The document contains schedules for constructing a prestressed concrete bridge and a steel composite bridge. It lists activities required for each type of bridge construction including site preparation, fabrication, substructure work, superstructure erection, and finishing work. Time estimates are provided for each activity in days, weeks, and the number of concurrent activities that can be worked on. The schedules allow planning and tracking of bridge construction progress.
The document contains schedules for constructing a prestressed concrete bridge and a steel composite bridge. It lists activities required for each type of bridge construction including site preparation, fabrication, substructure work, superstructure erection, and finishing work. Time estimates are provided for each activity in days, weeks, and the number of concurrent activities that can be worked on. The schedules allow planning and tracking of bridge construction progress.
The document contains schedules for constructing a prestressed concrete bridge and a steel composite bridge. It lists activities required for each type of bridge construction including site preparation, fabrication, substructure work, superstructure erection, and finishing work. Time estimates are provided for each activity in days, weeks, and the number of concurrent activities that can be worked on. The schedules allow planning and tracking of bridge construction progress.