Sie sind auf Seite 1von 2

Ref No : CHN/POG/Tripping lC-42100s94

0
EVENT ANALYSIS
Date: 1 7 FEB ?0t5
REPORT
UNIT NO : 7 ITPS: Chandrapur Super Thermal Power Station Unit Capacity: 500 MW
1. *HO Code: Station Code: CSTPS U7 Time- Date- No. of days from last
T09 2014-15 L7:56 Hrs 2sl0Ll20Ls sync.:- 1,5
Last Overhaul (AOH) synchronisation Date 0210812014 176.3 Days 0.48 Years
2. Operating conditions at the time of Event :-
Load MW Coal Cycles in seruice Oil Suppoft
425 AB,CD , EF, GH, JK Nil
3. Nature of Event :
unit withdrawn due to turbine shaft vaibration very high.(Turbine Brg./cv/rotor/bal)

4. Name of First Up, Main Protections & protection on which eCatrippe*


TTurbine hand tripped from control room, Generator tripped on revere power protection, Boiler tripped on RH
Protection.
5 A) Obseruations :-
Unit was running at 425 MW @ 17:45 Hrs, TG set bearing and Shaft vibrations found increasing eventhough all
other parameters were normal. So as to reduce the vibrations load was reduced to 286 MW, but the vibrations
were found increasing.
As the vibration level were increasing continuously (HPT front shaft : 196 Microns), Turbine was hand tripped @
17:56 Hrs.

5 B) Remedial Action/work done :-


Boiler immediately lighted up as after tripping vibrations got normalised & synchronisation activities started.

6. Root Cause Analysis :-


Matter is being continuously conveyed & follow up to M/s BHEL after each incidence, for this matter is conveyed
for detailed analysis as per ref. CHN/TM-II/U2000301 dated zglOLlzOLS & CHNrTM-II/U2000334 dated
30101120L5. CE (nC), Nagpur & Mis BHEL representative visited U-7 on 03.02.2015, collected vibrations reading,
repoft will be submitted after detailed analysis.

7. Preventive action suggested (Shoft Term) l-


I

Vibrations are being monitored continuously.


8. Preventive action suggested (Long Term) :- Nil
9. Similar event occurred last time:
Unit withdrawn due to turbine shaft vibration
very high.(Turbine Brg I CY I
. rotor/bal)
u# 7,340 MW Time : 04:48 Hrs Date: L5109120L4

9A. Implementation Status of Long Term/Shoft Term measures stated at Sr No 9:-


Long Term
Shoft Term - Vibrations are being monitored continuously.
10. Boiler lighted up Time - 18:40 Hrs Date- 2510L120L5
11. T-A Set Synchronised Time - 2L:44 Hrs Date- 25l0ll20ls
12. Remark :- Nil

Chief E r (o&M)
CSTPS, andrapur.

13. Recommendations of Works Section:


1. Procurement/Replacement plan:
2. Operationa! Error:
3. Delay in Maintenance:
4. Delay in bringing back the Unit:
5. Training of Staff:
6. whether remedial action is completed satisfactory & point is closed :

cElDy C E (Works)
*HO Code will be given by Works Section.