STR. 1
Drawing Title
3.1 FOUNDATION SHOULD BE EXECUTED IN ACCORDANCE WITH
RECOMMENDATION OF GEOTECHNICAL INVESTIGATION REPORT , STRUCTURAL NOTES
WHICH IS NEEDED TO BE TAKEN FOR INSTANCE, AN ALLOWABLE
SOIL BEARING CAPACITY OF100 KN/M2 HAS BEEN RECOMMENDED AT -4M DEPTH
FROM EXISTING GRADE LEVEL.
Drawing No. Scale
3.3 THE SITE SHOULD BE CLEANED FROM ALL RANDOM FILL MATERIALS.
THE SITE MUST BE EXCAVATED AND IS TO BE COMPACTED AND BACK FILLED
1
(AS AND WHERE REQUIRED) AS PER THE RECOMMENDATIONS OF SOIL
INVESTIGATION REPORT.
Designed By:
3.4 LEAN CONCRETE SHALL BE USED FOR BLINDING UNDER ALL
SUBSURFACE STRUCTURES AS SPECIFIED. HAYMAN S. AHMED
MINIMUM THICKNESS SHALL BE 10 CM:
Drawing By:
Date Checked
9-10-2016 Cihan Office