Beruflich Dokumente
Kultur Dokumente
COEF.
DESCRIPCION UND PRECIO s/. CANTIDAD PARCIAL INCIDENCIA
Aceite para motor SAE-30 GLN 6.00 1.04 6.240 0.000 Agrupar
Alambre Negro recocido N 16 KG 3.80 988.80 3,757.440 0.012 Agrupar
Alambre negro recocido N 8 KG 3.40 261.93 890.562 0.003 Agrupar
Clavos de fierro (promedio) KG 3.80 320.53 1,218.014 0.004 Agrupar
Acero Estructural de Refuerzo 2.50 26,304.65
KG 65,761.625 0.216 Monomio
fy=4200kg/cm2
Piedra Chancada 1/2" M3 46.22 155.25 7,175.655 0.024 Agrupar
Piedra Grande 8" M3 30.00 24.79 743.700 0.002 Agrupar
Piedra de 6" M3 30.00 0.79 23.700 0.000 Agrupar
Arena Gruesa M3 46.22 186.75 8,631.585 0.028 Agrupar
Cemento Portland Tipo I (42.5kg) BLS 18.49 3,232.49 59,768.740 0.197 Monomio
Yeso de 28 kg BLS 10.00 1.15 11.500 0.000 Agrupar
Gasolina 84 octanos GLN 8.65 70.78 612.247 0.002 Agrupar
Hormigon M3 46.22 71.19 3,290.402 0.011 Agrupar
Agua M3 1.00 7.45 7.450 0.000 Agrupar
Apuntalamiento GLB 1,470.00 1.00 1,470.000 0.005 Agrupar
Madera Nacional p/encofrado P2 2.00 10,085.96 20,171.920 0.066 Monomio
Petroleo GLN 9.00 14.09 126.810 0.000 Agrupar
Plastoformo PL 8.40 443.00 3,721.200 0.012 Agrupar
Ladruillo UND 0.35 42,900.00 15,015.000 0.049 Agrupar
192,403.790
Mt
Fe
Fe
Fe
Fe
Mt
Mt
Mt
Mt
Ce
Mt
Mt
Mt
Mt
Mt
Mt
Mt
Mt
Mt
FORMULA POLINMIC
OBRA : HOTEL RESTAURANT GRAJEDA
UBICACI : CUSCO
FECHA : Feb. 2008
PARTIDAS
UND METRADO MANO DE OBRA
ITEM DESCRIPCION Aceite Alambre N16 Alambre N8 Clavos Acero Ref.
02.02.00 EXCAVACION MANUAL PARA CIMIENTOS HASTA 1.40 MT TERRENO NORMAL M3 79.01 1381.100
02.06.00 RELLENO DE CIMIENTOS CON MATERIAL PROPIO SELECCIONADO COMPACT. 95% M3 149.07 2871.090
02.07.00 ACARREO DE MATERIAL EXCEDENTE DE EXCAVACIONES (DIST. PROMEDIO 30M) M3 56.00 571.200
03.01.00 CIMIENTOS CORRIDOS FC = 100 KG/CM2 + 30% PIEDRA GRANDE MAX. 8" M3 10.46 261.400 1.320
03.03.00 SOBRECIMIENTOS CONCRETO FC=140 KG/CM2 + 25% P.M. 4" MAX. M3 1.87 98.430
03.04.00 ENCOFRADO Y DEDESENCOFRADO SOBRECIMIENTO HASTA 0.30 MT M2 14.97 145.060 13.226 7.410
03.06.00 CALZADURAS CONCRETO FC= 100 KG/CM2 + 30% P.G MAX. 8" M3 39.35 2538.080
03.07.00 ENCOFRADO Y DESENCOFRADO PARA CALZADURAS M2 61.85 838.690 25.228 47.006
03.10.00 GRADAS CONCRETO FC=140 KG/CM2 + 30% PG. MAX 8" M3 1.37 70.700
03.11.00 ENCOFRADO Y DESENCOFRADO NORMAL EN GRADAS M2 1.14 25.760 0.342 0.782 0.418
04.01.01 CONCRETO FC= 210 KG/CM2 EN CIMIENTO CORRIDO ARMADO M3 56.00 2148.160
04.01.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 EN CIMENTACION KG 3,511.66 2844.440 533.786 9657.075
04.02.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 EN MUROS DE CONTENCION KG 3,816.35 2251.640 580.070 10208.725
04.03.00 PLACAS
04.03.01 CONCRETO EN MUROS TABIQUES Y PLACAS F'C= 210 KG/CM2 M3 10.59 1107.290 0.480
04.03.02 ENCOFRADO Y DESENCOFRADO MUROS TABIQUES Y PLACAS M2 66.98 998.680 27.336 50.920
04.03.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 EN MUROS TABIQUES Y PLACAS KG 1,589.90 1685.300 241.680 4252.975
04.04.00 COLUMNAS
04.04.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 TRABAJADO PARA COLUMNAS KG 5,026.68 2965.730 764.066 13446.375
04.05.00 VIGAS
04.06.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 PARA LOSAS ALIGERADAS KG 4,826.53 2847.650 733.628 12910.975
04.07.00 ESCALERAS
04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS M2 77.55 1751.850 23.560 52.734 29.488
04.07.03 ACERO FY= 4200 KG/CM2 EN ESCALERAS KG 1,325.84 782.250 201.514 3546.625
04.08.02 ENCOFRADO Y DESENCOFRADO NORMAL EN CISTERNA SUBTERRANEA M2 31.50 359.110 16.082 14.364
04.08.03 ACERO FY= 4200 KG/CM2 EN CISTERNA SUBTERRANEA KG 326.53 192.650 49.628 873.475
05.00.00 ALBAILERA
MONOMIOS : M Mt Fe
0.256 0.000017 0.010 0.002 0.003 0.178
k=
MATERIALES GASTOS
Arena EQUIPO GENERALES +
Piedra 1/2 Piedra 8" Piedra 6" Cemento Yeso Gasolina Hormigon Agua Madera Petroleo Ladrillo Plastoform UTILIDAD
Gruesa
1456.400
1.920
1470.000
3091.700
41.090
28.730
122.160
7.050
7.450 1080.760
17.360
3733.430
289.220 8.680
144.620 4.340
13.080 0.780
910.200 34.110
70.230
1315.420 66.260
76.330
545.220 30.140
47.700
100.530
5573.860 261.660
124.180
5475.380 260.480
96.530
3721.200 4.430
890.280 52.730
26.520
229.320 10.710
6.530
7,175.66 743.70 23.70 8,631.59 59,768.74 11.50 612.25 3,290.40 7.45 21,641.92 126.81 15,015.00 3,721.20 17,085.620 65,169.710
Mt Ce Mt Mt Mt Eq GGU
0.019 0.002 0.000064 0.023 0.162 0.000031 0.002 0.009 0.000020 0.059 0.000343 0.041 0.010 0.046 0.176 1.000
192,403.790
04.04.00 COLUMNAS
04.04.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 28.95 357.52
04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 281.82 30.11
04.04.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 TRABAJADO PARA COLUMNAS KG 5,026.68 3.09
04.05.00 VIGAS
04.05.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 63.64 289.79
04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 415.34 36.75
04.05.03 ACERO ESTRUCTURAL FY=4200KG/CM2 TRABAJADO PARA VIGAS KG 4,139.20 3.31
04.07.00 ESCALERAS
04.07.01 CONCRETO EN ESCALERAS F'C=210 KG/CM2 M3 11.14 335.71
04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS M2 77.55 36.10
04.07.03 ACERO FY= 4200 KG/CM2 EN ESCALERAS KG 1,325.84 3.09
05.00.00 ALBAILERIA
05.01.00 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-CAL-ARENA M2 1,100.00 31.15
COSTO DIRECTO
COSTO DIRECTO + GASTOS GENERALES + UTILIDAD
FECHA Feb. 2008
DISTR. CUSCO
2,318.80 1,456.40
69.12 1.92
1,470.00
207.36 21.12 119.04
451.16 3,091.70
1,381.10 41.09
963.29 28.73
2,451.18 122.16
179.76 7.05
2,871.09 7.45 1,080.76
571.20 17.36
1,980.39 3,733.43