TRUBA JAYA ENGINEERING DATE 5/31/201


OKI Mill Plant MEI Installation Work Package #1 & #4
Recovery Boiler & Fiber Line

QUOTATION
TIME SHEET AND ACTIVITIES REPORT ADDITIONAL WORK

Name of Additional Work Filter Sand Device Dynasand WTP#3

Ref. No

WORK'S DESCRIPTION :
Making a Device for Filtering Small stone with a sands at Dynasand WTP#3

Qty Hour Days Total (Manhour)


No Description
(F) (G) (H) (F) x (G) x (H)

A Manpower
1. Engineer 1 2 -
2. Supervisor 1 2 -
3. Fitter Mechanical 3 2 -

Sub Total A
B Tools & Equipment
1. Welding Engine 1 Set
2. Grinding Machine 2 Ea
3. Measuring Tape 1 Ea

Sub Total B
D Consummable Qty Unit
1. Oxygen 1 Ea
2. Aceteylene 1 Ea
3. Cutting Wheel 7" cs 7 Ea
4. Cutting Wheel 4" cs 4 Ea

Sub Total C
E Others Qty Unit
1.

2.
Sub Total D
Total A+B+C+D

Submited By : Approved By :
PT. TRUBA JAYA ENGINEERING PT. OKI PULP & MILL

...................................... ......................................
Eng / Sptd / SM PT. OKI Representati
5/31/2017

OTATION
VITIES REPORT ADDITIONAL WORK

Remarks
PT. OKI PULP & MILL PLANT

......................................
PT. OKI Representative
PT. TRUBA JAYA ENGINEERING DATE 5/31/201
OKI Mill Plant MEI Installation Work Package #1 & #4
Recovery Boiler & Fiber Line

QUOTATION
TIME SHEET AND ACTIVITIES REPORT ADDITIONAL WORK

Name of Additional Work Filter Sewage Device at Sludge Lift Regulating Tank

Ref. No

WORK'S DESCRIPTION :
Making a Device for Filtering Small stone with a sands at Dynasand WTP#3

Qty Hour Days Total (Manhour)


No Description
(F) (G) (H) (F) x (G) x (H)

A Manpower
1. Engineer 1 4 -
2. Supervisor 1 4 -
3. Fitter Mechanical 3 4 -

Sub Total A
B Tools & Equipment
1. Grinding Machine 1 Set
2. Drill Machine 2 Ea

Sub Total B
D Consummable Qty Unit
1. Cutting Wheel 7" cs 10 Ea
2. Cutting Wheel 4" cs 5 Ea
3. Drill bit 12 6 Ea

Sub Total C
E Others Qty Unit
1.

2.
Sub Total D
Total A+B+C+D

Submited By : Approved By :
PT. TRUBA JAYA ENGINEERING PT. OKI PULP & MILL

...................................... ......................................
Eng / Sptd / SM PT. OKI Representati
5/31/2017

OTATION
VITIES REPORT ADDITIONAL WORK

Remarks
PT. OKI PULP & MILL PLANT

......................................
PT. OKI Representative
DAY Thursday
DATE 5/25/2017
SUPERVISOR Darmono

TIME SHEET AND ACTVITIES REPORT


WTP#3
MORNING SHIFT
No Badge No. Name Classification REMARKED
IN SIGN OUT SIGN

1 6855 Nalwan Hadi Fitter 1 09.00 17.00

2 7070 Domi Ferdiyan Fitter 2 09.00 17.00

3 6862 Syukron Ma'mun Scaffolder 09.00 17.00

4 6864 Abdullah Scaffolder 10.00 17.00

5 6854 Hermansyah Scaffolder 10.00 17.00

10

11

12

13

14

15

16

17

18

19

20

NO. JOB DESCRIPTION REMARKED


1 Dissmantle Coupling and Impeller Pump 17133-U2036 at Water Supply Pump Room

NO. TOOL USAGE QTY UNIT HANDLING UNIT PT. TRUBA JAYA ENGINEERING
SUPERVISOR SUPERINTENDEMT CONTRUCTION MANAGER

NAME : NAME : NAME :


DATE : DATE : DATE :

HANDLING UNIT PT. OKI PULP & PAPER

NAME : NAME : NAME :


DATE : DATE : DATE :
AREA
PT. TRUBA JAYA ENGINEERING
01 RECOVERY BOILER
Client : OKI PULP & PAPER
Client : PT. OKI PULP & PAPER 02 FIBER LINE
Job No. : T-5108
Project Name : OKI MILL PLANT MEI INSTALLATION RB & FL
Location : SEI BAUNG - PALEMBANG - SUMSEL
Day and Date :
Supervisor WBS Holder
Sign : Sign :

Badge No : Badge No :
Name : DARMONO Name : M UDIN
DAILY TIME SHEET REPORT

No Badge No. Name Classification In Out Ba

1 6833 Bambang Swidal Fitter 1

2 3343 Angga Fitter 3

3 6855 Nalwan Hadi Fitter 1

4 6856 Suparman Fitter 3

5 6857 Jafar Sidik Fitter 3

6 7070 Domi Ferdiyan Fitter 2

7 7251 Adi Muzaid Fitter 2


PROGRESS REPORT *)

No. Drawing No Description Material No. Received Open Case Mate


Material
1
2
3
4
5
6
Note : Equipment
Remarks Code : No. Name Capacity
L : Annual Leave, S : Sick, P : Permition, A : Absent 1
Loss Time Code : 2
01:Weither, 02:Waiting For Permit, 03:Waiting For 3
Equipment, 04:Waiting For Consumable, 05:Lack Of 4
Material, 06:Lack Of Consumable, 07:Reworks, 08: 5
Tool Box Meeting, 09:Travel To Site, 10:Wait For Other 6
*) Bila tidak muat dalam pengisian progress, gunakan form tambahan 7
8
AREA WBS : T5108 (X) 22AG
RECOVERY BOILER A B C D E F G H I J K

FIBER LINE N O P Q R S T U V W X

General Activities

ME SHEET REPORT

Basic Over Time Lost Time Total Actual Sign. Remarks


RESS REPORT *)
Quantity
Lifting Up on Fit Up Welding/ Inspect/Test Unit
Material On Site Base Install Alignment /NDE/PWHT

Equipment Main Consumable & Tools


Capacity Hours Consum & Tools Name Quantity Unit
PT. TRUBA JAYA ENGINEERING DATE
OKI Mill Plant MEI Installation Work Package #1 & #4
Recovery Boiler & Fiber Line

QUOTATION
TIME SHEET AND ACTIVITIES REPORT ADDITIONAL WORK

Name of Additional Work Assist Man Power Commisioning

Ref. No

WORK'S DESCRIPTION :
Assist Commisioning/Water Run Fiberline#1 As Per OKI requirement For Night Shift

Qty Hour Days Total (Manhour)


No Description Remarks
(F) (G) (H) (F) x (G) x (H)

A Manpower
1. Supervisor 1 1 -
2. Foreman 3 1 -
3. Pipe Fitter 13 1 -
4. Scafolder/Rigger 3 1 -
5. Welder 1 1 -

Sub Total A
B Tools & Equipment
1. Wrench 20,24,30,32,36,41,46,50,55,60,70,75 3 Set
2. Hummer 6 Ea
3. Adjustabel Wrench 18" 2 Ea
4. Welding Machine 1 Unit
5. Grinding Machine 4" 1 Ea

Sub Total B
D Consummable Qty Unit
1.
2.

Sub Total C
E Others Qty Unit
1.

2.

Sub Total D
Total A+B+C+D

Submited By : Approved By :
PT. TRUBA JAYA ENGINEERING PT. OKI PULP & MILL PLANT

...................................... ......................................
Eng / Sptd / SM PT. OKI Representative
DAY
DATE
SUPERVISOR SUDAYONO

TIME SHEET AND ACTVITIES REPORT


PRE COMMISIONING FL#1 & FL#2
NIGHT SHIFT
No Badge No. Name Classification REMARKED
IN SIGN OUT SIGN

1 6833 Bambang Swidal Fitter 1 19:00 7:00

2 3343 Angga Fitter 3 19:00 7:00

3 6855 Nalwan Hadi Fitter 1 19:00 7:00

4 6856 Suparman Fitter 3 19:00 7:00

5 6857 Jafar Sidik Fitter 3 19:00 7:00

6 7070 Domi Ferdiyan Fitter 2 19:00 7:00

7 7251 Adi Muzaid Fitter 2 19:00 7:00

8 4273 Slamet W Welder 19:00 7:00

9 3343 Darius Welder 19:00 7:00

10 2398 Ihsan Welder 19:00 7:00

11 1221 Mauludin Fitter 1 19:00 7:00

12 2546 Indra Gunadi Fitter 2 19:00 7:00

13 5120 Aidil Fitri Fitter 3 19:00 7:00

14 7382 Rusliyadi Sapura Fitter 19:00 7:00

15 7329 Moh Thoifin Fitter 19:00 7:00

16 5929 Johan Saputra Fitter 19:00 7:00

NO. JOB DESCRIPTION REMARKED

NO. TOOL USAGE QTY UNIT HANDLING UNIT PT. TRUBA JAYA ENGINEERING
SUPERVISOR SUPERINTENDEMT CONTRUCTION MANAGER

NAME : NAME : NAME :


DATE : DATE : DATE :

HANDLING UNIT PT. OKI PULP & PAPER

NAME : NAME : NAME :


DATE : DATE : DATE :
AREA
PT. TRUBA JAYA ENGINEERING
01 RECOVERY BOILER
Client : OKI PULP & PAPER
Client : PT. OKI PULP & PAPER 02 FIBER LINE
Job No. : T-5108
Project Name : OKI MILL PLANT MEI INSTALLATION RB & FL
Location : SEI BAUNG - PALEMBANG - SUMSEL
Day and Date :
Supervisor WBS Holder
Sign : Sign :

Badge No : Badge No :
Name : SUDAYONO Name : SUPROBO
DAILY TIME SHEET REPORT

No Badge No. Name Classification In Out Ba

1 5144 WAHYU ARYADI P SKILL FITTER 2

2 5145 ARSEDI IRAWAN SKILL FITTER 2

3 5147 UJANG FOREMAN

4 5149 ANDIKA SKILL FITTER 1

5 5165 KODIRIN UMAR BIN D SKILL FITTER 2

6 5456 ALI YUSNI FOREMAN

7 5465 MIKTISEN SKILL FITTER 3

8 6191 FAUZAN SKILL FITTER 1

9 7455 RIO SELI CHECKER 3

10 7458 EDI SIDIK SKILL FITTER 3

11 7382 RUSLIYADI SAPUTRA SEMI SKILL FITTER

12 7384 WISNU NARO SIMA SKILL FITTER

13 7385 NURHADI SKILL FITTER 1

14 7386 SLAMET SETYO UTOMO FOREMAN

15 2589 RELI PURWADI PIPE FITTER 3


16 3279 HAMAM AZRUL PIPE FITTER 3

17 6128 TAUFIK L/H SCAFFOLDER

18 4813 DWI TEGUH PANUNTUN SCAFOLDER 1

19 7434 RANO SEMI SKILL SCAFOLDER

20 5472 AHMAD NUR HIDAYAT WELDER

PROGRESS REPORT *)

No. Drawing No Description Material No. Received Open Case Mate


Material
1
2
3
4
5
6
Note : Equipment
Remarks Code : No. Name Capacity
L : Annual Leave, S : Sick, P : Permition, A : Absent 1
Loss Time Code : 2
01:Weither, 02:Waiting For Permit, 03:Waiting For 3
Equipment, 04:Waiting For Consumable, 05:Lack Of 4
Material, 06:Lack Of Consumable, 07:Reworks, 08: 5
Tool Box Meeting, 09:Travel To Site, 10:Wait For Other 6
*) Bila tidak muat dalam pengisian progress, gunakan form tambahan 7
8
AREA WBS : T5108 (X) 22AG
RECOVERY BOILER A B C D E F G H I J K

FIBER LINE N O P Q R S T U V W X

General Activities

ME SHEET REPORT

Basic Over Time Lost Time Total Actual Sign. Remarks


RESS REPORT *)
Quantity
Lifting Up on Fit Up Welding/ Inspect/Test Unit
Material On Site Base Install Alignment /NDE/PWHT

Equipment Main Consumable & Tools


Capacity Hours Consum & Tools Name Quantity Unit
DAY Saturday
DATE 5/9/2017
SUPERVISOR Darmono

TIME SHEET AND ACTVITIES REPORT


WTP#3
MORNING SHIFT
No Badge No. Name Classification REMARKED
IN SIGN OUT SIGN

1 6833 Bambang Swidal Fitter 1 19.00 00.00


5

2 3343 Angga Fitter 3 19.00 21.00


2

3 6855 Nalwan Hadi Fitter 1 19.00 21.00


2

4 6856 Suparman Fitter 3 19.00 00.00


5

5 6857 Jafar Sidik Fitter 3 19.00 00.00


5

6 7070 Domi Ferdiyan Fitter 2 19.00 00.00


5

7 7251 Adi Muzaid Fitter 2 19.00 21.00


2

8 4273 Slamet W Welder 19.00 22.00


2

9 3343 Darius Welder 19.00 22.00


2

10 2398 Ihsan Welder 19.00 22.00


2

NO. JOB DESCRIPTION REMARKED


1 Cutting Pipe DN 900 17133-1002-WM-900-10H1A
2 Fabricated Pipe DN 900 Dynasand Bypass WTP#3

NO. TOOL USAGE QTY UNIT HANDLING UNIT PT. TRUBA JAYA ENGINEERING
SUPERVISOR SUPERINTENDEMT CONTRUCTION MANAGER

NAME : NAME : NAME :


DATE : DATE : DATE :

HANDLING UNIT PT. OKI PULP & PAPER

NAME : NAME : NAME :


DATE : DATE : DATE :
DAY Saturday
DATE 5/10/2017
SUPERVISOR Darmono

TIME SHEET AND ACTVITIES REPORT


WTP#3
MORNING SHIFT
No Badge No. Name Classification REMARKED
IN SIGN OUT SIGN

1 3343 Angga Fitter 3 07.00 21.00


12

2 6855 Nalwan Hadi Fitter 1 07.00 21.00


12

3 6856 Suparman Fitter 3 07.00 21.00


12

4 6857 Jafar Sidik Fitter 3 07.00 21.00


12

5 7070 Domi Ferdiyan Fitter 2 07.00 21.00


12

6 7251 Adi Muzaid Fitter 2 07.00 21.00


12

7 4273 Slamet W Welder 07.00 21.00


12

8 3343 Darius Welder 07.00 21.00


12

9 2398 Ihsan Welder 07.00 21.00


12

NO. JOB DESCRIPTION REMARKED


1 Install Collar DN 600 and weldneck DN 900
2 Fabricated Primer & Secondary Support Pipe DN 900 Dynasand Bypass WTP#3
3 Continue Fabricated Line Pipe for tie in to 17133-1003-wm-800-10H1A

NO. TOOL USAGE QTY UNIT HANDLING UNIT PT. TRUBA JAYA ENGINEERING
SUPERVISOR SUPERINTENDEMT CONTRUCTION MANAGER

NAME : NAME : NAME :


DATE : DATE : DATE :

HANDLING UNIT PT. OKI PULP & PAPER

NAME : NAME : NAME :


DATE : DATE : DATE :
DAY Saturday
DATE 5/11/2017
SUPERVISOR Darmono

TIME SHEET AND ACTVITIES REPORT


WTP#3
MORNING SHIFT
No Badge No. Name Classification REMARKED
IN SIGN OUT SIGN

1 3343 Angga Fitter 3 07.00 18.00


10

2 6855 Nalwan Hadi Fitter 1 07.00 18.00


10

3 6856 Suparman Fitter 3 07.00 21.00


10

4 6857 Jafar Sidik Fitter 3 07.00 21.00


10

5 7070 Domi Ferdiyan Fitter 2 07.00 18.00


10

6 7251 Adi Muzaid Fitter 2 07.00 18.00


10

7 4273 Slamet W Welder 07.00 18.00


10

8 3343 Darius Welder 07.00 18.00


10

9 2398 Ihsan Welder 07.00 21.00


10

NO. JOB DESCRIPTION REMARKED


1 Welding Reinforce Plate DN 1000/900
2 Install Dynabolt & Welding Secondary primer Support for Pipe DN 900

NO. TOOL USAGE QTY UNIT HANDLING UNIT PT. TRUBA JAYA ENGINEERING
SUPERVISOR SUPERINTENDEMT CONTRUCTION MANAGER

NAME : NAME : NAME :


DATE : DATE : DATE :

HANDLING UNIT PT. OKI PULP & PAPER

NAME : NAME : NAME :


DATE : DATE : DATE :
DAY Saturday
DATE 5/12/2017
SUPERVISOR Darmono

TIME SHEET AND ACTVITIES REPORT


WTP#3
MORNING SHIFT
No Badge No. Name Classification REMARKED
IN SIGN OUT SIGN

1 3343 Angga Fitter 3 07.00 18.00


10

2 6856 Suparman Fitter 3 07.00 21.00


12

3 6857 Jafar Sidik Fitter 3 07.00 21.00


12

4 3343 Darius Welder 07.00 18.00


10

5 2398 Ihsan Welder 07.00 21.00


12

NO. JOB DESCRIPTION REMARKED


1 Continue Welding Reinforce Plate DN 1000/900
2 Continue Install Dynabolt & Welding Secondary primer Support for Pipe DN 900

NO. TOOL USAGE QTY UNIT HANDLING UNIT PT. TRUBA JAYA ENGINEERING
SUPERVISOR SUPERINTENDEMT CONTRUCTION MANAGER

NAME : NAME : NAME :


DATE : DATE : DATE :

HANDLING UNIT PT. OKI PULP & PAPER

NAME : NAME : NAME :


DATE : DATE : DATE :
DAY Saturday
DATE 5/12/2017
SUPERVISOR Darmono

TIME SHEET AND ACTVITIES REPORT


WTP#3
MORNING SHIFT
No Badge No. Name Classification REMARKED
IN SIGN OUT SIGN

1 6833 Bambang Swidal Fitter 1 09.00 18.00

2 6855 Nalwan Hadi Fitter 1 09.00 18.00

3 7070 Domi Ferdiyan Fitter 2 09.00 18.00

4 7251 Adi Muzaid Fitter 2 09.00 18.00

5 5572 Aidil Fitter 2 09.00 18.00

NO. JOB DESCRIPTION REMARKED


1 Cutting DN 300 Pipe 17133-1032-WM-300-10H2A (5 Pcs) to disconect with the wall
2 Assist oki team to Moving Pipe Header DN 800 17133-1004-WM-800-10H1A

NO. TOOL USAGE QTY UNIT HANDLING UNIT PT. TRUBA JAYA ENGINEERING
SUPERVISOR SUPERINTENDEMT CONTRUCTION MANAGER

NAME : NAME : NAME :


DATE : DATE : DATE :

HANDLING UNIT PT. OKI PULP & PAPER

NAME : NAME : NAME :


DATE : DATE : DATE :
DAY Saturday
DATE 5/4/2017
SUPERVISOR Darmono

TIME SHEET AND ACTVITIES REPORT


WTP#3
MORNING SHIFT
No Badge No. Name Classification REMARKED
IN SIGN OUT SIGN

1 6833 Bambang Swidal Fitter 1 07.00 18.00

2 6855 Nalwan Hadi Fitter 1 07.00 18.00

3 7070 Domi Ferdiyan Fitter 2 07.00 18.00

4 7251 Adi Muzaid Fitter 2 07.00 18.00

5 6857 Jafar Sidik Fitter 3 07.00 18.00

NO. JOB DESCRIPTION REMARKED


1 Cutting DN 1000 Pipe 17133-1003-WM-800-10H2A
2 Remove Existing Pipe & Elbow DN1000

NO. TOOL USAGE QTY UNIT HANDLING UNIT PT. TRUBA JAYA ENGINEERING
SUPERVISOR SUPERINTENDEMT CONTRUCTION MANAGER

NAME : NAME : NAME :


DATE : DATE : DATE :

HANDLING UNIT PT. OKI PULP & PAPER

NAME : NAME : NAME :


DATE : DATE : DATE :
DAY Saturday
DATE 5/8/2017
SUPERVISOR Darmono

TIME SHEET AND ACTVITIES REPORT


WTP#3
MORNING SHIFT
No Badge No. Name Classification REMARKED
IN SIGN OUT SIGN

1 6833 Bambang Swidal Fitter 1 07.00 18.00

2 6855 Nalwan Hadi Fitter 1 07.00 18.00

3 7070 Domi Ferdiyan Fitter 2 07.00 18.00

4 7251 Adi Muzaid Fitter 2 07.00 18.00

5 6857 Jafar Sidik Fitter 3 07.00 18.00

NO. JOB DESCRIPTION REMARKED


1 Beveling Pipe DN 1000 17133-1003-WM-800-10H2A
2 Continue Remove Existing Pipe & Elbow DN1000

NO. TOOL USAGE QTY UNIT HANDLING UNIT PT. TRUBA JAYA ENGINEERING
SUPERVISOR SUPERINTENDEMT CONTRUCTION MANAGER

NAME : NAME : NAME :


DATE : DATE : DATE :

HANDLING UNIT PT. OKI PULP & PAPER

NAME : NAME : NAME :


DATE : DATE : DATE :
DAY Saturday
DATE 5/8/2017
SUPERVISOR Darmono

TIME SHEET AND ACTVITIES REPORT


WTP#3
MORNING SHIFT
No Badge No. Name Classification REMARKED
IN SIGN OUT SIGN

1 7261 Rionald A.P Fitter 2 07.00 21.00

2 6854 Hermansyah Fitter 1 07.00 21.00

3 6862 Syukron Ma'mun Semi Skill 07.00 21.00

4 6864 Abdullah Fitter 3 07.00 21.00

5 3343 Jonele Welder 07.00 21.00

NO. JOB DESCRIPTION REMARKED


1 Fabricated Reinforce Bracing H-Beam 100 (10 Pcs) to Support the manganese wall
2 Welding Reinforce Bracing H-Beam

NO. TOOL USAGE QTY UNIT HANDLING UNIT PT. TRUBA JAYA ENGINEERING
SUPERVISOR SUPERINTENDEMT CONTRUCTION MANAGER

NAME : NAME : NAME :


DATE : DATE : DATE :

HANDLING UNIT PT. OKI PULP & PAPER

NAME : NAME : NAME :


DATE : DATE : DATE :