Beruflich Dokumente
Kultur Dokumente
dfasdfas
erfqwetery
fdgerrgerg
th3 h
vs
fasf
rgegfqewgfqewt
for footing
foundatio
n
lower
strap
beam and
wall
between
lower and
upper tie
beam
Entrance
Steps
rectangula
r 1.0 3.307 1.303 0.6 2.59
exacavato
n porton
triangular
excavaton 2.0 0.5 1.303 0.6 0.78
porton
Entrance 2.0 2.943 0.84 0.6 2.97
Ramp
Entrance
Planting
area
rectangula
2.0 1.15 1.442 0.6 1.99
r porton
trapezoida 2.0 0.9045 0.6 1.09
l porton
for Exit
auditoriu 1.0 3.825 1.6 0.6 3.67
m door
for apron 1.0 52.617 0.625 0.44 14.47
drain
Total of Item 2.1 584.01 Cu. m
Filling
2.2 Work
Earthwork
in filling in
foundaton
on
trenches
and floor
with
materials
from
associated
excavaton
including
machine
2.2.1 compacto
n in 150
mm layers
with
sprinkling
water
required
to obtain
90%
density as
per
specificat
ons all
complete
(Earth to
be
supplied
from site
within
50m
distance
from the
place of
filling)
Filling of
soil from
existng 1.0 99.06 1.05 104.01
ground to
Entrance
lvl.
Filling of
soil from
existng 1.0 131.20 0.6 78.72
ground to
Plinth lvl.
faewfasf
rer