Beruflich Dokumente
Kultur Dokumente
Networking and
Protection
www.huawei.com
z The OptiX RTN 910/950 can carry the TDM E1, ATM/IMA
E1, and IP/Ethernet services in the different scenarios. A
suitable networking is important for the network efficiency
and reliability
z The course is the basics for the OptiX RTN 910/950 data
configuration and network planning
f1
Star Tree
Tree
Star
Low station
f1
1+0 1+0
A B C
RNC/PTN D
Forwarder
PWE3 (Encapsulation) PW
PPP 802.2
(MP) 802.3
IMA Data-Link CE:
Physical UNI E1/ E1/ E1/ GE and
FE GE
E1 cSTM-1
cSTM-1 cSTM-1 Physical customer equipment
ML-PPP Ethernet
PSN:
To CE To PSN
Packet switch network
UNI FE
NE1
Company A
PSN
Company B UNI FE
NE1 NE2
NE1 NE2
Dept. A Dept. A
Dept. B
PSN Dept. B
Branch 1 Branch 2
C-VLAN C-VLAN
11 11
PSN C-VLAN
S-VLAN
Dept. B 31 11 Dept. B
Branch 1 Branch 2
PSN
UNI NNI NNI UNI
L2 L2 L2 L2 QinQ link
NE1
GE
NODE B
PSN
RNC
NE3
FE
MPLS IMA E1
Tunnel NE2
NODE B
IMA E1s/
cSTM-1 IMA E1
RNC
UNI-UNI NODE B
PSN PW
NE1
IMA E1 NE3
IMA E1
NODE B
NODE B UNI-NNI
IMA E1
links
NODE B UNI UNI
IMA Group
IMA Group
RNC
IMA E1
links
NODE B
IMA E1
links
NODE B UNI
NNI MPLS Tunnel NNI UNI
IMA Group
PW of
ATM IMA
Group RNC
IMA E1
links
NODE B
MPLS E1
Tunnel NE2
NODE B
E1
RNC cSTM-1
UNI-UNI NODE B
PSN PW
NE1
E1 NE3
E1
NODE B
NODE B UNI-NNI
E1
NODE B UNI
UNI
cSTM-1
RNC/PTN
E1
NODE B
E1
NODE B UNI
NNI MPLS Tunnel NNI UNI
PW of cSTM-1
CES
RNC/PTN
E1
NODE B
Protection Tunnel
Before Switch
Work Tunnel
Protection Tunnel
After Switch
Work Tunnel
Protection Tunnel
Before Switch
Work Tunnel
Protection Tunnel
After Switch
Performance Description
Protection Type 1+1 Single-ended, 1+1 dual-ended, 1:1 dual-ended
Revertive Mode Revertive mode, Non-revertive mode
Switching Condition Tunnel failure detected by MPLS OAM
External Switching Lockout, forced switching, manual switching,
exercise switching, clear
Priority relation: Clear Lockout Forced switching
Manual switching Exercise switching
Switching event In the case of switching, the switching event is
report reported automatically
PLR MP MP
NE 8 NE 5
NE 2 NE 3 NE 4
NE 1 NE 9
NE 6 NE 7
Primary Tunnel 1
Bypass Tunnel 1
Primary Tunnel 2
Bypass Tunnel 2
Primary Tunnel 3
PLR MP
NE 1
NE 2 NE 3 NE 4
NE 5
NE 6 NE 7
PLR MP
NE 1
NE 2 NE 3 NE 4
NE 5
NE 6 NE 7
MP
125
101 293
125
z Load sharing
Switching condition The port is down. The board is offline. The key chip
of the board is faulty
BTS/Node B
ML-PPP
E1
E1
E1
BTS/Node B
RTN RTN
BTS/Node B
Standby Standby
Mute ODU IF Board
f1
f3
Standby Standby
tf2 ODU IF Board
rf2
f1
H
f3
Standby Standby
ODU IF board
tf2
rf2