Sie sind auf Seite 1von 1

EMPLOYER: M/s AL Fazeela Technical services APP APPROVED

ENGINEER: M/s Adnan Saffarini AAN APPROVED AS NOTED


PROJECT: Proposed B+G+1 villa UCR UNDER CONSULTANT REVIEW
Date: 6.6.2017 AANR APPROVED AS NOTED RESUBMIT
NAR NOT APPROVED, RESUBMIT
SHOP DRAWING SUBMITTAL - MECHANICAL LOG
1ST SUBMISSION 2nd SUBMISSION
DATE APPROVAL DATE APPROVAL APPROVAL
SL No: REF. DESCRIPTION REV. DATE REPLIED DATE REPLIED DATE REPLIED DATE REPLIED
SUBMITTED STATUS SUBMITTED STATUS STATUS

1 AFT-HVAC-SD-0101 HVAC-Basement Floor R00 29.05.2017


2 AFT-HVAC-SD-0102 HVAC-Ground Floor R00 29.05.2017
3 AFT-HVAC-SD-0103 HVAC-First Floor R00 29.05.2017
4 AFT-HVAC-SD-0104 HVAC-Roof R00 29.05.2017
5 AFT-HVAC-SD-0105 HVAC-Typical Details R00 29.05.2017
6 AFT-EL-SD-0101 Electrical-Setting Out Plan R00 29.05.2017
7 AFT-EL-SD-0102 Lighting Plan-Basement Floor R00 29.05.2017
8 AFT-EL-SD-0103 Lighting Plan-Ground Floor R00 29.05.2017
9 AFT-EL-SD-0104 Lighting Plan-First Floor R00 29.05.2017
10 AFT-EL-SD-0105 Lighting Plan-Roof R00 29.05.2017
11 AFT-EL-SD-0106 Setting Out Plan-Cable layout R00 29.05.2017
12 AFT-EL-SD-0107 Power layout-Basement Floor R00 29.05.2017
13 AFT-EL-SD-0108 Power layout-Ground Floor R00 29.05.2017
14 AFT-EL-SD-0109 Power layout-First Floor R00 29.05.2017
15 AFT-EL-SD-0110 Power layout-Roof R00 29.05.2017
16 AFT-EL-SD-0111 Single Line drawing R00 29.05.2017
17 AFT-DR-SD-0103 Drainage-Basement Floor R00 6.6.2017
18 AFT-DR-SD-0101 Drainage-Ground Floor R00 29.05.2017
19 AFT-DR-SD-0102 Drainage-First Floor R00 29.05.2017
20 AFT-WS-DR-0104 Water Supply-Basement Floor R00 29.05.2017 s

21 AFT-WS-DR-0101 Water Supply-Ground Floor R00 29.05.2017


22 AFT-WS-DR-0102 Water Supply-First Floor R00 29.05.2017