Table of Contents

A) INQUIRY REQUIREMENTS AND FORMS


1.1 Invitation Letter
1.2 RFP Cover Letter
1.3 Table of contents
1.4 Acknowledgement and Intent to Bid
1.5 Instructions to Bidders
1.6 Proposal Letter

B) SCHEDULES
1.0 Schedule 01 Project Description

2.0 Schedule 02 Technical Specification PVDC 1277-SP-4144-00-0005


2..1 Appendix A H321277-4144-EGL-M-0001-Mechanical Equipment List
2.2 Appendix B 01 01 15.01 Hatch Drawing List and Drawings
2.3 Appendix C 01 01 15.02 Mechanical Equipment Drawing List
2.4 Appendix D 01 01 15.03 Air Products Drawing List and Drawings
2.5 Appendix E H 321277 -4144-GEP-N-0001 Commissioning
2.6 AppendixF1 H321277-4144-EGL-P-0001 Hatch Piping Line List
2.7 AppendixF2 H321277-4144-EGL-P-0002 Tie Point List
2.8 Appendix G H321277-4144-EGL-P-0003 Hatch Manual Valve List
2.9 Appendix H H321277-4144-EGL-P-0004 Hatch In Line Instrument List
2.10 Appendix I H321277-4144-EGL-P-0005 Hatch Piping Speciality Item List
2.11 Appendix J H321277-4144-EGL-P-0006 Air Product Piping Line List
2.12 Appendix K H321277-4144-EGL-P-0007 Air Product Manual Valve List
2.13 Appendix L H321277-4144-EGL-P-0008 Air Products In line Instrument List
2.14 Appendix M H321277-4144-EGL-P-0009 Air Products Piping Speciality item List
2.15 Appendix N 40 05 13 Piping Material Date Sheet Index
2.16 Appendix O H321277-4144-EGL-P-0010 Piping Support Index
2.17 Appendix P H321277-4144-EGL-P-0011 Pipe Support List

3.0 Schedule 03 Drawings and specification table of Content

4.00 Schedule 04 Performance Test

ISO 9001 Pg 1 of 3

00.30-CM004 Table Of Contents 00 01 11.Doc Hatch 2010/04


PUEBLO VIEJO DOMINICANA CORPORATION SECTION: 00 01 11
PUEBLO VIEJO PROJECT TABLE OF CONTENTS
INQUIRY: H321277 CM004
STRUCTURAL MECHANICAL PIPING INSTALLATION AREA 4144 REV. 0, PAGE: 2

5.0 Schedule 05 Construction Program


5.1 Schedule 05 Appendix A1 Contract Milestone Schedule
5.1 Schedule 05 Appendix A2 SMP Installation Schedule
5.2 Schedule 05 Appendix B Progress Assessment Increments
5.3 Schedule 05 Appendix C Bar Chart major Activities
5.4 Schedule 05.5 Appendix D Mobilization Plan

6.0 Schedule 06 Contractors Execution Plan

7.0 Schedule 07 Contractors Organization and Key Personnel


7.1 Schedule 07.1 Appendix A Resume Form
7.2 Schedule 07.2 Appendix B Contractors Org Chart

8.0 Schedule 08 Subcontractors Material Supplies

9.0 Schedule 09 Contractors Key Construction Equipment


9.10 Schedule 09 Appendix A List of Contractors Key Construction Equipment

10.0 Schedule 10 Info Provided by the Contractor


10.1 Schedule 10.1 Appendix A Contractors Employment Contract Form

11.0 Schedule 11 Owner and Contractors Supplied Facilities and Services


11.1 Schedule 11.1 Appendix A Field Material Request return
11.1 Schedule 11.1 Appendix BOSM on Site Dates
11.2 Schedule 11.2 Attachment H Owners Supplied Materials Issuing Document
11.3 Schedule 11.3 Attachment B Owners supply material and Equipment on site Date

12.0 Schedule 12 Hazardous Material


12.1 Schedule 12.1 Appendix A Material Safety Data Sheet

13.0 Schedule 13 Schedule of Remuneration


13.1 Schedule 13.1 Attachment A Schedule Forms
13.2 Schedule 13.2 Attachment B Letter of Credit format

14.0 Schedule 14 Rates for Changes


15.0 Schedule 15 Owners Policies and Site Rules
15.0 Schedule 15 - Appendix A Health and Safety requirements
15.0 Schedule 15 Appendix B Environmental Requirements
15.0 Schedule 15 Appendix C-Generic Site Rules
15.0 Schedule 15 Appendix D Local Labour content

15.1 Schedule 15.1 Attachment A Owners Policies and Site Rules


15.2 Schedule 15.2 Attachment B Engineers Project Health , Safety and Environmental (HSE) Rules and
Regulations
15.2 Schedule 15.2 Attachment B Appendix A Not Applicable
15.2 Schedule 15.2 Attachment B Appendix B . Contractors Compliance with Engineers substance Abuse
Policy

ISO 9001 Pg 2 of 3

00.30-CM004 Table Of Contents 00 01 11.Doc Hatch 2010/04


PUEBLO VIEJO DOMINICANA CORPORATION SECTION: 00 01 11
PUEBLO VIEJO PROJECT TABLE OF CONTENTS
INQUIRY: H321277 CM004
STRUCTURAL MECHANICAL PIPING INSTALLATION AREA 4144 REV. 0, PAGE: 3

15.2 Schedule 15.2 Attachment B Appendix C Sample Rigging Requirements and Administrative
Procedure
15.2 Schedule 15.2 Attachment B Appendix D Sample Cranes and Lifting Equipment
15.2 Schedule 15.2 Attachment B Appendix E Engineers HSE Program and Procedure (not used)

16.0 Schedule 16 Quality Assurance Plan


16.1 Schedule 16.1 Attachment E Quality Assurance and Control Requirements

17.0 Schedule 17.1 Reports


17.0 Schedule 17 Appendix A Scheduling and Reporting Process
17.2 Schedule 17.2 Appendix B Daily Force Report

18.0. Schedule 18 Forms and Administrative Procedure


18.1 Schedule 18.1 Attachment B Administrative Procedures
19.0 Schedule 19 Construction Mechanical Completion
19.1 Schedule 19 Appendix A Interim Turnover Notice

20.1 Schedule 20 Appendix A- Electrical Storm Alert


20.2 Schedule 20 Appendix B Monthly Precipitation
20.3 Schedule 20 Appendix C Hurricane Preparation and Response
20.4 Schedule 20 Appendix D Tablas Meteorologia
20.5 Schedule 20 Appendix D1 Tablas Meteorologia Mayo 2008
20.6 Schedule 20 Appendix D2 Tablas Meteorologia Junio 2008
20.6 Schedule 20 Appendix D3 Tablas Meteorologia Augusto 2008

C) PROFORMA CONSTRUCTION CONTRACT


20 Addendum 1 Contract Documents Matrix
20.1 Annexure
20.2 Letter of Credit Format

ISO 9001 Pg 3 of 3