Sie sind auf Seite 1von 1

ARE 4.

0
Overview

ARE 4.0 Overview


What is the ARE?
ARE 4.0 SCHEDULED APPOINTMENT TIMES
Benefits of NCARB
Certification

Key Organizations PROGRAMMING, PLANNING & PRACTICE SCHEMATIC DESIGN


Intro Time :15 Intro Time :15
MC Testing Time 2:00 85 items Graphic Testing Time 1:00 Interior Layout
Exam Content
Scheduled Break :15 Scheduled Break :15
Confidentiality
Intro Time :15 Intro Time :15
Using the ARE 4.0 Graphic Testing Time 1:00 Site Zoning Graphic Testing Time 4:00 Building Layout
Study Aids Exit Questionnaire :15 Exit Questionnaire :15
Scheduled Appointment Time 4:00 Scheduled Appointment Time 6:00
Units, Standards,
and Terms
SITE PLANNING & DESIGN STRUCTURAL SYSTEMS
Rolling Clock and Intro Time :15 Intro Time :15
Maintaining Eligibility MC Testing Time 1:30 65 items MC Testing Time 3:30 125 items
Scheduled Break :15 Scheduled Break :15
Scheduled Intro Time :15 Intro Time :15
Appointment Times
Graphic Testing Time 2:00 Site Grading, Site Design Graphic Testing Time 1:00 Structural Layout
Exit Questionnaire :15 Exit Questionnaire :15
Six Steps to
Scheduled Appointment Time 4:30 Scheduled Appointment Time 5:30
Completing
the ARE
BUILDING DESIGN & CONSTRUCTION SYSTEMS BUILDING SYSTEMS
Intro Time :15 Intro Time :15
MC Testing Time 1:45 85 items MC Testing Time 2:00 95 items
Scheduled Break :15 Scheduled Break :15
Multiple- Intro Time :15 Intro Time :15
Choice Graphic Testing Time 2:45 Accessibility/Ramp, Stair Design, Graphic Testing Time 1:00 Mechanical & Electrical Plan
Sections Roof Plan Exit Questionnaire :15
Exit Questionnaire :15 Scheduled Appointment Time 4:00
Scheduled Appointment Time 5:30
CONSTRUCTION DOCUMENTS & SERVICES
Intro Time :15
Graphic MC Testing Time 2:00 100 items
Vignette Scheduled Break :15
Sections
Intro Time :15
Graphic Testing Time 1:00 Building Section
Exit Questionnaire :15
Scheduled Appointment Time 4:00

July 2009 ARE 4.0 8

Das könnte Ihnen auch gefallen