Sie sind auf Seite 1von 1

OKI PULP & PAPER - INSPECTION REPORT - MACHINERY

Start Up Group No: Name:

Equipment Pos No: Name:

Supplier: Manufacture: MEI-Contractor:

Machine List Motor Data Special Data for Pump


Flow Subtance: Capacity (I/s): Head (MIc):
Power (kW): Speed (r/min):
Motor Name Palte Data Check bv Supplier

Power (kW): Speed (r/min): Date: Sign:


Check by Verified by
Notes in Defect List
Check List n/a Date Supplier Contractor Purchaser Mills
1 Identification (name plate / tagging)
2 Overall Cleaning
3 Confortmity with specifcation and drawings
4 Aligment/Alignment Report
5 Grouting Inspection
6 Belt and Chain tension
7 Inside Inspection
8 Auxiliary (utility/service) piping and fittings installation
9 Cooling Selling Sys
10 Accessories
11 Lubrication
12 Lubrication / Lubricant instruction / specification plate
13 Packet Stuffing Box
14 Mechanical Seal
15 Inlet and Outlet flange parallelism
16 Flange bolt tightening / torque
17 Supports
18 Manufacturer's name plate
19 Pressure Characteristic
20 Painting and Finishing
21 Free rotation (by hand)
NOTE: Rotation test with motor will be made during commissoning Note: Defect List must be always enclosec
The referred eguipmet has been inspected and is hereby released for commissioning.
Date Sign Contractor Sign Supplier Sign OKI

103

Das könnte Ihnen auch gefallen