Beruflich Dokumente
Kultur Dokumente
2006
Content
1. TMN-SD1 001E3
2. TMN-SD1 002E5
3. TMN-SD1 003E9
4. TMN-SD1 004E11
5 TMN-SD1 005E13
6 TMN-SD1 006E15
7 TMN-SD1 007E18
8 TMN-SD1 008 E...21
9 TMN-SD1 009 E...26
SD1
S5 TMN&Service info
SD1 S5TMN - 1 -
01.2006
- 2 - S5TMN SD1
01.2006
1. TMN-SD1 001E
Mechanical
Application range
BAC will provide the high pressure hose assy. and related parts with the new structure for free
for those machines which left factory before Oct, 2003 and are still before the deadline of
warranty.
Introduction
BAC changed new provider for the high pressure hose assy. with the new structure since
Oct,2003.
Solved problems:
Hose splitting and water leakage
Implementary method
Unfix the old high pressure hose assy. and two pipe connectors. Fix the high pressure hose
assy. with the new structure and two new pipe connectors.
Required parts:
(1) High pressure hose assy.p/n. 335.009.106, 1 piece
(2) Pipe connectorp/n. 333.009.107, 1 piece
(3) Right-angle pipe connectorp/n. 333.009.564, 1 piece
Fixed position as below, the other end connected with the high pressure pump:
Software
Application range
BAC will update for all left-factory machines for free the control software installed in which were
not the newest version.
SD1 S5TMN - 3 -
01.2006
C o m m s u c c e s s !
V e r s i o n 0 3 - 0 5
then the control software should be updated.
Introduction
The control software has been updated from Ver. SD1S-04 to Ver. SD1S-05. In the new
Version:
(1) The fuctions such as automatic touch sense and set zero, automatic compensation of
electrode wear were added. When multi-hole machining, manually set zero on Z-axis is not
needed any more, Z-axis value set in the program is just the relative machining depth
comparing to Z-axis position of the supposed touch sense point. (The compensation value of
electrode wear can be supposed in page 4 of SET0 window with special function F30.) Thus
electrodes withdrawing out of ruby electrode guide can be avoided. The detailed operating
regulations of multi-hole machining and special function F30 are introduced in the new version
Ver. 02.00 of SD1 Users manual.
(2) R-axis rotates when special function edge find or center find is ongoing. In addition, R-axis
also rotates when automatic touch sense with F30 is ongoing.
Solved problems:
The electrode wear cant be compensated automatically and the tubular electrode easily
retracts out of
electrode guide when multi-hole machining.
Implementary method
The control software assy. is an EPROM chip fixed on CNC control board SBC-B22. For
updating, just need to replace this chip.
Fixed position as below:
- 4 - S5TMN SD1
01.2006
Required parts:
Control software assy. (p/n. 388.504.280): EPROM chip, 1 piece
Others
1.3.1 Operation interface software
Besides the metric mode of the operation interface software, the inch mode was added. To
change the mode, just need to order corresponding EPROM chip. From then on, BAC requires
the agents to claim the mode of this software (either metric or inch ) in the order list definitely.
Before leaveing factory ,the different mode will be installed to finish commissioning just
according to the order list.
The operation interface software assy. is an EPROM chip fixed on main control board
SBC-B20:
SD1 S5TMN - 5 -
01.2006
For more doubts, please contact SD1 technical support Mr. Ma Zhenlei:
Tel: +8610-69403149, 69403355-8049
Fax: +8610-69402288
E-mail: ma.zhenlei@actspark.cn
2. TMN-SD1 002E
2.1 Model change of the high pressure pump and related parts
2.1.1 Introduction
BAC began to fix new-model high pressure pump on new-made SD1 machines since March
2003. The new model of the pump is AD-1008, while the old one is AD-708. Also models of
related parts such as pressure gauge, big belt pulley, small belt pulley, motor and timing belt
have been changed. Fix dimensions of pumps with different models are not same, thus
new-model parts are not compatible with old-model parts. If parts mentioned above need to be
replaced when repairing, first of all, the model of the high pressure pump fixed on the machine
must be checked clearly before ordering parts, then determine part number of corresponding
parts.
model of high-pressure
pump
- 6 - S5TMN SD1
01.2006
2.2 Improvements of parts included in holder assy.
2.2.1 Introduction
(1) Fixation of the tubular electrode
(3)
(4)
Selection of Gasket (3) and Seal
(3) gland (4)
(2) Holder assy. (Holder + Guide sleeve + Gaskets + Seal gland + Electrode guide) has been
modified in 3 items:
(a) The structure of seal gland has been changed, reduced from 6 kinds to 3 kinds. Dia.
1.0mm, dia. 2.0mm, dia. 3.0mm are provided;
(b) Two gaskets are added to each holder assy. Dia. 1.1mm, dia. 2.1mm, dia. 3.1mm are
provided;
(c) The structure of guide sleeve has been changed, reduced from 7 kinds to 6 kinds. Dia.
0.5mm, dia. 1.0mm, dia. 1.5mm, dia. 2.0mm, dia. 2.5mm, dia. 3.0mm are provided.
Dimensions of guide sleeve are showed in the drawing as below:
SD1 S5TMN - 7 -
01.2006
2.2.2 Remarks for ordering parts included in holder assy. when repairing
(1) Ordering of gaskets
Gasket is new-added part, it must be used together with new-structure seal gland and guide
sleeve. When ordering gaskets for machines on which gaskets have never been used,
corresponding seal gland and guide sleeve according to the list as below must be ordered at
the same time;
- 8 - S5TMN SD1
01.2006
No. ID-NR Description Qty. Remarks
6.1 335.009.141 Holder 1.5 1x
6.2 335.009.129 Guide sleeve 1.5 1x
6.3 333.010.464 Gasket 2.1 2x
6.4 335.009.136 Seal gland 2.0 1x
6.5 335.009.075 Electrode guide 1.5 1x
3. TMN-SD1 003E
Not recommended
TMN-SD1 003E
Date Jun 16, 2004
Subject
software update & temperature relay type change
Released by Ma Zhenlei
Signatures
Controlled by Liu Mingjun
Parts last order
Parts availability Jun 16, 2004
Machine under Machine out of
warranty warranty
Retrofit Policy
Field retrofit No No
Free of charge Yes No
Manufacturing cost USD 93.3
Importance SD1-E-2004-004
Normal References
of problem SD1-E-2004-007
SD1 S5TMN - 9 -
01.2006
1. Introduction 4. Machines concerned
2. Tools needed 5. Modification procedure
3. Content of the kit 6. Material return
1. Introduction
2. Tools needed
4. Machine concerned
5. Modification procedure
(1) Control software of drilling machine was updated from Ver 05 to Ver 06 (metric mode: 03-06 ;
inch mode:04-06). New MCU control board SBC-B22A should be ordered for update. Fixed
position is figured as below:
(2) The type of temperature relay was changed from 60 normal close to 70
normal close. Fixed position of temperature relay is figured as below:
- 10 - S5TMN SD1
01.2006
6. Material return
The old board SBC-B22 must be returned to BAC if new MCU control board SBC-B22A is
ordered for free under warranty. The replaced temperature relay is not necessary to be returned
to BAC.
4. TMN-SD1 004E
Improvement
TMN-SD1 004E
Date Jan 7, 2005
Subject
R-axis assy. improvement
Released by Ma Zhenlei
Signatures
Controlled by Liu Mingjun
Parts last order
Parts availability Jan 7, 2005
Machine under Machine out of
Retrofit Policy warranty warranty
Field retrofit No No
Free of charge Yes No
Manufacturing cost USD 474.00
Importance
Normal References SD1-2004-003
of problem
1. Introduction
The structure of R-axis assy. was improved in order to decrease the possibility of water
leakage.
2. Tools needed
3mm T-shaped spanner, 4mm T-shaped spanner, 5mm T-shaped spanner, 17-19mm solid
spanner, screwdriver, indicator.
SD1 S5TMN - 11 -
01.2006
Qty.: 1 piece for each tool
4. Machine concerned
The machine R-axis on which cant work normally because of water leakage.
5. Modification procedure
Unfix old assy. and parts, replace them with new assy. and parts referring to procedures listed
as below:
(1) Unfix small sheet metal box, cover and high pressure hose assy.
(2) Unfix R-axis assy. away from insulated block demonstrated in the photo below
(4) Check and adjust parallelism between R-axis and Z-axis movement (X & Y direction,
tolerance: 0.020mm)
--- Adjust parallelism between R-axis and Z-axis movement (X direction) through adjusting 4
fixing screws of R-axis
--- Adjust parallelism between R-axis and Z-axis movement (Y direction) through inserting
shims between R-axis assy. and its fixing insulated block. Tighten R-axis assy. after the
adjustment
(5) Fix small sheet metal box, cover and connect high pressure hose assy.
- 12 - S5TMN SD1
01.2006
Insulated
block Fixing
screw
of R-axis
[4 pcs ]
6. Material return
5. TMN-SD1 005E
Information
TMN-SD1 005E
Date Jul. 6, 2005
Subject
The modification of timing belt
Released by Sun Lijun
Signatures
Controlled by Liu Mingjun
Parts last order
Parts availability
SD1 S5TMN - 13 -
01.2006
Machine under Machine out of
Retrofit Policy warranty warranty
Field retrofit No No
Free of charge
Manufacturing cost
Importance
References
of problem
1. Introduction
Now the timing belt of R axis has been changed, because the new one is not compatible
with the old one, so when you want to replace this timing belt, please confirm the original
model of timing belt on the machine for avoiding to change a wrong part.
2. Tools needed
4. Machine concerned
(1) SD1
5. Modification procedure
Now the timing belt of R axis has been changed, the new timing belt (Model: HTD 3M 234-5 9,
part number: 336010820) has been used on the current drilling machine. The new time belt is
longer than the old timing belt (Model: HTD 3M 225 9, part number: 336006689), so they
are not compatible, during repairing the machine and if you want to apply this timing belt,
please confirm the model of timing belt first for changing a correct timing belt.
- 14 - S5TMN SD1
01.2006
6. Material return
6. TMN-SD1 006E
Mandatory
TMN-SD1 006E
Date Jul. 6, 2005
Subject
The improvement of quality of belt pulley and timing belt
Released by Sun Lijun
Signatures
Controlled by Liu Mingjun
Parts last order
Parts availability About Aug.20, 2005 for timing belt GATES 234-3M
Machine under Machine out of
warranty warranty
Retrofit Policy Field retrofit Yes No
Free of charge Yes No
Manufacturing cost
Importance High 050615B
References
of problem 050623
SD1 S5TMN - 15 -
01.2006
1. Introduction 4. Machines concerned
2. Tools needed 5. Modification procedure
3. Content of the kit 6. Material return
1. Introduction
(1) Because the edge of teeth of belt pulley on R axis motor is very sharp, so the belt is worn
out quickly and broken easily. If this problem occurred on the customers machine, please
check the belt pulley and replace the belt pulley and timing belt with a new one.
(2) Now the Belt 1 and Belt 2 are used on the current drill machine, for improving the life of
timing belt, the Belt 3 (GATES 234-3M) will be used on the drill machine, the quality of Belt 3 is
better than other belts. In the future if the timing belt is broken please replace the damaged belt
with Belt 3.
2. Tools needed
4. Machine concerned
(1) SD1 (059-010, 060-001, 060-002, 060-003, 060-004, 060-005, 060-006, 060-007, 060-008,
060-010, 061-001, 062-002, 062-008, 064-005)
- 16 - S5TMN SD1
01.2006
5. Modification procedure
(1) If the timing belt is worn out quickly and broken easily on the above machine (Item 4),
please check the belt pulley and replace the R axis motor assy. and timing belt with a new one.
(2) If the problem of the timing belt is broken occurred on other machines, please replace the
timing belt with Belt 3.
Belt 1
Belt 2
Belt 3
SD1 S5TMN - 17 -
01.2006
6. Material return
7. TMN-SD1 007E
Improvement
TMN-SD1 007E
Date Oct 8, 2005
Subject
The improvement of inlet valve and filter system
Released by Shan Jun & Sun Lijun
Signatures
Controlled by Liu Mingjun
Parts last order
Parts availability
Machine under Machine out of
Retrofit Policy warranty warranty
Field retrofit No No
Free of charge
Manufacturing cost
Importance SD1-2005-004
Normal References
of problem SD1-2005-008
1. Introduction
Inlet valve:
The inlet valve was improved in order to decrease the possibility of water leakage and
damage.
Filter system(Option):
Now the filtration tank had been improved, the new function is shown as below: (1) Turn on
the pump automatically when switch on the machine. (2) The detection of water level. (3)
Automatic alarm if the water level is less than the setting position. (4) Fill the water into the
reservoir that mounted back of the machine automatically, etc. So the water can be used
circularly.
2. Tools needed
Standard
- 18 - S5TMN SD1
01.2006
- Include
Reservoir
P/N.384013549
Filter system
P/N.384010068
Control box
P/N.383013561
4. Machine concerned
5. Modification procedure
Inlet valve
1. Please dismantle the old inlet valve
2. Fix the new inlet valve by spanner
SD1 S5TMN - 19 -
01.2006
Connect to float
Reservoir switch SQ1
Overflow hose
Intake pipe
Return pipe
for sewage
Return box
Fig 1
- 20 - S5TMN SD1
01.2006
R0S0T0PE
connect to QF1
12VGND connect
to switch power
220AS2 connect to
XT6
Fig 4
6. Material return
8. TMN-SD1 008 E
Topics: Improvements on R-axis and capacitor board
1. Procedure
A. Please unfix some parts below away from the machine [Fig1]:
Cover of R-axis assy.
SD1 S5TMN - 21 -
01.2006
Electrode cable, motor cable, ground wire, high pressure hose.
Unfix the R-axis assy. away from the insulator block.
Insulated
block
Fig1 Fig2
- 22 - S5TMN SD1
01.2006
SD/Nut:373.461.768
SD/Stick:373.461.767
[Two parts]
NOTE: If you dont have the check stick, you can order it from BAC.
Connect the high-pressure hose assy. and fix the new cover (P/N: 387.014.611) of new R-axis.
2. Material list
The SD1 R axis assy. [Spare part] P/N: 388.014.880
Include: New R-axis P/N: 387.014.606
New Cover of R-axis [SD1] P/N: 387.014.611
Small sheet metal box [SD1] P/N: 334.009.557
3. Material return
The replaced materials are not necessary to be returned.
SD1 S5TMN - 23 -
01.2006
1. Procedure
Please according to the procedure of below fix the capacitors.
- 24 - S5TMN SD1
01.2006
Connection
2. Material list
Capacitor assy.1: 383507352
Capacitor assy.2: 383507353
3. Material return
The replaced materials are not necessary to be ret
SD1 S5TMN - 25 -
01.2006
9TMN-SD1 009 E
Topics: Finish drilling assy.
CE update packet
1. Procedure
Install the capacitor box assy.
A. Remove two capacitors 330nF/630V on capacitor board in generator, if the board only has
two capacitors, please dont change it.
B.
B. Install the capacitor box assy. on back cover of handle panel (see fig. 12).
C. Connect two cables to P4 and GND from capacitor box (see fig. 34).
NoteUser need drill oneself if there have not mounting holes.
- 26 - S5TMN SD1
01.2006
Fig 3
Connect cable
Fig 1
Adjust switch
of capacitor
Five kind, free
compounding.
Fig 2
Fig 4
SD1 S5TMN - 27 -
01.2006
user need drill oneself. The position of mounting hole is higher than the topmost water level of
clean tank.
Mounting hole
Deionizing bucket
Ceramic filter
- 28 - S5TMN SD1
01.2006
Method: Remove the ceramic filter to clean rightabout using tap water (replacing it
after 200 hours).
3.2 Conductivity apparatus
Note: Using the Conductivity apparatus to measure the waters conductivity if the
conductivity is over 10s, then using the spanner to open the deionizing bucket and
change new resin.
2. Material list
1. Finish drilling assy. 388.015.389
Include three parts:
A. Finish drilling module 388.015.161
Include Capacitor box subassembly 383.507.416
Deionizing subassembly 387.015.164
Conductivity apparatus 357.015.541
B. Balzer chuck assy.
Include four types: 0.1 388015133
0.15 388015132
0.2 388015131
0.3 388015130
C. Joint sleeve [333.014.879]
2. Ceramic filter: 327.015.163
Note: The filter system packet includes the ceramic filter.
3. Material return
The replaced materials are not necessary to be returned.
SD1 S5TMN - 29 -
01.2006
Subject: CE update packet
1. Procedure 3. Material return
2. Material list
1 Procedure
Put the 3 connecting cables (381504252) inside an orange synthetic hosing
(371506831) L=160mm, tie the two side of the orange hosing with binders (365500465),
add the PE connector (364500610) for the optional filtering system
Add cable pass (366505501) for the electric power supply cable to the pump motor.
Change the action pin (365507567) on each of the 6 safety switches (343504880) for
2 position switch
- 30 - S5TMN SD1
01.2006
Cover the yellow twisted cable near the main switch with black hosing (361501408)
L=400mm
Put the protection covers (331507564) on the top and bottom of the main
switch(343505611), and stick the lightning label(331505276) on the top protection cover.
Scrape the cover (332008907) on the pace see in the picture, stick the electric tape
(305507099)
SD1 S5TMN - 31 -
01.2006
- 32 - S5TMN SD1
01.2006
Stick the protection label (331507566) on the left and right hand side of the machine
base.
2 Material list
CE update packet 388.507.565
include
371.506.831 Orange hosing 160mm
364.500.610 PE connector 1 EA
365.500.465 Cable binder 3 EA
366.505.501 Cable pass 1 EA
365.507.567 Action pin 6 EA
361.501.408 Black hosing 400mm
364.501.820 Pin 2 EA
331.507.564 Protection cover 2 EA
331.505.276 Lightning label 1 EA
313.015.601 Expand screw 2 EA
305.507.099 Electric tape 120mm
331.507.566 Protection label 2 EA
372.350.479 CE update instruction 1 EA
20 3. Material return
The replaced materials are not necessary to be returned.
SD1 S5TMN - 33 -