Beruflich Dokumente
Kultur Dokumente
TABLE OF CONTENTS
[1]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
3.1. OBJECTIVE.................................................................................................. 19
[2]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[3]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
3.8.4.2. Recommendations........................................................................... 58
4.11.4. Accessibility............................................................................................ 76
[4]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[5]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[6]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
6.11.3. Maintenance plan for of maintenance of fire protection system ........... 149
6.11.4. Maintenance plan of water column system and hoses .......................... 150
[7]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[8]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
1.1. OVERVIEW
The Iquitos Emergency Operations Center (EOC) & Disaster Relief Warehouse
(DRW) is part of the National Institute of Civil Defense (Instituto Nacional de
Defensa Civil-INDECI) effort to offer immediate response to natural disasters,
and to minimize their impacts in an efficient manner. To work properly the
building includes: the EOC facilities in the first floor to provide an effective
working environment for the organization of tasks and the Disaster Relief
Warehouse in the ground floor to reinforce emergency response during any
eventuality.
1.2. LOCATION
The project site is located in the city of Iquitos Peru. Iquitos is the capital of the
Maynas province and also de capital of the Loreto department, Peru. The city is
located at 3 43 46 South Latitude and 73 14 18 West Latitude at an
approximate elevation of 104 m above the sea level and an approximate
population of 423.000 habitants. Iquitos is located to the northeast side of Peru
in the middle of the Amazonas River Hydrographic System, the river Itaya to the
south side and the Nanay river to the north side are a natural expansion limits
for the city, both of these rivers flow to the Amazonas river. Seismic activities
are usually very rare and if they occur they are very deep. Iquitos is a city
mainly touristic, is a cultural center which gathers gastronomy, customs,
cosmovision, art and historic references of the Peruvian Amazonia.
1.2.1. Access
[9]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
The city has an equatorial weather, which is warm and humid; with
precipitations most of the year without a dry season, the average
temperature is 26.7C and a temperature range between a maximum of
33C and a minimum of 21C.
The property has a mostly flat terrain with difference levels of 0,50 meters
in some areas (See Topographic survey C-101).
BY NORTH: Limits with the terrain of others with a straight line of 95,00m
BY SOUTH: Limits with the terrain of others, with a straight line of 95,00
BY EAST: Limits with the terrain of others, with a straight line of 52,70m
Limits with the road to Nauta town, with a straight line of
BY WEST:
52,70m
PERIMETER 295,00m
For the grading plan is showing the existing and proposed topography. The
outside of the structure is shown with elevations in each building corner and the
elevation for each floor level is indicated.
[10]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[11]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[12]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
2.1. OVERVIEW
The Iquitos Emergency Operations Center (EOC) & Disaster Relief Warehouse
(DRW) is part of the National Institute of Civil Defense (Instituto Nacional de
Defensa Civil-INDECI) effort to offer immediate response to natural disasters,
and to minimize their impacts in an efficient manner. To work properly the
building includes: the EOC facilities in the first floor to provide an effective
working environment for the organization of tasks and the Disaster Relief
Warehouse in the ground floor to reinforce emergency response during any
eventuality. Future Search and Rescue Training facilities (SAR) might be
implemented.
The EOC is located in the first floor and includes: the EOC main entry, EOC
Directors office, Communications room, Server, a dormitory with bathroom and
closet by the communications room, Break room, Operations room, Male and
Female bathrooms, Storage, Humanitarian assistance, Conference room, Press
room and Corridors.
The property is located by the road to Nauta; approximately 17,5 Kms to the
southwest side of the city, currently in the property are operating offices, a
laboratory, sand dryer and a sand collection area.
The property has a mostly flat terrain with difference levels of 0,50 meters in
some areas.
The city has an equatorial weather, which is warm and humid; with
precipitations most of the year without a dry season, the average temperature is
26.7C and a temperature range between a maximum of 33C and a minimum
[13]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
of 21C. Currently, the storm drainage consists of superficial runoff flow. The
project shall include gutters, vertical downspouts, storm chambers, storm drain
canals and piping to evacuate storm water outside of the facilities.
The Contract Design and Build of the project Emergency Operations Center
(EOC) and Disaster Relief Warehouse (DRW) at Iquitos, Peru:
This facility includes: The EOC main entry, EOC Directors office,
Communications room, Server, a dormitory with bathroom and closet by
the communications room, Break room, Operations room, Male and
Female bathrooms, Storage, Humanitarian assistance, Conference room,
Press room and Corridors.
The scope of work for this project is as follows: Pedestrian and vehicle access
gates (electric operation), Guard post which operates and controls the
pedestrian and vehicle entrance gates (trough remote control), , lightning rod
(on top of elevated water tank), electric generator (100KVA), electric
transformer, sanitary sewer treatment system (Septic tank and filtration
galleries), pedestrian access corridor (42m2), hot water with tank water heater
for bathrooms and a deep water well (50 meters of depth) with pumping system.
The project also includes the construction of approximately 290 meters of
perimeter fencing and the steel reinforced mortar pavement for the truck
maneuver area and parking area (approximate area of 855m2).
[14]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Electric generator, elevated water tank and sewer water treatment system shall
have enough capacity to bare EOC and DRW and future SAR facilities
demands.
2.6.1. Roofing
The roof shall be trapezoidal metallic panels or approved equal over metallic
roof framing (curved shape). Roof slopes shall be as required from codes and
standards for metallic panels.
[15]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
a) Exterior wall finishes. All exterior walls shall be plastered and painted
with an elastomeric or epoxy coating to the specified color(s). Those
surfaces receiving an elastomeric coating finish must be primed
according to the manufacturers recommendations.
b) Interior wall finishes. All Interior walls shall be plastered and painted;
color shall apply to the entire wall surface. Items not specified in other
paragraphs shall be painted to match adjacent wall surface. Wall
materials shall be provided in accordance with the following and in
locations indicated on the criteria drawings schedules:
a) Finished mortar: Float mortar for technical areas (Mechanical room, fire
protection mechanical room and storage areas) and exteriors. Clear
sealed with two heavy coats.
b) Ceramic Tile: Glazed porcelain impact resistant ceramic tile for main
building offices, bathrooms, first floor circulation areas and guard post.
Installation of all ceramic tile floors shall be dry-set mortar or latex-
Portland cement mortar. Tiles shall be for heavy duty traffic.
c) Ceramic tile Base (for ceramic tile flooring areas, except bathrooms):
Glazed or matte finished, class II durability base to match wall color.
Install tile using dry-set mortar or latex-Portland cement mortar method.
Base shall be top-set cove type and match floor and wall tile color.
[16]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
All exterior doors shall be aluminum and metal frames. All interior doors shall be
wood with metal frame. All doors shall be 2.20m minimum in height. Doors shall
include heavy duty accessories for door handles.
Provide ceramic tile floors with a slope to floor drains. Toilet room walls shall be
ceramic tiles.
2.6.9. Piping
(Soil, Waste, Vent, Indirect and Rainwater) Sch 40 PVC with glued joints.
Smoke detectors shall be provided for offices, bathrooms and Guard post, at
least one sensor per room. Heat detectors shall be provided for technical areas
and/or facilities where smoke may be available, like. Mechanical room, Fire
protection mechanical room and storage areas; heat detectors shall be
regulated to 50C to activate the alarm.
Emergency light system will be applied all over the main building with a
minimum of one piece per room, preferably by rooms exit door.
[17]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Hot water is required for all bathrooms; a tank water heater shall be installed for
EOC bathrooms and another one for DRW bathrooms.
[18]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
3.1. OBJECTIVE
This design analysis calculation has as main objective the structural concrete
design for this project.
3.2. REGULATION
[19]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
3D view of structure
[20]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[21]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
View of truss
[22]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
ZUSC
Sa g
R
Where:
[23]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[24]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
CONDICIONES DE CIMENTACION
For analysis of trusses shall have considered gravity and wind loads.
For gravity loads have considered loads by own weight of the structure and
overload; as follows:
Overload= 30 Kg/cm2
[25]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
For gravity loads have considered loads by own weight of the structure, of
trusses and overload; as follows:
For seismic loads; shall use dynamic method using for spectral acceleration
the inelastic spectrum of pseudo acceleration, to obtain the maximum
expected response (r)
m m
r 0.25 ri 0.75 r 2
i
i 1 i 1
Z .U .C.S
V P
R
U1 1.4CM 1.7CV
U 2 1.25(CM CV ) CS
U 3 1.25(CM CV ) CS
U 4 0.9CM CS
U 5 0.9CM CS
[26]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Reinforced concrete:
Concrete
Reinforcement Steel:
Where:
[27]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Resistance Factors:
Flexion : 0.85
Design by flexion:
Mu Mn
Mu As. fy fy
As a
. fy.(d a / 2) 0.85 f `c.b f 'c
Mu bd 2 f 'c (1 0.59)
Design by cutting:
Av. fy.d
Vs Vn Vc S
Vs
[28]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Structural modeling
[29]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Design Loads:
For loads analysis has considered dead, live and wind loads:
CARGA VIVA:
Sobrecarga de Montaje: 40.00 Kg/m2
CARGA DE VIENTO:
Barlovento: 22.66 Kg/m2
-22.66 Kg/m2 Ang. Inclinacin= 29.06
Sotavento: -36.26 Kg/m2 Cos = 0.87411
Sen = 0.48573
Barlovento
WVB(Kg/m)= -326.30 Kg/m WSx= -158.49 Kg/m WSy= -285.23 Kg/m 29.06
WSx= -88.02 Kg/m WSy= -314.21 Kg/m 15.65
[30]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[31]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
T
T C Sa' C 2.5. p
0 2.50 0.066 Ts
0.40 2.50 0.066
0.50 2.50 0.066
0.60 2.50 0.066 Z .U .C.S
Sa .g
0.65 2.31 0.061 R
0.70 2.14 0.056
m m
r 0.25. ri 0.75. r
0.75 2.00 0.053 2
0.80 1.88 0.049 i
i 1 i 1
0.85 1.76 0.046
0.90 1.67 0.044
0.95 1.58 0.041
1.00 1.50 0.039
1.05 1.43 0.038
1.10 1.36 0.036
1.15 1.30 0.034
1.20 1.25 0.033
1.25 1.20 0.032
1.30 1.15 0.030
1.35 1.11 0.029
1.40 1.07 0.028
1.45 1.03 0.027
1.50 1.00 0.026
1.55 0.97 0.025
1.60 0.94 0.025
1.65 0.91 0.024
1.70 0.88 0.023
1.75 0.86 0.023
1.80 0.83 0.022
1.85 0.81 0.021
1.90 0.79 0.021
1.95 0.77 0.020
2.00 0.75 0.020
[32]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Period
Case Mode UX UY RZ
sec
Modal 1 0.716 0.361716 0.00446 0.006379
Modal 2 0.7 0.013121 0.213875 0.091835
Modal 3 0.624 0.001184 0.1473 0.247694
Modal 4 0.331 0.025754 1.8E-05 5E-06
Modal 5 0.289 0.197579 0.000235 4.2E-05
Modal 6 0.235 0.000644 0.078017 0.116531
Modal 7 0.233 3.3E-05 0.058838 0.010851
Modal 8 0.208 0.003391 0.061296 0.009561
Modal 9 0.204 0.012514 0.095231 0.022029
Modal 10 0.189 0.16826 0.003096 0.02736
Modal 11 0.176 0.011544 0.117973 0.033293
Modal 12 0.174 0.026104 0.043713 0.271777
Displacement analysis
Displacement of structure
Analysis by Gravity
Dead Loads:
[33]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Live loads:
[34]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[35]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[36]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[37]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[38]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[39]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[40]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[41]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[42]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[43]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[44]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[45]
selbisimdA sozreufsE rop agraC ed niserP selbisimdA sozreufsE ed noicanibmoC
dadevarG omsiS sotnemoM selaixA sagraC sotnemoM selaixA sagraC senoisnemiD
)2m/nT( nimQ ) 2 m /nT( xamQ ) 2 m /nT( nimQ ) 2 m /nT( xamQ ) m( 6 /B )m(1 e )m( e S7.0+D L+D S7.0+D L+D )nT( zD ) m-nT( S ) m-nT( L ) m-nT( 1D )nT( S )nT( L )nT( 1D )m( L )m( B
43.5 57.5 63.3 64.6 76.0 20.0 12.0 21.9 81.1 12.34 08.84 07.21 08.11 23.0 68.0 03.4 06.8 05.72 02.2 00.4 1-Z
32.5 22.6 38.3 93.6 76.0 60.0 71.0 38.6 56.2 09.04 28.54 25.11 07.6 15.0 41.2 52.2 05.6 08.72 00.2 00.4 2-Z
00.6 11.7 00.4 93.6 76.0 60.0 51.0 79.7 86.3 79.15 35.56 04.41 77.7 51.1 35.2 01.3 37.51 04.53 05.2 00.4 3-Z
10.5 74.5 24.4 84.6 35.0 20.0 01.0 15.3 87.0 09.43 25.33 22.9 03.4 82.0 05.0 04.3 00.1 03.32 00.2 02.3 4-Z
summary in:
58.4 48.5 47.2 14.6 74.0 40.0 91.0 48.3 30.1 94.02 59.32 54.6 44.4 03.0 37.0 77.1 07.4 08.21 06.1 08.2 5-Z
94.5- 50.01 71.3- 73.21 05.5 67.82 69.43 18.06 10.76 03.67 077.7 051.1 035.2 01.3 37.51 04.53 3-Z
58.3- 57.4 33.3- 82.5 81.1 75.71 73.42 89.62 87.33 23.43 003.4 082.0 005.0 04.3 00.1 03.32 4-Z
87.3- 01.5 51.3- 37.5 35.1 57.9 92.31 11.02 56.32 19.52 044.4 003.0 037.0 77.1 07.4 08.21 5-Z
[46]
arutoR ed sozreufsE rop agraC ed niserP sedadicertnecxE
5 4 3 2 1 5 4 3 2 1
47.1 47.6 86.4 86.9 53.8 53.0- 13.0 81.0- 02.0 20.0 1-Z
59.1 30.5 44.4 25.7 79.6 12.0- 23.0 80.0- 22.0 80.0 2-Z
TRUJILLO, PERU
50.2 00.5 16.5 65.8 54.8 91.0- 92.0 50.0- 81.0 70.0 3-Z
26.1 02.5 42.3 28.6 17.5 22.0- 91.0 21.0- 61.0 30.0 4-Z
73.0 04.5 89.2 20.8 25.6 93.0- 83.0 61.0- 42.0 60.0 5-Z
W91278-13-D-0012 TO 0001
D/B EMERGENCY OPERATIONS CENTER
PREDIMENSIONAMIENTO
Z-6 Z-7 Z-8
BZ ( M) = 2.8 2.6 2.2
Az=PS/
B 1 1 1
S 2.8 2.4 2
CONDICION DE DISEO
[47]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
VERIFICACION DE ASMIN.
[48]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
PREDIMENSIONAMIENTO
Z-1 Z-2 Z-3 Z-4 Z-4
AZ ( M2) = 10.7 10.7 13.7 2.3 6.7
Az=PS/ L 3.27 3.27 3.7 1.52 2.59
TB 3.47 3.4 3.83 1.67 2.59
TS 3.07 3.15 3.58 1.37 2.59
B 2.2 2 2.5 2 1.6
S 4.00 4.00 4.00 3.8 2.8
LvB 0.95 0.85 1.1 0.93 0.63
LvS 1.65 1.73 1.73 1.68 1.23
Az 8.8 8 10 7.60 4.48
0.82243 0.747664 0.729927 3.304348 0.668657
CONDICION DE DISEO
[49]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
VERIFICACION DE ASMIN.
[50]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
The arch truss of structural Steel shall be of structural Steel A-36 and
Grade 50, rectangular section of 0,225x0,60m at the ends and
0,30x0,60m in the intermediate truss; which are spacing between each
other in an average length of 9,00m.
Truss shall have a tensor that supports traction forces; which supports
on fixed and movable supports.
1"x1"x3/16" DIAGONALES
2"x2"x3/16" DIAGONALES
2"x2"x1/4" TENSORES:
(Acero Estr. Alta Resiste)
3/8" - liso ARRIOSTRES
3/8" - liso ARRIOSTRES
[51]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[52]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Lower bridle:
Upper bridle:
[53]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Design of Tensor:
Design of Diagonal:
[54]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
3.8. ANNEXES
Zone 1
Zone 2
Zone 3
[55]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
3.8.4.1. Conclusions
[56]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
EXPLORATION INFILTRATION
LOCATION
DEPTH (m) DEPTH (m)
C-1 3,00 Infiltration: 0,70
C-2 3,00 Infiltration: 0,80
C-3 3,00 Infiltration: 0,70
STRATUS POTENTIAL
LOCATION DESCRIPTION CLASSIF. LL IP
(m) EXPANSION
Reviewing historical seismicity of the area (from 1955 until now), there were
found no background of destructive seismicity, also detect no active fails or
tectonic evidence that there is risk of seismic movements for projected
structures.
[57]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Seismic Zone : 1
Seismicity : Low
Soil : S3
3.8.4.2. Recommendations
Shall avoid surface puddles of water that modify soil stability, by properly
channeling storm rain water to the discharge areas, where shall drain
properly.
In the area next to the worksite, shall avoid outcrops water or construction of
water storage wells and without any coating, because may form little
caverns and/or negative taluds, creating voids in the soil mass, so it is
recommended that any construction of structure of groundwater uptake or
dug wells, shall be done in a way that prevent the loss of soil particles, so,
shall coat walls of dug wells and cover pipes of this wells with geotextiles,
operating with pumps, so avoid migration of materials to exterior, which
produce loss of soil density of granular type SM, SP, SC and clayey CH,
with the consequent decrease of the bearing capacity.
Any over excavation shall be filled with poor concrete 1:12. Shall have care
with fillings that comply with Article 4.4.1 of the Regulation E-050.
[58]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
If during construction work different soil conditions for foundations are found
and are different to the ones indicated in this report, shall communicate
immediately with the professional to analyze the problem and give the
respective recommendations.
Results from this report apply exclusively to the studied area and shall not
be used in other sectors and/or for other purposes.
[59]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[60]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
4.1. OVERVIEW
The projected building shall have a three phase feeding line of low tension and
a demanded power, shall de feed from an Aerial Sub Station projected
(Technical Project: System for use of tension of primary distribution for electrical
supply for the lot of EOC / DRW Iquitos).
The project has been designed base on the projected architecture drawings.
The contractor of the project construction shall comply with general indications
of the mentioned project.
[61]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
a) Electrical feeders:
Feeder projected from the Areal Sub Station projected to the General
Electrical Panel board (TG-01) projected.
Feeder projected from Areal Sub Station projected to the Automatic
Transfer Panelboard (TT) projected.
Feeder projected from Generator projected to the Automatic Transfer
Panelboard (TT) projected.
Feeder projected from Automatic Transfer Panelboard (TT) to the
General Electrical Panelboard (TG-01) projected.
Feeders projected from the General Electrical Panelboard (TG-01)
projected to the Electrical Distribution Panelboards (TD) projected,
distributed in the ground and first floor of the building.
Feeders projected from the General Electrical Panelboard (TG-02)
projected to the Electrical Distribution Panelboards (TD) projected,
distributed in the ground and first floor of the building, for loads with
continuity of work uninterrupted.
[62]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
c) Electrical Panelboards
Supply and installation of Electrical Panelboards projected with
respective terminals of ground, thermomagnetic and differential
breakers.
[63]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
a) The objective of this project is to finish, test and get ready for operation
all the electrical system.
f) None of the lighting switches shall be behind doors, these shall be easily
located when opening doors.
4.3. DESCRIPTION
The electrical design of the project EOC / DRW at Iquitos is divided in Design
Analysis, Calculation and Electrical Drawings, composed by:
Energy Distribution System 380/220 V, 60 Hz.
Distribution Systems of Electrical Panelboards, Wiring, Lighting fixtures and
respective lamps, Switches and Power Outlets.
[64]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
a) Electrical Panelboards
General Panelboard and Distribution Panelboards projected shall
distribute electrical energy to the facilities of the projected building.
Shall be metal type, embedded, equip with automatic breakers for the
different projected circuits, according to the purpose and demand.
a) Exterior lighting
Pedestrian sidewalks, at the exterior and court of the building, shall have
lighting based on luminaires for outdoor exposure.
[65]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
According to Article 3.2.7 and 3.6.6 of the National Code of Electricity, and for the
Distribution System TT to be applied according to Code IEC 60364, shall be
protected by wire of ground well, all metal casings of power box, energy register,
general panelboard, distribution panelboard, pass box, metal conduit pipes with
PVC cover; also, all use outlets, of power and all other installations which
structures are metal.
Ground well system is composed by 1 ground well, constructed according to detail
indicated in drawings. Resistance of each one of the ground wells shall be less or
equal to 5 ohms.
As summary, all metal parts normally with tension and no conductors of current,
exposed to installation, as cover of panelboards, and ground well rod of the
panelboards shall be connected to ground.
According to mentioned before, it is responsibility of comply with the Codes NEMA,
contractor shall perform works corresponding this project, according to
prescriptions about safety indicated in National Code of Electricity at the moment
of performing activities.
Installed Maximum
Demand
Panelboard Circuit Type Power Demand
Factor
(kW) (kW)
The Maximum Demand is 97.074 KW. With F.P. = 0.9, having a Power of 107.86
KVA, being able to be covered by a 125 KVA commercial transformer.
[66]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Number of poles: 4P / 2P
Drop of tension at each circuit: From point of design to
farthest point of use < 4.0 %
Lighting: Shall ensure correct lighting of various facilities of the building, according
to the activity, dimensions and characteristics of facility.
FACILITY LUX
OFFICES 500
CORRIDOR 70
BATHROOM 100
DEPOSIT/STORAGE 100
[67]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
4.8. TESTS
4.9. CALCULATION
M.D .TOTAL
I=
KxVx cos
Where:
xLxCos
V = KxI
S
Where:
o I = Current in Amperes.
o V = Voltage of service in volts.
o M.D. TOTAL = Total maximum demand in Watts.
o Cos = Power factor.
o V = Voltage drop in volts.
o L = Length in meters.
o = Conductor resistivity in Ohms-mm2/m.
For the Cu = 0.0175.
o S = Section of conductor in mm2.
o K = Constant 3 for three phase line circuits and
2 for one phase line circuit.
[68]
Luminaries and Receptacles for External and Internal Electrical Instalation
1,00 Receptacle of 2 outlets 2P+T (Recessed in wall) Receptacle phase-neutral + ground 2,00 100,00 200,00
2,00 Receptacle of 4 outlets 2P+T (Recessed in wall) Receptacle phase-neutral + ground 4,00 100,00 400,00
[69]
3,00 Receptacle of 4 outlet 2P+T (Recessed in floor) Receptacle phase-neutral + ground 4,00 100,00 400,00
TRUJILLO, PERU
1,00 Luminarie reflector Type (Attached to wall) Luminarie Contempo Mini L SON-T 250 W 1,00 250,00 250,00
2,00 Luminarie of Public Lighting (Mount in Pole C.A.C. 8 m) Luminarie ECOM SON-T 70 W 1,00 70,00 70,00
D/B EMERGENCY OPERATIONS CENTER
Thermomagnetic
Unitary Maximum Differential breaker
# Installed Demand breaker
Panel Circuit Type # Luminaries # Receptacles Load Demand In (A) Id (A) Selected Conductor
Equipment Power (kW) Factor N Poles Type by rail N Poles Type by rail
(W) (kW) In (A)
x (A) DIN35 x (A) DIN35
C-1 T.D.-1 --- --- --- --- 7,152 --- 7,152 --- --- --- --- --- --- --- ---
C-2 T.D.-2 --- --- --- --- 9,780 --- 9,780 --- --- --- --- --- --- --- ---
C-3 T.D.-3 --- --- --- --- 8,090 --- 8,090 --- --- --- --- --- --- --- ---
C-4 T.D.-6 --- --- --- --- 3,140 --- 3,140 --- --- --- --- --- --- --- ---
Modular
C-5 Lighting 10,00 --- --- 72,00 0,720 1,00 0,720 3,64 4,55 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
T.G.-1 Modular
C-6 Lighting 4,00 --- --- 56,00 0,224 1,00 0,224 1,13 1,41 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
Modular
C-7 Ceiling fans --- --- 4,00 60,00 0,240 1,00 0,240 1,21 1,52 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
Modular Modular
C-8 Receptacle --- 5,00 --- 200,00 1,000 1,00 1,000 5,05 6,31 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Modular Modular
C-9 Receptacle --- 5,00 --- 200,00 1,000 1,00 1,000 5,05 6,31 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Sub-Total (kW) 31,346 31,346
Thermomagnetic
Unitary Maximum Differential breaker
# Installed Demand breaker
Panel Circuit Type # Luminaries # Receptacles Load Demand In (A) Id (A) Selected Conductor
Equipment Power (kW) Factor N Poles Type by rail N Poles Type by rail
(W) (kW) In (A)
x (A) DIN35 x (A) DIN35
C-1 T.D.-4 --- --- --- --- 4,032 --- 4,032 --- --- --- --- --- --- --- ---
Modular
C-2 Lighting 15,00 --- --- 56,00 0,840 1,00 0,840 4,24 5,30 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
Modular
T.D.-1 C-3 Ceiling fans --- --- 8,00 60,00 0,480 1,00 0,480 2,42 3,03 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
Modular Modular
C-4 Receptacle --- 6,00 --- 200,00 1,200 1,00 1,200 6,06 7,58 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Modular Modular
C-5 Receptacle --- 3,00 --- 200,00 0,600 1,00 0,600 3,03 3,79 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Sub-Total (kW) 7,152 7,152
Thermomagnetic
Unitary Maximum Differential breaker
# Installed Demand breaker
Panel Circuit Type # Luminaries # Receptacles Load Demand In (A) Id (A) Selected Conductor
Equipment Power (kW) Factor N Poles Type by rail N Poles Type by rail
(W) (kW) In (A)
x (A) DIN35 x (A) DIN35
C-1 T.D.-7 --- --- --- --- 5,868 --- 5,868 --- --- --- --- --- --- --- ---
Modular
C-2 Lighting 12,00 --- --- 56,00 0,672 1,00 0,672 3,39 4,24 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
Modular
T.D.-2
C-3 Ceiling fans --- --- 4,00 60,00 0,240 1,00 0,240 1,21 1,52 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
Modular Modular
C-4 Receptacle --- 5,00 --- 200,00 1,000 1,00 1,000 5,05 6,31 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Modular
C-5 Receptacle --- --- 1,00 2000,00 2,000 1,00 2,000 10,10 12,63 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 --- --- ---
Case
Sub-Total (kW) 9,780 9,780
Thermomagnetic
Unitary Maximum Differential breaker
# Installed Demand breaker
Panel Circuit Type # Luminaries # Receptacles Load Demand In (A) Id (A) Selected Conductor
Equipment Power (kW) Factor N Poles Type by rail N Poles Type by rail
(W) (kW) In (A)
x (A) DIN35 x (A) DIN35
C-1 T.D.-8 --- --- --- --- 3,608 --- 3,608 --- --- --- --- --- --- --- ---
Modular
C-2 Lighting 8,00 --- --- 56,00 0,448 1,00 0,448 2,26 2,83 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
Modular
C-3 Lighting 6,00 --- --- 56,00 0,336 1,00 0,336 1,70 2,12 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
Modular
C-4 Ceiling fans --- --- 4,00 60,00 0,240 1,00 0,240 1,21 1,52 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
T.D.-3 Modular Modular
C-5 Receptacle --- 6,00 --- 200,00 1,200 1,00 1,200 6,06 7,58 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Modular Modular
C-6 Receptacle --- 6,00 --- 200,00 1,200 1,00 1,200 6,06 7,58 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Modular Modular
C-7 Receptacle --- 5,00 --- 200,00 1,000 1,00 1,000 5,05 6,31 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Exhaus fans in Modular
C-8 --- --- 2,00 29,00 0,058 1,00 0,058 0,29 0,37 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
bathrooms Case
Sub-Total (kW) 8,090 8,090
Thermomagnetic
Unitary Maximum Differential breaker
# Installed Demand breaker
Panel Circuit Type # Luminaries # Receptacles Load Demand In (A) Id (A) Selected Conductor
Equipment Power (kW) Factor N Poles Type by rail N Poles Type by rail
(W) (kW) In (A)
x (A) DIN35 x (A) DIN35
C-1 T.D.-5 --- --- --- --- 2,488 --- 2,488 --- --- --- --- --- --- --- ---
Modular
C-2 Lighting 4,00 --- --- 56,00 0,224 1,00 0,224 1,13 1,41 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
T.D.-4 Modular
C-3 Ceiling fans --- --- 2,00 60,00 0,120 1,00 0,120 0,61 0,76 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
Modular Modular
C-4 Receptacle --- 6,00 --- 200,00 1,200 1,00 1,200 6,06 7,58 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Sub-Total (kW) 4,032 4,032
Thermomagnetic
Unitary Maximum Differential breaker
# Installed Demand breaker
Panel Circuit Type # Luminaries # Receptacles Load Demand In (A) Id (A) Selected Conductor
Equipment Power (kW) Factor N Poles Type by rail N Poles Type by rail
(W) (kW) In (A)
x (A) DIN35 x (A) DIN35
Modular
C-1 Lighting 8,00 --- --- 56,00 0,448 1,00 0,448 2,26 2,83 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
2 2 Modular
C-2 Ceiling fans --- --- 4,00 60,00 0,240 1,00 0,240 1,21 1,52 NH-80 - 2x4 mm +1x4 mm (T) 2x16 --- --- ---
Case
T.D.-5
Modular Modular
C-3 Receptacle --- 5,00 --- 200,00 1,000 1,00 1,000 5,05 6,31 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Modular Modular
C-4 Receptacle --- 4,00 --- 200,00 0,800 1,00 0,800 4,04 5,05 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Sub-Total (kW) 2,488 2,488
[70]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Thermomagnetic
Unitary Maximum Differential breaker
# Installed Demand breaker
Panel Circuit Type # Luminaries # Receptacles Load Demand In (A) Id (A) Selected Conductor
Equipment Power (kW) Factor N Poles Type by rail N Poles Type by rail
(W) (kW) In (A)
x (A) DIN35 x (A) DIN35
Modular
C-1 Lighting 6,00 --- --- 56,00 0,336 1,00 0,336 1,70 2,12 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
Modular
C-2 Lighting 5,00 --- --- 20,00 0,100 1,00 0,100 0,51 0,63 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
Modular
C-3 Ceiling fans --- --- 3,00 60,00 0,180 1,00 0,180 0,91 1,14 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
Modular
C-4 Lighting 4,00 --- --- 56,00 0,224 1,00 0,224 1,13 1,41 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
T.D.-6 Modular
C-5 Lighting 5,00 --- --- 20,00 0,100 1,00 0,100 0,51 0,63 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
Modular Modular
C-6 Receptacle --- 6,00 --- 200,00 1,200 1,00 1,200 6,06 7,58 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Modular Modular
C-7 Receptacle --- 5,00 --- 200,00 1,000 1,00 1,000 5,05 6,31 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Exhaust fans in Modular
C-8 --- --- 2,00 29,00 0,058 1,00 0,058 0,29 0,37 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
bathrooms Case
Sub-Total (kW) 3,140 3,140
Thermomagnetic
Unitary Maximum Differential breaker
# Installed Demand breaker
Panel Circuit Type # Luminaries # Receptacles Load Demand In (A) Id (A) Selected Conductor
Equipment Power (kW) Factor N Poles Type by rail N Poles Type by rail
(W) (kW) In (A)
x (A) DIN35 x (A) DIN35
Modular
C-1 Lighting 13,00 --- --- 56,00 0,728 1,00 0,728 3,68 4,60 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
Modular
C-2 Lighting 5,00 --- --- 20,00 0,100 1,00 0,100 0,51 0,63 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
Modular
C-3 Ceiling fans --- --- 4,00 60,00 0,240 1,00 0,240 1,21 1,52 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
Modular Modular
C-4 Receptacles --- 4,00 --- 200,00 0,800 1,00 0,800 4,04 5,05 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
T.D.-7 Electric water Modular
C-5 --- --- 1,00 2000,00 2,000 1,00 2,000 10,10 12,63 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 --- --- ---
heater Case
Modular Modular
C-6 Receptacles --- 4,00 --- 200,00 0,800 1,00 0,800 4,04 5,05 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Modular Modular
C-7 Receptacles --- 6,00 --- 200,00 1,200 1,00 1,200 6,06 7,58 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Exhauste fans Modular
C-8 --- --- 1,00 29,00 0,029 1,00 0,029 0,15 0,18 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
in bathrooms Case
Sub-Total (kW) 5,868 5,868
Thermomagnetic
Unitary Maximum Differential breaker
# Installed Demand breaker
Panel Circuit Type # Luminaries # Receptacles Load Demand In (A) Id (A) Selected Conductor
Equipment Power (kW) Factor N Poles Type by rail N Poles Type by rail
(W) (kW) In (A)
x (A) DIN35 x (A) DIN35
Modular
C-1 Lighting 8,00 --- --- 56,00 0,448 1,00 0,448 2,26 2,83 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
Modular
C-2 Ceiling fans --- --- 6,00 60,00 0,360 1,00 0,360 1,82 2,27 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
Modular Modular
T.D.-8 C-3 Receptacle --- 5,00 --- 200,00 1,000 1,00 1,000 5,05 6,31 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Modular Modular
C-4 Receptacle --- 3,00 --- 200,00 0,600 1,00 0,600 3,03 3,79 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Modular Modular
C-5 Receptacle --- 6,00 --- 200,00 1,200 1,00 1,200 6,06 7,58 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Sub-Total (kW) 3,608 3,608
[71]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Thermomagnetic
# Unitary Maximum Differential breaker
Installed Demand breaker
Panel Circuit Type # Luminaries # Receptacles Equipme Load Demand In (A) Id (A) Selected Conductor
Power (kW) Factor N Poles Type by rail N Poles Type by rail
nt (W) (kW) In (A)
x (A) DIN35 x (A) DIN35
C-1 T.D.-1D --- --- --- --- 5,200 --- 5,200 --- --- --- --- --- --- --- ---
C-2 T.D.-1A --- --- --- --- 1,201 --- 1,201 --- --- --- --- --- --- --- ---
Modular
C-3 Lighting 4,00 --- --- 56,00 0,224 1,00 0,224 1,13 1,41 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
Exterior N2XOH - 2-1x16 mm 2+1x10 Modular
T.G.-2 C-4 5,00 --- --- 250,00 1,250 1,00 1,250 6,31 7,89 2x16 --- --- ---
Lighting mm 2(T) Case
Exterior N2XOH - 2-1x16 mm 2+1x10 Modular
C-5 5,00 --- --- 250,00 1,250 1,00 1,250 6,31 7,89 2x16 --- --- ---
Lighting mm 2(T) Case
C-6 T.B.-1 --- --- --- --- 2,377 --- 2,377 --- --- --- --- --- --- --- ---
C-7 T.AAC. --- --- --- --- 50,200 --- 50,200 --- --- --- --- --- --- --- ---
Sub-Total (kW) 61,702 61,702
Thermomagnetic
# Unitary Maximum Differential breaker
Installed Demand breaker
Panel Circuit Type # Luminaries # Receptacles Equipme Load Demand In (A) Id (A) Selected Conductor
Power (kW) Factor N Poles Type by rail N Poles Type by rail
nt (W) (kW) In (A)
x (A) DIN35 x (A) DIN35
C-1 T.D.-2D --- --- --- --- 3,800 --- 3,800 --- --- --- --- --- --- --- ---
N2XOH - 3-1x10 mm 2+1x6 Modular
T.D.-1D C-2 FACP --- --- --- --- 1,000 --- 1,000 1,69 2,11 3x16 --- --- ---
mm 2 Case
Modular Modular
C-3 Receptacles --- 2,00 --- 200,00 0,400 1,00 0,400 2,02 2,53 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Sub-Total (kW) 5,200 5,200
Thermomagnetic
# Unitary Maximum Differential breaker
Installed Demand breaker
Panel Circuit Type # Luminaries # Receptacles Equipme Load Demand In (A) Id (A) Selected Conductor
Power (kW) Factor N Poles Type by rail N Poles Type by rail
nt (W) (kW) In (A)
x (A) DIN35 x (A) DIN35
Modular Modular
C-1 Receptacles --- 3,00 --- 400,00 1,200 1,00 1,200 6,06 7,58 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Modular Modular
C-2 Receptacles --- 1,00 --- 200,00 0,200 1,00 0,200 1,01 1,26 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Modular Modular
C-3 Receptacles --- 1,00 --- 400,00 0,400 1,00 0,400 2,02 2,53 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Modular Modular
T.D.-2D C-4 Receptacles --- 1,00 --- 400,00 0,400 1,00 0,400 2,02 2,53 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Modular Modular
C-5 Receptacles --- 1,00 --- 400,00 0,400 1,00 0,400 2,02 2,53 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Modular Modular
C-6 Receptacles --- 1,00 --- 400,00 0,400 1,00 0,400 2,02 2,53 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Modular Modular
C-7 Receptacles --- 4,00 --- 200,00 0,800 1,00 0,800 4,04 5,05 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
Sub-Total (kW) 3,800 3,800
Thermomagnetic
# Unitary Maximum Differential breaker
Installed Demand breaker
Panel Circuit Type # Luminaries # Receptacles Equipme Load Demand In (A) Id (A) Selected Conductor
Power (kW) Factor N Poles Type by rail N Poles Type by rail
nt (W) (kW) In (A)
x (A) DIN35 x (A) DIN35
Modular
C-1 Lighting 2,00 --- --- 20,00 0,040 1,00 0,040 0,20 0,25 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
2 2 Modular Modular
C-2 Receptacles --- 2,00 --- 200,00 0,400 1,00 0,400 2,02 2,53 NH-80 - 2x4 mm +1x4 mm (T) 2x20 2x25 0,03
Case Case
Electrical Door
T.D.-1A Modular
C-3 1 (Pedestrian --- --- --- --- 0,015 --- 0,015 0,08 0,09 --- 2x10 --- --- ---
Case
Access)
Electrical Door
Modular
C-4 2 (Vehicle --- --- --- --- 0,746 --- 0,746 3,77 4,71 --- 2x10 --- --- ---
Case
Access)
Sub-Total (kW) 1,201 1,201
Thermomagnetic
# Unitary Maximum Differential breaker
Installed Demand breaker
Panel Circuit Type # Luminaries # Receptacles Equipme Load Demand In (A) Id (A) Selected Conductor
Power (kW) Factor N Poles Type by rail N Poles Type by rail
nt (W) (kW) In (A)
x (A) DIN35 x (A) DIN35
Modular
C-1 Lighting 2,00 --- --- 56,00 0,112 1,00 0,112 0,57 0,71 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x16 --- --- ---
Case
Modular Modular
C-2 Receptacle --- 2,00 --- 200,00 0,400 1,00 0,400 2,02 2,53 NH-80 - 2x4 mm 2+1x4 mm 2(T) 2x20 2x25 0,03
Case Case
T.B.-1 Water pump N2XOH - 2-1x16 mm 2+1x10 Modular
C-3 --- --- 1,00 746,00 0,746 1,00 0,746 3,77 4,71 2x25 --- --- ---
N01 mm 2(T) Case
Water pump N2XOH - 2-1x16 mm 2+1x10 Modular
C-4 --- --- 1,00 1119,00 1,119 1,00 1,119 5,65 7,06 2x25 --- --- ---
N02 mm 2(T) Case
Sub-Total (kW) 2,377 2,377
Thermomagnetic
# Unitary Maximum Differential breaker
Installed Demand breaker
Panel Circuit Type # Luminaries # Receptacles Equipme Load Demand In (A) Id (A) Selected Conductor
Power (kW) Factor N Poles Type by rail N Poles Type by rail
nt (W) (kW) In (A)
x (A) DIN35 x (A) DIN35
[72]
TENSION DROP TG-1
DISTANCE Thermomagnetic
SECTION OF V= % V
FEEDER TO FROM breaker
M.D. (kW) In (A) Id (A) SELECTED CONDUCTOR CONDUCTOR 3^(1/2)xIx*Lx =(V/380)x100
PANEL CONDUCTOR (W .m m 2/m )
(m m 2) 0.9/S %
(m ) N Poles x
Type
(A)
Molded
T.G.-1 31,35 52,92 66,15 N2XOH, 3-1x50mm 2+1x35mm 2(N) 50,00 45,00 0,0175 1,62 0,43% 3x160
Case
Molded
T.D.-1 7,15 12,07 15,09 N2XOH, 3-1x35mm 2+1x25mm 2(N) 35,00 17,00 0,0175 0,20 0,05% 3x63
Case
Molded
>T.D.-4 4,03 6,81 8,51 N2XOH, 3-1x25mm 2+1x16mm 2(N) 25,00 5,00 0,0175 0,05 0,01% 3x40
Case
[73]
Molded
>>T.D.-5 2,49 4,20 5,25 N2XOH, 3-1x16mm 2+1x10mm 2(N) 16,00 15,00 0,0175 0,13 0,04% 3x25
Case
TRUJILLO, PERU
Molded
T.D.-2 9,78 16,51 20,64 N2XOH, 3-1x25mm 2+1x16mm 2(N) 25,00 18,00 0,0175 0,41 0,11% 3x40
Case
W91278-13-D-0012 TO 0001
Molded
>T.D.-7 5,87 9,91 12,38 N2XOH, 3-1x16mm 2+1x10mm 2(N) 16,00 5,00 0,0175 0,11 0,03% 3x25
Case
D/B EMERGENCY OPERATIONS CENTER
Molded
T.D.-3 8,09 13,66 17,07 N2XOH, 3-1x25mm 2+1x16mm 2(N) 25,00 40,00 0,0175 0,75 0,20% 3x40
Case
Molded
>T.D.-8 3,61 6,09 7,61 N2XOH, 3-1x16mm 2+1x10mm 2(N) 16,00 5,00 0,0175 0,06 0,02% 3x25
Case
Molded
T.D.-6 3,14 5,30 6,63 N2XOH, 3-1x16mm 2+1x10mm 2(N) 16,00 5,00 0,0175 0,06 0,01% 3x25
Case
SUBMITTAL 100%
DESIGN ANALYSIS
EOC / DRW AT IQUITOS
TENSION DROP TG-2
DISTANCE Thermomagnetic
SECTION OF V= % V
FEEDER TO FROM breaker
M.D. (kW) In (A) Id (A) SELECTED CONDUCTOR CONDUCTOR 3^(1/2)xIx*Lx =(V/380)x100
PANEL CONDUCTOR (W .m m 2/m )
(m m 2) 0.9/S %
(m ) N Poles x
Type
(A)
Molded
T.G.-2 61,70 104,16 130,20 N2XOH, 3-1x50mm 2+1x35mm 2(N) 50,00 3,00 0,0175 0,21 0,06% 3x160
Case
Molded
>T.D.-1D 5,20 8,78 10,97 N2XOH, 3-1x25mm 2+1x16mm 2(N) 25,00 25,00 0,0175 0,30 0,08% 3x40
Case
Molded
>>T.D.-2D 3,80 6,42 8,02 N2XOH, 3-1x16mm 2+1x10mm 2(N) 16,00 7,00 0,0175 0,10 0,03% 3x25
Case
Molded
T.D.-1A 1,20 2,03 2,53 N2XOH, 3-1x16mm 2+1x10mm 2(N) 16,00 78,00 0,0175 0,34 0,09% 3x25
Case
[74]
Molded
T.B.-1 2,38 4,01 5,02 N2XOH, 3-1x16mm 2+1x10mm 2(N) 16,00 8,00 0,0175 0,07 0,02% 3x25
Case
TRUJILLO, PERU
50,20 84,75 97,46 N2XOH, 3-1x16mm 2 16,00 4,00 0,0175 0,66 0,17% 3x100
to Transf. Dry Case
D/B EMERGENCY OPERATIONS CENTER
DISTANCE Thermomagnetic
SECTION OF V= % V
FEEDER TO FROM breaker
M.D. (kW) In (A) Id (A) SELECTED CONDUCTOR CONDUCTOR 3^(1/2)xIx*Lx =(V/380)x100
PANEL CONDUCTOR (W .m m 2/m )
(m m 2) 0.9/S %
(m ) N Poles x
Type
(A)
Section:
Molded
Transf. Dry to 50,20 146,38 168,34 N2XOH, 3-1x35mm 2 35,00 3,00 0,0175 0,39 0,18% 3x160
Case
T.AAC.
SUBMITTAL 100%
DESIGN ANALYSIS
EOC / DRW AT IQUITOS
LOADS SCHEDULE SAB AND TT
Thermomagnetic
Unitary Maximum
# Installed Demand breaker
Panel Circuit Type # Luminaries # Receptacles Load Demand In (A) Id (A) Selected Conductor
Equipment Power (kW) factor N Poles x
(W) (kW) Type
(A)
[75]
Thermomagnetic
Unitary Maximum
TRUJILLO, PERU
T.T- Molded
C-1 T.G.-2 --- --- --- --- 61,702 --- 61,702 104,16 130,20 N2XOH, 3-1x50mm 2+1x35mm 2(N) 3x160
Generator Case
D/B EMERGENCY OPERATIONS CENTER
82,269
Having a M.D. = 61.702 kW and adding a reserve of 20% of the capacity (12.340 kW), have a Power of 74.042 kW and with a F.P.=0.9, we have 82.269 kVA. Commercially you can find an Emergency
Generator of 100 kVA.
SUBMITTAL 100%
DESIGN ANALYSIS
EOC / DRW AT IQUITOS
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
4.11.1. Overview
4.11.2. Objective
4.11.3. Location
District : Iquitos.
Province : Maynas.
Department : Loreto.
4.11.4. Accessibility
[76]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Aereal:
Flights frome Tarapoto - Iquitos (45 minutes).
Primary Network:
Supply and installation of conductor AAAC bare wire of 7 wires,
hard temper and 35mm2 of section, for Primary Network
projected area.
Supply and installation of C.A.C. poles 13/400, supports of the
Aerial Two-Pole Sub-Station, with sectioning between the
network area of the Primary Network with the Transformer.
The projected Aerial Two-Pole Sub-Station, shall be located
according to drawings. This shall be composed by a
Transformer, traformix and all its protection and sectioning
elements, so as an energy meter, protected by a reinforced
concrete wall and a Distribution Panel.
Supply and installation of one (01) mixed Transformer for
measure of medium tension (Traformix 3.2/5 A, for 22.9/0.22
kV), composed by three coils of tension and three of current,
isolators on the top, cooling ONAN, class of precision on Tension
and Current 0.2, height of installation at 1000 m.o.s.l., exterior
mounting.
[77]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[78]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
The selection of the leakage distance of insulators has been taken from
the recommendation of the Norm IEC 815, for different levels of
pollution. The line of leakage phase to ground is given by the following
expression
L fuga L f 0 xU MAX xf ch
Where:
Lfuga : Required length of leakage phase-ground
Lf0 : Unitary length of leakage in mm /kV-.
Umax : Maximum tenion of service
Fch : Factor of correction by height;
fch = 1 + 1,25 (msnm 1 000) x 10-4
[79]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Conductor:
Conductor to be used is of aluminum alloy; and section of conductor has
been defined considering the following aspects:
Short-circuit currents
Mechanical efforts
Current capacity in normal operation
Tension drop
The two first factors have been determined in the definitions of the
section of 35 mm2 as the required section in the project.
Isolators:
Part of the determination of the level of primary network isolation, is the
selection of isolators, based on the Norm DGE Bases for the Design of
Lines and Primary Networks for Rural Electrification for a tension of
[80]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
22.9 KV.
May be used porcelain insulators of PIN 56-3 types and polymeric for
tension of 25KV. The isolators of type Pin shall be installed in alignment
and deflection angles of moderate topography and polymeric isolators in
terminal structures, important deflection angles and retention.
Grounding:
Grounding shall be composed by the following elements:
Electrode of pure copper of 2.4 m, 16 mm
Annealed copper conductor for the electrical ground.
Accessories for connection and fixing.
Sifted earth or of cultivation.
All structures of sectioning shall have grounding connection type
PAT-1 (with rod of 2,40m), with a value of 25 .
Structure of Measurement: Shall have a grounding connection,
selected according to its resistivity, and may be of type PAT-2.
Electrodes shall be 2,4m and 16mm , and down copper
conductor shall be of 25mm2, ground wells shall have a register
concrete box and the connection rod 16 mm and conductor Cu
25 mm shall be with connector type AB.
Sub-Station of Distribution: In the Sub-Station of Distribution shall
have a ground connection, selected according to its resistivity,
and may be of type PAT-3, which shall connect to the neutral
terminal of AT, to the neutral terminal of BT and the case.
Electrodes shall be of 2,4m and 16mm , and down copper
conductor shall be of 25mm2, ground wells shall have a register
concrete box and the connection rod 16 mm and conductor Cu
25 mm shall be with connector type AB.
Structures that do not correspond to the before mentioned, shall
have a grounding connection type PAT-1C (counterweight), for
grounding of metal accessories that support insulators.
[81]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Hardware material:
All elements of iron and Steel, like bolts, clamps and accessories of
isolators, shall be hot dip galvanized to protect against corrosion. The
mechanical properties of these elements have been defined based on
the charges which shall be subjected.
Balance of Currents
Balance of currents between phases has been performed trying that the
electrical system approaches the ideal, i.e. a balanced three phase
system.
The criteria used in the design of lines and primary networks is mainly
governed by the following codes:
[82]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Installed Maximum
Demand
Panelboard Circuit Type Power Demand
Factor
(kW) (kW)
T.D.-SAB
C-2 T.T. 66.964 --- 61.464
The Maximum Demand is 97.074 KW. With F.P. = 0.9, having a Power
of 107.86 KVA, being able to be covered by a 125 KVA commercial
transformer.
4.11.8. Calculation
[83]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Calculation of Intensity
From the formula, obtains intensity of current to transmit:
P
It
3 * V * Cos
Replacing data:
[84]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Radial distance between conductor and walls and other not accessible
structures: 2,5m.
Horizontal distance between conductor and part of the building normally
accessible to people including opening of windows, balconies and
similar places: 2,5m.
Radial distance between conductor and antennas or different types of
lightning: 3,0m.
FACTORS OF SECURITY:
According to Codigo Nacional de Electricidad, minimum factors of
security are:
Conductors : 3.0
Poles : 2.0
Crossheads : 2.0
Isolators : 3.0
Calculation of Resistance
Considering that maximum temperature of operation of conductor shall
be 40C; in consequence calculates with:
[85]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
RT (C ) R20(C ) 1 T 20
Where:
: Coefficient of lineal dilatation (0.0036 C-1)
T : Increase of temperature (20 C)
R20 C : Resistance of conductor to 20 C (1.37 Ohm/Km)
Calculation of Reactance
re = ( S/ )1/2 * 10-3
Where:
DMG (3) : Geometric Medium Diameter (m.) = (D*D*L)1/3
re : Radius Equivalent of conductor (m)
S : Section of conductor (mm)
Calculation of Impedance
Using the formula:
P * L * ( R1 X L * Tan )
%V
10 * V 2
Where:
V = Tension of line in ------------------------ 22.9 kV
L = Length of line ------------------------------- km
Z = Impedance of line ------------------------- W/Km
P = Power --------------------------- kW
[86]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
tensions.
Selection of isolators shall be designed to work in a three phase system
without any problem.
L fuga L f 0 xU MAX xf ch
Where:
Lfuga : Required Length of leakage phase-ground
Lf0 : Unitary Length of leakage in mm/kV
Umax : Maximum Tension of Service
fch : Factor of Correction by Height
fs Vmax H
Vfi
3 (1 N ) n fl
Where:
[87]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
3,92 xb msnm
log b log 76
273 t and 18336
NBI
Vi
(1 N )
Where:
NBI : Basic Level of Isolation (150 kV-BIL)
N : Number of Standard Deviations around the media (1,2)
: Standard Deviation (2%)
3,92 xb msnm
log b log 76
273 t and 18336
[88]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
For t = 27C
For m.o.s.l. = 1 000 m (d = 0,90)
Obtaining in Annex N 06 where it is determined selection of isolators.
ANNEX N 01
CALCULATION OF DMG
Vertical Configuration Triangular Configuration
R 1,41 1,41 1
1,00
S T
S
1,00
T 2
[89]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
ANNEX N 01
CALCULATION OF PARAMETERS OF LINE
Data
Section of conductor of AAAC (mm2) 2
Temperature of Operation (C ) 40
R20C (ohm/km) 0,966
Configuration 2
DMG (m) 1,25992105
re(m) 0,003337791
Cos 0,9
() 25,84193276
Frequency (Hz) 60
Length of line (km) 0,004
Tension (kV) 22,9
2.Inductive Reactance ( XL )
X_L=377(0.5+4.6Log(DMG/r_e ))10^(-4)
XL (ohm/km)= 0,465733266
GL (uS/km)= 0,000000966
GL (uS/km)= 0
G=1/R_1
[90]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
5.Capacity
CL (nF/km)= 9,391186289
C=24.2/(Log(DM
CL (uF/km)= 0,009391186
6. Susceptance
B=24.2/(Log(DMG/r_e ))10^(-
B (S/km)= 3,5404E-06
B (uS/km)= 3,540393822
7. Admittance
Y (S/km)= 3,54039382249093E-06i
X_L=L =2f
L (H/km)= 0,001235396
10. Summary
Longitudinal Parameters
Resistance= R1 = 1,035552 Ohm/km 0,004142208 Ohms
Inductance= L= 0,001235396 H/km 4,94158E-06 Henry
Transversales Parameters
Capacitance= CL = 9,391186289 nf/km 0,037564745 nano faradios
Conductance= GL = 0 us/km 0 micro siemens
[91]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
ANNEX N 01
CALCULATION OF ELECTRICAL MOMENT
u U2
M Elect P*L *( )
100 R1 X L * Tg
Data:
R1 (ohm/km)= 1,035552
XL (ohm/km)= 0,465733266
Cos 0,9
() 25,84193276
u ( %) 2,4400
Length of the line (km) 0,004
U ( kV) 22,9
1. Electrical Moment
2. Power of Transport
P = 2536,562 MW
3. Power loss
100 * R1 * P
p% p%= 618,3884606
U 2 * Cos 2
In line of 0,004 km p%= 2,4736
p = 62,743222 MW
p = 62743,2220 kW
[92]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
ANNEX N 02
1.Data
Method Germany Code VDE103
Power of shorcircuit in the finite of fail (MVA) 250
Minimum Tension of the network (kV) 22,9
Time of elimination of fail (s) 0,2
Relation R/X 0,3
Relation between Icco/I.ccp
I.subtransitory /I.permanent 0,2
Pcc
I cco
3 * Vmin
Icco (kA) = 6,30
R/X 0,3
m 0 (tabla a)
n 0,85 (tabla b)
4. Calculation of Im
I m I cco * (m n) * t
Im (kA) = 2,60
6. Minimum Section
Im
A 28,56 mm2
7.Conclussion
[93]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[94]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[95]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
ANNEX N 3
Al circular una corriente en el conductor produce una cierta cantidad de calor por efecto joule. Cuando el sistema se
encuentra en regimen, todo el calor producido es disipado parte por conveccion, parte por radiacion.
Wc=(95.5PVT)/((T_a+T/2)^0.125D)
Wr=5700Em(((T_a+T)/1000)^4-(T_a/1000)^4)
Where:
Wc = Dissipated heat for convention in (W/m2) T= Over temperature of conductor respect to environment (K)
P = Pressure in (atm) D = Diameter of conductor in (mm)
V = Velocity of air in (km/h) Wr = Dissipated heat for radiation in (W/m2)
Ta = Absolute Temperature of environment in ( K) Em = Emissivity of conductor
Data
A=Area of conductor (mm2) 2
V= Velocity of air in (km/h) 75
P= Pressure in ( kg/m2) 23,625
P= Pressure in ( atm) 0,002287306
Ta= Reference temperature of conductor in (C) 20
Ta= Reference temperature of conductor in (K) 293
D= Diameter of conductor in (mm) 7,5
Em= Emissivity of conductor 0,38
T= Over temperature of conductor respect to environment (C) 20
T= Over temperature of conductor respect to environment (K) 293
[96]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
3 .Resistance of conductor
R=R0 (1+(T+T-T0 ))
Where:
R0= Resistance of reference temperature (Ohm/km) 0,966
T0=Reference temperature of conductor (C) 20
a=Coefficient of increase of resistivity (1/C) 0,0036
I=(D((Wc+Wr)/R))
I (Amp)= 224,60
NOTE: OK
Current to transport shall be less or iqual to this admissible current of selected conductor.
Conclussion :
So using section of 35mm2 es feasible
[97]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
ANNEX N 04
CALCULATION AND SELECTION OF TRANSFORMER
Cos 0,90
Calculated Capacity of Transformer 125,00
Selected Capacity of Transformer (kVA) 125,0
OK
CALCULATION OF CURRENT INTENSITY
I_t=P/(3VCos)
Primary Winding
Power of Transformer S 125,00 kVA
Intensity of Current It = 3,15
Power to transmit P 112,5 kW
Tension of service V 22,9 kV
Power factor Cos 0,90
So commercial fuse = 3 A
IT = 250 A
[98]
ANNEX N 5
0 0,0 0,0 112,5 IQUITOS Trifsico 35 0,000 3-1x35 3 35 2,390 0,00000 0,00000
[99]
1 125,0 112,5 112,5 IQUITOS Trifsico 35 0,004 3-1x35 3 35 2,390 0,00011 0,00011
TRUJILLO, PERU
W91278-13-D-0012 TO 0001
22.9/0.38-0.22kV
D/B EMERGENCY OPERATIONS CENTER
4 m 1
0 STB
projected
SUBMITTAL 100%
DESIGN ANALYSIS
EOC / DRW AT IQUITOS
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
ANNEX N 06.A
ISOLATOR PIN
1. PREMISES
2. FORMULAS
Fvc=VbcPvCos(/2) F_t=(273+T)/313
U=2.1(V_nF_corr+5)
Tc=2TmaxSen(/2) F_h=1+1.25(h-1000)10^(-4)
Fc=Fvc+Tc F_corr=F_tF_h
Q=CsFc L=(V_nF_corrM)/(N)
[100]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
3. RESULTS
4. CONCLUSSIONS
Mechanical Characteristics
Resistance (kN) 13 OK
Electrical characteristics
Typical Voltage of aplication (kV) 33
Flameo of low frequency in dry (kV) 125
Flameo of low frequency in wet (kV) 80
Critical flame of positive impulse (kVp) 200
Critical flameo of negative impulse (kVp) 265
Voltaje de perforation of low frequency (kV) 165
[101]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
ANNEX N 07
CALCULATION OF LIGHTNING
1. PREMISES
2. FORMULAS
V_n=K_eV_max L_f=G_a(F_h(Umax)/3)
I_d=(2NBI)/Z F_h=1+1.25(h-1000)10^(-4)
3. RESULTS
4. SELECTION OF LIGHTNING
[102]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
ANNEX N 08
CALCULATION AND SELECTION OF FUSES - EXPULSION TYPE ( CUT-OUT )
1.Line Diagram
F
125kVA
Source Load
I= 3,15
2.Data of transformer
System: Trifasico
Tension (kV) : 22,9
Power (kVA) : 125
Cos : 0,9
Power (kW): 112,5
Current (A): 3,15
Z%: 3,00%
Icc (A) : 105,05
k : 1,25
3.Calculation Formulas
kI_(carga max)<I_pf<0.25I_(CC.min)
I_pf=1.5I_n
k1.2
Donde:
k: Factor de crecimiento de la carga , considera la energizacion
4. Results
Type: 3K
In ( A ) : 3 OK OK
6. Selection of Sectioner
It is the equipment that contains fuse expulsion type mentioned before
Characteristics shall be for the level of final tension of the electrical system
[103]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
ANNEX N 09
4* L 0,016 2,4
R * ( Ln( ))
2* * L r
R = 4,70 Ohms
2L 4h 3L 2h>L
R 0.366 * * Log *
L d 4h L
0,016 2,4
R = 3,93 Ohms
[104]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
ANNEX N 10
CALCULATION AND SELECTION OF TRAFOMIX
1. Denomination: TMEA33
Point of Design
4.Transformers of Current:
Relation of Transforming:
Current of Primary (A): 3,2
Current of Secondary (A): 5
Number of Current Coils: 3
5.Transformers of Tension:
Relation of Transforming:
Nominal Tension of primary winding (kV): 22,9
Nominal Tension of secondary winding (kV): 0,22
Number of tension coils: 3
6.Selection of Trafomix
7. Denomination: TMEA33
9.Transformers of Current:
Relation of Transforming:
Current of Primary (A): 3,5 OK
Current of Secondary (A): 5
Number of current coils: 3
10.Transformers of Tension:
Relation of Transforming:
Nominal Tension of primary winding (kV): 22,9
Nominal Tension of secondary winding (kV): 0,22
Number of tension coils: 3
[105]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Considered Hypothesis
For mechanical calculation of conductors, it was established the
hypothesis of calculation according to Codigo Nacional de Electricicad
(Supply) for normal conditions, maximum effort, maximum wind,
maximum deflection, and although that in the project area there is no
presence of ice was taken into account the condition of only ice. Table
N 3 shows the considered hypothesis.
Table N 3
Hypothesis of Calculation
I II III IV V
Minimum
Minimum Temperature Maximum
Hypothesis Medium Maximum
Temperatur and Temperatur
EDS Load of Ice
e Maximum e
Wind
Temperature 25 0 15 5 50 (40+10)
Velocity
0 0 75 50 0
of Wind
Thickness
0 0 0 0 0
of Ice
Tempered
18%TR 0%TR 60%TR 0%TR 40%TR
effort
As indicated, tension for each day or Initial EDS has taken equal to 18%
of breakage shot and final EDS equal to 15%, which is usual for primary
lines in Semi Tropical Weathers. With these hypotheses of calculation it
has been determined tables of horizontal shot, maximum and deflection
of vano for five hypotheses (See Annex N 01 Mechanical
Calculation).
[106]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[107]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
H Total Height m 13
Q Effort on the top Kg 400
Cs Coefficient of Security 2
Characteristics of conductor:
Section 35mm2
Material AAAC
Load of breakage 1055.36 kg
Weight 94 Kg/Km
Exterior diameter 7.5 mm
Considered equations
For calculation were used the following formulas:
Diameter of embedment:
D1 = Do + (h/H)*(D2-Do)
Height of in where force of the wind is applied:
Z = (h/3)*(D1 + 2DO)/(D1 + Do)
Load produced by wind on the pole:
Fvp = Pv * (h* (Do + D1))/2
Momento of the wind on the pole:
Mvp = Fvp*Z
Load produced by the wind on the conductor:
Fvc = Pv*L*(/1000)* Cos(/2)
Traction of conductors:
Tc = 2*a*A*Sen(/2)
Force because of conductor son Poles:
Fc = Fvc + Tc
Moment of conductor on Pole:
Mc = Fc *1
Resulting Total Moment:
[108]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Mt = Fc*1 + Fvp*Z
Total Force on Pole:
Fp = Mt/hp
Where:
H = Total Length of Pole in m
h = Free Length of Pole exposed to wind in m
hp = Height over terrain by a distance of 10cm
from the upper end of Pole in: m
L = Average Vano in m
A = Section of conductor in mm
Pv = Pressure because of wind, in Kg/m
Z = Point of application of Fvp, in m
= Exterior diameter of conductor, in mm
Calculation of brackets
Results of calculation are shown in Annex N 05 of mechanical
calculation.
Calculation of foundation
Results of calculation are shown in Annex N 03 of mechanical
calculation.
[109]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
ANNEX 01
Hypothesis MEDIA EDS (HIP. 1 ) Min. tem perature (HIP 2) Min. Tem . y Max. Wind (HIP 3) Maxim um C. Ice (HIP 4) Max. Tem perature (HIP 5)
T(C) 25 0 15 5 50 (40 + 10)
V(km /h) 0 0 75 50 0 Por CREEP
e (m m ) 0 0 0 0 0
(Kg/mm2) 5,43 18,09 12,06
18%TR 60%TR 40%TR
(2)^2*(2-+ *E*(t2-t1)+(d^2*E*Wr^2)/(24*S^2*^2))=(d^2*E*(Wr2)^2)/(24*S^2)
[110]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
TABLE OF TENSOR
(Arrow in meters)
TC / Vano 0 5 10 15 20 25 30 35 40 45 50
20 0,015 0,016 0,018 0,020 0,022 0,025 0,028 0,033 0,040 0,051 0,066
25 0,023 0,025 0,028 0,031 0,034 0,039 0,044 0,052 0,063 0,078 0,100
30 0,034 0,037 0,040 0,044 0,049 0,056 0,064 0,075 0,089 0,110 0,139
35 0,046 0,050 0,055 0,060 0,067 0,076 0,087 0,101 0,121 0,147 0,183
40 0,060 0,065 0,071 0,079 0,088 0,099 0,113 0,132 0,156 0,189 0,232
45 0,076 0,083 0,091 0,100 0,111 0,125 0,143 0,166 0,196 0,234 0,284
50 0,094 0,103 0,112 0,124 0,137 0,155 0,176 0,204 0,239 0,284 0,340
55 0,114 0,124 0,136 0,150 0,166 0,187 0,213 0,245 0,286 0,337 0,399
60 0,137 0,148 0,162 0,178 0,198 0,223 0,253 0,290 0,337 0,394 0,462
65 0,161 0,174 0,191 0,210 0,233 0,261 0,296 0,339 0,392 0,455 0,528
70 0,187 0,203 0,222 0,244 0,271 0,303 0,343 0,391 0,449 0,518 0,597
75 0,215 0,234 0,255 0,281 0,311 0,348 0,392 0,446 0,510 0,585 0,669
80 0,246 0,267 0,291 0,320 0,355 0,396 0,445 0,505 0,575 0,655 0,744
85 0,278 0,302 0,330 0,362 0,401 0,447 0,502 0,567 0,642 0,728 0,822
90 0,313 0,340 0,371 0,407 0,450 0,501 0,561 0,632 0,713 0,804 0,902
95 0,351 0,380 0,415 0,455 0,502 0,558 0,624 0,700 0,786 0,882 0,986
100 0,390 0,423 0,461 0,505 0,558 0,619 0,690 0,771 0,863 0,964 1,072
105 0,432 0,468 0,510 0,559 0,616 0,682 0,758 0,846 0,943 1,049 1,161
110 0,476 0,516 0,562 0,615 0,677 0,748 0,830 0,923 1,025 1,136 1,253
115 0,523 0,566 0,616 0,674 0,741 0,818 0,905 1,003 1,111 1,226 1,347
120 0,572 0,619 0,674 0,736 0,808 0,891 0,984 1,087 1,199 1,319 1,444
125 0,624 0,675 0,734 0,802 0,879 0,966 1,065 1,173 1,291 1,415 1,544
130 0,678 0,734 0,797 0,870 0,952 1,045 1,149 1,263 1,385 1,513 1,646
135 0,735 0,795 0,863 0,941 1,029 1,127 1,236 1,355 1,482 1,615 1,751
140 0,794 0,859 0,932 1,015 1,108 1,212 1,327 1,450 1,582 1,719 1,859
145 0,857 0,926 1,004 1,092 1,191 1,300 1,420 1,549 1,684 1,825 1,969
150 0,922 0,996 1,079 1,173 1,277 1,392 1,516 1,650 1,790 1,935 2,082
155 0,990 1,069 1,158 1,256 1,366 1,486 1,616 1,754 1,898 2,047 2,198
160 1,061 1,145 1,239 1,343 1,458 1,583 1,718 1,861 2,009 2,162 2,316
165 1,135 1,224 1,323 1,433 1,553 1,684 1,824 1,971 2,123 2,279 2,437
170 1,212 1,307 1,411 1,526 1,652 1,788 1,932 2,083 2,240 2,400 2,561
175 1,292 1,392 1,502 1,623 1,754 1,894 2,043 2,199 2,359 2,523 2,687
180 1,376 1,481 1,596 1,722 1,858 2,004 2,158 2,317 2,482 2,648 2,816
185 1,462 1,572 1,693 1,825 1,966 2,117 2,275 2,439 2,607 2,777 2,948
190 1,552 1,668 1,794 1,931 2,078 2,233 2,395 2,563 2,735 2,908 3,082
195 1,645 1,766 1,898 2,040 2,192 2,352 2,519 2,691 2,866 3,042 3,219
200 1,741 1,868 2,005 2,153 2,309 2,474 2,645 2,821 2,999 3,179 3,359
205 1,841 1,973 2,116 2,269 2,430 2,599 2,774 2,954 3,136 3,319 3,502
210 1,944 2,081 2,230 2,388 2,554 2,728 2,907 3,090 3,275 3,461 3,647
215 2,050 2,193 2,347 2,510 2,681 2,859 3,042 3,229 3,417 3,606 3,794
220 2,160 2,309 2,468 2,636 2,812 2,994 3,180 3,370 3,562 3,754 3,945
225 2,273 2,428 2,592 2,765 2,945 3,131 3,322 3,515 3,710 3,904 4,098
230 2,390 2,550 2,719 2,897 3,082 3,272 3,466 3,663 3,860 4,058 4,254
235 2,511 2,676 2,850 3,033 3,222 3,416 3,613 3,813 4,014 4,214 4,413
240 2,635 2,805 2,985 3,172 3,365 3,563 3,764 3,967 4,170 4,373 4,575
245 2,762 2,938 3,122 3,314 3,511 3,713 3,917 4,123 4,329 4,535 4,739
250 2,893 3,074 3,263 3,459 3,661 3,866 4,073 4,282 4,491 4,699 4,906
[111]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
ANNEX N 02
CALCULATION OF SPIGOTS
2,86
It has considered the characteristics of steel A36;
manufactured by SIDERPERU. 170,00
1. Mechanical Characteristics
20,3
Effort of fluency ( f ) 36 o 25 kg/mm2
Maximum Effort of work ( t ) 0.6f o 15kg/mm2
2. Formulas
t
M *C
IX
M P*h
*d4 t
32 P * h
IX
*( 3 )
d
64
d ( t * * d 3 )
C P
2 32 * h
P ( kg ) = 170,00
4. Conclussions
So for maximum shot; that shall support spigot of isolator PIN 56-3 es 170 kg
[112]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
ANNEX N 03.B
CALCULATION OF FOUNDATION FOR STRUCTURES OF 13/400
P 4P
Fp h t a Cbt 3
2 3b
2.-Premises
1,7
P Pposte Pc PEquipo Pm Db 2
A2
3.-Results 4
A1= 0,08788 m2
A2= 0,10 m2
Vt= 0,16 m3
Vm= 1,90 m3
Pm= 3825,6 Kg
P= 5526,8 Kg
Cs= 1,7835851 OK
[113]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
ANNEX 04
MECHANICAL CALCULATION OF STRUCTURES 13/400 PRIMARY NETWORK
A c L H
Db Dp De Dp Fc Fvc Tc
Hpv
[114]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
C.- LEGEND
SYMBOL DESCRIPTION
Apv Area of Pole exposed to wind (m2 )
Fc Total force on conductor (kgf)
Fp Force on the top of Pole (kgf)
Fvc Force of wind on conductor (kgf)
Fvp Force of wind on Pole (Kg)
Hc Height of application of Fc (mts)
Hpv Height of Pole exposed to wind (mts)
Mt Total Moment (kg-m)
Mc Moment because of wind on conductor (kg-m)
Mvp Moment caused by Fvp (kg-m)
T Maximum shot work of conductor (kgf)
Tc Traction of conductors on Pole (Kgf)
Z Height of application of Fvp (mts)
Pv Pressure of wind (kgf/m2)
a Tc Fvc Fc Mc Mt Fp
grades sex() Kg Kg Kg Kg-m Kg-m Kg
0 0,000 8,930 8,930 99,126 433,223 38,681
5 21,921 8,922 30,843 342,355 676,452 60,398
10 43,800 8,896 52,697 584,933 919,030 82,056
15 65,596 8,854 74,450 826,397 1160,494 103,616
20 87,267 8,795 96,062 1066,289 1400,386 125,034
25 108,772 8,719 117,491 1304,150 1638,247 146,272
30 130,070 8,626 138,696 1539,529 1873,626 167,288
35 151,121 8,517 159,638 1771,978 2106,075 188,042
40 171,883 8,392 180,275 2001,053 2335,150 208,496
45 192,319 8,250 200,569 2226,319 2560,416 228,609
50 212,388 8,094 220,482 2447,348 2781,445 248,343
55 232,053 7,921 239,975 2663,717 2997,814 267,662
60 251,277 7,734 259,010 2875,016 3209,113 286,528
65 270,022 7,532 277,553 3080,843 3414,940 304,905
70 288,253 7,315 295,568 3280,805 3614,902 322,759
75 305,935 7,085 313,020 3474,521 3808,618 340,055
80 323,035 6,841 329,876 3661,624 3995,721 356,761
85 339,520 6,584 346,104 3841,756 4175,853 372,844
90 355,359 6,315 361,674 4014,576 4348,673 388,274
180 502,553 0,000 502,553 5578,342 5912,439 527,896
[115]
60 60 60
60 min ROTULO
MF / XY T/F/V
85 min
130 min
50
ANNEX N 05.A
CALCULATION AND SELECTION
7 AGUJEROS DE 20 mm OF THE BRACKET
V
Ln 50 min
L 60 min
ROTULO
MF / XY
T/F/V
MENSULA
DEL AGUJERO PARA MONTAJE,
T SEGUN UBICACION EN POSTE Designacin
70 min
M / Ln / T
130 min
2 AGUJERO DE 20 mm
I .DATA
Overview Conductor
Wind Vano (Eolovano) 70 m Material AAAC
Weight Vano (Gravivano) 70 m Section 35 mm2
Maximum Lateral Vano 70 m Diameter of conductor 7,5 mm
Angle of Line 5 Weight of conductor 0,094 kg/m
Velocity of Wind 70 Km/h Breaking shot of conductor 1110 kg
Pressure of Wind 20,58 kg/m2 Maximum shot of conductor 370,00 kg
IV.SELECTION DE BRACKET
.
M/1.00/250
[116]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[117]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[118]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
5.1. OVERVIEW
With this purpose, it is projected to install TWELVE (12) air conditioning equipment
Split Type which capacities are based on the facilities to be air conditioned which
are detailed in schedule of Annex 01.
The evaporator units are most Spilt Wall type and some Split Ceiling Type;
these have the function of lowering the temperature of the indoor environment to a
feeling of pleasant climate within a selected temperature. The Condensing units
are located on the outside of the building to meet the cooling process.
Calculation of this process of air conditioning required for each facility was applied
according to the following parameters:
Constant, K (10.76)
Formula:
[119]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
5.3. FEATURES
The technical and physical features of the equipment of air conditioning are
detailed in Annex 03.
These are cooper pipes that connects the Evaporator unit with the
Condensing unit, carrying refrigerant gas at different states (Liquid and
gaseous), diameter of these pipes is determined by the capacity of the
equipment to be used and are lined to its fullest extent by thermal
insulation (Armaflex) avoiding isotropic lost. Pipes mentioned runs through
the attic space (between roof and ceiling) until they leave the compartment
to the outside where in its path to the Condensing unit are coated with
metal channels. The path of this channels is indicated in the respective
drawings.
Thermal effect by passing the air through the heat exchanger of the
Evaporator Unit generates the accumulation of water that must be drained
to the outside, for which the equipment comes with a sleeve to be inserted
into an outlet of 3/4 " diameter and carried through PVC pipes 3/4" to a
[120]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
drain pipe from 1 "to 1.1/2" according to how many evaporator units
receives.
This drainage will join the storm drainage system. Normally these pipes
are in sight, coated with metal channels, but if it is necessary to embed
these must be lined with thermal insulation to prevent moisture in walls.
5.4. ANNEXES
[121]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[122]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[123]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[124]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
6.1. OVERVIEW
The property is located by the road to Nauta; approximately 17,5 Kms to the
southwest side of the city, in the property were operating offices, a laboratory,
sand dryer and a sand collection area, nowadays there are any facilities operating
and the terrain is empty of any construction.
The property is located to an average elevation of 102.50 meters above the sea
level.
6.2. COMPONENTS
The project consists of the following systems: Storage, Cold and Hot water
systems, Fire Protection System and Sewer System.
6.4. ENDOWMENT
6.4.1. Demand
[125]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
With these values daily endowment for EOC Iquitos equals to a daily
average flow of 0.163 lps and a per capita endowment of 158,61
lit/hab/day, considering a total of 85 user people in the facilities. Will be
assumed as a contribution to the sewer system, the 80% of consumption
from all facilities, without considering garden irrigation and parking area
demands:
N1 SSHH MALE 1 2 2 1 1 6
N1 SSHH FEMALE 1 2 2 1 1 6
N1 SSHH 0
N1 ADMINISTRACION 2 2
N2 BREAK 1 1 1
N2 MALE 1 2 1 1 1 1 6
N2 FEMALE 1 2 2 1 1 6
N2 ADMINISTRACION 1 1 1 1 3
SUB
1 8 8 1 5 1 0 4 28
TOTALES
UH SUB
TOTAL
5 64 16 3 20 5 0 0 113
UH COLD
WATER
5 64 12 2 15 5 0 103
UH HOT
WATER
0 0 12 2 15 0 0 29
UH SEWER 4 64 16 2 15 8 8 117
Adding up spending units, (for water), and discharge units, (for sewer), we
have values of simultaneous maximum demands:
[126]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Elevated water tank storage, both EOC Iquitos demands, as fire protection
demands. To separate both, outlet of supply pipes in the elevated tank area in
different levels.
To supply demands of fire protection system, it is included in the elevated water
tank a volume of 22,71m3, which satisfy the indicated requirement in the National
Regulation for Construction, it means, that supply per 30 minutes of two fire
protection cabinets, which use hoses of 30,00m length. The facility is considered
as soft risk building, this is why it is defined the mentioned parameters.
[127]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
6.6.1. Feeding
Feeding, actually shall be the impulsion line, which comes from the water
pump unit to the elevated water tank, by a pipe PVC C10, buried and with
a diameter of 1 .
Supply pipes of the cold and hot water systems (PVC and CPVC),
according to the case, shall be embedded, wall mounted, and/or hanged
from slabs in the second floor, whichever corresponds. Pipes shall be
class 10. Accessories shall be the same class and brand of pipes.
Fittings elements for hanged pipes and its spacing are defined in the
specifications in the respective drawings.
All sanitary fixtures, (except flush toilets and flus urinals), shall be supplied
by elevated water tank. For design it has been used Hunter units method
for public service use. Calculation has been performed by the software
Water Cad. Pressures in each fixture are inside the range established by
the RNE, it means pressures higher to 2,00m and lower than 50,00m of
water column (MCA), except for the fire protection system, where it is
required pressures higher than 45 MCA.
For toilets and urinals with flush meter, it has been designed a pressurized
system that provides a pressure higher than 20 psi, equal to 14 MCA, for
this it is used the independent hydro pneumatic tank, of 105 liters volume
and with an outlet pressure of 40,00 MCA.
Distribution network for flush meter fixtures shall have iron pipes SCH40.
[128]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Pipes for hot water are CPVC type, class 10, and are embedded or
attached to walls, and hanged from slabs of the first floor.
[129]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
It is defined two scenarios of fire in the facilities of EOC and DRW Iquitos,
with the objective to evaluate the operation and pressure in the network.
Pipe for fire protection, which supplies fire protection cabinets, shall be of
Steel SCH 40, hanged from slab of first floor, and/or embedded in walls,
whichever is applicable. Pipes for siamese oulets, of PVC or HDP, shall be
buried and listed.
Pumps for fire protection system shall be of recognized rand, listed and
comply with codes NFPA 20 (for pump stations).
The main pump shall be 20HP, with a pump flow of 12,62 LPS and a total
dynamic height (HDT) of 51,60m.
Jockey pump shall be 1HP, with a pump flow of 0,63 LPS and a HDT of
55,00m.
[130]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Pipes for interior sewer system (inside bathrooms and services), shall be
PVC-SAP (heavy duty) and accessories of the same brand and type like
piping.
Hanged pipes have support elements which type and spacing are detailed
in specifications in drawings.
Exterior pipes of 6 are flexible joint type are flexible joint with rubber
rings in the joints.
Ventilation pipes are PVC type, with diameters that varies between:
[131]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Derivations of ventilation shall end at least 0,30m above the top of the roof
and shall have respective ventilation hats. Holes generated in roof, for
ventilation pipes going through, shall be sealed or waterproofed so that
rainwater does not leak through joints between metal roof panels and pipe.
Showers and sumps, necessarily shall have trap P. Supervisor shall not
permit connections of these points, only with 90 bents.
Calculation for storm drainage used the rational method, that according to RNE,
applies to zones of less than 13 km2.
The values of constants and design data, for a period of 50 years, from zone maps
and pluviometric sub zones, defined in the RNE.
Intensity of rainfall calculated in mm/hour (3,78), is lower to recommended
(150mm/hour), even assuming a security factor of 4,0. However, characteristics of
canal may support until 0,083 m3/sec.
Galvanized metal gutters, projected to collect water from roof, have 6 inches
diameter in the semicircular base. Rectangular gutter of 0,20m width base, can
also be used.
Downspouts, and horizontal pipe connection between downspout and storm
drainage canal, shall be PVC rigid of 6 diameter, with push-on type joint.
Slope for horizontal pipes shall be 1%.
Slope for main drainage canal (trapezoidal), is 0,5%.
6.10. CALCULATION
[132]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
DOTACIONES
CLASIFICACION DOTACIONES RNE Dotacin (Lit/da)
c) Establecimientos de hospedaje 500.00
f) Instituciones Educativas 4,250.00
g) Espectculos y centros de reunin 156.00
i) Oficinas 1,671.22
j) Depsitos 436.00
r) Bares, Fuentes de Soda, Cafs, etc. 1,500.00
Agua para riego / segn caso 1,885.92
Estacionamientos 3,717.24
TOTAL DOTACION 14,116.37
To determine maximum demand of cold water for EOC /DRW Iquitos shall
apply the possible spending method (Hunter Units), so it has been used
the total number of sanitary fixtures in the building.
Reserve 0,97 m3
TOTAL STORAGE: 37,80 m3
[133]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
The fire protection system is supplied from the bottom of the elevated
water tank, by 02 pipes, (one for each chamber), with 3. These
elements, to the outlet in the elevated water tank have a derivation to the
storm drainage system, which shall use as a cleaning pipe.
[134]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
TANQUE HIDRONEUMATICO
POTENCIA DE LA BOMBA
113 UH
H.P.= ( Qb x Hdt ) / ( n x 75) ) MAXIMA DEMANDA SIMULTANEA 2.64 LPS
158.16 LPM
Qb = 2.64
POTENCIA DE BOMBA 1.15 HP HDT = 23.00
Valor comercial 1 HP n (%) = 70.00%
0.75 KW
[135]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[136]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
137 P-52 0.10 J-38 Ind-J-42 29.40 PVC 140 1 1.47 0.091
139 P-53 1.01 J-29 J-43 54.20 PVC 140 1.83 0.79 0.014
140 P-54 2.26 J-43 J-30 54.20 PVC 140 1.7 0.74 0.012
Diam,
ID Pipe L= (m) N Start N Final Material H&W Q (L/s) V (m/s) GradHidr (m/m)
(mm)
142 P-55 1.29 J-43 J-44 43.40 PVC 140 0.48 0.32 0.003
146 P-57 0.37 J-45 J-46 17.40 PVC 140 0.12 0.5 0.023
148 P-58 0.08 J-46 Dch-J-47 17.40 PVC 140 0.12 0.5 0.023
150 P-59 0.4 J-29 J-48 29.40 PVC 140 0.74 1.09 0.052
152 P-60 0.33 J-48 J-49 29.40 PVC 140 0.74 1.09 0.052
154 P-61 0.40 J-49 J-50 29.40 PVC 140 0.74 1.09 0.052
156 P-62 0.25 J-50 J-51 29.40 PVC 140 0.74 1.09 0.052
158 P-63 1.01 J-51 J-52 29.40 PVC 140 0.74 1.09 0.052
160 P-64 0.37 J-52 J-53 43.40 PVC 140 0.5 0.34 0.004
162 P-65 0.50 J-53 J-54 17.40 PVC 140 0.12 0.5 0.023
164 P-66 0.13 J-54 Dch-J-55 17.40 PVC 140 0.12 0.5 0.023
166 P-67 0.37 J-44 J-56 17.40 PVC 140 0.12 0.5 0.023
168 P-68 0.05 J-56 Dch-J-57 17.40 PVC 140 0.12 0.5 0.023
170 P-69 1.96 J-53 J-58 43.40 PVC 140 0.38 0.26 0.002
172 P-70 1.48 J-58 J-59 22.90 PVC 130 0.12 0.29 0.007
181 P-76 0.55 J-59 J-62 17.40 PVC 140 0.12 0.5 0.023
183 P-77 0.12 J-62 Dch-J-63 17.40 PVC 140 0.12 0.5 0.023
185 P-78 1.29 J-30 J-64 54.20 PVC 140 1.7 0.74 0.012
186 P-79 3.44 J-64 J-37 54.20 PVC 140 1.3 0.56 0.008
188 P-80 0.54 J-64 J-65 29.40 PVC 140 2 2.95 0.328
190 P-81 0.10 J-65 Ind-J-66 29.40 PVC 140 1 1.47 0.091
192 P-82 0.98 J-65 J-67 29.40 PVC 140 1 1.47 0.091
194 P-83 0.1 J-67 Ind-J-68 29.40 PVC 140 1 1.47 0.091
196 P-84 2.49 J-52 J-69 29.40 PVC 140 0.24 0.35 0.006
200 P-86 1.19 J-70 J-71 22.90 PVC 140 0.12 0.29 0.006
202 P-87 0.52 J-71 J-72 17.40 PVC 140 0.12 0.5 0.023
204 P-88 0.17 J-72 Lvd-J-73 17.40 PVC 140 0.06 0.25 0.006
206 P-89 0.49 J-69 J-74 22.90 PVC 140 0.24 0.58 0.022
207 P-90 3.44 J-74 J-70 22.90 PVC 140 0.12 0.29 0.006
209 P-91 1.19 J-74 J-75 22.90 PVC 140 0.12 0.29 0.006
213 P-93 0.17 J-76 Lvd-J-77 17.40 PVC 140 0.06 0.25 0.006
215 P-94 0.52 J-75 J-78 17.40 PVC 140 0.12 0.5 0.023
216 P-95 0.70 J-78 J-76 17.40 PVC 140 0.06 0.25 0.006
218 P-96 0.17 J-78 Lvd-J-79 17.40 PVC 140 0.06 0.25 0.006
220 P-97 1.27 J-64 J-80 22.90 PVC 140 0.12 0.29 0.006
222 P-98 0.12 J-80 J-81 22.90 PVC 140 0.12 0.29 0.006
226 P-100 0.10 J-82 Lvd-J-83 17.40 PVC 140 0.06 0.25 0.006
231 P-102 1.82 J-44 J-86 43.40 PVC 140 0.42 0.28 0.003
232 P-103 1.62 J-86 J-45 22.90 PVC 140 0.12 0.29 0.006
234 P-104 1.01 J-86 J-87 43.40 PVC 140 0.36 0.24 0.002
236 P-105 1.01 J-58 J-88 43.40 PVC 140 0.26 0.18 0.001
238 P-106 1.72 J-21 J-89 54.20 PVC 140 2.242 0.97 0.021
239 P-107 12.54 J-89 J-24 54.20 PVC 140 2.206 0.96 0.02
241 P-108 3.13 J-89 J-90 22.90 PVC 140 0.12 0.29 0.006
243 P-109 18.65 J-90 J-91 22.90 PVC 140 0.12 0.29 0.006
245 P-110 19.83 J-91 J-92 22.90 PVC 140 0.12 0.29 0.006
[137]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
247 P-111 1.53 J-92 J-93 22.90 PVC 140 0.12 0.29 0.006
249 P-112 0.25 J-93 GR94 22.90 PVC 140 0.12 0.29 0.006
255 P-115 0.10 J-96 Ind-J-97 29.40 PVC 140 1 1.47 0.091
258 P-117 1.02 J-98 J-96 29.40 PVC 140 -1 1.47 0.091
260 P-118 0.10 J-98 Ind-J-99 29.40 PVC 140 1 1.47 0.091
Diam,
ID Pipe L= (m) N Start N Final Material H&W Q (L/s) V (m/s) GradHidr (m/m)
(mm)
264 P-120 0.1 J-100 Lv-J-101 17.40 PVC 140 0.06 0.25 0.006
267 P-122 0.84 J-102 J-100 29.40 PVC 140 -1.06 1.56 0.101
269 P-123 0.10 J-102 Lv-J-103 17.40 PVC 140 0.06 0.25 0.006
271 P-124 1.21 J-23 J-104 54.20 PVC 140 2.012 0.87 0.017
276 P-127 0.15 J-105 J-106 22.90 PVC 140 0.12 0.29 0.006
278 P-128 0.05 J-106 Dch-J-107 17.40 PVC 140 0.12 0.5 0.023
285 P-130 0.90 J-96 J-112 29.40 PVC 140 -1.22 1.8 0.131
287 P-131 0.75 J-112 J-113 29.40 PVC 140 1 1.47 0.091
289 P-132 0.81 J-113 J-114 29.40 PVC 140 0.12 0.18 0.002
291 P-133 0.84 J-114 J-115 17.40 PVC 140 0.06 0.25 0.006
293 P-134 0.10 J-115 J-116 17.40 PVC 140 0.06 0.25 0.006
295 P-135 0.10 J-114 J-117 17.40 PVC 140 0.06 0.25 0.006
297 P-136 0.10 J-113 U-1 29.40 PVC 140 0.91 1.34 0.076
300 P-138 4.41 J-119 J-105 29.40 PVC 140 0.12 0.18 0.002
301 P-139 1.72 J-112 J-119 29.40 PVC 140 -1.42 2.09 0.174
302 P-140 2.59 J-119 J-104 29.40 PVC 140 -1.48 2.18 0.188
306 P-142 0.35 J-120 J-121 17.40 PVC 140 0.12 0.5 0.023
308 P-143 0.08 J-121 Dch-J-122 17.40 PVC 140 0.12 0.5 0.023
323 P-150 2.86 J-104 J-130 54.20 PVC 140 1.515 0.66 0.01
324 P-151 1.96 J-130 J-120 17.40 PVC 140 0.12 0.5 0.023
339 P-159 1.72 J-130 J-137 29.40 PVC 140 1.395 2.05 0.168
341 P-160 0.42 J-137 J-138 29.40 PVC 140 0.38 0.56 0.015
343 P-161 0.32 J-138 J-139 29.40 PVC 140 0.38 0.56 0.015
345 P-162 0.38 J-139 J-140 29.40 PVC 140 0.38 0.56 0.015
347 P-163 1.98 J-140 J-141 29.40 PVC 140 0.12 0.18 0.002
349 P-164 2.49 J-141 J-142 29.40 PVC 140 0.12 0.18 0.002
352 P-166 0.16 J-142 Dch-J-143 17.40 PVC 140 0.12 0.5 0.023
353 P-167 0.26 J-100 J-137 29.40 PVC 140 -1.12 1.65 0.112
356 P-169 0.90 J-144 J-102 29.40 PVC 140 -1 1.47 0.091
358 P-170 0.10 J-144 Ind-J-145 29.40 PVC 140 1 1.47 0.091
360 P-171 0.42 J-140 J-146 54.20 PVC 140 0.32 0.14 0.001
362 P-172 6.72 J-146 J-147 22.90 PVC 140 0.25 0.61 0.024
366 P-174 3.28 J-148 J-149 22.90 PVC 140 0.12 0.29 0.006
368 P-175 0.45 J-149 J-150 17.40 PVC 140 0.12 0.5 0.023
370 P-176 0.13 J-150 Dch-J-151 17.40 PVC 140 0.12 0.5 0.023
372 P-177 0.13 J-147 J-152 17.40 PVC 140 0.12 0.5 0.023
373 P-178 1.70 J-152 J-148 54.20 PVC 140 0.12 0.05 0
374 P-179 0.13 J-147 J-152 17.40 PVC 140 0.12 0.5 0.023
378 P-181 0.17 J-153 Lv-J-154 17.40 PVC 140 0.06 0.25 0.006
380 P-182 0.55 J-152 J-155 17.40 PVC 140 0.12 0.5 0.023
381 P-183 0.84 J-155 J-153 17.40 PVC 140 0.06 0.25 0.006
383 P-184 0.17 J-155 Lv-J-156 17.40 PVC 140 0.06 0.25 0.006
385 P-185 7.8 J-87 J-157 43.40 PVC 140 0.36 0.24 0.002
389 P-187 0.10 Ind-158 J-159 54.20 PVC 140 0.23 0.1 0
[138]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
391 P-188 0.59 J-157 J-160 54.20 PVC 140 0.36 0.16 0.001
392 P-189 0.82 J-160 Ind-158 54.20 PVC 140 0.33 0.14 0.001
394 P-190 0.10 J-160 Lvd-J-161 17.40 PVC 140 0.06 0.25 0.006
396 P-191 0.37 Ind-158 J-162 22.90 PVC 140 0.195 0.47 0.015
398 P-192 0.38 J-162 J-163 22.90 PVC 140 0.195 0.47 0.015
400 P-193 0.21 J-163 J-164 22.90 PVC 140 0.195 0.47 0.015
404 P-195 0.10 J-165 Dch-166 17.40 PVC 140 0.12 0.5 0.023
Diam,
ID Pipe L= (m) N Start N Final Material H&W Q (L/s) V (m/s) GradHidr (m/m)
(mm)
406 P-196 0.47 J-164 J-167 22.90 PVC 140 0.195 0.47 0.015
407 P-197 1.69 J-167 J-165 17.40 PVC 140 0.12 0.5 0.023
409 P-198 0.31 J-167 Lvt-168 17.40 PVC 140 0.08 0.34 0.011
411 P-199 7.8 J-88 J-169 43.40 PVC 140 0.26 0.18 0.001
413 P-200 0.19 J-169 J-170 54.20 PVC 140 0.26 0.11 0
415 P-201 0.28 J-170 J-171 54.20 PVC 140 0.26 0.11 0
417 P-202 0.17 J-171 Lvd-J-172 17.40 PVC 140 0.06 0.25 0.006
419 P-203 1.41 J-171 J-173 22.90 PVC 140 0.2 0.49 0.016
421 P-204 0.44 J-173 J-174 22.90 PVC 140 0.2 0.49 0.016
423 P-205 0.31 J-174 J-175 22.90 PVC 140 0.2 0.49 0.016
430 P-209 0.28 J-175 J-177 22.90 PVC 140 0.2 0.49 0.016
431 P-210 0.18 J-177 Lvt-178 17.40 PVC 140 0.08 0.34 0.011
433 P-211 0.70 J-72 J-179 17.40 PVC 140 0.06 0.25 0.006
435 P-212 0.18 J-179 Lvd-J-180 17.40 PVC 140 0.06 0.25 0.006
437 P-213 0.13 J-146 J-181 29.40 PVC 140 0.12 0.18 0.002
441 P-215 0.17 J-182 Lv-J-183 17.40 PVC 140 0.06 0.25 0.006
443 P-216 0.52 J-181 J-184 17.40 PVC 140 0.12 0.5 0.023
444 P-217 0.85 J-184 J-182 29.40 PVC 140 0.06 0.09 0
446 P-218 0.17 J-184 Lv-J-185 17.40 PVC 140 0.06 0.25 0.006
448 P-219 0.65 J-81 J-186 17.40 PVC 140 0.12 0.5 0.023
449 P-220 0.70 J-186 J-82 17.40 PVC 140 0.06 0.25 0.006
450 P-221 0.15 J-186 Lvd-J-85 17.40 PVC 140 0.06 0.25 0.006
453 P-223 0.16 PMP-2 HT-1 54.20 PVC 140 5.747 2.49 0.118
456 P-224 0.15 J-17 CV-5 54.20 PVC 140 5.747 2.49 0.118
457 P-225 0.18 CV-5 PMP-2 54.20 PVC 140 5.747 2.49 0.118
461 P-227 1.73 J-177 J-187 17.40 PVC 140 0.12 0.5 0.023
463 P-228 0.23 J-187 Dch-188 17.40 PVC 140 0.12 0.5 0.023
[139]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[140]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[141]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[142]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
Scenario N1 consider a fire in level 1, which shall attend from outside with
two cabinets J12 and J18 (the farthest), resulting a work pressure in the
outlet of the cabinet, of 50,25 and 99,62 MCA, respectively.
[143]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
caso 1
BOMBAS
Results for each one of the mentioned scenarios, are indicated in the
following schedules:
[144]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[145]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[146]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[147]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[148]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[149]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[150]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
[151]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
1 a = (1/tc)n x o 32.2
tc = 15.2
1/tc (1/tc )n o a = (1/tc)n x o o = 85
0.010526316 0.196767185 85 32.2
4 Q pico = 0.287xIxCxA
A (Km2)
I (mm/h)
C = Coef. escorrenta
AREAS DE DESCARGA
Ambientes Area m2 Area Km2 C Q m3/s Q l/s
a Area Techada 1,888.80 0.0018888 0.83 0.1450033 145.003298
b Area Libre 3,143.20 0.0031432 0.45 0.13082729 130.82729
c
d TOTAL 0.27583059 275.830588
m/Base S% N Q m3/sec
PIPE PVC CONNECT TO DOWNSPOUT 0,1 10 0,01450033
METAL GUTTER 0,25 1 1 0,27583059
HORIZONTAL PIPES 0,15 1 10 0,01450033
[152]
D/B EMERGENCY OPERATIONS CENTER
(EOC) AND DISASTER RELIEF WAREHOUSE DESIGN ANALYSIS
(DRW) AT IQUITOS AND, D/B EOC/DRW AND EOC / DRW AT IQUITOS
SEARCH & RESCUE TRAINING FACILITY AT
TRUJILLO, PERU SUBMITTAL 100%
W91278-13-D-0012 TO 0001
MAIN CANAL
The main canal is trapezoidal shape with a base of 0,25m and lateral
taluds Z=1/2. Concrete made, with Manning coefficient of 0,013. Results
are the following:
PIPES
[153]