1This drawing shall be read in conjuction with all
relevant drawings. 2 Foundations shall generally be taken down below existing ground level 1000mm and all excavations to be confirmed by engineer. 3 Weak pockets of bearing strata to be dug out and filled with 1:4:8 all in concrete mix 4 Concrete mixes (a) Mass concrete to have a minimum works cube strength of 15N/mm^2 at 28 days with 40mm maximum aggregate size (b) Reinforced concrete to have works cube strength of 25N/mm^2 at 28 days with 20mm maximum aggregate size 5 Reinforcement (a) High yield bars to be square twisted cold formed bars to B.S. 4461 (b) Mild steel to be round bars to B.S. 4449 (c) Mesh reinforcement to comply with requirement of B.S. 4483 6 Minimum cover to all steel in foundations = 50mm Stub column = 40mm Beams = 25mm Slab = 25mm Columns = 40mm unless otherwise specified 7 All dimensions must be verified on site before cutting any reinforcement 8 All dimensions must be checked on site before commencing any works. 9 MUJU CONSULTING ENGINEERS LIMITED STRUCTURAL & CIVIL ENGINEERS KIKUBA HOUSE P.O.BOX 11284 KAMPALA PLOT 967 MBOGO ROAD KIBULI TEL 0772838691,0752693987,0312261050 PROJECT PROPOSED HEAD OFFICE AT NAMANVE, MUKONO MUNICIPAL COUNCIL CLIENT COSTA CONSTRUCTION SERVICES LTD TITLE 1ST FLOOR LAYOUT ARCHITECT DESIGNPLAN BUREAU, P.O.BOX 8033 KAMPALA DRAWN RONNIE LULE CHECKED ENG. DR. UMARU BAGAMPADDE SCALE 1:20, 1:75 DATE NOVEMBER 2016 DRG NO. 0032016 SHEET NO. 04 NOTES: 1This drawing shall be read in conjuction with all relevant drawings. 2 Foundations shall generally be taken down below existing ground level 1000mm and all excavations to be confirmed by engineer. 3 Weak pockets of bearing strata to be dug out and filled with 1:4:8 all in concrete mix 4 Concrete mixes (a) Mass concrete to have a minimum works cube strength of 15N/mm^2 at 28 days with 40mm maximum aggregate size (b) Reinforced concrete to have works cube strength of 25N/mm^2 at 28 days with 20mm maximum aggregate size 5 Reinforcement (a) High yield bars to be square twisted cold formed bars to B.S. 4461 (b) Mild steel to be round bars to B.S. 4449 (c) Mesh reinforcement to comply with requirement of B.S. 4483 6 Minimum cover to all steel in foundations = 50mm Stub column = 40mm Beams = 25mm Slab = 25mm Columns = 40mm unless otherwise specified 7 All dimensions must be verified on site before cutting any reinforcement 8 All dimensions must be checked on site before commencing any works. 9 All load bearing walls should be constructed 11 before beams over them are cast. 12Crushing strength of blocks at 28 days to be 7N/mm^2 in foundation and 3.5N/mm^2 in superstructure. 13 Mortar to be designation (iv) to BS5628. 14 MUJU CONSULTING ENGINEERS LIMITED STRUCTURAL & CIVIL ENGINEERS KIKUBA HOUSE P.O.BOX 11284 KAMPALA PLOT 967 MBOGO ROAD KIBULI TEL 0772838691,0752693987,0312261050 PROJECT PROPOSED HEAD OFFICE AT NAMANVE, MUKONO MUNICIPAL COUNCIL CLIENT COSTA CONSTRUCTION SERVICES LTD TITLE PART PLAN - 1ST FLOOR DETAILS BEAM DETAILS ARCHITECT DESIGNPLAN BUREAU, P.O.BOX 8033 KAMPALA DRAWN RONNIE LULE CHECKED ENG. DR. UMARU BAGAMPADDE SCALE 1:20, 1:50 DATE NOVEMBER 2016 DRG NO. 0032016 SHEET NO. 05 NOTES: 1This drawing shall be read in conjuction with all relevant drawings. 2 Foundations shall generally be taken down below existing ground level 1000mm and all excavations to be confirmed by engineer. 3 Weak pockets of bearing strata to be dug out and filled with 1:4:8 all in concrete mix 4 Concrete mixes (a) Mass concrete to have a minimum works cube strength of 15N/mm^2 at 28 days with 40mm maximum aggregate size (b) Reinforced concrete to have works cube strength of 25N/mm^2 at 28 days with 20mm maximum aggregate size 5 Reinforcement (a) High yield bars to be square twisted cold formed bars to B.S. 4461 (b) Mild steel to be round bars to B.S. 4449 (c) Mesh reinforcement to comply with requirement of B.S. 4483 6 Minimum cover to all steel in foundations = 50mm Stub column = 40mm Beams = 25mm Slab = 25mm Columns = 40mm unless otherwise specified 7 All dimensions must be verified on site before cutting any reinforcement 8 All dimensions must be checked on site before commencing any works. 9 All load bearing walls should be constructed 11 before beams over them are cast. 12Crushing strength of blocks at 28 days to be 7N/mm^2 in foundation and 3.5N/mm^2 in superstructure. 13 Mortar to be designation (iv) to BS5628. 14 MUJU CONSULTING ENGINEERS LIMITED STRUCTURAL & CIVIL ENGINEERS KIKUBA HOUSE P.O.BOX 11284 KAMPALA PLOT 967 MBOGO ROAD KIBULI TEL 0772838691,0752693987,0312261050 PROJECT PROPOSED HEAD OFFICE AT NAMANVE, MUKONO MUNICIPAL COUNCIL CLIENT COSTA CONSTRUCTION SERVICES LTD TITLE BEAM DETAILS ARCHITECT DESIGNPLAN BUREAU, P.O.BOX 8033 KAMPALA DRAWN RONNIE LULE CHECKED ENG. DR. UMARU BAGAMPADDE SCALE 1:20 DATE NOVEMBER 2016 DRG NO. 0032016 SHEET NO. 06 NOTES: 1This drawing shall be read in conjuction with all relevant drawings. 2 Foundations shall generally be taken down below existing ground level 1000mm and all excavations to be confirmed by engineer. 3 Weak pockets of bearing strata to be dug out and filled with 1:4:8 all in concrete mix 4 Concrete mixes (a) Mass concrete to have a minimum works cube strength of 15N/mm^2 at 28 days with 40mm maximum aggregate size (b) Reinforced concrete to have works cube strength of 25N/mm^2 at 28 days with 20mm maximum aggregate size 5 Reinforcement (a) High yield bars to be square twisted cold formed bars to B.S. 4461 (b) Mild steel to be round bars to B.S. 4449 (c) Mesh reinforcement to comply with requirement of B.S. 4483 6 Minimum cover to all steel in foundations = 50mm Stub column = 40mm Beams = 25mm Slab = 25mm Columns = 40mm unless otherwise specified 7 All dimensions must be verified on site before cutting any reinforcement 8 All dimensions must be checked on site beforeand bearing commencing 230 thick.any works. 9 All load bearing walls should be constructed 11 before beams over them are cast. 12Crushing strength of blocks at 28 days to be 7N/mm^2 in foundation and 3.5N/mm^2 in superstructure. 13 Mortar to be designation (iv) to BS5628. 14 MUJU CONSULTING ENGINEERS LIMITED STRUCTURAL & CIVIL ENGINEERS KIKUBA HOUSE P.O.BOX 11284 KAMPALA PLOT 967 MBOGO ROAD KIBULI TEL 0772838691,0752693987,0312261050 PROJECT PROPOSED HEAD OFFICE AT NAMANVE, MUKONO MUNICIPAL COUNCIL CLIENT COSTA CONSTRUCTION SERVICES LTD TITLE UPPER GUARD HOUSE ROOF SLAB LAYOUT UPPER GUARD HOUSE ROOF SLAB DETAILS UPPER GUARD HOUSE ROOF SLAB BEAM DETAILS ARCHITECT DESIGNPLAN BUREAU, P.O.BOX 8033 KAMPALA DRAWN RONNIE LULE CHECKED ENG. DR. UMARU BAGAMPADDE SCALE 1:20, 1:50 DATE NOVEMBER 2016 DRG NO. 0032016 SHEET NO. 07