the task you wish to undertake.
The work area must be cordoned off from the general public and bystanders.
This equipment must not be erected, used or dismantled by persons who are under the influence of alcohol or drugs.
Do not use this equipment if you are tired or unwell.

This equipment must only be used by persons who are medically fit to do so. If you have any medical
condition, are recovering from any medical condition or suffer from any mental or physical disability, you
MUST seek professional medical advice before using this equipment.

You MUST perform a risk assessment before using this equipment to ensure your safety and the safety of others.
Wear the correct Personal Protective Equipment for the task ahead.
Wear gloves when handling this equipment. Steel toecap boots must be worn. Wear a hard hat.
DO NOT wear loose jewellery or clothing that may get in the way or become trapped in the equipment. Tie back long
hair.
Inform everyone in the work area of what you are doing.
DO NOT lean from the platform and never apply a lot of side force, maximum 20kn.
Never use step ladders or similar to gain additional height.
DO NOT use this equipment where there are overhead power lines or similar hazards within your reach and that of the
equipment.
This equipment must not be used in wind conditions above 17 mph, (7.7 m/s, Beaufort scale 4; Large branches in motion;
whistling heard in telegraph wires; umbrellas used with difficulty).
If the wind becomes a strong breeze, expected to reach 25mph (11.3 m/s), tie the tower to a rigid structure. If the wind
is likely to reach a gale force, over 40mph (18 m/s), the tower should be dismantled.
Take care when using mobile scaffold towers in hangars or uncovered buildings as the wind force may be increased due
to a funnelling effect.
Only use this equipment if you are comfortable working at heights.
Never suspend the tower from another structure.
Make sure that all four castors are locked and remain in contact with the ground at all times.

RAISING COMPONENTS
You must not raise any tower component at height by carrying it. Use suitable rope to tie to each component and haul
up.

LIMITATIONS OF USE
The tower must only be erected on firm ground capable of bearing its weight, plus tools and users.
It MUST NOT be used to access another structure.

WORK AREA PREPARATIONS


Clear the floor area of all obstacles and debris. Where possible sweep the floor.
Cordon off the work area and where applicable, stop any pedestrian or forklift activity.

PRE-INSPECTION
Check each component for condition and correct operation BEFORE you start erecting the tower. Any faulty or damaged
items MUST be replaced before erecting the tower.
As you inspect each part, segregate types to make the task easier.

ACCESSING THE TOWER


Always use the tower frames built in ladder rungs to access platforms and climb from inside the tower NEVER from the
outside.
When climbing, always keep your feet in the middle of the rungs and grip the upper rungs with your hands NEVER the
sides.
When ascending or descending, you must keep your hands free to grip the rungs, so if you need to carry anything with
you, use a suitable tool belt.
Do not lean a ladder against the tower.
Do not jump from, or to the tower frames or platforms.
2 2008 Textwrite Publications Ltd
MAXIMUM SAFE WORKING LOAD
Each platform has a maximum safe working load of 200 kg/m2 and this must be spread evenly over the platform area.
The tower is NOT designed for attaching additional equipment to it IE a hoist.

ASSEMBLY OF COMPONENTS
The Tower components will need assembling before the tower can be erected. You will need 1 x 17mm spanner for the
assembly of the ballast bar, and 2 x 10mm spanners for the Snaplock assembly.

Stabilisers Snaplocks
All Stabilisers will need to have the The Snaplocks must be fitted to the
ballast bars bolted into place. Position horizontal and diagonal braces. When
the bar on the outer side of the stabiliser fitted, the locks should be opened ready
and secure with the nut and washer for attachment to a frame tube. Attach
provided. As these will support quite one snap lock to each end of all
substantial weights, make sure they are horizontal and diagonal braces.
securely fitted.

Interlock Clip Screw Clamps


The Interlock Clip is basically a spring These simple screw clamps are used to
clip fitted with a pin that locates into a secure the stabilisers to the towers
retaining hole. When the pin is inserted vertical corner tubing.
into a hole it is held in place by the
spring. It is used to lock the tower
frames together when they are placed
one on top of the other.

3T (THROUGH THE TRAPDOOR) SYSTEM


This method of construction reduces the risk faced by the erector from a fall. You will
complete an assembly platform from which to add the next lift then another platform until
the final height is reached.
Using standard components, the erector will always be protected by a set of guard rails.
These will be attached to the frames whilst the erector sits on the platform with legs through
the hatch.
USE THIS METHOD! It has been developed for your safety. If you ignore it, you risk serious
injury or death.
3 2008 Textwrite Publications Ltd
GETTING STARTED
The Trademaster tower is supplied in modular format. Correct assembly will require that you have the modules necessary
for a given platform height.
Check with the schedule below to confirm the modules required.
Number of 10kg ballast weights required on each stabiliser
Size Platform Height Modules Required Stabiliser Pack Indoor Use Outdoor Use
Trademaster A100 1 Metre A No NA NA
Trademaster A200 2 Metre A+B Optional NA NA
Trademaster A300 3 Metre A+B+D Included NA NA
Trademaster A400 4 Metre A+B+C Included NA NA
Trademaster A500 5 Metre A+B+C+D Included 1 1
Trademaster A600 6 Metre A+B+C+C Included 2 2
Trademaster A700 7 Metre A+B+C+C+D Included 2 2

A B C D
Modules
Weight Kg Base Pack Guardrail Pack Lift Pack Lift Pack Stabiliser Pack Castor Pack
Product Code Description 48420 48421 48422 48423 48428 44444
44400 Base Frame 1.75m - 7 Rung 6 2
44405 End Frame 2.00m - 8 Rung 6.5 2 1
44407 End Frame 1.00m - 4 Rung 3.6 2
44410 Horizontal Brace 1.50m 1.2 1 5 4
44420 Diagonal Brace 1.50m 1.5 1 1 3 1
44435 Trapdoor Platform 9.4 1 1 1
44470 Side Toeboard 1.50m 3.5 2
44469 End Toeboard 0.70m 0.7 2
44459 Footplate Incl. Locking Pins 0.5 4
44460 Balast Weight 10Kg 10
44454 Height Adjustable Locking Castor 3.75 4
44472 Telescopic Stabiliser Leg 5.5 2

ASSEMBLY
For clarity, these instructions deal individually with the towers construction dependant upon total maximum height, from
start to finish.
Please go directly to the set of instructions that cover the tower you are erecting.

Trademaster A100
Using Base Pack A to give a work platform height of 1M.
Take the first two base frames and fit with base plates and adjustable legs. Alternatively, fit with
castors if purchased as an optional extra. Turn the legs height adjustment collar so that each
leg will be set 50mm from the lowest position with the leg fully inserted into the frames tube.

Attach the horizontal brace to the lowest horizontal tube of one base frame square and level. Levelling the tower is best achieved with a spirit level. DO
and close the Snaplocks. Next, attach the other end of the brace to the lowest NOT use the adjustable legs to gain additional height.
horizontal tube of the remaining base frame and close the Snaplocks. Finally position the platform on the fourth rung of the base frames and close
Attach the diagonal brace from the first rung of a base frame to the fifth rung the Snaplocks.
of the opposite frame and close the Snaplocks. The tower is now ready to use.
Now lock all four castors (if fitted) then adjust each leg to bring the tower

4 2008 Textwrite Publications Ltd


Trademaster A200
Using Base Pack A and Guardrail Pack to give a maximum work platform height of 2M.
Take the first two base frames and fit with base plates and adjustable legs. Alternatively, fit
with castors if purchased as an optional extra. Turn the legs height adjustment collar so that
each leg will be set 50mm from the lowest position with the leg fully inserted into the frames
tube.

Attach a horizontal brace to one side of the lowest horizontal tube of one base Now lock all four castors (if fitted) then adjust each leg to bring the tower
frame and close the Snaplocks. Next, attach the other end of the brace to the square and level. Levelling the tower is best achieved with a spirit level. DO
lowest horizontal tube of the remaining base frame and close the Snaplocks. NOT use the adjustable legs to gain additional height.
Then take a second horizontal brace and attach to the opposite side of the Release the interlock clips fitted to the top of each base frame. Fit a four rung
lowest horizontal tubes of the base frames. frame to each base frame and insert the interlock clips ensuring they are
Attach a single diagonal brace from the first rung of a base frame to the fifth secure.
rung on the opposite side of the tower and close the Snaplocks. Fit a brace
on the other side but in the opposite direction.

Optional Stabilisers Take a horizontal brace and from the seated position, attach one end to the
farthest frame and the other to the nearest frame two rungs above and to the
Fit the stabilisers at this stage, prior to fitting any platform.
side of the platform.
Fit a stabiliser to each corner of the tower. Loosen all screw clamps then
Fit a second brace above the first brace on the fourth rung above the platform.
position the stabiliser as shown.
Repeat this on the other side of the platform so that the area is protected on
Position the lower horizontal clamp just above the frames second both sides at 49.5 cm and 99 cm.
horizontal bar and the top clamp below the nearest casting.
Make sure that all Snaplocks have locked in position before accessing the
Set each stabiliser at a 45 degree angle. Adjust each stabilisers length platform.
and position to bring the foot pad in contact with the ground.
Climb onto the platform and make sure that the access hatch closes correctly.
Make sure that all screw clamps are correctly secured.
The platform must be fitted with toeboards to prevent tools and materials
Carefully position a platform on to the seventh rung of the base frames and from slipping off the platform and falling to the ground.
close the Snaplocks. Firstly, slot the end toeboards into position across the tower frames.
Climb the base frame rungs from inside the tower, open the trap and continue Next, slot the side toeboards into the runners fitted to the end Toeboards.
until you can sit on the platform with legs through the trap and your feet on The tower is now ready to use.
a rung.
From this position, you can attach two sets of hand rails (horizontal braces)
on each side of the platform.

5 2008 Textwrite Publications Ltd


Trademaster A300
Using Base Pack A, Guardrail Pack B and Lift Pack D to give a maximum work platform
height of 3M.
Take the first two base frames and fit with base plates and adjustable legs. Alternatively, fit
with castors if purchased as an optional extra. Turn the legs height adjustment collar so that
each leg will be set 50mm from the lowest position with the leg fully inserted into the frames tube.

Attach a horizontal brace to one side of the lowest horizontal tube of one base rung frame to the remaining base frame. Make sure that you insert all
frame and close the Snaplocks. Next, attach the other end of the brace to the interlock clips ensuring they are secure.
lowest horizontal tube of the remaining base frame and close the Snaplocks. Fit the stabilisers at this stage, prior to fitting any platform.
Then take a second horizontal brace and attach to the opposite side of the Fit a stabiliser to each corner of the tower. Loosen all screw clamps then
lowest horizontal tubes of the base frames. position the stabiliser as shown.
Attach a single diagonal brace from the first rung of a base frame to the fifth Position the lower horizontal clamp just above the frames second horizontal
rung on the opposite side of the tower and close the Snaplocks. Fit a brace bar and the top clamp below the nearest casting.
on the other side but in the opposite direction.
Set each stabiliser at a 45 degree angle. Adjust each stabilisers length and
Now lock all four castors (if fitted) then adjust each leg to bring the tower position to bring the foot pad in contact with the ground.
square and level. Levelling the tower is best achieved with a spirit level. DO
NOT use the adjustable legs to gain additional height. Make sure that all screw clamps are correctly secured.
Release the interlock clips fitted to the top of each base frame. Fit both four
rung frames together then fit the pair to one of the base frames. Fit the eight

Carefully position the platform on to the third rung of the base frames and Fit a second brace above the first brace on the fourth rung above the platform.
close the Snaplocks. Make sure that all Snaplocks have locked in position Repeat this on the other side of the platform so that the area is protected on
before accessing the platform. both sides at 49.5 cm and 99 cm.
Attach a single diagonal brace from the sixth rung of a base frame to the tenth Make sure that all Snaplocks have locked in position before accessing the
rung on the opposite side of the tower and close the Snaplocks. platform.
Carefully position the second platform on to the eleventh rung and close the The platform must be fitted with toeboards to prevent tools and materials
Snaplocks. from slipping off the platform and falling to the ground.
Climb the frame rungs from inside the tower, open the trap and continue until Firstly, slot the end toeboards into position across the tower frames.
you can sit on the platform with legs through the trap and your feet on a rung. Next, slot the side toeboards into the runners fitted to the end Toeboards.
From this position, you can attach two sets of hand rails (horizontal braces) The tower is now ready to use.
on each side of the platform.
Take a horizontal brace and from the seated position, attach one end to the
farthest frame and the other to the nearest frame two rungs above and to the
side of the platform.

6 2008 Textwrite Publications Ltd


Trademaster A400
Using Base Pack A, Guardrail Pack B and 2M Lift Pack C to give a maximum work
platform height of 4M.
Take the first two base frames and fit with castor and adjustable leg. Turn the legs height
adjustment collar so that each leg will be set 50mm from the lowest position with the leg fully
inserted into the frames tube.

Attach a horizontal brace to one side of the lowest Now lock all four castors (if fitted) then adjust Fit the stabilisers at this stage, prior to fitting any
horizontal tube of one base frame and close the each leg to bring the tower square and level. platform.
Snaplocks. Next, attach the other end of the brace Levelling the tower is best achieved with a spirit Fit a stabiliser to each corner of the tower. Loosen
to the lowest horizontal tube of the remaining level. DO NOT use the adjustable legs to gain all screw clamps then position the stabiliser as
base frame and close the Snaplocks. additional height. shown.
Then take a second horizontal brace and attach to Release the interlock clips fitted to the top of each Position the lower horizontal clamp just above the
the opposite side of the lowest horizontal tubes of base frame. Fit a four rung frame to each base frames second horizontal bar and the top clamp
the base frames. frame and insert the interlock clips ensuring they below the nearest casting.
Attach a single diagonal brace from the first rung are secure. Set each stabiliser at a 45 degree angle. Adjust
of a base frame to the fifth rung on the opposite Attach a single diagonal brace from the sixth rung each stabilisers length and position to bring the
side of the tower and close the Snaplocks. Fit a of a base frame to the tenth rung on the opposite foot pad in contact with the ground.
brace on the other side but in the opposite side of the tower and close the Snaplocks. Fit a Make sure that all screw clamps are correctly
direction. brace on the other side but in the opposite secured.
direction.

Carefully position a platform on to the seventh rung of the base frames and fifteenth rung on the opposite side of the tower and close the Snaplocks.
close the Snaplocks. Carefully position the next platform onto the fifteenth rung and close the
Climb the base frame rungs from inside the tower, open the trap and continue Snaplocks.
until you can sit on the platform with legs through the trap and your feet on Climb the frame rungs from inside the tower, open the trap and continue until
a rung. you can sit on the platform with legs through the trap and your feet on a rung.
From this position, you can attach two sets of hand rails (horizontal braces) From this position, you can attach two sets of hand rails (horizontal braces)
on each side of the platform. on each side of the platform.
Take a horizontal brace and from the seated position, attach one end to the Take a horizontal brace and from the seated position, attach one end to the
farthest frame and the other to the nearest frame two rungs above and to the farthest frame and the other to the nearest frame two rungs above and to the
side of the platform. side of the platform.
Fit a second brace above the first brace on the fourth rung above the platform. Fit a second brace above the first brace on the fourth rung above the platform.
Repeat this on the other side of the platform so that the area is protected on Repeat this on the other side of the platform so that the area is protected on
both sides at 49.5 cm and 99 cm. both sides at 49.5 cm and 99 cm.
Make sure that all Snaplocks have locked in position before accessing the Make sure that all Snaplocks have locked in position before accessing the
platform. platform.
Climb onto the platform and make sure that the access hatch closes correctly. Climb onto the platform and make sure that the access hatch closes correctly.
You can now continue to construct the upper parts of the tower. The platform must be fitted with toeboards to prevent tools and materials
Release the interlock clips fitted to the top of the frames. Fit an eight rung from slipping off the platform and falling to the ground.
frame to each the top of frame and insert the interlock clips ensuring they Firstly, slot the end toeboards into position across the tower frames.
are secure. Next, slot the side toeboards into the runners fitted to the end Toeboards.
Attach a single diagonal brace from the eleventh rung of a base frame to the The tower is now ready to use.

7 2008 Textwrite Publications Ltd


Trademaster A500
Using Base Pack A, Guardrail Pack B and Lift Packs C and D to give a maximum work
platform height of 5M.
Take the first two base frames and fit with base plates and adjustable legs. Alternatively, fit
with castors if purchased as an optional extra. Turn the legs height adjustment collar so that
each leg will be set 50mm from the lowest position with the leg fully inserted into the frames tube.

Attach a horizontal brace to one side of the lowest Release the interlock clips fitted to the top of each Position the lower horizontal clamp just above the
horizontal tube of one base frame and close the base frame. Fit both four rung frames together frames second horizontal bar and the top clamp
Snaplocks. Next, attach the other end of the brace then fit the pair to one of the base frames. Fit the below the nearest casting.
to the lowest horizontal tube of the remaining eight rung frame to the remaining base frame. Set each stabiliser at a 45 degree angle. Adjust
base frame and close the Snaplocks. Make sure that you insert all interlock clips each stabilisers length and position to bring the
Then take a second horizontal brace and attach to ensuring they are secure. foot pad in contact with the ground.
the opposite side of the lowest horizontal tubes of Attach a single diagonal brace from the sixth rung Make sure that all screw clamps are correctly
the base frames. of a base frame to the tenth rung on the opposite secured.
Attach a single diagonal brace from the first rung side of the tower and close the Snaplocks. Fit a
brace on the other side but in the opposite Carefully position the platform on to the third rung
of a base frame to the fifth rung on the opposite of the base frames and close the Snaplocks.
side of the tower and close the Snaplocks. Fit a direction.
Make sure that all Snaplocks have locked in
brace on the other side but in the opposite Fit the stabilisers at this stage, prior to fitting any position before accessing the platform.
direction. platform.
Now lock all four castors (if fitted) then adjust Fit a stabiliser to each corner of the tower. Loosen
each leg to bring the tower square and level. all screw clamps then position the stabiliser as
Levelling the tower is best achieved with a spirit shown.
level. DO NOT use the adjustable legs to gain
additional height.

8 2008 Textwrite Publications Ltd


Trademaster A500 (cont.)
Carefully position another platform on to the eleventh rung and close the Carefully position the final platform on to the nineteenth rung and close the
Snaplocks. Snaplocks.
Climb the frame rungs from inside the tower, open the trap and continue until Climb the frame rungs from inside the tower, open the trap and continue until
you can sit on the platform with legs through the trap and your feet on a rung. you can sit on the platform with legs through the trap and your feet on a rung.
From this position, you can attach two sets of hand rails (horizontal braces) From this position, you can attach two sets of hand rails (horizontal braces)
on each side of the platform. on each side of the platform.
Take a horizontal brace and from the seated position, attach one end to the Take a horizontal brace and from the seated position, attach one end to the
farthest frame and the other to the nearest frame two rungs above and to the farthest frame and the other to the nearest frame two rungs above and to the
side of the platform. side of the platform.
Fit a second brace above the first brace on the fourth rung above the platform. Fit a second brace above the first brace on the fourth rung above the platform.
Repeat this on the other side of the platform so that the area is protected on Repeat this on the other side of the platform so that the area is protected on
both sides at 49.5 cm and 99 cm. both sides at 49.5 cm and 99 cm.
Make sure that all Snaplocks have locked in position before accessing the Make sure that all Snaplocks have locked in position before accessing the
platform. platform.
Release the interlock clips fitted to the top of the frames. Fit an eight rung The platform must be fitted with toeboards to prevent tools and materials
frame to each the top of frame and insert the interlock clips ensuring they from slipping off the platform and falling to the ground.
are secure. Firstly, slot the end toeboards into position across the tower frames.
Attach a single diagonal brace from the twelfth rung of a base frame to the Next, slot the side toeboards into the runners fitted to the end Toeboards.
sixteenth rung on the opposite side of the tower and close the Snaplocks. Fit
a brace on the other side in the opposite direction but this time from the The tower is now ready to use.
fourteenth rung to the eighteenth rung and close the Snaplocks.

Trademaster A600
Using Base Pack A, Guardrail Pack B and two Lift Packs C to give a maximum work
platform height of 6M.
Take the first two base frames and fit with base plates and adjustable legs. Alternatively, fit
with castors if purchased as an optional extra. Turn the legs height adjustment collar so that
each leg will be set 50mm from the lowest position with the leg fully inserted into the frames tube.

Attach a horizontal brace to one side of the lowest Release the interlock clips fitted to the top of each Set each stabiliser at a 45 degree angle. Adjust
horizontal tube of one base frame and close the base frame. Fit a four rung frame to each base each stabilisers length and position to bring the
Snaplocks. Next, attach the other end of the brace frame and insert the interlock clips ensuring they foot pad in contact with the ground.
to the lowest horizontal tube of the remaining are secure. Make sure that all screw clamps are correctly
base frame and close the Snaplocks. Attach a single diagonal brace from the fifth rung secured.
Then take a second horizontal brace and attach to of a base frame to the ninth rung on the opposite Carefully position a platform on to the seventh
the opposite side of the lowest horizontal tubes of side of the tower and close the Snaplocks. Fit a rung of the base frames and close the Snaplocks.
the base frames. brace on the other side in the opposite direction
Attach a single diagonal brace from the first rung but this time from the seventh rung to the
of a base frame to the fifth rung on the opposite eleventh rung and close the Snaplocks.
side of the tower and close the Snaplocks. Fit a Fit the stabilisers at this stage, prior to fitting any
brace on the other side but in the opposite platform.
direction. Fit a stabiliser to each corner of the tower. Loosen
Now lock all four castors (if fitted) then adjust all screw clamps then position the stabiliser as
each leg to bring the tower square and level. shown.
Levelling the tower is best achieved with a spirit Position the lower horizontal clamp just above the
level. DO NOT use the adjustable legs to gain frames second horizontal bar and the top clamp
additional height. below the nearest casting.

9 2008 Textwrite Publications Ltd


Trademaster A600 (cont.)

Climb the base frame rungs from inside the Climb the frame rungs from inside the tower, open the trap and continue until you can sit on
tower, open the trap and continue until you can sit open the trap and continue until you can sit on the platform with legs through the trap and your
on the platform with legs through the trap and the platform with legs through the trap and your feet on a rung.
your feet on a rung. feet on a rung. From this position, you can attach two sets of
From this position, you can attach two sets of From this position, you can attach two sets of hand rails (horizontal braces) on each side of the
hand rails (horizontal braces) on each side of the hand rails (horizontal braces) on each side of the platform.
platform. platform. Take a horizontal brace and from the seated
Take a horizontal brace and from the seated Take a horizontal brace and from the seated position, attach one end to the farthest frame and
position, attach one end to the farthest frame and position, attach one end to the farthest frame and the other to the nearest frame two rungs above
the other to the nearest frame two rungs above the other to the nearest frame two rungs above and to the side of the platform.
and to the side of the platform. and to the side of the platform. Fit a second brace above the first brace on the
Fit a second brace above the first brace on the Fit a second brace above the first brace on the fourth rung above the platform. Repeat this on the
fourth rung above the platform. Repeat this on the fourth rung above the platform. Repeat this on the other side of the platform so that the area is
other side of the platform so that the area is other side of the platform so that the area is protected on both sides at 49.5 cm and 99 cm.
protected on both sides at 49.5 cm and 99 cm. protected on both sides at 49.5 cm and 99 cm. Make sure that all Snaplocks have locked in
Make sure that all Snaplocks have locked in Make sure that all Snaplocks have locked in position before accessing the platform.
position before accessing the platform. position before accessing the platform. The platform must be fitted with toeboards to
Climb onto the platform and make sure that the Climb onto the platform and make sure that the prevent tools and materials from slipping off the
access hatch closes correctly. You can now access hatch closes correctly. You can now platform and falling to the ground.
continue to construct the upper parts of the continue to construct the final parts of the tower. Firstly, slot the end toeboards into position across
tower. Release the interlock clips fitted to the top of the the tower frames.
Release the interlock clips fitted to the top of the frames. Fit an eight rung frame to each the top of Next, slot the side toeboards into the runners
frames. Fit an eight rung frame to each the top of frame and insert the interlock clips ensuring they fitted to the end Toeboards.
frame and insert the interlock clips ensuring they are secure.
are secure. The tower is now ready to use.
Attach a single diagonal brace from the thirteenth
Attach a single diagonal brace from the eleventh rung of a base frame to the seventeenth rung on
rung of a base frame to the fifteenth rung on the the opposite side of the tower and close the
opposite side of the tower and close the Snaplocks. Fit a brace on the other side in the
Snaplocks. Fit a brace on the other side in the opposite direction but this time from the fifteenth
opposite direction but this time from the rung to the nineteenth rung and close the
thirteenth rung to the seventeenth rung and close Snaplocks.
the Snaplocks. Carefully position the next platform onto the
Carefully position the next platform onto the twenty-third rung and close the Snaplocks.
fifteenth rung and close the Snaplocks. Climb the frame rungs from inside the tower,

10 2008 Textwrite Publications Ltd


Trademaster A700
Using Base Pack A, Guardrail Pack B, two Lift Packs C and Lift Pack D to give a
maximum work platform height of 7M.
Take the first two base frames and fit with base plates and adjustable legs. Alternatively, fit
with castors if purchased as an optional extra. Turn the legs height adjustment collar so that
each leg will be set 50mm from the lowest position with the leg fully inserted into the frames tube.

Attach a horizontal brace to one side of the lowest Levelling the tower is best achieved with a spirit platform.
horizontal tube of one base frame and close the level. DO NOT use the adjustable legs to gain Fit a stabiliser to each corner of the tower. Loosen
Snaplocks. Next, attach the other end of the brace additional height. all screw clamps then position the stabiliser as
to the lowest horizontal tube of the remaining Release the interlock clips fitted to the top of each shown.
base frame and close the Snaplocks. base frame. Fit both four rung frames together Position the lower horizontal clamp just above the
Then take a second horizontal brace and attach to then fit the pair to one of the base frames. Fit the frames second horizontal bar and the top clamp
the opposite side of the lowest horizontal tubes of eight rung frame to the remaining base frame. below the nearest casting.
the base frames. Make sure that you insert all interlock clips
ensuring they are secure. Set each stabiliser at a 45 degree angle. Adjust
Attach a single diagonal brace from the first rung each stabilisers length and position to bring the
of a base frame to the fifth rung on the opposite Attach a single diagonal brace from the seventh foot pad in contact with the ground.
side of the tower and close the Snaplocks. Fit a rung of a base frame to the eleventh rung on the
brace on the other side but in the opposite opposite side of the tower and close the Make sure that all screw clamps are correctly
direction. Snaplocks. Fit a brace on the other side but in the secured.
Now lock all four castors (if fitted) then adjust opposite direction.
each leg to bring the tower square and level. Fit the stabilisers at this stage, prior to fitting any

Carefully position the first platform on to the third rung and close the Snaplocks.
Carefully position the next platform on to the eleventh rung and close the Snaplocks.
Climb the frame rungs from inside the tower, open the trap and continue until you
can sit on the platform with legs through the trap and your feet on a rung.
From this position, you can attach two sets of hand rails (horizontal braces) on each
side of the platform.
Take a horizontal brace and from the seated position, attach one end to the farthest
frame and the other to the nearest frame two rungs above and to the side of the
platform.
Fit a second brace above the first brace on the fourth rung above the platform.
Repeat this on the other side of the platform so that the area is protected on both
sides at 49.5 cm and 99 cm.
Make sure that all Snaplocks have locked in position before accessing the platform.

11 2008 Textwrite Publications Ltd


Trademaster A700 (cont.)

Release the interlock clips fitted to the top of the frames. Fit an eight rung Attach a single diagonal brace from the twenty-first rung of a base frame to
frame to each the top of frame and insert the interlock clips ensuring they the twenty-fourth rung on the opposite side of the tower and close the
are secure. Snaplocks. Fit a brace on the other side in the opposite direction but this time
Attach a single diagonal brace from the thirteenth rung of a base frame to from the twenty-third rung to the twenty-seventh rung and close the
the seventeenth rung on the opposite side of the tower and close the Snaplocks.
Snaplocks. Fit a brace on the other side but in the opposite direction. Carefully position the final platform onto the twenty-seventh rung and close
Carefully position the next platform on to the nineteenth rung and close the the Snaplocks.
Snaplocks. Climb the frame rungs from inside the tower, open the trap and continue until
Climb the frame rungs from inside the tower, open the trap and continue until you can sit on the platform with legs through the trap and your feet on a rung.
you can sit on the platform with legs through the trap and your feet on a rung. From this position, you can attach two sets of hand rails (horizontal braces)
From this position, you can attach two sets of hand rails (horizontal braces) on each side of the platform.
on each side of the platform. Take a horizontal brace and from the seated position, attach one end to the
Take a horizontal brace and from the seated position, attach one end to the farthest frame and the other to the nearest frame two rungs above and to the
farthest frame and the other to the nearest frame two rungs above and to the side of the platform.
side of the platform. Fit a second brace above the first brace on the fourth rung above the platform.
Fit a second brace above the first brace on the fourth rung above the platform. Repeat this on the other side of the platform so that the area is protected on
Repeat this on the other side of the platform so that the area is protected on both sides at 49.5 cm and 99 cm.
both sides at 49.5 cm and 99 cm. Make sure that all Snaplocks have locked in position before accessing the
Make sure that all Snaplocks have locked in position before accessing the platform.
platform. The platform must be fitted with toeboards to prevent tools and materials
Attach a single diagonal brace from the eighteenth rung of a base frame to from slipping off the platform and falling to the ground.
the twenty-second rung on the opposite side of the tower and close the Firstly, slot the end toeboards into position across the tower frames.
Snaplocks. Fit a brace on the other side in the opposite direction but this time Next, slot the side toeboards into the runners fitted to the end Toeboards.
from the nineteenth rung to the twenty-second rung and close the Snaplocks.
The tower is now ready to use.
Release the interlock clips fitted to the top of the frames. Fit an eight rung
frame to each the top of frame and insert the interlock clips ensuring they
are secure.

Intermediate Work Platforms


Any platform fitted to the tower at any stage may be used as a work platform provided toeboards are fitted.
Do take into consideration the maximum weights that can be applied to your respective tower, see MAXIMUM SAFE
WORKING LOAD.
Toeboards
ALL Work Platforms must be fitted with toeboards to prevent tools and materials from slipping off the platform and falling
to the ground.

12 2008 Textwrite Publications Ltd


SAFETY CHECK
Once the tower has been completed, it must be checked by a competent person before it can be used.

SAFETY CHECK LIST

All Components free from damage


Castors Locked
Tower Level
Screwclamps Secure
All Platforms Fully Guardrailed
Brace Snaplocks Locked Correctly
Windlock Catches Engaged
Interlock Clips Engaged
Toeboards Correctly Positioned on ALL Work Platforms
MOVING A TOWER
If you need to move the tower to a new location or a new level, fully dismantle it and rebuild at the new location.
If you wish to move the tower a small distance on the same level, remove all personnel, materials, tools and anything
else from the tower. Reduce the tower height to a maximum of 2 metres before moving.
Raise the stabilisers legs so that the foot pads are approximately 25 mm off the ground.
With help, unlock all castors, move the tower then relock castors and level the tower ready for rebuilding to the required
height.

Once the tower has been completed, it must be checked by a competent person before it can be used.

TYING IN
Tying in should be considered to add to stability.
DISMANTLING THE TOWER
Dismantle the tower by reversing the erection sequence but pay special attention to the following procedure regarding
the 3T system.
You MUST always be protected by a full set of guard rails when standing on a platform. When dismantling using the 3T
system, the snaplocks on the end of the braces that are positioned to the far end of the tower will need to be
disconnected before you sit within the trapdoor.
This should be performed with the greatest of care, and once disconnected you should go directly to the trapdoor and
sit on the platform with your feet on the lower frame rungs.
From this position you can disconnect the remaining snaplocks and remove the braces.
EMERGENCY PLAN
In case of an emergency where the user may require medical assistance for whatever reason, make an emergency plan
whereby everyone knows exactly what action is required. Give each person specific responsibilities.
EQUIPMENT MAINTENANCE & CLEANING
When not being used, store the unit in a clean condition and in a safe place, away from thieves and unauthorised users.
TOWER SECURITY
If leaving an erected tower unattended you must block access to the tower by unauthorised persons. Use suitable mesh
fencing or boarding to make access impossible. If you cannot block access, the tower MUST be dismantled.

13 2008 Textwrite Publications Ltd


COMPONENT LISTING
The charts below lists ALL parts required for a given tower platform height, use this to make sure you have everything
you need.

Trade Master Components


Name Height 7 Rung 8 Rung 4 Rung Diagonals Horizontals Platforms Toeboards Total Rungs
A100 1m 2 1 1 1 7
A200 2m 2 2 2 6 1 1 11
A300 3m 2 1 2 3 6 2 1 15
A400 4m 2 2 2 5 10 2 1 19
A500 5m 2 3 2 6 10 3 1 23
A600 6m 2 4 2 8 14 3 1 27
A700 7m 2 5 2 9 14 4 1 31

14 2008 Textwrite Publications Ltd


15 2008 Textwrite Publications Ltd
Contact information:
Zarges UK Ltd
8 Holdom Avenue, Saxon Park Industrial Estate, Bletchley, Milton Keynes MK1 1QU
Technical Contact: Alistair Twigg
Sales: 01908 641118 Fax: 01908 648176 email: sales@zargesuk.co.uk www.zargesuk.co.uk