NOTES:

1This drawing shall be read in conjuction with all


relevant drawings.
2 Foundations shall generally be taken down below
existing ground level 1000mm and all excavations
to be confirmed by engineer.
3 Weak pockets of bearing strata to be dug out
and filled with 1:4:8 all in concrete mix
4 Concrete mixes
(a) Mass concrete to have a minimum works
cube strength of 15N/mm^2 at 28 days with
40mm maximum aggregate size
(b) Reinforced concrete to have works
cube strength of 25N/mm^2 at 28 days with
20mm maximum aggregate size
5 Reinforcement
(a) High yield bars to be square twisted cold
formed bars to B.S. 4461
(b) Mild steel to be round bars to B.S. 4449
(c) Mesh reinforcement to comply with
requirement of B.S. 4483
6 Minimum cover to all steel in foundations = 50mm
Stub column = 40mm
Beams = 25mm
Slab = 25mm
Columns = 40mm
unless otherwise specified
7 All dimensions must be verified on site
before cutting any reinforcement
8 All dimensions must be checked on site
before commencing any works.
9
MUJU CONSULTING ENGINEERS LIMITED
STRUCTURAL & CIVIL ENGINEERS
KIKUBA HOUSE P.O.BOX 11284 KAMPALA
PLOT 967 MBOGO ROAD KIBULI TEL 0772838691,0752693987,0312261050
PROJECT PROPOSED HEAD OFFICE AT NAMANVE,
MUKONO MUNICIPAL COUNCIL
CLIENT COSTA CONSTRUCTION SERVICES LTD
TITLE 1ST FLOOR LAYOUT
ARCHITECT DESIGNPLAN BUREAU, P.O.BOX 8033 KAMPALA
DRAWN RONNIE LULE
CHECKED ENG. DR. UMARU BAGAMPADDE
SCALE 1:20, 1:75 DATE NOVEMBER 2016
DRG NO. 0032016 SHEET NO. 04
NOTES:
1This drawing shall be read in conjuction with all
relevant drawings.
2 Foundations shall generally be taken down below
existing ground level 1000mm and all excavations
to be confirmed by engineer.
3 Weak pockets of bearing strata to be dug out
and filled with 1:4:8 all in concrete mix
4 Concrete mixes
(a) Mass concrete to have a minimum works
cube strength of 15N/mm^2 at 28 days with
40mm maximum aggregate size
(b) Reinforced concrete to have works
cube strength of 25N/mm^2 at 28 days with
20mm maximum aggregate size
5 Reinforcement
(a) High yield bars to be square twisted cold
formed bars to B.S. 4461
(b) Mild steel to be round bars to B.S. 4449
(c) Mesh reinforcement to comply with
requirement of B.S. 4483
6 Minimum cover to all steel in foundations = 50mm
Stub column = 40mm
Beams = 25mm
Slab = 25mm
Columns = 40mm
unless otherwise specified
7 All dimensions must be verified on site
before cutting any reinforcement
8 All dimensions must be checked on site
before commencing any works.
9 All load bearing walls should be constructed
11
before beams over them are cast.
12Crushing strength of blocks at 28 days to be
7N/mm^2 in foundation and 3.5N/mm^2 in
superstructure.
13 Mortar to be designation (iv) to BS5628.
14
MUJU CONSULTING ENGINEERS LIMITED
STRUCTURAL & CIVIL ENGINEERS
KIKUBA HOUSE P.O.BOX 11284 KAMPALA
PLOT 967 MBOGO ROAD KIBULI TEL 0772838691,0752693987,0312261050
PROJECT PROPOSED HEAD OFFICE AT NAMANVE,
MUKONO MUNICIPAL COUNCIL
CLIENT COSTA CONSTRUCTION SERVICES LTD
TITLE PART PLAN - 1ST FLOOR DETAILS
BEAM DETAILS
ARCHITECT DESIGNPLAN BUREAU, P.O.BOX 8033 KAMPALA
DRAWN RONNIE LULE
CHECKED ENG. DR. UMARU BAGAMPADDE
SCALE 1:20, 1:50 DATE NOVEMBER 2016
DRG NO. 0032016 SHEET NO. 05
NOTES:
1This drawing shall be read in conjuction with all
relevant drawings.
2 Foundations shall generally be taken down below
existing ground level 1000mm and all excavations
to be confirmed by engineer.
3 Weak pockets of bearing strata to be dug out
and filled with 1:4:8 all in concrete mix
4 Concrete mixes
(a) Mass concrete to have a minimum works
cube strength of 15N/mm^2 at 28 days with
40mm maximum aggregate size
(b) Reinforced concrete to have works
cube strength of 25N/mm^2 at 28 days with
20mm maximum aggregate size
5 Reinforcement
(a) High yield bars to be square twisted cold
formed bars to B.S. 4461
(b) Mild steel to be round bars to B.S. 4449
(c) Mesh reinforcement to comply with
requirement of B.S. 4483
6 Minimum cover to all steel in foundations = 50mm
Stub column = 40mm
Beams = 25mm
Slab = 25mm
Columns = 40mm
unless otherwise specified
7 All dimensions must be verified on site
before cutting any reinforcement
8 All dimensions must be checked on site
before commencing any works.
9 All load bearing walls should be constructed
11
before beams over them are cast.
12Crushing strength of blocks at 28 days to be
7N/mm^2 in foundation and 3.5N/mm^2 in
superstructure.
13 Mortar to be designation (iv) to BS5628.
14
MUJU CONSULTING ENGINEERS LIMITED
STRUCTURAL & CIVIL ENGINEERS
KIKUBA HOUSE P.O.BOX 11284 KAMPALA
PLOT 967 MBOGO ROAD KIBULI TEL 0772838691,0752693987,0312261050
PROJECT PROPOSED HEAD OFFICE AT NAMANVE,
MUKONO MUNICIPAL COUNCIL
CLIENT COSTA CONSTRUCTION SERVICES LTD
TITLE BEAM DETAILS
ARCHITECT DESIGNPLAN BUREAU, P.O.BOX 8033 KAMPALA
DRAWN RONNIE LULE
CHECKED ENG. DR. UMARU BAGAMPADDE
SCALE 1:20 DATE NOVEMBER 2016
DRG NO. 0032016 SHEET NO. 06
NOTES:
1This drawing shall be read in conjuction with all
relevant drawings.
2 Foundations shall generally be taken down below
existing ground level 1000mm and all excavations
to be confirmed by engineer.
3 Weak pockets of bearing strata to be dug out
and filled with 1:4:8 all in concrete mix
4 Concrete mixes
(a) Mass concrete to have a minimum works
cube strength of 15N/mm^2 at 28 days with
40mm maximum aggregate size
(b) Reinforced concrete to have works
cube strength of 25N/mm^2 at 28 days with
20mm maximum aggregate size
5 Reinforcement
(a) High yield bars to be square twisted cold
formed bars to B.S. 4461
(b) Mild steel to be round bars to B.S. 4449
(c) Mesh reinforcement to comply with
requirement of B.S. 4483
6 Minimum cover to all steel in foundations = 50mm
Stub column = 40mm
Beams = 25mm
Slab = 25mm
Columns = 40mm
unless otherwise specified
7 All dimensions must be verified on site
before cutting any reinforcement
8 All dimensions must be checked on site
beforeand
bearing commencing
230 thick.any works.
9 All load bearing walls should be constructed
11
before beams over them are cast.
12Crushing strength of blocks at 28 days to be
7N/mm^2 in foundation and 3.5N/mm^2 in
superstructure.
13 Mortar to be designation (iv) to BS5628.
14
MUJU CONSULTING ENGINEERS LIMITED
STRUCTURAL & CIVIL ENGINEERS
KIKUBA HOUSE P.O.BOX 11284 KAMPALA
PLOT 967 MBOGO ROAD KIBULI TEL 0772838691,0752693987,0312261050
PROJECT PROPOSED HEAD OFFICE AT NAMANVE,
MUKONO MUNICIPAL COUNCIL
CLIENT COSTA CONSTRUCTION SERVICES LTD
TITLE UPPER GUARD HOUSE ROOF SLAB LAYOUT
UPPER GUARD HOUSE ROOF SLAB DETAILS
UPPER GUARD HOUSE ROOF SLAB BEAM DETAILS
ARCHITECT DESIGNPLAN BUREAU, P.O.BOX 8033 KAMPALA
DRAWN RONNIE LULE
CHECKED ENG. DR. UMARU BAGAMPADDE
SCALE 1:20, 1:50 DATE NOVEMBER 2016
DRG NO. 0032016 SHEET NO. 07