(TABLE OF CONTENTS)
2
Reaction due to Impact value:....................................................................................... 47
Lateral pressure of soil: ................................................................................................ 47
Break load:.................................................................................................................... 48
Effective of variable temperature:................................................................................. 48
Force due to wind load: ................................................................................................ 48
Earthquake Load:.......................................................................................................... 49
CALCULATING OF MOMENTS ON ABUTMENT: ................................................................ 50
COMBINATION OF LOADS: ................................................................................................ 52
REINFORCEMENT CALCULATION: ................................................................................... 55
Design of Stem: ............................................................................................................. 55
Design of Toe: ............................................................................................................... 56
Design of Heel:.............................................................................................................. 57
Design of fore wall reinforcement: ............................................................................. 57
(DESIGN OF PIERS) .................................................................................................................... 59
DESIGN OF PIER CAP: ....................................................................................................... 59
DESIGN OF SHEAR AND FLEXURE MOMENT REINFORCEMENT: ................................... 62
DESIGN OF PIER: ............................................................................................................... 64
Design of a pier for the Second group of loading:........................................................ 68
Spiral Design: ............................................................................................................... 69
(DESIGN OF ELASTOMERIC BEARING PAD) ............................................................... 72
CALCULATION THICKNESS OF ELASTOMER BEARING PAD: ......................................... 72
CALCULATION AREA OF ELASTOMER BEARING PAD: ................................................... 72
CALCULATION OF SHAPE FACTOR: ................................................................................. 73
CALCULATION OF COMPRESSION TRANSFORMATION:.................................................. 73
CHECKING OF RELATION BETWEEN DL AND TEMPERATURE DEFORMATION: ........... 73
CHECKING OF SLIDING:.................................................................................................... 73
CALCULATION OF FORCE ON PIER DUE TO TEMPERATURE: ......................................... 73
CHECKING THE SUFFICIENCY OF ELASTOMERIC BEARING PAD FOR TURNING OF
SUPPORT: ........................................................................................................................... 74
(DESIGN OF CAISSON FOUNDATION) ............................................................................. 75
CALCULATION DIMENSION OF CAISSON FOUNDATION: ................................................ 75
Calculation diameter of Caisson:.................................................................................. 75
Calculation diameter bottom of Caisson: ..................................................................... 76
Calculation thickness bottom of Caisson: ..................................................................... 76
Checking for shear: ...................................................................................................... 76
Checking for Floating: ................................................................................................. 77
MIX DESIGN: ................................................................................................................................. 77
RENFERNCES: .................................................................................................................... 75
3
(Plane of the Site)
RESIDINTIALAREA
WASHBED
ROAD
CONSTRUCTIONSITE
EXISTINGSITE
4
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
Vertical Loading:
Bridge Elevation
5
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
40cm
35 800cm
40
80
70
310 10
450
160
150
450
6
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
1
WPier Cap = 8 0.42 + 3.1 0.68 2 + 1.8 0.68 + 0.4 0.35 2 1.5 2.5
2
= 26.2Ton
4.25m (4.25-9.15)m
3. Tank Load:
In this loading 70Ton load above two chains with 3.51
dimension is take in to computation. In each lane of bridge just
consider one tank and along the bridge length distance between
two tanks at least should be consider 30m.
7
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
Note: By putting this loading on influence line diagram we can find the
maximum moment and shear, and then use the most critical situation in
the calculation from all three kinds of loading just the most critical
situation is used in designing of members.
20Ton/m
3.5m
Tank Load
Some of loading rules:
1. Transverse of loading line should be 3m.
2. In continuous and sample beams for finding shear and moment we
should consider one truck.
3. Each Ton in American standard is equal to 908Kg.
4. In process of slab designing we should consider that the control
axes of wheels are in a distance of 0.3m from the face of site walk.
5. If the bridge was dual way we should take one truck in each way
for computation, for example if the bridge was both way we will
take two truck for computation.
8
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
2. If it is possible that the vehicle tire pass from the walk way
its live load is equal to 5Ton concentrated load which is in a
critical condition.
Influence of walk way load on the main longitudinal beam and pier
is as fallow:
3. Lateral Loading:
Influence of Break load:
The horizontal force of break is equal to 5% of distributed load
which is along the length of bridge with movable flexure load
without influence of impact.
9
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
10
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
Earthquake force:
The amount of earthquake force is determined from bellow
formula:
E Q = C.F.W
W = Dead Load quota of selected pier
P = Concentred load which applied at the top of pier
3EI
P= 3 = 1cm
h
F = Coeficient of frame F =1
Hydrodynamic Pressure in Earthquake Time:
If the edge and middle columns of bridge was inside water the
hydrodynamic pressure of water should be consider in earthquake
time.
11
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
7 b
P = K h W bh 2 3.1 <
6 h
1
hg = h
2
P = Hydrodynamic force in edge columns.
K h = Coefficientof horizontal earthquake.
W = Specific gravity (Ton/m 3 )
h = Depth of water.
b = Diameter of edge pier.
hg = Heigth of force whic influence is above the deck of bridge.
12
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
(Hydraulic Analysis)
1
Q= AR 2/3S1/2
n
916.08 915.12
S= = 0.00064
1500
1/6
d 50
n=
21.1
d 50 = 2.5mm
1/6
2.5
1000
n= = 0.0175
21.1
1
A = (408 + 406.2) 0.9 = 366.4m 2
2
P = 406.2 + 2 0.9 2 + 0.9 2 = 408.4m 2
A 366.4
R= = = 0.896m
P 408.75
Q = 1.5 492.27 738m 3 /sec
B = 3.26 Q
B = 3.26 738 = 89m
Q 738
q= = = 8.3m 3 /m.sec
B 89
V
F=
gy
Q 738
V= = = 2.014m/sec
A 366.4
2.014
F= = 0.678 > 0.5
9.81 0.9
13
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
Normall Depth
Ymax
Normaal River Bed
River Bed at Time of Flood
ds
D? (Y+ds)/3
450cm
So d S = 3.585m
14
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
(Deck design)
Number of main beams = 5
Width of deck without side walk = 8.6m
Clear distance between two piers = 16m
fc = 21MPa fy = 360MPa
Thickness of slab = 22cm
27.5
110
425
20
22
130
20 40
180 180
5.625
15
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
n 10
k= = = 0.318
n + r 10 + 21.43
J = 1 k/3 = 1 0.318/3 = 0.894
2M 2 2.113 105
d= = = 13.3cm
fcKJb 84 0.318 0.894 100
Clearcover = 3cm
Radius of reinforcement = 1cm
Total thickness slab = 13.3 + 1 + 3 = 17.3cm 22cm so it' s O.K
M
As = J = 0.894 d = h - 4cm = 22 - 4 = 18cm
fsJd
2.113 105
As = = 7.295cm 2 /m 7.3cm 2 /m
1800 0.894 18
use 16mm bars As(cm 2 ) S(cm)
2.01 100
7.3 X
2.04 100
S= = 27.5cm 25cm c c
7.3
As(cm 2 ) S(cm)
2.01 100
X 25
100 2.01
As = = 8.04cm 2 7.3cm 2 So it' s O.K
25
So use 16mm@25cm c - c
16
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
1.54 100
S= = 31.5cm 30cm c c
4.891
As(cm2 ) S(cm)
1.54 100
X 30
100 1.54
As = = 5.13cm 2 4.891cm 2 So it' s O.K
30
So use 14mm@30cm c - c
17
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
2M 2 7.295 105
d = = = 24.72cm
min fcKJb 84 0.318 0.894 100
h = d + 3 + 1 = 24.72 + 3 + 1 = 28.72cm 42cm So it' s O.K
min
M 7.295 105
As = = = 11.93cm2 /m
fsJd 1800 0.894 38
use 16mm bars As = 2.01cm2 /m
As(cm2 ) S(cm)
2.01 100
11.93 X
2.01 100
S= = 16.85cm 15cm c c
11.93
As(cm2 ) S(cm)
2.01 100
X 15
100 2.01
As = = 13.4cm 2 11.93cm 2 So it' s O.K
15
So use 16mm@15cm c - c
350
S=1%
275
S=1.5%
18
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
19
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
(Beam Design)
Interior Beam Design:
(L + 3) (16 + 3)
h = 1.1 = 1.1 = 1.161m 1.3m
min 18 18
16m
RA RB
wLn 2.5 16
RA = RB = = = 20Ton
2 2
Mo = 0
4m
R A =20Ton
Fy + = 0
20 V 2.5 4 = 0
V = 10Ton
M o )+ = 0
20 4 + 2.5 4 4/2 + M o = 0
M o = 60Ton.m
20
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
8m
R A =20Ton
Fy + = 0
20 2.5 8 V = 0
V=0
M o )+ = 0
20 8 + 2.5 8 2 /2 + M = 0
o
M = 80Ton.m
o
Effective of Live Load and Impact Load:
15 15
I.L = 0.3 = 0.28
L + 38 16 + 38
Total Live Load = L.L + I.L = (1 + 0.28)w = 1.28w
M o )+ = 0
9.5 7.25 1.813 4.25 + 16.313 X = 0
X = 3.75m
e = X/2 = 1.875m
W I
R = 1+ e
1 5 2I x
x
4W I
= 1+ 3.6 1.875 = 0.97W
5 2 2
I(2 1.8 + 2 3.6 )
21
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
W I
R = 1+ e
2 5 2I x
x
4W I
= 1+ 1.8 1.875 = 0.88W
5 2 2
I(2 1.8 + 2 3.6 )
W I
R = 1+ e
3 5 2I x
x
4W I
= 1+ 0 1.875 = 0.8W
5 2 2
I(2 1.8 + 2 3.6 )
Portion of beam from front wheel = 1.28 3.625/2 0.88 = 2.04Ton
2
Portion of beam from back wheel = 1.28 14.5/2 0.88 = 8.2Ton
2
Portion of beam from front wheel = 1.28 3.625 0.8 = 1.856Ton
3
Portion of beam from back wheel = 1.28 14.5/2 0.8 = 7.424Ton
3
2. Equivalent Linear Load:
Maximum flexure moment due to the equivalent linear load obtain,
when the concentrate load is place at the center of beam.
Distribution of Live loads uses AASHTO Standards:
S 1.8
Portion of beam from the equivalent linear load = 12 W = 12 W = 0.49W
2 1.83 1.83
= 1.28 0.49 0.95 = 0.6Ton/m
Portion of beam from the Concentrate load for Flexure = 1.28 0.49 8.2 = 5.14Ton.m
2
Portion of beam from the Concentrate load for Shear = 1.28 0.49 11.8 = 7.4Ton
2
22
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
10
12
14
16
0
8
Influence Line ForRL
1
0.875
Influence Line For 2m
0.125
0.75
Influence Line For 4m
0.25
0.625
Influence Line For 6m
0.375
0.5
Influence Line For 8m
0.5
0.625
0.75
0.875
1
Influence Line For RR
23
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
10
12
14
16
0
8
1.75
Influence Line For 2m
3.75
3.75
1.75
Influence Line For 14m
24
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
10
12
14
16
0
8
x
RA RB
MB)+ = 0
R L + 1 (L X ) = 0
A
LX
R = For 0 X 16
A L
Fy + = 0
LX
R 1+ =0
B L
LX
R = 1 For 0 X 16
B L
R A = (L -X )/L
Fy + = 0
LX
1 V = 0
L
LX
V = 1 For 0 X 2m
L L
Ivalveting :
V
(0 ) = 0
16 2
V = 1 = 0.125
(2 ) 16
25
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
Fy + = 0
LX
V =0
L R
LX
V = For 2m X 16m
R L
Ivalveting :
16 2
V = = 0.875
(2) 16
16 16
V = =0
(16) 16
Sketching of Diagram:
0.875
Shear Influence Line For 2m
0.125
R A = (L -X )/L
M )+ = 0
O
LX
M 2 + 1(2 X ) = 0
(x ) L
LX
M = 2 + 1 (X - 2 ) For 0 X 2m
(x )L L
Ivalveting :
M
(0) = 0
16 2
M = 2 + 1 (2 - 2 ) = 1.75
(0) 16
26
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
M )+ = 0
O
LX
M 2 = 0
(x ) L
LX
M = 2 For 2m X 16m
(x )R L
Ivalveting :
M
(2) = 1.75
16 16
M = 2 = 0
(16) 16
Sketching of Diagram:
1.75
7.4Ton
Critical Situation due to Linear
0.6Ton/m Load for Shear at the Support
27
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
0.75
0.25
4.25m 4.25m
9.28Ton
4m
4.25m 4.25m
28
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
0.25
7.4Ton
Critical Situation due to Linear
0.6Ton/m Load For Positive Shear at 14Ln
7.4Ton
5.14Ton
Critical Situation due to
0.6Ton/m Linear Load For Moment
1
Positive V = 0.75 12 0.6 + 7.4 0.75 = 8.25Ton
Linear 2
1
Negative V = 0.25 4 0.6 7.4 0.25 = 2.15Ton
Linear 2
1 1
M = 4 3 0.6 + 12 3 0.6 + 5.14 3 = 29.82Ton.m
max 2 2
Effect of shear force and Maximum Moment at the1/2Ln:
Shear force and Maximum Flexure Moment due to truck load:
3.75 0.5
Positive V = 9.28 0.5 + 8.2 = 6.56Ton
truck 8
3.75 0.5
Negative V = 0.5 9.28 - 8.2 = -6.56Ton
truck 8
3.75 4 3.75 4
M max = 9.28 + 8.2 4 + 2.04 = 54.1Ton.m
8 8
29
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
0 .5
0 .5
9 .2 8 T o n 8 .2 T o n
4 .2 5 m
T ru ck L o a d H s 2 0 -44
8 .2 T o n 9 .2 8 T o n
4 .2 5m
T ru ck L o a d H s 2 0-4 4
9 .2 8 T o n 8 .2 T o n 2 .0 4 T o n
4 .2 5 m 4 .2 5m
T ru ck L o a d H s 2 0 -44
0.5
7.4Ton
Critical Situation due to Linear
0.6Ton/m Load For Positive Shear at 14 Ln
7.4Ton
30
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
5.14Ton
Critical Situation due to
0.6Ton/m Linear Load For Moment
Support Equivalent
12.2 ------ 0
Linear
Truck 11.4 -2.32 45.51
1/4Ln Equivalent
8.25 -2.15 29.82
Linear
Truck 6.56 -6.56 54.1
1/2Ln Equivalent
4.71 -4.71 39.76
Linear
Maximum flexure moment and shear force obtain from truck load, so we
design edge beam from truck load.
31
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
W I
R = 1+ e
1 5 2I x
x
4W I
= 1+ 3.6 2.5 = 0.31W
5 2 2
I(1.8 + 3.6 )
W I
R = 1+ e
2 5 2I x
x
4W I
= 1+ 1.8 2.5 = 0.26W
5 2 2
I(1.8 + 3.6 )
W I
R = 1+ e
3 5 2I x
x
4W I
= 1+ 0 2.5 = 0.2W
5 I(1.82 + 3.62 )
M max = 249.38Ton.m
Vmax = 62.34Ton
32
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
If we multiply the shear force and flexure moment of interior beam with
2.14 the shear force and flexure moment of edge beam will obtain.
Live load:
If we multiply the shear force and flexure moment of interior beam with
1.22 the shear force and flexure moment of edge beam will obtain.
I will design the edge beam because the load of edge beam is greater than
the internal beams. In practical work we assign dimension of great beam
instead of other beams.
33
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
So b = 180cm
180
22
h
bw
Assume that we use 3 layers steel 30mm clear spacing 5cm and clear
cover 7.5cm.
d = 1.3 - (0.075 + 0.05 + 0.03 + 0.015) = 1.13m
fc = 0.4 210 = 84Kg/cm 2
fs = 1800Kg/cm 2
Ec = 5000 f' c = 5000 21 = 2.29 10 4 Kg/cm 2
Es = 2 105 Kg/cm 2
2 105
n= = 8.7 10
2.29 10 4
34
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
35
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
113
Smax = = 48cm for point a
8 0.294
113
Smax = = 21.83cm for point b
8 0.647
0.06A fy 0.06 /4 3.2 2 3600
b = = 119.88cm
distance to continue d = max f' c 210
0.006db fy = 0.006 3.2 3600 = 69.12cm
So distance to contiue d = 120cm
For 6 remainder 32mm bars with 121cm effective depth, capacity of flexure moment
is equal to :
M
Development Lenght = + La
V
Capacity of 32mm = Asfs(d - t/2) = 6 /4 3.2 2 1800(121 22/2) = 95.54Ton.m
Width of Support = 70cm
a = 70/2 - 5 = 30cm
M 95.54 10 2
+ La = + 30 = 182.4cm d = 120cm So O.K
V 62.69
3 5 .3 1 T o n
Vc
0 .3 1 .1 3 2
36
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
After 5cm from the face of column we use 12mm@20cm c-c and to
other length use 12mm@35cm c-c.
37
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
M 704520
yt = = = 85.1cm
A 8280
M2 704520 2
Ig = Iy = I = 4358760 = 55586702.6 1cm 4
1 A 8280
Fr = 2 f' c = 2 210 = 28.983Kg/c m 2
FrIg 28.983 55586702.6 1
Mcr = = = 189.32Ton. m
yt 85.1
Mcr 189.32
= = 1.11
M max 171.2
a= c (2d + hf f ) + (1 + f )2 (1 + f) /c
bw 40
c= = 0.0293
n As 10 136.72
f = hf(b bw)/n As = 22(180 40)/10 136.72 = 2.253
a= 0.0293(2113 + 22 2.253) + (1 + 2.253)2 (1 + 2.253) /0.0293
a = 36.4cm hf = 22cm
Ict = (b bw)hf 3 /12 + bwa 3 /3 + (b bw)hf(a hf/2) 2 + nAs(d a) 2
Ict = (180 40)223 /12 + 40 36.43 /3 + (180 40)22(36.4 22/2) 2 +
+ 10 136.72(113 36.4) 2 = 10776494.75cm 4
3 3
Mcr Mcr
Ie = Ig + 1 I ct Ig
M max M max
Ie Ig we use Ie = Ig = 55586702.61cm 4
E = 15000 f' c = 15000 210 = 217370.65Kg/cm 2
5 qL4 5 25 1600 4
= = = 0.177cm
384 EIe 384 217370.65 55586702.61
38
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
=
1 + 50 0
' = 0 For the beam, which don' t have compresion reinforcement.
= 2 For the 5years times of loading.
2
= =2
1+ 0
perment = 0.177 2 = 0.354cm
Total = 0.354 + 0.177 = 0.531cm 6cm
So we use minimum camber of forms from AASHTO standard = 6cm
6? 20mm
22
113
4? 20mm
130
17 ? 32mm
40
(Section for Design of Edge Beam)
39
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
So b = 180cm
180
22
h
bw
Assume that we use 3 layers steel 28mm clear spacing 5cm and clear
cover 7.5cm.
d = 1.3 - (0.075 + 0.05 + 0.03 + 0.015) = 1.13m
fc = 0.4 210 = 84Kg/cm 2
fs = 1800Kg/cm 2
Ec = 5000 f' c = 5000 21 = 2.29 10 4 Kg/cm 2
Es = 2 105 Kg/cm 2
2 105
n= = 8.7 10
2.29 10 4
Combination Loading use Limit State Method
Position V (Ton) M (Ton.m)
(D+L+I) (D+L+I)
Support 20 + 16.3 = 36.3 0
1/4Ln 10 + 11.4 = 21.4 60 + 45.51 = 105.51
1/2Ln 6.56 80 + 64.84 = 144.84
40
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
To 0.75d 85cm at two cutting point sides must Place addition stirrups,
its magnitude is equal to:
Av 4.2bw 4.2bw
= = 0.0012bw
S fy 3600
bw = 40cm
Av
= 0.0012 40 = 0.047
S
d Cuted Reinforcement
Smax = =
8 b Total Reinforcement
b
41
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
5
for 5 above bars =
= 0.294
b 17
11
for 5 midle bars = = 0.647
b 17
113
Smax = = 48cm for point a
8 0.294
113
Smax = = 21.83cm for point b
8 0.647
0.06A fy 0.06 /4 3.2 2 3600
b = = 119.88cm
distance to continue d = max f' c 210
0.006db fy = 0.006 3.2 3600 = 69.12cm
So distance to contiue d = 120cm
For 6 remainder 25mm bars with 121cm effective depth, capacity of flexure moment
is equal to :
M
Development Lenght = + La
V
Capacity of 32mm = Asfs(d - t/2) = 6 /4 2.52 1800(121 22/2) = 58.32Ton.m
Width of Support = 70cm
a = 70/2 - 5 = 30cm
M 58.32 10 2
+ La = + 30 = 190.66cm d = 120cm So O.K
V 36.3
9 .0 7 5 T o n
Vc
0 .3 1 .1 3 2
42
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
36.3 P
= P = 29.81Ton
8 6.57
vc = 0.25 f' c = 0.25 210 = 3.63Kg/cm 2
Vc = vc bw d = 3.63 40 113 10 3 = 16.4Ton
V = 29.81Ton
Vs = V Vc = 29.8 16.4 = 13.41Ton
Av Vs Av 13.41 1000
= = = 0.0659
S fs d S 1800 113
To this value we add Av/S = 0.047 from additional stirrup.
Av
= 0.0659 + 0.047 = 0.1129
S
Use 12mm As = 1.13cm 2
Av = 4 1.13 = 4.52cm 2
4.52
= 0.22 S = 40.04cm
S
Use double stirrup 12mm@40cm
Av bw 40
Min = 3.5 = 3.5 = 0.039
S fy 3600
Use 12mm As = 1.13cm 2
4.52
= 0.039 S = 116.23cm
S
Max S use AASHTO standard = d/2=113/2=56.5cm
Use 12mm@35cm c-c
Av/S=4.52/35=0.129
fs d = 0.129 1800 113 10 3 = 26.24Ton
Av
Vs =
S
V = Vs + Vc = 26.24 + 16.4 = 42.64Ton
After 5cm from the face of column we use 12mm@40cm c-c and to
other length use 12mm@35cm c-c.
43
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
bw 40
c= = 0.0293
n As 10 136.72
f = hf(b bw)/n As = 22(180 40)/10 136.72 = 2.253
Ict = (b bw)hf 3/12 + bwa 3/3 + (b bw)hf(a hf/2)2 + nAs(d a)2
Ict = (180 40)223 /12 + 40 36.43 /3 + (180 40)22(36.4 22/2)2 +
+ 10 136.72(113 36.4)2 = 10776494.75cm 4
3 3
Mcr Mcr
Ie = Ig + 1 Ict Ig
M max M max
44
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
a = 36.4cm hf = 22cm
Ie Ig we use Ie = Ig = 55586702.61cm 4
E = 15000 f' c = 15000 210 = 217370.65Kg/cm 2
5 qL4 5 25 1600 4
= = = 0.177cm
384 EIe 384 217370.65 55586702.61
6? 16mm
22
113
4? 16mm
130
17? 25mm
40
(Section for Design of Interior Beam)
45
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
(Design of Abutment)
Calculating of loads on abutment:
4.25m 4.25m
M )+ = 0
B
R 16 + 14.5 16 + 14.5 11.75 + 3.625 7.5 = 0
A
R = 26.85Ton
A
2 26.85
Live loads per 1m of width = = 5.6Ton/m Two line of traffic
9.6
46
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
11.8Ton
0.95Ton/m
RA RB
M )+ = 0
B
R 16 + 0.95 16 2 /2 + 11.8 16 = 0
A
R = 19.4Ton
A
2 19.4
Live loads per 1m of width = = 4.042Ton/m Two line of traffic
9.6
Tank load:
M )+ = 0
B
R 16 + 20 3.5 14.25 = 0
A
R = 62.35Ton
A
62.35
Live loads per 1m of width = = 6.5Ton/m One line of traffic
9.6
So RA=6.5Ton/m is critical and this load use for design of abutment.
47
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
Break load:
BL = 16 + About 2m more than 8m we add 1Ton load.
16 8
BL = 16 + = 20Ton
2
10
Load per 1m width = = 2.1Ton/m
9.6
48
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
Earthquake Load:
V = CFW
F = 1 from Japan standard.
I = 1.2
A = 0.25
R =3
M W
T=2 = 0.2
K P
3EI
P=
h3
E = 2.1 10 5 Kg/cm 2
= 1cm
h = 570cm
W = 92 10 3 Kg
3 2.1 10 5 /4 160 4 1
P= = 17.51 10 2 Ton
570 3
92 10 3
T = 0.2 = 0.05sec
17.51 10 5
2/3 2/3
T 1
B = 2.5 = 2.5 = 19.5 2.5sec So we use B = 2.5sec
T 0.05
ABI 0.25 2.5 1.2
C= = = 0.25
R 3
K =K + 0.75K
AE A h
K = 0.33 + 0.75 0.25 = 0.52
AE
0.52
Percentage of increase at the staticle mood = 1 100 = 56.8%
0.33
49
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
1. Righting Moments:
Righting Moment due to concrete wall about the toe:
Weight Moment
Place X
(Ton) (Ton.m/m)
W1 1.210.452.5=1.35 2.425 1.352.425=3.274
W2 13.5 1.6 21.6
W5 20.64 2.75 53.76
Total 35.49 81.63
Weight Moment
Place X
(Ton) (Ton.m/m)
W3 5.72.8511.9=30.87 4.075 30.874.075=125.8
W2 0.453.91.91=3.34 2.425 8.1
Total 34.21 133.9
2. Overturning Moments:
Overturning Moment due to wind force about the toe:
For group2 :
R = 0.272Ton
A
Y = 6m
M = 6 0.272 = 1.632Ton.m/m
50
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
For group3 :
R = 0.21Ton
A
Y = 6m
M = 6 0.21 = 1.26Ton.m/m
51
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
Combination of loads:
Group First: DL+LL+IL+CF+Ha+B+SF
Horizontal force or Ha = 16.8Ton/m
Vertical force = 35.49 + 34.21 + 9.58 + 6.5 = 85.78Ton/m
Riting Moment = 81.63 + 133.9 + 15.33 + 10.4 = 241.26Ton.m/m
Overturning Moment = 40.88Ton.m/m
M 241.26
Overturning Safety factor = V = = 5.9 > 1.5 So O.K
M 40.88
H
F F 0.5 85.78
Sliding Safety factor = F = N = = 2.6 > 1.5 So O.K
F F 16.8
H H
M -M
X= V O = 241.26 40.88 = 2.34 > 5.5/3 Inside Middle Thired So O.K
R 85.78
V
P 6e 85.78 6 (5.5/2 2.34)
= (1 + ) = 1+ = 22.57Ton/m 2
Toe A L 5.5 1 5.5
P 6e 85.78 6 (5.5/2 2.34)
= (1 ) = 1 = 8.62Ton/m 2
Heel A L 5.5 1 5.5
52
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
M
Overturning Safety factor = V = 230.866 = 5.43 > 1.5 So O.K
M 42.512
H
F F 0.5 79.28
Sliding Safety factor = F = N = = 2.32 > 1.5 So O.K
F F 17.072
H H
M -M
X= V O = 230.86 42.512 = 2.4 > 5.5/3 Inside Middle Thired So O.K
R 79.28
V
P 6e 79.28 6 (5.5/2 2.4)
= (1 + ) = 1+ = 19.927Ton/m 2
Toe A L 5.5 1 5.5
P 6e 79.28 6 (5.5/2 2.4)
= (1 ) = 1 = 8.91Ton/m 2
Heel A L 5.5 1 5.5
53
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
M
Overturning Safety factor = V = 241.26 = 4.4 > 1.5 So O.K
M 54.74
H
F F 0.5 85.78
Sliding Safety factor = F = N = = 2.24 > 1.5 So O.K
F F 19.11
H H
M -M
X= V O = 241.26 54.74 = 2.17 > 5.5/3 Inside Middle Thired So O.K
R 85.78
V
54
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
Reinforcement calculation:
Design of Stem:
To design of this retaining wall we dont have any surcharge load.
Ha = 21.42Ton
Overturning Moment = 67.55Ton.m
M
As =
fsJd
J = 1 K/3
n
K=
n+r
135 135
n= = = 9.32
f' c 210
fs 1800
r= = = 21.43
fc 84
n 9.32
K= = = 0.3031
n + r 21.43 + 9.32
J = J = 1 K/3 = 1 0.3031/3 = 0.898
M 67.55 105
As = = = 37.99cm 2 /m
fsJd 1800 0.898 110
55
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
As 37.79
= = = 0.00346
bd 100110
Min vertical (ACI Section 14.3) = 0.0015 < 0.00346
As = 37.99cm 2 /m
Try 8 28@13cm c/c
As = 8 /4 (2.8) 2 = 39.3cm 2 /m > 37.99cm 2 /m So O.K
Design of Toe:
MM
X= V H = 241.26 67.55 = 2.025 > 1.83 So O.K
R 85.78
V
P 6e 85.78 6 (5.5/2 2.025)
= (1 + ) = 1+ = 27.93Ton/m 2
Toe A L 5.5 1 5.5
P 6e 85.78 6 (5.5/2 2.025)
= (1 ) = 1 = 3.26Ton/m 2
Heel A L 5.5 1 5.5
27.93 3.26 v 3.26
= v = 23.45Ton/m 2
5.5 4.5
Vu = 1/2(27.93 + 23.45)1 = 25.69Ton
X=
(1/2 4.48 1)1/3 + 23.45 11/2 = 0.486m
1/2 4.48 1 + 23.45 1
Mu at the face of Stem = 0.486 25.69 = 12.485Ton.m
fc = 84Kg/cm 2
fs = 1800Kg/cm 2
vc = 0.25 f' c = 0.25 210 = 3.63Kg/cm 2
J = 0.898
M 12.485 105
As = = = 5.52cm 2 /m
fsJd 1800 0.898 140
As 37.79 1.4 1.4
= = = 0.00346 < = = 0.00389
bd 100 110 fy 360
56
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
So we use = 0.00389
min
As = 0.00389 100 140 = 54.44cm 2 /m
Try 28mm@15cm c/c
100/11 9 28mm
As = 9 /4 (2.8) 2 = 55.42cm 2 /m > 54.44cm 2 /m So O.K
Minimum horizontal As = 0.0025 b d
As = 0.0025 100 120 = 30cm 2
Try 25mm@15cm c/c
V 25.69 10 3
v= = = 1.835Kg/cm 2 < vc = 3.63Kg/cm 2 So O.K
bd 100 140
Design of Heel:
The upward soil pressure is conservatively negligible.
Vu = 5.8 3.3 1.9 1 + 3.3 1.5 2.4 1 = 48.25Ton
vc = 0.25 f' c = 0.25 210 = 3.63Kg/cm 2
V 48.25 10 3
v= = = 3.45Kg/cm 2 < 3.63Kg/cm 2 So O.K
bd 100 140
M at the face of Stem = 48.25 (3.3/2 ) = 79.613Ton
J = 0.898
M 79.613 10 5
As = = = 35.18cm 2 /m
fsJd 1800 0.898 140
As 35.18 1.4 1.4
= = = 0.00252 < = = = 0.00389
bd 100 140 min fy 360
So we use = 0.00389
min
As = 0.00389 100 140 = 54.46cm 2 /m
Try 9 28mm@11cm c/c
57
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
3 - ? 16
3- ? 20
3 - ? 16
7 - ? 16
? 16 @ 150
DETAIL X
? 16 @ 150
7-?16 (EQUALLY SPACED)
DETAIL X
? 20 @ 100
?28@110
?28@110
?25@ 150
?28@110
? 25 @ 250
150
5-?16@300 5-?16@300
550
?25@ 250
?28@110
SECTION B
58
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
(Design of Piers)
110 110
425 425
20
20
22
22
130
130
70
310 10 450
160
150
450
Elevation of Pier
59
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
1. Truck Load:
15 15
Impact Value = = = 0.28
38 + L 38 + 16
M )+ = 0
B
14.5 16 + 14.5 11.75 + 3.625 7.5 R 16 = 0
R = 26.85Ton
R = (1 + 0.28) 26.85 = 34.365Ton
(LL + IL)
M A )+ = 0
11.8 16 + 0.95 16 16 / 2 2 R 16 = 0
R = 27Ton
R = (1 + 0.28) 27 = 34.56Ton
(LL + IL)
3. Tank Load:
M A )+ = 0
20 3.5(16 3.5 / 2 ) R 16 = 0
R = 62.34Ton
60
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
1. Truck Load:
Fy + = 0
- 17.2 2 Va = 0
Va = 34.4Ton
M )+ = 0
a
17.2 0.875 + 17.2 2.675 + M = 0
a
M = 61.06Ton.m
a
M )+ = 0
a
11.52 3(0.025 + 3 / 2 ) + M = 0
a
M = 52.7Ton.m
a
3. Tank Load:
Fy + = 0
- 62.34/2 Va = 0
Va = 31.17Ton
M )+ = 0
a
62.34 / 2 2.025 + M = 0
a
M = 63.12Ton.m
a
For the design of pier cap we use Ma = 63.12Ton.m and Va = 34.56Ton.
Total Va = VDL + VLL = 34.56 + 84 = 118.56Ton
Total Ma = M DL + M LL = 156.48 + 63.12 = 219.6Ton.m
61
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
1. Shear Reinforcement:
d = 100cm
b = 150cm
V 118.56 103
v= = = 7.904Kg/cm 2
b.d 150 100
3T
vt =
X2Y
T = 17.2 2 0.45 = 15.48Ton.m
3T 3 15.48 10 5
vt = = = 0.796 < 0.22 210 = 3.2
X2Y 180 3
So we dont design this cross section for Torsion.
2. Flexure Reinforcement:
M = 219.6Ton.m
J = 1 K/3
n
K=
n+r
135 135
n= = = 9.32
f' c 210
fs 1800
r= = = 21.43
fc 84
62
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
n 9.32
K= = = 0.3031
n + r 21.43 + 9.32
J = J = 1 K/3 = 1 0.3031/3 = 0.898
PIER PIER
1200 1200
8500
6X2-EQUALSPACE 7-?
2200 400 7-?
7-?
500
500
7-?
7-?36 2-?
2-16@200 7-?36 2-16@200 2-?
1500
2?12@200 2?12@200
1500
500
500
1186
2-? 2-?
VARIES
4-?
500
4-?
750
2?20
? 2-?
750
4?
? 25?
2 SECTIONA-A 3 SECTIONB-B
?
750
PIER
750
CAISSON 1200
FOUNDATION 25-32EQUALYSPACED
400
7-?
500
2-? ?1600
VARIES
2?12@200
4-?
51
5189
89
5 SECTIOND-D
4 SECTIONC-C
1 TRANSVERSEELEVATIONOFVPIER &PIERCAP
63
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
Design of Pier:
450
160
150
450
Elevation of Pier
Dead Load:
ML = 0
Mt = 0
1. Truck Load:
Force Below and above the pier:
R V = 17.2 4 = 68.8Ton
ML = 68.8 0.45 = 30.96Ton.m
Mt = 17.2(3.4 + 1.6 + 0.3 1.5) = 65.36Ton.m
64
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
3. Tank Load:
Wind Load:
Magnitude of this load is small so negligible.
Break load:
65
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
Earthquake Load:
RV = 0
ML = 46 (1.1 + 0.65) + 6.55 0.55 = 84.1Ton.m
Mt = 84.1Ton.m
Lontidunal Shear Force = Transversal Shear Force = 46 + 6.55 = 52.55Ton
RV = 0
ML = 46 (0.65 + 1.1 + 4.5) + 6.55 (0.55 + 4.5) + 4.5/2 5.65
= 333.29Ton.m
Mt = 333.29Ton.m
Lontidunal Shear Force = Transversal Shear Force = 52.55 + 5.65 = 58.2Ton
Temperature Load:
66
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
(Combination Table)
V .Force S .Force T .M L .M
No Loading
(Ton) (Ton) (Ton.m) (Ton.m)
1 Dead Load 175.8 0 0 0
100% Total 175.8 0 0 0
First Group 175.8 0 0 0
2 LL+IL 68.8 0 30.96 65.36
100% Break Load 0 20 112 0
Total 244.6 20 142.96 65.36
First Group 175.8 0 0 0
T. Earthquake 0 58.2 333.29 0
Total 175.8 58.2 333.29 0
5
Total divided to 1.33 132.2 43.76 250.6 0
133%
L. Earthquake 0 58.2 0 333.29
Total 175.8 58.2 0 333.29
Total divided to 1.33 132.2 43.76 0 250.6
67
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
P = 244.6Ton
M X = 142.96Ton.m
M Y = 65.36Ton.m
For circular cross section we can write :
M = M X + M Y = 142.96 2 + 65.36 2 = 157.19Ton.m
2 2
K =1 Lu = 450cm
r = 0.25D = 0.25 160 = 40
KLu 1 4.5
= = 11.25 < 22 So Short Column
r 40
= 0.35 Use AASHTO Standard
Mu 157.19
Mn = = = 449.11Ton.m
0.35
Pu 244.6
Pn = = = 698.86Ton
0.35
e b = (0.24 + 0.39 t m)D
A st 25 /4 3.2 2
= = = 0.01
/4 160 2
t
Ag
fy 3600
m= = = 20.17
0.85f' c 0.85 210
e b = (0.24 + 0.39 0.01 20.17)1.6 = 0.51
Mn 449.11
e= = = 0.643 > e b = 0.51
Pn 698.86
e > e b So Tension Failure
Pn (max) = 0.85[0.85f' c(Ag Ast ) + fy Ast ]
Pn (max) = 0.85[0.85210( 802 25 1.62 ) + 3600 25 1.62 ]
Pn (max) = 3635.356Ton
2
0.85e mDs 0.85e
Pn = 0.85f' cD 2
0.38 + t
0.38
D 2.5D D
68
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
Spiral Design:
Ag f' c 80 2 210
= 0.45 = 0.45 = 0.0286
Ac 1 fy 76.6 1 3600
S 2
use 16mm
a s (Dc Ds) 0.8 2 (153.2 1.6 )
S= = = 1.82cm < 2.5cm
Ac S 76.6 2 0.0286
So use 16mm@2.5cm c/c
P = 132.2Ton
M = 250.6Ton.m
KLu 1 4.5
= = 11.25 < 22 So Short Column
r 0.25 1.6
= 0.35 Use AASHTO Standard
Mu 250.6
Mn = = = 716Ton.m
0.35
Pu 132.2
Pn = = = 377.71Ton
0.35
e b = (0.24 + 0.39 t m)D
A st 25 /4 3.2 2
= = = 0.01
/4 160 2
t
Ag
fy 3600
m= = = 20.17
0.85f' c 0.85 210
e b = (0.24 + 0.39 0.01 20.17)1.6 = 0.51
Mn 716
e= = = 1.896 > e b = 0.51
Pn 377.71
69
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
Spiral Design:
Ag f' c 80 2 210
= 0.45 = 0.45 = 0.0286
Ac 1 fy 76.6 1 3600
S 2
use 16mm
a s (Dc Ds) 0.8 2 (153.2 1.6 )
S= = = 1.82cm < 2.5cm
Ac S 76.6 2 0.0286
So use 16mm@2.5cm c/c
70
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
200
400
75
300
? 16mm@25
25? 32mm
200
75
250
300
50
71
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
Use 4(2mm ) Steel Layers and 3(8mm ) Elastomer Layers and 2(4mm ) Cover Layers
4 2 = 8mm
3 8 = 24mm
2 4 = 8mm
Total thickness = 40mm
ERT = 4cm
72
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
= 577.1cm 2
55 55
20 10
R ( DL ) 3
Checking of Sliding:
Break Force 20
Lateral Force of Beam = = = 4Ton
Nomber of Beam 5
1 1
R ( DL ) = 20 = 4Ton = 4Ton of Lateral Force
5 5
So Sliding Will happen.
73
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
If Elastomeric Bearing Pad can endure the force, we dont use halter
bolt, or if Elastomeric Bearing Pad cant endure the force we must use
halter bolt.
Checking the Sufficiency of Elastomeric Bearing Pad for turning of Support:
1 L
= M max
3 EI
1 1
Iy = 180 3 22 + 40 3 108 = 1.13 10 7 cm 4
12 12
M max = (M DL + M LL ) = (80 + 46.69 ) = 126.69Ton.m
1 1600
= 126.69 10 5 = 0.0026
3 2.29 10 1.13 10
5 7
= L = 0.0026 35 = 0.0914cm
0.0914
= = 0.0228 = 2.28% < 6% allowed So O.K
t 4
BEARING 58mmTHIK 6mmthick. cover layers
4-2.5 mmthik .steel plates PIER
12mmthik
elastomer BEARING BEARING
(3 layer)
BEARING PLINTH
2 SECTIONB
BEARING
5-? 16@250
DIRECTION 3?12
OF TRAFFIC
BEARING
3?16
BEARING
PLINTH
3 SECTIONC
74
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
Pu = 24000KN
f' c = 21MPa
GROUND LINE
60MIN
R.C.C COLUMN
R.CC CAP
150
100mm THK
LEAN CONCRETE
Ds CONSTRUCTION JOINT
200
300
t
50
125 MIN
Db
75
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
Ap =
2
Db
4
Q P (net) = S.F Pu = 2 24000 = 48000KN
Q P (net) = A p q' (N q 1)
48000 = A p 90 (60 1)
A p = 9.04m 2
D b = 3.39m
So we use D b = 3.5m
V= c
Pi t
1.252 (15.11 9.81 1.25 24 )
V= = 59.11KN/m 2
2 1.25 1.25
76
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
Fd = Wc + Ws + Qs
Fu = floating Force
Wc = Weight of caisson
Ws = Weight of concrete
Qs = Frection of agility
Wc = (R 2
Ri
2
) c
Ht
Wc = (1.75 2 1.25 2 )24 16.61 = 1878.55KN
Ws = R i t
2
c
Assume Qs 0
Fd = 1878.55 + 147.26 = 2025.81KN > 1426.11KN So O.K
77
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
GROUND LINE
14
5
60MIN
R.C.C COLUMN
350
CONSTRUCTION
JOINT
See DETAIL 2 R.CC CAP
150
45
100mm THK
350 LEAN CONCRETE
CONSTRUCTION JOINT
1 PLAN 250
14
200
5
FILLED WITH
GRAVEL&SAND FILLED WITH COMPACTED
GRAVEL & SAND(MIN UNIT
WEIGHT 20KN/M
300
125 MIN
45
PRECAST CONCRETE
50 PORTION 500 THIK
350
78
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
Requirement:
Required slump = 3in (7.6cm)
For a slump of 7.6cm and a maximum aggregate size of 3/4in
the, Weight of water required per cubic meter
of concrete = 112.95 kg/m3
For the specified compression strength f'c = 210kg/cm2
W/C Ratio = 0.58
Amount of cement required per cubic meter of concrete:
Weight of cement = 112.95/0.58 = 194.74 kg/m3
Using a sand fineness value of 2.8:
Volume of coarse aggregate = 0.62 yd3
Using dry rodded weight of 100lb/ft3 for coarse aggregate,
Weight of coarse aggregate = (0.62) (27 ft3/ yd3) 100 = 1674
lb/yd3
Weight of coarse aggregate = 581.8 kg/m3
Estimated weight of fresh concrete for aggregate of 3/4in =
3960 lb/yd3
Weight of sand = [weight of fresh concrete weight of (water +
Cement + coarse aggregate)]
= 1376.2-112.95-194.74-581.8 = 486.71 kg/m3
Moisture absorption 1% for coarse aggregate = 5.82 kg/m3
Moisture absorption 1.5% for fine aggregate = 7.25 kg/m3
Net weight:
Net weight of gravel = 581.8 + 5.82 = 587.62 kg/m3
Net weight of sand = 486.71+ 7.25 = 493.96 kg/m3
Net weight of water = 112.95-0.01(518.8)-0.015(486.71) =
100.5 kg/m3
79
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
80
Project Design Project Created by Obaidullah (Ahmadzay) ID#995
(References)
ASHTOO
English References:
1. Hec- Ras- Hydraulics references chapter 5.
2. Bridge design manual- section 8.2 revised 05/04/2000- Hydraulics
design manual.
3. Bridge deck analysis- (Engene J. Obrien and Damieul Keogh).
4. Bridge design manual- (Washington state department of
transportation).
5. Bridge analysis guide- 2005 Edition part- (Michigan department of
transportation).