TenarisConfab Overview
Capabilities
Manufacturing processes
UOE LSAW process
ERW process
Spiral SAW process

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Worldwide Operations

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Tenaris Operations Brazil

City: Rio das Ostras/RJ


Area: 26.000 m
Yard capacity: 6 Th Tn

Brasil

City: Pindamonhangaba/SP
Area: 1.400.000 m (60.000 m of facilities)
Capacity: 550 Th tn/year

City: Pindamonhangaba/SP
Area: 904.000 m (57.000 m covered)
Capacity: 1.000 Th Hh/year

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
TenarisConfab
Regio
Sudeste
MG

ES

Brasil SP
RJ

RJ Port
Santos Port

Main Steel Suppliers:

USIMINAS Brazil

ArcelorMittal - Brazil

Voest Alpine Austria

POSCO South Korea

City: Pindamonhangaba/SP Dillinger Germany


Area: 1.400.000 m (60.000 m of facilities)
Nippon Steel - Japan
Capacity: 550 Th tn/year
The information contained herein is CONFIDENTIAL, and is not to be disclosed to
TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
TenarisConfab in figures
Division Pipes & Industrial Equipments

Welded Pipes: 550 Th Tn


Annual Equipments: 1.000 Th Hh
Manufacturing
Capacity

- Pipes: 1.203
Employees 3.312 (Dez.11)
- Equipments: 2.109

Net Revenue: R$ 1.635 millions (USD 812 million)


2011 Figures EBIDTA: R$ 326 millions (USD 162 million)
Income: R$ 253 millions (USD 126 million)

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
TenarisConfab
Production Capacity

Manufacturing Process Capacity

SAW UOE Longitudinal 400 Th Tn/year

ERW 120 Th Tn/year

SAW Spiral 30 Th Tn/year

Total Capacity 550 Th Tn/year

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
TenarisConfab - Lay Out Geral
Socotherm do Brasil

Pipe yard

Main offices

Threading SAW Spiral


ERW

HT Mills SAW
UOE

Coating

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Manufacturing Processes
UOE SAW Longitudinal
Line Pipe and OCTG/CSG - Range
OD: 12 48
Wt.: 0.250 - 1.575
Grades (5L): 5LB up to X100 (X120)
Special requirements: Sour Service (X65, X70, X80), Dimensional,
High toughness, offshore (DNV), High Collapse (Fab = 1)
Maximum Length: 13 m (43 ft)
Connectors: Tenaris BlueDock, Dril-Quip, Vetco Gray, XL Systems,

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
SAW Longitudinal Process

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Manufacturing Process
UO Forming process
U Press 1800 ton O Press - 51 Th ton

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Manufacturing Process
UOE SAW Longitudinal

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Manufacturing Process
UOE SAW Longitudinal

OD Welding

ID Welding

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Manufacturing Process
NDT Inspection Process Control
Visual Inspection
Fluoroscopy Inspection

UT for Process Control

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Manufacturing Process
Forming and Inspection process
Cold Expansion Hydrostatic Test

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Manufacturing Process
NDT Inspection
Final Ultrassonic Inspection Radiographic Inspection

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Digital X-Ray Inspection
Advantages:
Inspection quality (High resolution system
and software tools);

High traceability (redundant data base);

Productivity (reduced exposure time and


automated system);

Environmental gains (films and chemical


components are not required)

Standards :
DNV-OS-F101
API-5L
ISO10893-7

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Manufacturing Process
NDT Inspection and Final Inspection
Pipe End MP and Pipe Inspection Pipe End Laser Measurement

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
TenarisConfab Capability
X65 - 605 MPa

Product Range Confab


X70 - 640 MPa
X80 - 710 MPa
Thickness Under Consult
mm pol
40 1,575
38 1,500

35 1,375

32 1,250
20 22 24 26 28 30 32 34 36 38 40 42 44 46 48
29 1,125
1,000test pressure shall be checked case by case
ation the hydrostatic
25
ion in the 22
line is 80,875
ton (heavier pipes shall be consulted) X65 - 605 MPa

19 0,750 X70 - 640 MPa

16 0,625 X80 - 710 MPa


13 0,500 X65 - 605 MPa Under Consult

10 0,375 X70 - 640 MPa

8 0,313 X80 - 710 MPa

6 0,250 Under Consult

Diameter (in) 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48
Notes:
a) Due to equipment
X65 - 605 limitation
MPa the hydrostatic test pressure shall be checked case by case
b) The pipe weigth limitation in the line is 8 ton (heavier pipes shall be consulted)
12 14 16 18 20 22 24 X70
26 - 640
28 MPa
30 32 34 36 38 40 42 44 46 48
otes: X80 - 710 MPa
Due to equipment limitation the hydrostatic
Undertest pressure shall be checked case by case
Consult
The pipe weigth limitation in the line is 8 ton (heavier pipes shall be consulted)
The information contained herein is CONFIDENTIAL, and is not to be disclosed to
TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Manufacturing Process
ERW / HFW Continuos Forming
Line Pipe and OCTG Range
OD: 5 1/2 - 20
Wt.: 0.156 - 0.545
Grade (5L): up to X80
Grade (5CT): H40, J55, K55: as rolled, N80, L80, P110 (green steel)
Maximum Length: 15 m

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Manufacturing Process
ERW / HFW Continuos Forming

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Manufacturing Process
ERW Process

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Manufacturing Process
ERW Process

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Manufacturing Process
ERW / HFW Continuos Forming
The strip enters a cage roll system, formed by multiple
pairs of adjustable side rolls and sets of bottom and top
rolls.
Here it gradually changes its U-shape into an oval shape.
The almost formed pipe enters the Fin-Pass section. The
skelp edges are guided to produce a V convergence,
which will enable the welding process.
During this stage a high frequency electrical current is
transmitted to the material by means of copper sliding
contacts. As a result, the abutted V-shaped edges start
fusion when touching each other.
A set of squeezing rolls exerts the necessary pressure to
complete the welding process.

Left Weld area after the squeeze roll


centerline
Above Weld area after OD and ID
scarfing and seam annealing

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Pipe Manufacturing Process
ERW Range

in 0,156 0,172 0,188 0,203 0,219 0,237 0,250 0,281 0,312 0,344 0,375 0,406 0,469 0,500 0,545
5 1/2 140
6 5/8 168
7 178
8 5/8 219
9 5/8 244
10 3/4 273
12 3/4 324
13 3/8 340

OUTSIDE DIAMETER
14 356
16 406
18 457
18 5/8 473
20 508
4,0 4,4 4,8 5,2 5,6 6,0 6,4 7,1 7,9 8,7 9,5 10,3 11,9 12,7 13,8 mm
WALL THICKNESS

STANDARD PRODUCTS

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Production Process
SAW Spiral

Line Pipe Water Works


OD: 20 - 100 OD: 23,6 98,4
WT: 0.173 - 0.688 WT: 0.173 - 0.500 (Beveled)
Grade (5L): up to X80 Maximum Length: 12 m
Maximum Length: 13 m

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Manufacturing Process
SAW Spiral Process

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Connector and Connection
Connections Manufacturing
API Connections:
API Buttress and Round
API Round

Premium Connections:
Tenaris Hydril Easy Running
3SB
Tenaris Hydril SEC
Tenaris Hydril MS
TS Hydril Wedge

Weld-On Connectors:
Tenaris Proprietary Connector
Others (Drill-Quip, XL, Vecto and Others)

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Production Process
Heat Treatment
Products
OD: 5 1/2 to 16
Maximum Length: 6 a 14,7 m
Grade (5CT): N80, L80, P110 & Q125

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Heat Treatment

HEAT TREATMENT
BENCH ENTRANCE FURNACE ENTRANCE
INTERNAL CONTROL

AUSTENITIZING QUENCHING HEAD QUENCHING HEAD

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Production Process
Coating - Tenaris & Socotherm

Fusion Bonded Epoxy (External & Internal)

Polyethylene Tri-Layer

Polypropylene Tri-Layer

Thermal Insulation (PUF e Syntactic)

Expanded Polyethylene

Concrete

Anti-abrasion

Liquid Epoxy

Internal Epoxy (AWWA C210)

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Quality
Certifications & Specifications

API 5L API 5CT

API 2B DNV

ASTM NACE

CAN/CSA AWWA

TV ISO

Others by agreement

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Main Investments
R&D Center Tenaris Brazil (under construction)

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Main Investments
R&D Center Tenaris Brazil Future Activities
Full Scale Lab
Combined Loads Frame
Resonant Fatigue Machine
Make & Break Test Machine

Welding Technology & Metallurgy

Structural Integrity & Fracture Mechanics

Surfaces & Coatings Lab

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Main Projects
Projects Supplied Offshore 2001-12 (SAWL)
OD WT Ext. Vol.
Project Name End User Grade Delivery Status
(in) (in) (Km) (Th Tn)
Sour 858,6 265,6
ESS 164 Offshore Petrobras 24 0.875 -1.000 X65 2007-08 Delivered 54,5 18,0
Urugu-Mexilho Petrobras 18 0.750 -1.000 X65 2008 Delivered 183,7 43,1
Tupi Petrobras 18 1.125 X65 2009 Delivered 90,1 27,2
GSNC Petrobras 18 0.688 -0.750 X65 2010 Delivered 153,3 29,1
Lula-NE - Tupi Petrobras 18 1.125 X65 2011 Delivered 19,6 5,9
Guar - Tupi Petrobras 18 1.125 X65 2011 Delivered 57,5 17,4
Iracema - Cabinas Petrobras 24 1.125-1.250 DNV450 2013 on going 300,0 125,0

Non-Sour 733,0 240,2


Na kika North/South Flowlines Shell Int. E&P Inc. 16 0.750 X65 2001 Delivered 42,7 7,8
Na kika Oil Export Lines Shell Int. E&P Inc. 18 0.750 -0.562 X65 2001 Delivered 78,6 12,7
Na kika Gas Export Lines Shell Int. E&P Inc. 20 / 24 0.875 -1.125 X65/X70 2001-02 Delivered 125,2 45,9
ANGSI Development Petronas Carigali 24/24,5/28 0.625 -1.063 X65 2001 Delivered 80,2 18,8
PDET Offshore Petrobras 34 1.125 -1.250 X60 2003 Delivered 118,9 70,1
PDEG Offshore Petrobras 20/22 0.625 -0.875 X60 2003 Delivered 117,2 25,5
Simian Siena Sapphira Burullus Gas Co. 20/26 0.835 -1.035 X65/X70 2003-04 Delivered 66,4 24,9
PDET guas Profundas Petrobras 18 0.688 -0.875 X60 2006 Delivered 34,1 7,0
PDET Raso Petrobras 20 0.688 -0.812 X60 2006 Delivered 34,4 7,3
Mexilho Offshore Petrobras 34 0.750 -1.250 X60/X80 2008 Delivered 35,5 20,4
Total Offshore 1.592 505,9
The information contained herein is CONFIDENTIAL, and is not to be disclosed to
TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Offshore Equipment
Drilling Templates and Tools

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Offshore Equipment
Multifunctional Bellmouths

Multifunctional Bellmouths New Petrobras concept, which allows the connection of rigid and flexible riser to the FPSO

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Offshore Equipment
Separator Vessels

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Offshore Equipment
Jackets

Enchova Platform PRA-1 Platform PRA-1 Platform

PRA-1 Platform PRA-1 Platform

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Offshore Equipment
Jackets

OSX/Techint WHP Platform Anchor System OSX/Techint WHP Platform Anchor System

OSX/Techint WHP Platform Buoyancy Tanks

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Offshore Equipment
Modules for Platforms

Modules for Namorado II Platform

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.
Contacts

For additional information please contact:


Nicolau Bernardo nbernardo@tenaris.com
Ronaldo Silva rsilva@tenaris.com

The information contained herein is CONFIDENTIAL, and is not to be disclosed to


TENARIS or used by others without authorization by TENARIS. The published results refer 14 May 2013
only to the materials and samples tested. 2012 TENARIS. All rights reserved.

Das könnte Ihnen auch gefallen