UNIT NO : 7 ITPS: Chandrapur Super Thermal Power Station Unit Capacity: 500 MW
1. *HO Code: Station Code: CSTPS U7 Time- Date- No. of days from last
T09 2014-15 L7:56 Hrs 2sl0Ll20Ls sync.:- 1,5
Last Overhaul (AOH) synchronisation Date 0210812014 176.3 Days 0.48 Years
2. Operating conditions at the time of Event :-
Load MW Coal Cycles in seruice Oil Suppoft
425 AB,CD , EF, GH, JK Nil
3. Nature of Event :
unit withdrawn due to turbine shaft vaibration very high.(Turbine Brg./cv/rotor/bal)
Chief E r (o&M)
CSTPS, andrapur.
cElDy C E (Works)