Beruflich Dokumente
Kultur Dokumente
Outline
Six Sigma
A HUMBLE
BEGINING
20000
GENERATION (BUs)
19500
19000 19707.7
18500
18000 18305
17500 17820.8
17000
16500 16354
16000
FY 03-04 FY 04-05 FY 05-06 FY 06-07
95 92.46 92.73
90.01
90
85 82.38
80
FY 03-04 FY 04-05 FY 05-06 FY 06-07
PLF
NTPC Ltd : Powering Indias Growth
Thermal Power Plant Performance
Improvement using Quality Initiatives
Heat
Rate Boiler/
Cost Effective
Generation
Turbine
Cost Effective Generation depends broadly on :-
Unit Heat Rate RAH Seals/
Boiler Performance
Optimization
House Pent House/ Basket
ESP
Optimization
of
1) Optimizing Heat Rate
RAH Performance
Eff./ Seals
House
Optimization
Quality of House
2) Reducing
#1 Auxilliary
QualityPower Consumption
of House
Quality of
#2
3) Reducing operation & maintenance (O&M) costs Quality
.
#3
#4
H E
D SAPH B
L P O E C
I R SAPH B
F H L R C O
V E O/L TEMP
U S A I O N 160 0C
I H Z 549 N. O 365
R S 960 T 846 E 750 M
N I E O 1
944 A I SAPH A
A O 964 N 810 N 606 & 379 O/L TEMP
T T S
C R N 2 164 0C
E A E
E H A S
R L R SAPH A
S L H
S
H 3 SAPH B
O/L TEMP
145 0C PAPH A
Problems Faced
123
B- S/H R/H Right And 2nd Pass
115 125 127
117
C-2nd Pass Only
580 580
570 570
C15
C15
560 560
550 550
540 540
A B C D A B C D
C14 C14
12
109 9
133 131
107
120 112
122 114
Red Coloured
128 12 LRSBS are
6 116
124 in Reheater Area
118
130
132 134
110
136 138 108
106
165 165
160 160
Data
Data
155 155
150 150
145 145
140 140
SAPHAO/LBEF SAPHAO/LAFT SAPHAO/LBEF SAPHAO/LAFT
Auxilliary
Power
Boiler/
Cost Effective
Reduction
Generation
Turbine
House Unit Heat Rate FD/ PA/ ID
Boiler Performance
Optimization
Cost Effective Generation depends broadly on :-TIGs/ Hot
Fans/Mills
of
PA Fan Performance
Optimization
House Air Lkg/
Quality
1) Optimizing Heat of
Rate
Optimization
Impeller
House
#1 Quality of House
2) Reducing Auxilliary Power Consumption
Quality of
#2
Quality
# 3
3) Reducing operation & maintenance (O&M) costs.
#4
Project
ProjectYY11 BFP
BFPpower
powerconsumption
consumption
Project
ProjectYY22 ID
IDFan
Fanpower
powerconsumption
consumption
Process
Processdrill
drilldown
down Project
ProjectYY33 PA
PAFan
Fanpower
powerconsumption
consumption
Project
ProjectYY44 FD
FDFan
Fan power
powerconsumption
consumption
Project
ProjectYY55 Mill
Millpower
powerconsumption
consumption
Project
ProjectYY66 CW
CWPump
Pumppower
powerconsumption
consumption
Project
ProjectYY77 CEP
CEPpower
powerconsumption
consumption
Super Boiler
Condenser Turbine heater High level process
map done
Cooling water
out NTPC Ltd : Powering Indias Growth
Thermal Power Plant Performance
Improvement using Quality Initiatives
1500
80
APC Share
Percent
60
1000
40
500
20
0 0
Equipments BFP CW ID Fan PA Fan FD Fan Mill Other
Count 654.3 331.6 287.3 183.7 174.3 127.7 40.6
Percent 36.4 18.4 16.0 10.2 9.7 7.1 2.3
Cum % 36.4 54.8 70.8 81.0 90.6 97.7 100.0
3
3
NTPC Ltd : Powering Indias Growth
Thermal Power Plant Performance
Improvement using Quality Initiatives
Potential Failure Modes Effect Analysis - BFP
When? What? Result? Why? Existing Sev Occ Det RPN How Prevent? Who?
Process Potential Failure Potential Potential Cause Controls Mitigants Responsibility
Step Effects
BFP Passing from 5F1,5F2 & High Worn out seat To be attd. 6 10 5 300 1) L/S Adjust. on closing TMD+Opn*
C/V amp & others in O/H 2) Manual Tight., if possible
BFP Reduced Motor Efficiency High Continuous Motor O/H 2 4 5 40 To be attd.in O/H EMD
amp Service
BFP Passing from R/C V/V High Worn out seat To be 6 10 5 300 1) L/S Adjust. on closing TMD+Opn*
& D/V NRV not holding amp & others attd.in O/H 2) Manual Tight., if possible
BFP Passing from 421 V/V High Worn out seat To be 7 8 5 280 1) L/S Adjust. on closing TMD+Opn*
(Manual+Motorised) amp & others attd.in O/H 2) Manual Tight., if possible
BFP Passing from 605,607 & High Worn out seat To be 4 6 5 120 1) L/S Adjust. on closing TMD+Opn*
C/V V/V amp & others attd.in O/H 2) Manual Tight., if possible
BFP Passing / Opening from High Worn out seat 1) L/S Adjust. on closing TMD+Opn*
514 A & B V/Vs amp &/or Passing To be 5 10 5 250 2) Manual Tight., if possible
from 5A1,5A2, attd.in O/H
140/6 C/V
BFP Passing from 29/14 High Worn out seat To be 1) L/S Adjust. on closing TMD+Opn*
Spray V/Vs amp & others attd.in O/H 3 6 5 90 2) Manual Tight., if possible
BFP Passing from 3rd stage High Worn out seat To be 1) L/S Adjust. on closing TMD+Opn*
V/V (S/B BFP) amp & others of S/B attd.in O/H 3 6 5 90 2) Manual Tight., if possible
BFP 3) Change the BFP conbin.
BFP Low Pump High Worn out Pump O/H 5 10 5 250 1) Combination Change TMD
Efficiency amp cartridge (AC / BC)
2) To be attd.in O/H
BFP Higher DP across FRS High Slightly higher Regularly 5 10 5 250 Experiment regularly to Operation
amp NTPC Ltd : Powering Indias Growth
flow require. optimize DP +
C&I*+TMD
Thermal Power Plant Performance
Improvement using Quality Initiatives
ID Fan
Impact on conversion
PA Fan
FD Fan
Mill
Low
Difficult Easy
Ease of implementation
Control Summary
Control/Response
Control/ResponsePlan
PlanHighlights
Highlights Benefits
Benefitsof
ofProject
Project
Passing from High Worn out To be 6 10 5 300 1) Change V/Vs TMD 6 10 5 300
BFP
5F1,5F2 & C/V amp seat & others attd.in O/H 2) L/S Adjust. on +Opn*
closing
BFP Passing from High Worn out seat To be 4 6 5 120 1) L/S Adjust. on closing TMD+O 3 6 5 90
607 &C/V amp & others attd.in O/H 2) Manual Tightening pn*
BFP D/V NRV +3rd High Worn out To be 6 10 5 300 1) L/S Adjust. on TMD+O 6 10 5 300
stage spray amp seat & others attd.in O/H closing pn*
v/vs not
holding
2) Manual Tightening
BFP Higher DP High Slightly Regularly 5 10 5 250 Experiment regularly Opn,C&I 5 10 5 250
across FRS amp higher flow to optimize DP TMD
require.
Bottom-line is..