SEM - 3037E
Piping Design Manual
TOWER PIPING
REV. : 3
DATE : 2004. 03. 30
CONTENTS
Page
1. GENERAL
2. LAYOUT
3. ACCESSORY
4. NOZZLE ORIENTATION
1. GENERAL
This manual provides details of tower piping design, and it shall be applied to all jobs unless
otherwise specially required by owner or licenser.
2. LAYOUT
(1) N.P.S.H
(2) Reboiler suction head
(3) Natural gravity flow head
(4) Pressure loss in flow-meter orifice
Static head of fluid close to boiling point is small, and the measurement will be incorrect
due to the flash caused by pressure loss in the orifice.
3. ACCESSORY
3.1 Platform
(1) Install platform for maintenance and operation of following parts that are 3600mm
and over from the ground or 1800mm and over from other platform.
(1) Standard point shall be 750mm and under from the manhole centerline.
And, clearance shall be 2100mm and over from the upper platform.
(2) If more than two towers are paralleled, consideration shall be given to
allow the platform elevation to be the same.
SEM - 3037E
DESIGN MANUAL
REV. : 3
TOWER PIPING
DATE : 2004.03.30 PAGE 4 OF 49
(4) For a heat exchanger attached to tower, allow a proper space for cleaning and
withdraw of pipes.
(5) For a platform on which a lot of weight is loaded due to maintenance or supported
piping, report it to the engineer in charge of T/T (tank and tower).
(Strength of platform is approximately 300kg/.)
3.1.3 Structure
3.2 Ladder
3.2.3 Structure
3.3 Davit
3.3.3 Structure
Lifting lug shall be installed for erection weight from 10 ton and above.
However, all lifting lugs for tower shall be installed even though the load is just
1 ton.
Access Hole
Inside diameter of tower Size
Hot-insulation Cold-insulation
Name plates shall generally have the standard height of 1500mm from the aboveground and be
installed uniformly at operation and monitoring walkway.
SEM - 3037E
DESIGN MANUAL
REV. : 3
TOWER PIPING
DATE : 2004.03.30 PAGE 9 OF 49
For objects that are susceptible for making static electricity by the internal fluid
and required for installation of lightning arrestor according to the Building Standards
Act.
16 230 230 40 90 40
22 280 280 50 115 50
32 355 355 65 150 65
38 400 400 90 180 75
45 480 480 100 230 100
Note
General Notes
1. The outlet letters and stamping squares in the name plate shall be embossed and their faces glazed
enough by buffing. The other parts shall be corroder 0.5mm of depth, and the printed 0.1mm of
thickness black enamel. Letters to be the roundgothic type
3. Letters A.B.C etc. shall be followed to Item No. for more than tow vessels.
6. The boxed line of fabricator's name indicators dimension and only the name embossed.
4. NOZZLE ORIENTATION
1) Nozzle orientation
2) Platform elevation and width
3) Platform entrance and exit, and loading point
4) Ladder location
5) Davit location
6) Lifting lug location
7) Location of access hole and vent hole
8) Location of name plate
9) Opening/closing direction of manhole cover
10) Other special remarks
4.2 Manhole
Manhole of platform with two ladders shall be opened without any trouble.
SEM - 3037E
DESIGN MANUAL
REV. : 3
TOWER PIPING
DATE : 2004.03.30 PAGE 16 OF 49
(1) Feed nozzle is oriented in the same way as reflux nozzle, but platform shall be considered
as block valves are usually installed .
Make stripping stream inlet 300450mm lower than the bottom tray.
DOUBLE FLOW
(1) As there are many cases that the pockets are made and drawn off from the tray, the area
where installation of pocket is convenient is preferable. (Refer to paragraph 4.3.3.)
(2) It is recommended to avoid the area straight down from the tray down-commer above one
stage.
SEM - 3037E
DESIGN MANUAL
REV. : 3
TOWER PIPING
DATE : 2004.03.30 PAGE 20 OF 49
(3) The following shows a special case where tower bottom is used for hold-up.
This type of reboiler is so different from other types of reboilers that only vapor goes
into the tower and product comes out of the reboiler. And, it is recommended that
orientation shall be determined according to the reboiler piping.
SEM - 3037E
DESIGN MANUAL
REV. : 3
TOWER PIPING
DATE : 2004.03.30 PAGE 24 OF 49
For this type of reboiler, all fluid from down-comer is gathered into the reboiler, and the
part of full-volume fluid in the tower bottom is circulated through the reboiler. And, for
this type of rebolier, fluid level of tower bottom is affected by the reboiler elevation.
SEM - 3037E
DESIGN MANUAL
REV. : 3
TOWER PIPING
DATE : 2004.03.30 PAGE 25 OF 49
4.7 Others
(1) Tray direction shall be crossed at 90if upper part of tray is single cross flow and the
lower part of tray is double cross flow.
SEM - 3037E
DESIGN MANUAL
REV. : 3
TOWER PIPING
DATE : 2004.03.30 PAGE 26 OF 49
(4) As nozzle for TI or PI can be moved up and down by one tray, it is necessary to discuss the
nozzle arrangement with the engineer in charge of T/T when it is not suitable.
(5) Field indicators such as TG, PG and LG shall be observed at the location where handle of
relevant valve can be operated.
(6) The length of min. 600mm is required to draw-out TI nozzle in front side of it.
(8) Do not install level gauge in direction of 60angle from fluid inlet nozzle so that
the effect of liquid surface fluctuation may be reduced. Special caution is required for
installation of level controller.
SEM - 3037E
DESIGN MANUAL
REV. : 3
TOWER PIPING
DATE : 2004.03.30 PAGE 29 OF 49
(1) There is no limitations on the direction of overhead piping. But, this piping route shall
be decided in advance as the big bore pipes have a major role.
(3) Thorough consideration is required for thermal stress calculation (If temperature
difference between piping and tower) and support (If piping is heavy).
(4) Where two or more condensers are arranged parallel, the inlet piping shall have routed
symmetrically.
(5) If a platform is installed on tower top, length of nozzle neck mounted with a valve is
preferable if done as follows:
SEM - 3037E
DESIGN MANUAL
REV. : 3
TOWER PIPING
DATE : 2004.03.30 PAGE 30 OF 49
(1) Platform is not necessary if valve is not operated or internal piping is disconnected
from inside of tower.
(2) Special caution is required for flexibility as the piping size is small, in low
temperature and installed in upper side of tower.
(1) Special caution is required for flexibility as this piping size is large and in high
temperature.
(2) If possible, minimize the number of bend since the pressure drop is critical.
(1) For open type, discharge pipe shall be extended at least 3m above any platform within a 8m
radius of the point of discharge.
SEM - 3037E
DESIGN MANUAL
REV. : 3
TOWER PIPING
DATE : 2004.03.30 PAGE 32 OF 49
(2) Outlet piping of relief valve shall be preferably slopped to avoid drain collection.
And, it shall be routed to minimize the back-pressure.
(4) A 9mm weep-hole shall be provide at the low point of discharge piping.
When the fluid is toxic or in high temperature, drain piping shall be provided.
(6) Flexibility shall be given in order to avoid excessive heavy load on the safety valve.
(1) Valve shall be generally connected directly to the nozzle. (To prevent drain pocket.)
(2) Big bore piping or piping in the upper side of tower shall be installed first, and
bottom nozzle piping or small-size nozzle piping shall be installed afterward.
(3) Flexibility shall be given to the piping that are connected to the tower erected
parallel or fixed equipment considering sway of tower.
(4) Check hose station thoroughly and install it at the desired location.
(5) If vertical pipe moves to horizontal line, its elevation shall be as same as that of yard
piping.
SEM - 3037E
DESIGN MANUAL
REV. : 3
TOWER PIPING
DATE : 2004.03.30 PAGE 33 OF 49
(6) When the orifice flange is installed on the vertical pipe around tower, refer to the
followings and consult with instrumentation & system control engineer.
(7) For cold-insulated tower, allow sufficient clearance between piping and the ring binding
the insulation material.
6. SUPPORT CLIP
(1) For heavy weight piping, consult with mechanical engineer about the strength of tower wall to
decentralize the load by reinforcing pad or spring hanger.
(2) If possible, standardize the clip type. Use the clip drawing format in SEM-3041 "Standard
Attachment".
(3) If necessary to route pipeline circuitously, turn it as close to the nozzle as possible,
and support the vertical line.
SEM - 3037E
DESIGN MANUAL
REV. : 3
TOWER PIPING
DATE : 2004.03.30 PAGE 35 OF 49
CLIP t f k m m P BOLT
MARK HOLE
107D 12 100 90 60 65 60 28
107E 12 100 90 60 75 75 28
107A 12 75 70 40 40 35 21
CLIP H
MARK
104A 100
104B 125
104C 150
102 -EB
1 S-1 30B 107B 180 SM41B 33400 1525 650 1526 7000 30CO3B A25A
102 -EB
1 S-2 14B 107D 155 SM50B 22150 1385 470 1625 5500 14CAR2B A13K
102 -EB
1 RS-3 18B 107D 205 SM41B 31550 1185 250 1276 4300 18CAR5B A24A
102 -EA
1 S-11 30B 107D 180 SM41B 33400 1525 650 1526 7000 30CO3A A25A
102 -EA
1 S-22 14B 107D 205 SM50B 22150 1585 470 1625 5500 14CAR5A A13K
102 -EA
1 RS-33 18B 107D 155 SM41B 31550 1185 250 1276 4300 18CAR5A A24A
102 -EB
1 RS-7 8B 107A 125 SM50B 12300 1600 200 1820 800 8PW25B A11K
102 -EA
1 KS-77 8B 107A 235 SM50B 12300 1600 200 1820 800 8PW25A A11K
SEM - 3037E
DESIGN MANUAL
REV. : 3
TOWER PIPING
DATE : 2004.03.30 PAGE 39 OF 49
(Notes) 1) Welding without special notes shall be continuous fillet welding on both sides with
9mm thick.
However, if welding length goes over 200mm, take the intermittent fillet welding on both
sides in a row, and with interval of 150mm pitch.
In this case, weld smoothly on both ends.
2) Check with the tower vendor as the strength of tower wall thickness is not calculated
for the installation the clip.
SEM - 3037E
DESIGN MANUAL
REV. : 3
TOWER PIPING
DATE : 2004.03.30 PAGE 40 OF 49
Calculate incoming and outgoing of materials and heat corresponding to tower pressure and
temperature, and calculate the volume of gas ascending and the volume of liquid through every
section of tower, and then decide diameter and length of tower.
1) Tower length is determined on the basis of tray spacing multiplied by the numbers of
tray.
2) Add the dimensions of tower top, tower bottom (depending on liquid holding time),
manhole, etc.
(3) Tower diameter deterines the increased temperature of gas, and it shall be according to the
following formula.
V = VD D : Tower inside diameter (m)
4
V: Ascending gas volume (/sec)
(Value corresponding to gas volume)
4 V
D = V: Allowable ascending gas velocity
V (Value corresponding to internal
temperature and pressure of tower)
When tower diameter is subject to the weight velocity of gas (Souders & Droun formula),
it shall be determined according to the following formula:
G = DW
4
4 G 4 G
D = = m
W C d(d- d)
SEM - 3037E
DESIGN MANUAL
REV. : 3
TOWER PIPING
DATE : 2004.03.30 PAGE 41 OF 49
Where,
(4) Tower length , if tower is a tray type as the below, shall be indicated as the following
formula:
L = N + h1 + h2
Where,
For distillation of tower, tray spacing is generally used as the following considering
how much length is preferable as an empirical value.
As the number of tray "N" and tray spacing " " are the important factors to control the
tower performance, there is standardized decision method for tower length
according to the purpose of tower function.
Nth
N =
G
Where,
N : Actual number of tray stage
Nth : Theoretical number of tray stage
G : Tray efficiency = 0.45 0.7
SEM - 3037E
DESIGN MANUAL
REV. : 3
TOWER PIPING
DATE : 2004.03.30 PAGE 42 OF 49
8.2 Strength Calculation for Tower with Skirt (excerpt from JPI-7B-35-78)
This standard is the basis of strength calculation for towers with skirt (hereinafter
refered as tower) mainly used in petroleum industry (including petroleum distillation,
natural gas and petrochemical industry).
Regulations & Laws and codes to be applied to strength calculation for towers are
subject to the following:
Related to Department Labor Sanitation Safety Law, Boiler and Pressure Vessel
of Labor Safety Regulation, Pressure Vessel Structure Standard
1) Wind load
2) Seismic load (earthquake)
(Remarks) : 1) Special checking is necessary for designing under the condition of impact
load by instant changes of temperature and pressure.
2) The bigger load between wind load and seismic load shall be the maximum
temporary load.
SEM - 3037E
DESIGN MANUAL
REV. : 3
TOWER PIPING
DATE : 2004.03.30 PAGE 43 OF 49
(1) Wind load shall be calculated by multiplying velocity pressure by shape factor
and effective area.
Fw = qcA
(1) Seismic load shall be calculated by multiplying each component weight by seismic
coefficient.
Fe = KiWi
(2) Seismic coefficient shall be 0.2 for the part where tower height is 16m and under.
For the part where tower height is over 16mm, the coefficient shall be calculate by
adding 0.01 for each additional height of 4m to the above value 0.2.
SEM - 3037E
DESIGN MANUAL
REV. : 3
TOWER PIPING
DATE : 2004.03.30 PAGE 44 OF 49
Hydro-test
Condition Instal- and water Normal Shut-
Load lation oper. down
filling
Eccentric load
(2) Of the above load conditions, strength calculation for normal operation condition
and shut-down shall be done basically. If there is more severe load condition for
each condition, strength calculation for that condition shall be done.
8.2.7 Strength calculation for body plate and head plate where only pressure is effected.
Strength calculation for body plate and head plate that are placed in internal and
external pressure shall be done according to the applicable standards and regulations
& laws.
SEM - 3037E
DESIGN MANUAL
REV. : 3
TOWER PIPING
DATE : 2004.03.30 PAGE 45 OF 49
8.2.8 Strength calculation body plate and head plate to be placed under multiple loads.
(1) Stress under multiple loads for tower body plate is calculated on the basis of main
stress calculation according to paragraph 7.
(2) Direction of load is according to the following table 3.
Type of load Direction of load
Pressure Internal pressure is tension(+),
external pressure is compression(-)
Self-weight Compression(-)
Load Tension(+) for one side of body, and
compression(-) for other side
Remark : Load of moment is refered to as the load caused by the load,
seismic load and eccentric load.
Check it only if symbols of main direction stress and axial stress occurring in
body plate differ each other.
- 1/2 y -------- When wind load and seismic load are not considered.
- 1.5 1/2 y --------- When wind load and seismic load considered.
b a' ------------- When wind load and seismic load are not considered.
b 1.5 a' --------- When wind load and seismic load are considered.
0.03E (t - a)
a =
Dm (1 + 0.004E/Y)
(6) Stress at cylinder part of head plate which receives multiple loads due to the
structural condition is according to the body plate.
SEM - 3037E
DESIGN MANUAL
REV. : 3
TOWER PIPING
DATE : 2004.03.30 PAGE 47 OF 49
8.2.9 Strength calculation for skirt, foundation bolt and base plate
When tower is under multiple loads, strength calculation for skirt shall be
according to the followings.
sa' ------------ When wind load and seismic load are not considered.
s1.5 a' -------- When wind load and seismic load are considered.
sb a' ------------- When wind load and seismic load are not considered.
sb 1.5 a' --------- When wind load and seismic load are considered.
0.3 Ets
a =
Dm (1 + 0.004E/Y)
Dis the outside diameter(mm) of base plate, and Dis the inside diameter(mm).