Sie sind auf Seite 1von 14

PRECIO DE INSUMOS SOLO MATERIALES

COEF.
DESCRIPCION UND PRECIO s/. CANTIDAD PARCIAL INCIDENCIA
Aceite para motor SAE-30 GLN 6.00 1.04 6.240 0.000 Agrupar
Alambre Negro recocido N 16 KG 3.80 988.80 3,757.440 0.012 Agrupar
Alambre negro recocido N 8 KG 3.40 261.93 890.562 0.003 Agrupar
Clavos de fierro (promedio) KG 3.80 320.53 1,218.014 0.004 Agrupar
Acero Estructural de Refuerzo 2.50 26,304.65
KG 65,761.625 0.216 Monomio
fy=4200kg/cm2
Piedra Chancada 1/2" M3 46.22 155.25 7,175.655 0.024 Agrupar
Piedra Grande 8" M3 30.00 24.79 743.700 0.002 Agrupar
Piedra de 6" M3 30.00 0.79 23.700 0.000 Agrupar
Arena Gruesa M3 46.22 186.75 8,631.585 0.028 Agrupar
Cemento Portland Tipo I (42.5kg) BLS 18.49 3,232.49 59,768.740 0.197 Monomio
Yeso de 28 kg BLS 10.00 1.15 11.500 0.000 Agrupar
Gasolina 84 octanos GLN 8.65 70.78 612.247 0.002 Agrupar
Hormigon M3 46.22 71.19 3,290.402 0.011 Agrupar
Agua M3 1.00 7.45 7.450 0.000 Agrupar
Apuntalamiento GLB 1,470.00 1.00 1,470.000 0.005 Agrupar
Madera Nacional p/encofrado P2 2.00 10,085.96 20,171.920 0.066 Monomio
Petroleo GLN 9.00 14.09 126.810 0.000 Agrupar
Plastoformo PL 8.40 443.00 3,721.200 0.012 Agrupar
Ladruillo UND 0.35 42,900.00 15,015.000 0.049 Agrupar
192,403.790

COSTO DIRECTO S/. 304,134.47


MONOMIO

Mt
Fe
Fe
Fe
Fe
Mt
Mt
Mt
Mt
Ce
Mt
Mt
Mt
Mt
Mt
Mt
Mt
Mt
Mt
FORMULA POLINMIC
OBRA : HOTEL RESTAURANT GRAJEDA
UBICACI : CUSCO
FECHA : Feb. 2008

PARTIDAS
UND METRADO MANO DE OBRA
ITEM DESCRIPCION Aceite Alambre N16 Alambre N8 Clavos Acero Ref.

01.00.00 TRABAJOS PRELIMINARES

01.01.00 DEMOLICION DE CONSTRUCCIONES EXISTENTE M2 110.00 2318.800

01.02.00 LIMPIEZA DE TERRENO MANUAL M2 192.00 69.120

01.03.00 APUNTALAMIENTO DE CONSTRUCCIONES EXISTENTE GLB 1.00

01.04.00 TRAZO Y REPLANTEO M2 192.00 207.360 2.204

02.00.00 MOVIMIENTO DE TIERRAS

02.01.00 EXCAVACION MASIVA A MAQUINA EN TERRENO NORMAL"C"/RETRO .5Y3 M3 349.74 451.160

02.02.00 EXCAVACION MANUAL PARA CIMIENTOS HASTA 1.40 MT TERRENO NORMAL M3 79.01 1381.100

02.03.00 EXCAVACION DE TERRENO POR DEBAJO DE CIMIENTO P/CALZADURAS M3 39.35 963.290

02.04.00 EXCAVACION PARA MUROS DE CONTENCION M3 100.13 2451.180

02.05.00 NIVELACION FONDO CIMETACION Y PERFILADO CARAS LATERALES M2 352.47 179.760

02.06.00 RELLENO DE CIMIENTOS CON MATERIAL PROPIO SELECCIONADO COMPACT. 95% M3 149.07 2871.090

02.07.00 ACARREO DE MATERIAL EXCEDENTE DE EXCAVACIONES (DIST. PROMEDIO 30M) M3 56.00 571.200

02.08.00 ELIM.MAT.CARG.MANUAL/VOLQUETE 6 M3,V=30 D= 5 KMS. M3 437.17 1980.390

03.00.00 CONCRETO SIMPLE

03.01.00 CIMIENTOS CORRIDOS FC = 100 KG/CM2 + 30% PIEDRA GRANDE MAX. 8" M3 10.46 261.400 1.320

03.02.00 ENCOFRADO Y DESENCOFRADO CIMIENTOS CORRIDOS M2 29.94 290.120 20.366 17.062

03.03.00 SOBRECIMIENTOS CONCRETO FC=140 KG/CM2 + 25% P.M. 4" MAX. M3 1.87 98.430

03.04.00 ENCOFRADO Y DEDESENCOFRADO SOBRECIMIENTO HASTA 0.30 MT M2 14.97 145.060 13.226 7.410

03.05.00 SUB-ZAPATAS CONCRETO CICLOPEO FC=140KG/CM2 + 40 % PG. M3 8.79 453.570

03.06.00 CALZADURAS CONCRETO FC= 100 KG/CM2 + 30% P.G MAX. 8" M3 39.35 2538.080
03.07.00 ENCOFRADO Y DESENCOFRADO PARA CALZADURAS M2 61.85 838.690 25.228 47.006

03.08.00 SOLADO 1:12 CEMENTO-HORMIGON PARA CIMENTACIONES E= 5CM M2 128.30 860.890

03.09.00 FALSO PISO DE 4" DE CONCRETO 1:12 CEMENTO-HORMIGON M2 180.84 484.650

03.10.00 GRADAS CONCRETO FC=140 KG/CM2 + 30% PG. MAX 8" M3 1.37 70.700

03.11.00 ENCOFRADO Y DESENCOFRADO NORMAL EN GRADAS M2 1.14 25.760 0.342 0.782 0.418

04.00.00 CONCRETO ARMADO

04.01.00 CIMIENTO CORRIDO ARMADO

04.01.01 CONCRETO FC= 210 KG/CM2 EN CIMIENTO CORRIDO ARMADO M3 56.00 2148.160

04.01.02 ENCOFRADO Y DESENCOFRADO DE CIMENTACION M2 83.20 1128.200 84.864 47.424

04.01.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 EN CIMENTACION KG 3,511.66 2844.440 533.786 9657.075

04.02.00 MUROS DE CONTENCION

04.02.01 CONCRETO EN MUROS DE CONTENCION FC=210KG/CM2 M3 56.70 3966.730

04.02.02 ENCOFRADO Y DESENCOFRADO EN MUROS CONTENCION M2 161.60 2191.300 65.926 135.090

04.02.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 EN MUROS DE CONTENCION KG 3,816.35 2251.640 580.070 10208.725

04.03.00 PLACAS

04.03.01 CONCRETO EN MUROS TABIQUES Y PLACAS F'C= 210 KG/CM2 M3 10.59 1107.290 0.480

04.03.02 ENCOFRADO Y DESENCOFRADO MUROS TABIQUES Y PLACAS M2 66.98 998.680 27.336 50.920

04.03.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 EN MUROS TABIQUES Y PLACAS KG 1,589.90 1685.300 241.680 4252.975

04.04.00 COLUMNAS

04.04.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 28.95 2888.050 1.380

04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 281.82 4776.850 287.470 182.058

04.04.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 TRABAJADO PARA COLUMNAS KG 5,026.68 2965.730 764.066 13446.375

04.05.00 VIGAS

04.05.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 63.64 3174.370 1.500

04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 415.34 8771.980 296.548 378.784


04.05.03 ACERO ESTRUCTURAL FY=4200KG/CM2 TRABAJADO PARA VIGAS KG 4,139.20 3476.930 629.166 10865.400

04.06.00 LOSAS ALIGERADAS

04.06.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 M3 46.51 3493.830 0.840

04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS M2 531.59 8718.080 222.186

04.06.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 PARA LOSAS ALIGERADAS KG 4,826.53 2847.650 733.628 12910.975

04.06.04 PLASTOFORMO DE 0.3x0.15x3M PLN 443.00 119.610

04.07.00 ESCALERAS

04.07.01 CONCRETO EN ESCALERAS F'C=210 KG/CM2 M3 11.14 925.970 0.540

04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS M2 77.55 1751.850 23.560 52.734 29.488

04.07.03 ACERO FY= 4200 KG/CM2 EN ESCALERAS KG 1,325.84 782.250 201.514 3546.625

04.08.00 TANQUE CISTERNA SUBTERRANEO

04.08.01 CONCRETO EN CISTERNA SUBTERRANEA F'C=210 KG/CM2 M3 3.70 346.610 0.180

04.08.02 ENCOFRADO Y DESENCOFRADO NORMAL EN CISTERNA SUBTERRANEA M2 31.50 359.110 16.082 14.364

04.08.03 ACERO FY= 4200 KG/CM2 EN CISTERNA SUBTERRANEA KG 326.53 192.650 49.628 873.475

05.00.00 ALBAILERA

05.01.00 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-CAL-ARENA 11220.000 83.600

TOTAL 94,645.06 6.24 3,757.44 890.56 1,218.01 65,761.63

MONOMIOS : M Mt Fe
0.256 0.000017 0.010 0.002 0.003 0.178

COSTO DIRECTO 304,134.47


GASTOS GENERALES + UTILIDAD 65,169.710
COSTO TOTAL (SIN IGV) 369,304.18

M= MANO DE OBRA 0.256


Fe= acero estructural, alambre clavos 0.194
Ce= cemento 0.162
Em=Equipos y materiales 0.211
GGU= gastos generales y utilidad 0.176

k=

mano de obra 0.256


aceite 0.000017
alambre 16 0.010
alambre 8 0.002
clavos 0.003
acero
Piedra 1/2
piedra 8
piedra 6
arena gruesa
cemento
yeso
gasolina
hormigon
agua
madera
petroleo
ladrillo
plastoform
equipo
Gastos generales
INMICA

MATERIALES GASTOS
Arena EQUIPO GENERALES +
Piedra 1/2 Piedra 8" Piedra 6" Cemento Yeso Gasolina Hormigon Agua Madera Petroleo Ladrillo Plastoform UTILIDAD
Gruesa

1456.400

1.920

1470.000

11.500 7.300 119.040

3091.700

41.090

28.730

122.160

7.050

7.450 1080.760

17.360

3733.430

122.400 589.831 420.602 41.320

289.220 8.680

23.700 134.422 76.725 15.420

144.620 4.340

144.900 632.173 361.440 83.940

460.500 2219.170 1582.111 469.840


503.460 25.360

450.786 266.689 153.960

631.988 526.446 86.810

15.900 98.552 56.388 13.080

13.080 0.780

1449.459 1423.576 10085.186 121.100 400.400

910.200 34.110

70.230

1467.485 1441.602 10211.287 799.470

1315.420 66.260

76.330

274.085 269.000 1907.244 49.478 329.770

545.220 30.140

47.700

749.226 735.822 5213.625 135.200 897.160

2998.560 126.810 143.730

100.530

1647.281 1617.700 11461.027 148.607 986.420

5573.860 261.660
124.180

1204.031 1182.308 8376.155 88.490 972.990

5475.380 260.480

96.530

3721.200 4.430

288.413 283.329 2006.165 52.073 287.640

890.280 52.730

26.520

95.675 94.289 666.380 17.300 54.800

229.320 10.710

6.530

1583.959 5084.750 1276.000 15,015.000 341.000

7,175.66 743.70 23.70 8,631.59 59,768.74 11.50 612.25 3,290.40 7.45 21,641.92 126.81 15,015.00 3,721.20 17,085.620 65,169.710

Mt Ce Mt Mt Mt Eq GGU
0.019 0.002 0.000064 0.023 0.162 0.000031 0.002 0.009 0.000020 0.059 0.000343 0.041 0.010 0.046 0.176 1.000

192,403.790

tiene que ser como minimo 0.05


PRESUPUESTO DESAGREGADO
OBRA HOTEL RESTAURANT GRAJEDA
FORMULA ESTRUCTURAS
CLIENTE DR. ELIAS GRAJEDA Z.
DEP. CUSCO PROV. CUSCO

ITEM DESCRIPCION UND METRADO P.U


01.00.00 TRABAJOS PRELIMINARES
01.01.00 DEMOLICION DE CONSTRUCCIONES EXISTENTE M2 110.00 34.32
01.02.00 LIMPIEZA DE TERRENO MANUAL M2 192.00 0.37
01.03.00 APUNTALAMIENTO DE CONSTRUCCIONES EXISTENTE GLB 1.00 1,470.00
01.04.00 TRAZO Y REPLANTEO M2 192.00 1.81

02.00.00 MOVIMIENTO DE TIERRAS


02.01.00 EXCAVACION MASIVA A MAQUINA EN TERRENO NORMAL"C"/RETRO .5Y3 M3 349.74 10.13
02.02.00 EXCAVACION MANUAL PARA CIMIENTOS HASTA 1.40 MT TERRENO NORMAL M3 79.01 18.00
02.03.00 EXCAVACION DE TERRENO POR DEBAJO DE CIMIENTO P/CALZADURAS M3 39.35 25.21
02.04.00 EXCAVACION PARA MUROS DE CONTENCION M3 100.13 25.70
02.05.00 NIVELACION FONDO CIMETACION Y PERFILADO CARAS LATERALES M2 352.47 0.53
02.06.00 RELLENO DE CIMIENTOS CON MATERIAL PROPIO SELECCIONADO COMPACT. 95% M3 149.07 26.56
02.07.00 ACARREO DE MATERIAL EXCEDENTE DE EXCAVACIONES (DIST. PROMEDIO 30M) M3 56.00 10.51
02.08.00 ELIM.MAT.CARG.MANUAL/VOLQUETE 3 M3,V=30 D= 5 KMS. M3 437.17 13.07

03.00.00 CONCRETO SIMPLE


03.01.00 CIMIENTOS CORRIDOS FC = 100 KG/CM2 + 30% PIEDRA GRANDE MAX. 8" M3 10.46 129.92
03.02.00 ENCOFRADO Y DESENCOFRADO DE CIMIENTOS CORRIDOS M2 29.94 20.83
03.03.00 SOBRECIMIENTOS CONCRETO FC=140 KG/CM2 + 25% P.M. 4" MAX. M3 1.87 179.06
03.04.00 ENCOFRADO Y DEDESENCOFRADO SOBRECIMIENTO HASTA 0.30 MT M2 14.97 20.92
03.05.00 SUB-ZAPATAS CONCRETO CICLOPEO FC=140KG/CM2 + 40 % PG. M3 8.79 183.22
03.06.00 CALZADURAS CONCRETO FC= 100 KG/CM2 + 30% P.G MAX. 8" M3 39.35 177.42
03.07.00 ENCOFRADO Y DESENCOFRADO PARA CALZADURAS M2 61.85 23.26
03.08.00 SOLADO 1:12 CEMENTO-HORMIGON PARA CIMENTACIONES E= 5CM M2 128.30 13.12
03.09.00 FALSO PISO DE 4" DE CONCRETO 1:12 CEMENTO-HORMIGON M2 180.84 9.03
03.10.00 GRADAS CONCRETO FC=140 KG/CM2 + 30% PG. MAX 8" M3 1.37 178.42
03.11.00 ENCOFRADO Y DESENCOFRADO NORMAL EN GRADAS M2 1.14 36.10

04.00.00 CONCRETO ARMADO

04.01.00 CIMIENTO CORRIDO ARMADO


04.01.01 CONCRETO FC= 210 KG/CM2 EN CIMIENTO CORRIDO ARMADO M3 56.00 269.74
04.01.02 ENCOFRADO Y DESENCOFRADO DE CIMENTACION M2 83.20 26.39
04.01.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 EN CIMENTACION KG 3,511.66 3.38

04.02.00 MUROS DE CONTENCION


04.02.01 CONCRETO EN MUROS DE CONTENCION FC=210KG/CM2 M3 56.70 306.11
04.02.02 ENCOFRADO Y DESENCOFRADO EN MUROS CONTENCION M2 161.60 23.34
04.02.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 EN MUROS DE CONTENCION KG 3,816.35 3.09
04.03.00 PLACAS
04.03.01 CONCRETO EN MUROS TABIQUES Y PLACAS F'C= 210 KG/CM2 M3 10.59 362.47
04.03.02 ENCOFRADO Y DESENCOFRADO MUROS TABIQUES Y PLACAS M2 66.98 24.65
04.03.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 EN MUROS TABIQUES Y PLACAS KG 1,589.90 3.57

04.04.00 COLUMNAS
04.04.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 28.95 357.52
04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 281.82 30.11
04.04.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 TRABAJADO PARA COLUMNAS KG 5,026.68 3.09

04.05.00 VIGAS
04.05.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 63.64 289.79
04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 415.34 36.75
04.05.03 ACERO ESTRUCTURAL FY=4200KG/CM2 TRABAJADO PARA VIGAS KG 4,139.20 3.31

04.06.00 LOSAS ALIGERADAS


04.06.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 M3 46.51 320.01
04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS M2 531.59 27.63
04.06.03 ACERO ESTRUCTURAL FY=4200 KG/CM2 PARA LOSAS ALIGERADAS KG 4,826.53 3.09
04.06.04 PLASTOFORMO DE 0.3x0.15x3M PLN 443.00 3.78

04.07.00 ESCALERAS
04.07.01 CONCRETO EN ESCALERAS F'C=210 KG/CM2 M3 11.14 335.71
04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS M2 77.55 36.10
04.07.03 ACERO FY= 4200 KG/CM2 EN ESCALERAS KG 1,325.84 3.09

04.08.00 TANQUE CISTERNA SUBTERRANEO


04.08.01 CONCRETO EN CISTERNA SUBTERRANEA F'C=210 KG/CM2 M3 3.70 335.26
04.08.02 ENCOFRADO Y DESENCOFRADO NORMAL EN CISTERNA SUBTERRANEA M2 31.50 19.94
04.08.03 ACERO FY= 4200 KG/CM2 EN CISTERNA SUBTERRANEA KG 326.53 3.09

05.00.00 ALBAILERIA
05.01.00 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-CAL-ARENA M2 1,100.00 31.15

COSTO DIRECTO
COSTO DIRECTO + GASTOS GENERALES + UTILIDAD
FECHA Feb. 2008

DISTR. CUSCO

Mano Obra Material Equipo GG+Util.

2,318.80 1,456.40
69.12 1.92
1,470.00
207.36 21.12 119.04

451.16 3,091.70
1,381.10 41.09
963.29 28.73
2,451.18 122.16
179.76 7.05
2,871.09 7.45 1,080.76
571.20 17.36
1,980.39 3,733.43

261.40 1,132.82 41.32


290.12 326.65 8.68
98.43 235.00 15.42
145.06 165.12 4.34
453.57 1,138.92 83.94
2,538.08 4,261.61 469.84
838.69 575.83 25.36
860.89 717.19 153.96
484.65 1,157.37 86.81
70.70 170.93 13.08
25.76 14.64 0.78

2,148.16 13,079.92 400.40


1,128.20 1,042.49 34.11
2,844.44 10,183.82 70.23

3,966.73 13,119.81 799.47


2,191.30 1,517.42 66.26
2,251.64 10,800.27 76.33
1,107.29 2,500.41 329.77
998.68 623.58 30.14
1,685.30 4,499.42 47.70

2,888.05 6,835.40 897.16


4,776.85 3,596.02 143.73
2,965.73 14,225.50 100.53

3,174.37 14,875.85 986.42


8,771.98 6,246.71 261.66
3,476.93 11,506.98 124.18

3,493.83 10,851.25 972.99


8,718.08 5,698.65 260.48
2,847.65 13,659.08 96.53
119.61 3,721.20 4.43

925.97 2,630.26 287.64


1,751.85 995.74 52.73
782.25 3,752.13 26.52

346.61 873.61 54.80


359.11 259.88 10.71
192.65 924.08 6.53

11,220.00 22,990.00 341.00


94,645.06 192,404.13 17,085.62 65,169.71
304,134.81
369,304.52