Number : DIP-DO-01-001

DIP INTEGRATED MANAGEMENT SYSTEM


Issuance date : 10-05-2014
Revision : 00
TOPOGRAPHICAL SURVEY Page : Page 1 of 8

PROCEDURE
TOPOGRAPHICAL SURVEY

Acknowledgement

Prepared by, Checked by, Approved by,

Azim Kholis Rikanto Surtiyono R Bob Brata Djaja Rudy Setyopurnomo


Operation Department Operation Director General Affair Director President Director

Revision history

Revision No. Date Remarks

Table of content
Number : DIP-DO-01-001
DIP INTEGRATED MANAGEMENT SYSTEM
Issuance date : 10-05-2014
Revision : 00
TOPOGRAPHICAL SURVEY Page : Page 2 of 8

Page

1 Title 1

2 Acknowledgement& Revision history 1

3 Table of content 2

4 Objectives 3

5 Scope of work 3

6 Definition 3

7 Responsibilities 3

8 Functional deployment chart (FDC) 4

9 Detail procedure (SIPOC) ............................................................... 5

10 Related documents 6

11 Reference 6
Number : DIP-DO-01-001
DIP INTEGRATED MANAGEMENT SYSTEM
Issuance date : 10-05-2014
Revision : 00
TOPOGRAPHICAL SURVEY Page : Page 3 of 8

1. OBJECTIVE
Topographical Survey procedures were made to give a detailed description of the process of
topographic survey; topographical maps are available and ensure the process is effective and
efficient in accordance with the prevailing regulations and company requirements.

2. SCOPE OF WORK
The scope of work of this procedure is limited to certain items as follow:
2.1. This procedure describes the implementation of topographycal survei process

3. RESPONSIBILITY
3.1. DIRECTOR OPERATIONS
3.1.1. Director Operasi is responsible for:
3.1.1.1. Provide and assure mining permit (exploration and production permit) has been
meet and updated
3.1.1.2. Assure of land status has completed (Land Use)

3.2. General Manager Mine Operation (KTT)


3.2.1. General Manager Mine Operation (KTT) is responsible for:
3.2.1.1. Assure all regulation of maning activity has been met.
3.2.1.2. Assure all survey tool has completed and have calibrated.
3.2.1.3. Assure all document related topographical survey is available and complete in
accordance with prevailing regulations
3.2.1.4. Review topographical survey plan based on schedules, land tenure status, short-
term plans, and boundaries / area.
3.2.1.5. Monitor of topographic survey activities in accordance with a procedure.

3.3. Geologist and Geodetic


3.3.1. Geologis dan Engineer is responsible for:
3.3.1.1. Lead the implementation of topograpical survey.
3.3.1.2. Starting of topographical survey activity in accordance with schedule.
3.3.1.3. Provide personnel and topographic survey tools.
3.3.1.4. Coordinate with General Affair (Public Relation) related to schedule survey
activity and area (permit).
3.3.1.5. Review of topographical survey plan in accordance with based on the sequence
of short-term and boundary area.
3.3.1.6. Analyze survey objectives and specifications in order to prepare survey proposals
or to direct others in survey proposal preparation
3.3.1.7. Direct aerial surveys of specified geographical areas.
3.3.1.8. Determine specifications for photographic or geophysical measurement
equipment to be used for aerial photography, as well as altitudes from which to
photograph or to measure geophysical characteristic
3.3.1.9. Ensure the topographic survey tools that will be used has been calibrated to
produce accurate data.
3.3.1.10. Search survey records, and land titles in order to obtain information about
property boundaries in areas to be surveyed.
Number : DIP-DO-01-001
DIP INTEGRATED MANAGEMENT SYSTEM
Issuance date : 10-05-2014
Revision : 00
TOPOGRAPHICAL SURVEY Page : Page 4 of 8

3.3.1.11. Conduct research in surveying and mapping methods, using knowledge of


techniques of photogrammetric map compilation and electronic data processing.
Develop criteria for survey methods and procedures.
3.3.1.12. Train assistants and helpers, and direct their work in such activities as
performing surveys or drafting maps.
3.3.1.13. Supervise preparation of all data, charts, plots, maps, records, and
documents related to surveys.
3.3.1.14. Adjust surveying instruments in order to maintain their accuracy.
3.3.1.15. Determine longitudes and latitudes of important features and boundaries in
survey areas, using theodolites, transits, levels, and satellite-based GPS.
3.3.1.16. Establish fixed points to be used in making maps, using geodetic and
engineering instruments.
3.3.1.17. Processing data from filed into Surpac, Minescape and other program to
get topography data.
3.3.1.18. Calculate heights, depths, relative positions, property lines, and other
characteristics of terrain.
3.3.1.19. Compute geodetic measurements and interpret survey data in order to
determine positions, shapes, and elevations of geomorphic, terrain and
topographic features.
3.3.1.20. Check the topography map result with topography data in geological
survey (if any).
3.3.1.21. Check the topography map result with actual condition at the field.
3.3.1.22. Verify the accuracy of survey data, including measurements and
calculations conducted at survey sites.
3.3.1.23. Review problem that accure and develop corrective action.
3.3.1.24. Follow up and distribute report on finished topographical survey to related
department.

3.4. GEODETIC SURVEYOR


3.4.1. Surveyor is responsible for:
3.4.1.1. Developing Survey plan base on schedule
3.4.1.2. Conducting the topographic surveys in accordance with the procedures and the
design has been determined.
3.4.1.3. Creating the topography survey report.

3.5. Director of Finance (DF)


3.5.1. Director of Finance is responsible for providing of fund for topographical survey.

3.6. General Affair/Public Relation


3.6.1. Provide and assure of permit
3.6.2. Coordination with Geodetic Enginer in survey activity related permit and schedule
Number : DIP-DO-01-001
DIP INTEGRATED MANAGEMENT SYSTEM
Issuance date : 10-05-2014
Revision : 00
TOPOGRAPHICAL SURVEY Page : Page 5 of 8

4. Functional Deployment Chart


TOPOGRAPHICAL & LAND SURVEY

Engineer Manager
DIRECTOR OPERATIONS GA KTT (OT) Geodetic Engineer (OD) SURVEYOR (ODS) Finance
(OE)

Land Base Map Survey


IUP
status Budget
Data

Equipment
Survey

Ensure all
regulation have
been met

Ensure all
equipment
available and
complete

Ensure all
personnel
complete and
qualified

Ensure all document Develop


related survey plan
topographycal based on
survey available Scedule

Land Survey and


Stake out Working
Plan

Review activity plan Review activity plan


from Surveyor based on from Surveyor based on
schedule, land short term plan
acquisition data, shor sequence and boundary
term plan squence and area
boundary area

Make recommendation
Review Summary and
based on location will be
Recommendation
staked

Recommendatio
NO
n approved?

YES

Approved Coordination with GA


TOPOGRAPHICA (Public Relation) relate
L SURVEY to schedule survey
activity and area
(permit)

Order to commence
Joint Survey area refer
to schedule

Prepare manpower,
tools (have to calibrate)
and support.
Topographical
survey/Stake out
areas
Monitor and
Supervise survey
Controll the
activity Install the ribbon in area
survey activity
that surveyed according
to code standard of
ribbon

Processing data from


field into program
Boundary
surpac, Minescape and
area
others to get topography
data

Checked the
Topography map result
with Topography data in
Geological Survey

Checked the Topography


map result with actual
condition.

Prepare Report
Activity completed
YES Topographical
as plan?
survey

NO

Review problems and Report


develop action

Review report on
finished
topographical survey

NO
Complete?

Yes

Follow up and distribute


report on finished
topogrophical survey to
related party

Topography
Map
Number : DIP-DO-01-001
DIP INTEGRATED MANAGEMENT SYSTEM
Issuance date : 10-05-2014
Revision : 00
TOPOGRAPHICAL SURVEY Page : Page 6 of 8

5. DETAILPROCEDURE (SIPOC).
5.1. Input
Supplier Input Indicator
Direktur IUP (explorasi)
Available. Accurate. Update
Operasi
Geophysist Base Map
Accurate. 1 : 50.000 or 1 : 25.000 Scale.
and Geologist
Update
(OG)
Geophysist Equipment (Survey Equipment)
Available. Complete. Keep Working
and Geologist
Order. Has Calibrated
(OG)
GA Land Status (Permit)
Available. Complete.

Finance Survey Budget Available. Timely

5.2. Process
5.2.1. Plan
Plan Owner Indicator
Ensure all regulation have been Complete. Good coordination with the general;
KTT
met affair to get it. Permit letter available.
Ensure all equipment available and Complete. Keep working order. Has
KTT
complete Calibrated.
Ensure all personel complete and Complete. Competence (Completed with the
KTT
qualified Survey Certificate).
Ensure all document related
KTT Complete.
topographical survey available.

5.2.2. Do
Do Owner Indicator
Develop topographical survey base
on schedule
Surveyor
Complete.
Detail Check, comply with the schedule (time
Review activity plan from surveyor KTT line), Land acquisition data, short term plan
squence, and boundary area
Geophysist Detail Check, comply with the schedule (time
and line) and boundary area
Review activity Plan from surveyor
Geologist
(OG)
Geophysist
Make recommendation base on and Complete, Corective action base on plan if
Location will be staked Geologist any, Comply with the objective and time line
(OG)
Coordination with the Land
Geophysist
Management (GA and HR) related and
Geologist
Good coordination. Maximum D-7 before.
to schedule survey activity and
area (permit) (OG)

Order to commence joint survey Geophysist


Directly trough working order. Maximum D-3
and
area refer to schedule Geologist before.
Number : DIP-DO-01-001
DIP INTEGRATED MANAGEMENT SYSTEM
Issuance date : 10-05-2014
Revision : 00
TOPOGRAPHICAL SURVEY Page : Page 7 of 8

(OG)
Geophysist
Prepare manpower and and
Geologist
Complete. As a plan. Maximum D-3 Before
Equipment/tools survey
(OG)
Topographical activity/stake out Marking area/Tracking by GPS/ using
area (Determine longitudes and theodolites, transits, levels, and satellite-based
Surveyor
latitudes of important features and GPS. Complete action. As a schedule and
boundaries in survey areas) plan.
Install the ribbon in that surveyed Complete installed for each area. In
Surveyor
according code standard of ribbon accordance with design/plan.
Geophysist Direct supervise. Good coordination. Make
Supervise topographical survey and
Geologist
recommendation related corrective action if
activity
(OG) any problem.
Monitoring and controlling Check detail related condition at the field.
KTT (OT) Monitor the survey progress by phone, SMS,
topographical survey activity
E-mail. Keep comply with the procedure.
Processing data from field into Geophysist
program (software) to get and
Geologist
Complete Process. As a objective.
topography data (OG)

5.2.3. Check
Check Owner Indicator
Geophysist
Check the topography map result and Detail check. Compare with the accurate other
with the actual Geologist resource.
(OG)
Geophysist
Check the topographical survey Review for all activity plan done. Complete
and
Geologist
action. Comply with the planning, schedule, and
complete
(OG) objective

5.2.4. Act
Act Owner Indicator
Create the report topographical Complete. Accurate. Comply with the objective
Surveyor
survey survey.
Geophysist
Review report on finished and Detail Review. Complete. In accordance with the
Topographical survey Geologist Procedure.
(OG)
Distribute report on finished Geophysist
topographical survey to related and
Geologist
party (OG)

5.3. Output
Output Indicator Customer
Topography Map Accurate. Complete. Scale 1 : KTT
50.000 atau 1 : 25.000)
Number : DIP-DO-01-001
DIP INTEGRATED MANAGEMENT SYSTEM
Issuance date : 10-05-2014
Revision : 00
TOPOGRAPHICAL SURVEY Page : Page 8 of 8

Geologist and Geodetic


Engineer
Mine Engineer

6. RELATED DOCUMENTS
6.1. Base Map

7. REFERENCE
7.1. -
7.2. -