TOTAL Ikike Field Development Project:

(Optimization)

Client: Total E&P Nigeria Ltd (TEPNG)

Year: 2013 2014

Process Engineering verification for works previously


done by another contractor taking into account new
production profiles for Ikike and Amenam.

Project Management
Tie-ins to mother platform (Amenam)
Process & Safety design
Optimisation for all concerned disciplines
Multi-discipline 3D CAD computer modelling using PDMS.
Engineering hours: 52,100 (approx).
Basic Engineering
TOTAL OFON Phase II Detail Design
Engineering

CLIENT: Niger Dock

Niger Dock is EPC Contractor for TOTAL


Crestech is Engineering Subcontractor
2 Wellhead Platform topsides
2 steel jackets
2 Interconnecting Bridges
Year: 2011 2016

Scope:

Process & Safety.


Piping
Structural (inc weight control)
Mechanical
E&I design.
PDS 3D computer modelling.
Engineering LS hours (CresTech): 166,053
& Construction Follow-On
ExxonMobil ERHA NORTH FPSO

CLIENT: Esso E&P Nigeria Ltd (EEPNL)

Year: 2012 2014

Existing Erha FPSO Topsides and subsea system modification.

CresTech scope:

Detailed Engineering for brownfield modifications.


New Production, Water Injection & Gas Lift Lines.
Piping, E&I trays, and expansion of ICSS.
Support activities for Procurement, Pre-fabrication & Construction.
Interfacing with other EPC Contractors.
Engineering hours: 70,000 (approx).

PHASE 2 Detail Design

TOTAL EGINA FPSO :

CLIENT: Total Upstream Nigeria Ltd (TUPNI)

Year: 2009 2010

Scope:

FEED for the 2.3 MMbbl storage FPSO (hull & topsides)
Scope shared with two other Nigerian based Engineering Companies
CresTech scope included:
Overall Project Management,
Interfaces management,
FPSO process & safety design,
All systems definition,
Hull engineering and pipe rack design, weight control, 3D model
CresTech share of Engineering hours: 130,000

FEED

Onshore Asset Gas Management

CLIENT: Chevron Nigeria Limited

Year: 2008-2009

Scope:

Detailed Design, Procurement Support, Construction & Commissioning


Work Packages for 6 onshore platforms (Dibi, Olero, Abiteye, Makaraba, Utonana and
Opuekeba)
FEED also executed by us (Crestville) in Dec, 2007 (Engineering Hours: 35,000)
Engineering Hours: 80,000

Project Detail Design


Brass LNG Upstream

CLIENT: Nigeria Agip Oil Company (NAOC)

Crestech is Subcontractor to GENESIS Oil & Gas


Year: 2006-2007

Scope:

FEED for 2 flow stations modification and 6 new gas pipelines.


The flow stations are Clough Creek and Kwale Gas Plant.
Engineering hours (Crestech): 31,700

Project FEED
New gas pipeline details:
Samabri Idu OB/OB (40km, 4)
Oshie OB/OB (46Km, 18)
Clough Creek Ogbainbiri (30km, 14)
Kolo Creek Obama Brass (73km, 36)
Akri Oguta Wet Gas (8Km, 16)
Oguta Akri Dry Gas (8Km, 16)
TOTAL EGINA FPSO OLT :

CLIENT: NOV NIGERIA OIL & GAS LTD


NOV is EPC Contractor for TOTAL
Crestech is Engineering Subcontractor
Detailed Engineering and Procurement Support for Egina Oil Loading Terminal.
Weather-vaning buoy with internal turret.
Year: 2013 Ongoing
Scope:
Process & Safety
Piping
Structural
Mechanical
E&I
Autodesk Inventor 3D computer modelling
Engineering hours : 58,000 hrs
Detailed Design
TOTAL EGINA UMBILICALS :

CLIENT: Technip Umbiliclas (DUCO)


DUCO is EPC Contractor for TOTAL
Crestech is Local Engineering Subcontractor
Year: 2013 Ongoing
Scope:
Free Span Analysis for Umbilicals
Installation Load Calculations
Cathodic Protection design for STIs and Pulling Head
Structural Analysis of STIs
Inventor 3D computer modelling of STIs
In-country project management & interface management
Specification & Procedure Preparation
Manpower Supply
Engineering hours : 40,000 hrs
Detailed Design
Proposed Shoreline Protection
Conceptual

CLIENT: Shell Nigeria Exploration & Production Company (SNEPCO)


Year: 2014 2015
Scope:
The design of the berthing facilities in Polaku, Bayelsa
State to support a proposed line pipe mill being
promoted by NCDMB.
Conduct joint site visit(s) with NCDMB/SNEPCO/ investors and any other key stakeholders.
Conceptual design which shall form the input to the
FEED.
Execution of the FEED for shoreline protection, jetty / ramp / hard standing relieving areas.
Engineering hours: 9,120
Jetty Design in Polaku
& FEED
SAPELE FLOWSTATION

CLIENT: Seplat Nigeria Limited


Year: 2015
Scope:
Determine maximum production capacity
achievable from the existing facility, identify
bottlenecks and recommend ways to remove them.
Review the conceptual design for existing
Sapele flowstation capacity upgrade from
SEPLAT to determine its feasibility with respect
to shutdown time and provide the process design
for the upgrade.
Engineering Hours: 2,581
(Executed along with Genesis Oil & Gas,
Houston, USA)
DEBOTTLENECKING STUDY
TOTAL IKIKE Wellhead

CLIENT: Total E&P Nigeria Ltd (TEPNG)


Year: 2013 2014
Scope: Basic Engineering for a stand
alone, unmanned drilling wellhead
platform.
CresTech scope:
Project Management
Tie-ins to mother platform
Process & Safety design
Multi-discipline 3D CAD computer modelling
using PDMS.
Engineering hours: 52,100
Platform FEED
NLNG BVC Expansion Project

CLIENT: Nigeria Liquefied Natural Gas


(NLNG) Limited
Year: 2013 2014
IFR completion / project close out
March 2014
CresTech Scope:
Detailed Engineering Design for BVC
Facilities
Classrooms, Workshops, Canteen and
Office Buildings
Architectural and HVAC Scope subcontracted
Engineering hours (Crestech): 24,744
Sub-contracted hours: 3,595

Liquid Treatment Facility (LTF) Phase 1

CLIENT: Seplat Nigeria Limited


Year: 2012 2013
Scope:
Design, routing of the piping, tubing
and cables connecting the process
equipment and utilities of the new
LTF Phase 1 Facilities.
Post award site survey to identify
possible tie-in points (TPs) with the
existing Amukpe F/S.
Engineering Hours: 6,084
Project Detail Design

CHEVRON Escravos Gas

CLIENT: Chevron Nigeria Limited


Year: 2006-2008
Scope:
EGP 3B Brownfield, Stage 1 and stage 2
Brownfield Engineering Design involving the modification of 9 offshore production platforms for
gas gathering for the CNL flare-out campaign.
Covering conceptual studies, basic engineering and detailed design.
Overall scope shared with TP USA.
Engineering hours (Crestech): 140,000

Project Phase 3B