1.INTRODUCTION
An END TO END audit will be performed to have a complete overview of MOBINIL network behaviour in order
to:

insure of the good behaviour of the network

improve the QoS of the network.The network assessment will be done as followed:

Collect the necessary information thanks to Network Element measurements

Assess the Quality of Service accordingly with the traffic handled and the capacity installed

Provide recommendations on Architecture and Quality of Service improvements

Follow-up of recommendations implementation.The Audit concerns the following sub-systems:

BSS

NSS

IN

SDH

PDH

Alcatel File Reference Date Offer Tittle Edition Page


SOW_end to end audit 07/02/2005 End to end Optimization 01 4/14
All rights reserved. Passing on and copying of this document, use
and communication of its contents not permitted without written
authorization.
2.
BSSAUDIT2.1 A
REA
C
ONCERNED
This chapter presents a proposal for a network optimization session for
Mobinil radio network in Cairo.The area concerned by this proposal is the
area covered by Alcatel BSS in Cairo city. The exactb o r d e r s o f
this area can be fine-tuned by Alcatel and Mobinil.
2.2 P
R
E
RE
QU
IS
T
E
S

The following list is the list of data needed to start the frequency
p l a n n i n g t a s k s . REQUIREDDATA:

Site database containing the netwrok design with the following


data:

Location of sites (X and Y)

Planning parameters (Antennat Type, Azimuth, Tilt, Height)

Configuration(EIRP, Number of TRX)

Existing Frequency Plan

Quality of service indicators :

Permanent access to RNO station.

Activation of specific counters type uppon request.

A-bis and A-traces captures upon request.

Air interface drive tests:

Recent drive test data for the concerned area (in raw text format).

BSS logical parameters :

Updated parameters csv files for the concerned cells.

RNO access.
2.3 S
COPEOF
S
ERVICE

The network improvement session will be composed of the following


services
2.3.1
RNP Design assessment/optmization:
RNP design will be reviewed in order to solve design problems mainly in
terms of un-optimized fields t r e n g t h p r o p a g a t i o n l e a d i n g t o
undesired cell overlapping that may impact the network
q u a l i t y a n d interference levels.T h e d e s i g n w i l l r e v i e w e d u s i n g
Alcatel A955 planning tool with high precision morpho/topo
databasesand a calibrated propagatio n model for Cairo city.
2.3.2
Frequency plan assessment/optmization:
Together with the RNP assessment and with the help of
the provided detailed drive tests data, qualityproblems related to
frequency planning problems will be detected and proposals for
improvement willb e p r o v i d e d t o M o b i n i l .