Project Management
Tie-ins to mother platform (Amenam)
Process & Safety design
Optimisation for all concerned disciplines
Multi-discipline 3D CAD computer modelling using PDMS.
Engineering hours: 52,100 (approx).
Basic Engineering
TOTAL OFON Phase II Detail Design
Engineering
Scope:
CresTech scope:
Scope:
FEED for the 2.3 MMbbl storage FPSO (hull & topsides)
Scope shared with two other Nigerian based Engineering Companies
CresTech scope included:
Overall Project Management,
Interfaces management,
FPSO process & safety design,
All systems definition,
Hull engineering and pipe rack design, weight control, 3D model
CresTech share of Engineering hours: 130,000
FEED
Year: 2008-2009
Scope:
Scope:
Project FEED
New gas pipeline details:
Samabri Idu OB/OB (40km, 4)
Oshie OB/OB (46Km, 18)
Clough Creek Ogbainbiri (30km, 14)
Kolo Creek Obama Brass (73km, 36)
Akri Oguta Wet Gas (8Km, 16)
Oguta Akri Dry Gas (8Km, 16)
TOTAL EGINA FPSO OLT :
Project Phase 3B